DI-MGMT-80969.pdf
Data Item Description PDF 157 KB Posted
- Solicitation number
- FD203025008855
About this file
This document is a Data Item Description (DID) for a Production Surge Plan (Identification Number DI-MGMT-80969) that delineates a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment without war mobilization.
The document outlines specific requirements for the Production Surge Plan, which must include: 1) the maximum sustainable production rate with a building schedule, 2) two comprehensive lists of subcontracted and non-subcontracted items/components with details like nomenclature, part number, leadtime, and production buildup, 3) a list of government contracts being performed at the contractor's facility, and 4) detailed impact assessments including labor requirements, materials needed, and production equipment requirements. The plan aims to provide surge protection capability and enable accelerated production planning of select items, with a focus on identifying critical components, potential bottlenecks, and strategies to increase production rate and reduce leadtime by at least 10 percent.
View the file
Other versions and copies of DI-MGMT-80969
Show all 20
Who attaches DI-MGMT-80969
Other files
| File | Type | Posted |
|---|---|---|
| Transportation Data.pdf | ||
| DI-MGMT-81838.pdf | ||
| DI-MGMT-80441D.pdf | ||
| Synopsis.docx | DOCX document | |
| DI-PSSS-81995A.pdf | ||
| Updated SOW.pdf | ||
| Packaging Requirements.pdf | ||
| CDRL.pdf | ||
| CAVAF.pdf | ||
| GFP-Attachment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .