Copy of IFB-Contractor Cost Estimate Worksheet Baltimore Nalt Cem.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1AZ--ACQ PLAN (FY-22) | BALTIMORE NC | EXFACILITY RENO, IMPROVEMENT & REPAIRS | PO NO. 802CM3023 | EXP 2023
- Solicitation number
- 36C78622B0001
About this file
This document contains a contractor cost estimate worksheet and information on a related federal contract opportunity. The cost estimate worksheet is a template for contractors to provide lump sum pricing for various construction divisions for a facility renovation, improvements, and repairs project at the Baltimore National Cemetery. Contractors should include pricing for divisions like concrete, masonry, metals, and finishes, as well as bonds, overhead costs, and profit. The related federal contract opportunity is solicitation number 36C78622B0001 from the Department of Veterans Affairs National Cemetery Administration for the same Baltimore National Cemetery facility renovation and repairs project. The estimated period of performance completion date is 2023.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number | Baltimore Nalt Cem - IFB No. 36C78621B0022 |
| Project Name | Project No. 802CM3023 | Facility Renovation, Improvements, and Repairs Construction Project |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN 3 | CLIN4 | Total |
| Division 0 | ||||||
| Special Sections | ||||||
| Division 01 | ||||||
| General Requirements | ||||||
| Division 02 | ||||||
| Existing Conditions | ||||||
| Division 03 | ||||||
| Concrete | ||||||
| Division 04 | ||||||
| Masonry | ||||||
| Division 05 | ||||||
| Metals | ||||||
| Division 06 | ||||||
| Wood, Plastic, and Composites | ||||||
| Division 07 | ||||||
| Thermal and Moisture Protection | ||||||
| Division 08 | ||||||
| Openings (Doors, Windows, etc...) | ||||||
| Division 09 | ||||||
| Finishes | ||||||
| Division 10 | ||||||
| Specialties | ||||||
| Division 11 | ||||||
| Equipment | ||||||
| Division 12 | ||||||
| Furnishings | ||||||
| Division 13 | ||||||
| Special Construction | ||||||
| Division 14 | ||||||
| Fire Suppression | ||||||
| Division 22 | ||||||
| Plumbing | ||||||
| Division 23 | ||||||
| Heat, Ventilating, and Air Conditioning | ||||||
| Division 25 | ||||||
| Integrated Automation | ||||||
| Division 26 | ||||||
| Electrical | ||||||
| Division 27 | ||||||
| Communications | ||||||
| Division 28 | ||||||
| Electronic Safety and Security | ||||||
| Division 31 | ||||||
| Earthwork | ||||||
| Division 32 | ||||||
| Exterior Improvements | ||||||
| Division 33 | ||||||
| Utilities | ||||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $