DI-NDTI-81307A.pdf

PDF 20 KB Posted

Attached to
NSN: 3110-00-416-9422 NZ NOUN: BEARING, ROLLER, CYLI ENGINE: F100 PR: FD20302402022
Solicitation number
SPRTA1-25-Q-0181
Issued by

About this file

This is a Data Item Description (DID) document DI-NDTI-81307A that establishes requirements for First Article Qualification Test Plan and Procedures documentation. The DID, approved on November 21, 2006, provides format and content preparation instructions for contractors to develop test procedures, specify test equipment, and define inspection criteria for first article qualification testing.

The required content includes: purpose of test, applicable documents, description of units to be tested, and detailed test descriptions with step-by-step procedures for operators. The test plan must define readings, settings, test equipment specifications, drawings/schematics of noncommercial fixtures, and inspection criteria that establish minimum performance requirements. These requirements must address worst-case scenarios for prime power input, signal level and timing inputs/outputs. While the plan can use the contractor's format, it must comprehensively document how first article testing will be conducted and evaluated for government acceptance.

View the file

Other files

File Type Posted
SPRTA1-25-Q-0181 0002.pdf PDF
SPRTA1-25-Q-0181 0001.pdf PDF
DI-NDTI-80809B.pdf PDF
4043588_TRNSPDATA_REPORT.pdf PDF
3949433_CDRL1_REPORT.pdf PDF
SPRTA1-25-Q-0181.pdf PDF
FIRST ARTICLE Test Plan Report.pdf PDF
4043589_PKGRQMT_REPORT.pdf PDF
3813175_QUALRQMT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .