DDA0BDC2-FA19-ADB6-FAD2DEA5AE6B4AEE.pdf

PDF 183 KB Posted

Attached to
Professional Engineering Services S. Grener Avenue, Emmit Avenue, Mix Avenue, and Sullivant Avenue (
Solicitation number
RFQ No. 2025-09-03
Issued by
Franklin County, Ohio

About this file

This is Addendum No. 3 to a Request for Qualifications issued by the Franklin County Board of Commissioners for professional engineering services related to the GEMS Water Main Replacement Project. The project encompasses water main replacement on four streets in Columbus, Ohio: S. Grener Avenue (from Sullivant to Stiles), Mix Avenue (from Sullivant to Bunker), Emmit Avenue (from Stiles to Bunker), and Sullivant Avenue (from S. Grener to Emmit). The statement of qualifications submission deadline is April 24, 2025, at 2:00 PM EST. The design phase is anticipated to take eight months from contract award, with project bidding expected to occur around mid-February 2026 and construction award anticipated in late May 2026. The County intends to commence construction by the end of June 2026. Respondents must submit single-sided PDFs on flash drives and should reference the Franklin County Purchasing Department website for all published addenda.

The construction phase of the GEMS Water Main Replacement Project will be jointly funded by the Water Sewers and Locale Remediation Authority (WSLRA) and the Ohio Public Works Commission (OPWC). OPWC funding requirements mandate that construction commence by the end of June 2026, establishing a firm timeline constraint for the project schedule. This addendum clarifies project scope, submittal requirements, and anticipated timeline for prospective engineering firms submitting qualifications.

View the file

Other files

File Type Posted
4764BD72-A4C9-CB3B-C1392F63B1D7AA28.pdf PDF
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
47411393-E3B2-7F55-0865EAB909BEF818.xlsx XLSX spreadsheet
47647B12-EF69-CBAE-3877E615229CE346.pdf PDF
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
600B193E-A6DE-E459-0374B7046DEB49BE.xlsx XLSX spreadsheet
48C51FFE-B1BA-D9DA-11337A7B04016CA4.pdf PDF
4ADC54F2-C74F-3F02-B4900398FFBEE5A5.xlsx XLSX spreadsheet
48FFC2CD-AEC5-7A21-3B4F6E3270F0429B.pdf PDF
E9905CF7-C973-40FC-678D5FD85143E735.pdf PDF
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
44F2E64B-E391-5EAC-DD33927813E7BE98.xlsx XLSX spreadsheet
44B739A8-A554-F8F5-C38D97EF8EFBF991.xlsx XLSX spreadsheet
9124AC45-D403-5860-A4635A70C618C298.pdf PDF
8F3A405E-0241-7E43-C0DC0A6106AC42BB.pdf PDF
44F28715-E1AF-A884-828CBEAF47CBA5D7.xlsx XLSX spreadsheet
E990A518-E8F3-4318-3125803AC770B0DD.pdf PDF
1FF70774-E56E-EAC8-88A7694DAF5EB82C.pdf PDF
A46910BC-E967-DD22-10B71BADEA153824.docx DOCX document
8D7E2732-E2EF-8808-10498B0343D0DB6B.pdf PDF
47039A14-CC1D-3979-F8226F8E1E768343.pdf PDF
E93EE438-A2D2-AF8E-6F5941F303D00F6A.pdf PDF
A468D9BE-C742-A53B-A0E51044FC47530E.pdf PDF
96EE5830-0F4F-104B-FF1246192320CF51.pdf PDF
600B382B-92C2-EE01-36E3171A1CE23381.pdf PDF
ED338BF8-FCF8-7E6B-4327CDB3236D9A0A.pdf PDF
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
D19B3093-A699-8107-EE175100DAB2A969.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
1FF76D77-0146-31BD-B70AC2B9310C078F.pdf PDF
3CA5BBE9-A618-9D6F-45A1FE1B6F58F0BF.pdf PDF
4ADC244E-B24C-BEC2-4654E43F7ACFB8A4.xlsx XLSX spreadsheet
455CC78D-B78A-EC66-F7D6D71B8AF36042.pdf PDF
BEA8B132-08B9-5848-83E1018BFD8D09C5.xlsx XLSX spreadsheet
1FF8629C-E097-4138-B3B7BE56C0FCD3F5.pdf PDF
58DCD716-9EAC-9E14-6719EE5FDA607EE3.pdf PDF
600ACEFD-D8A4-EF86-6746123A35214FBD.pdf PDF
45745F40-E0BA-1577-1AE1A9CC2179CA13.pdf PDF
490005E7-0009-0FD7-0E92BD0F4BF1B987.xlsx XLSX spreadsheet
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
A4692B9C-E659-F33F-532C87A025A11AC2.pdf PDF
C0135AC1-FF9D-F3AC-BDB7FB4697056E65.pdf PDF
56D21EF1-090E-9236-DC87D4ABB226948A.pdf PDF
9188FC82-07E6-2A24-E7927A56369C067A.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
F388F0B8-095B-81FD-4AB0A90CB30AE31F.pdf PDF
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
379F0AFD-BC67-5833-47CED9B9F8A77644.pdf PDF
365FC443-9C1D-6871-4B183773D28A5AB9.pdf PDF
Show 40 more

Latest 50 of 148 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cleanwater.franklincountyohio.gov

April 18, 2025

FRANKLIN COUNTY BOARD OF COMMISSIONERS

REQUEST FOR QUALIFICATIONS 2025-09-03

PROVISION OF PROFESSIONAL ENGINEERING SERVICES FOR S.GRENER AVENUE, EMMIT

AVENUE, MIX AVENUE, AND SULLIVANT AVENUE (GEMS) WATER MAIN REPLACEMENT

PROJECT

373 South High Street, 25th Floor Purchasing Department Columbus, Ohio 43215

Franklin County

Addendum No. 3

TO ALL BIDDERS:

This Addendum supplements and amends the original Request for Qualifications and shall be taken into account in preparing submissions. When returning your statement of qualifications, please sign and return the signature page of the Addendum with your response.

Company name and signature of authorized company representative Date

Provision of Professional Engineering Services for S. Grener Avenue, Emmit Avenue, Mix Avenue, and

Sullivant Avenue (GEMS) Water Main Replacement Project

RFQ 2025-09-03

Addendum No. 3

April 18, 2025

1. The Submittal Deadline Date/Time shall remain the same: April 24, 2025, at 2:00 PM (EST).

2. Question 1: What is the anticipated schedule for bidding of this project?

Response 1: Per Response 2 (below), the project should be ready for bid around mid-February 2026.

Bidding is anticipated to take 3 months, which makes the award for construction in late-May 2026.

3. Question 2: What is FCSE’s desired date of design completion for this project?

Response 2: The County anticipates Design will take 8 months from the Award of Contract to Bidding.

4. Question 3: For the flash drives requested for the GEMS Project, do you want single-sided PDF for ease of copying, rather than the double-sided we are using for our spiral-bound submittals?

Response 3: Please submit single-sided PDFs on the flash drives.

5. Question 4: I had trouble with my audio for the meeting. It seems pretty short, so I assume there were no changes/addendums to the requirements originally published.

Response 4: Please see the Purchasing Department’s website (https://bids.franklincountyohio.gov/) for all addenda published related to this RFQ.

6. Question 5: We understand that this is funding dependent, but is the intent to begin construction in 2026?

Response 5: Yes. The County would like to start construction by end of June 2026.

7. Question 6: Could you please confirm the extents of the water main replacement for each street?

From the exhibit included in the RFQ it appears that the project limits are:

• S. Grener from Sullivant to Stiles

• Mix from Sullivant to Bunker

• Emmit from Stiles to Bunker

• Sullivant from S. Grener to Emmit

Response 6: The extents listed above are correct.

https://bids.franklincountyohio.gov/

8. Question 7: Has funding been established for the construction phase of this project? If so, are there any constraints placed on the construction schedule due the funding source(s)?

Response 7: The construction phase of this project will be jointly funded by WSLRA and OPWC. Per the requirements of OPWC, construction is to commence by the end of June 2026.

ATTACHMENTS:

None.

END OF ADDENDUM