36C78622B0001.docx
DOCX document 135 KB Posted
- Attached to
- Y1AZ--ACQ PLAN (FY-22) | BALTIMORE NC | EXFACILITY RENO, IMPROVEMENT & REPAIRS | PO NO. 802CM3023 | EXP 2023
- Solicitation number
- 36C78622B0001
About this file
This is a solicitation for construction services to provide facility renovation, improvements, and repairs at the Baltimore National Cemetery. The work includes nine work elements such as maintenance and administration buildings, equipment and floral stations, wood and iron fencing. The solicitation is a 100% set-aside for small businesses. The period of performance is 240 calendar days from notice to proceed. Bids are due on December 2, 2021 and the virtual bid opening will take place half an hour later. Liquidated damages of $817 per day will apply for delays in completion. The federal agency is the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C78622B0001
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5.
REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL
SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C78622B0001 X 10-21-2021
TBD
"NA"
802CM3023
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 Invitation for Bid (IFB) Electronic BID Opening, See Section: INSTRUCTIONS, CONDITIONS, AND OTHER STA
BIDDERS/OFFERORS
SHERYL PALACIO-DAVIS
1-703-630-9343 Baltimore Nalt Cem | The Department of Veterans Affairs, Nalt Cem Adm. (NCA), anticipates awarding a Firm, Fixed Price Contract, in accordance with FAR Part 14, Sealed Bidding; for Baltimore National Cemetery, under Project No. 802CM3023 The Construction Contractor shall provide labor, material, tools, equipment and professional supervision required for the construction and performance of All work; In Accordance With (IAW) the Solicitation Plans, Drawings Specifications, required permits, terms & conditions for the Facility, Renovation, Improvements and Repairs per Construction Documents, term and conditions of herein including (CLINS 0001 Thru CLINS 00009 & ADD ALTS, CLIN S 0001 Thru CLINS 0004). Please see SOW, Specs & Drawings.
This is a 100% Competitive Set-Aside for Small Business (SB). Interested Firms MUST have current registration in the System for Award Management (BetaSAM) database at www.betaSam.gov and have completed online Representatives and Certifications prior to Contract Award.
An organized Site Visit is scheduled for 10 November 2021, at 11:00 A.M. (EST) in the Admin Bldg. located at Baltimore Nation al Cemetery, MD: 5501 Frederick Ave, Baltimore, MD 21228. Please See clause52.236-27 for Site-Visit information.
5501 Frederick Ave, Baltimore, MD 21228. Please See clause52.236-27 for Site-Visit information.
Questions shall be submitted to sheryl.
palacio-davis@va.gov, NLT, 24 Nov 2021 at 4:00 P.M. (EST), after the Site-Visit.
Email subject line must contain line must contain the following in the subject line: Solicitation Number, Proj. Name & Proj. Number. Questions received after 24 Nov 202 1 WILL NOT be accepted. Telephone inquiries are not accepted during the Solicitation phases. Answers will be posted through an Amendment to the Solicitation.
BID Due Date & Time is: 02 December 2021 @ 1:00 P.M. (EST). Electronic BIDs received after 1:00 P.M. (EST) WILL NOT Be Accepted. The Virtual Bid Opening will occur on the same Date and Ti me, 02 December 2021 @ 1:30 P.M. (EST), Half-Hour after Bids are due. NOTE; Attendance for Virtual BID Opening is not Mandatory. Facsimile (FAX) submitted BIDs will not be accepted.
The Period of Performance (POP) is Two Hundred and Forty (240) Calendar Days after Notice to Proceed (NTP).
The North American Industry Classification System (NAICS) Code is 237990; Business Size Standard is $36.5 Mill ion IAW VAAR 836.204; THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $2,000,000.00 AND $5,000,000.00.
Contract award will be made to the responsible Bidder whose BID, conforming to the Invitation, will be most advantageous to the Government, considering only Price and Price Rated Factors included in the Invitation.
Unless otherwise noted, all references to "day(s)" thr oughout the solicitation documents shall be Calendar Days.
**This Procurement is a 100% Competitive Set-Aside for Small Business (SB)** X X 52.211-10 X 13:00
EST
12-02-2021 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLED
GMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO
ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED
AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this c ontract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or pr int) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Offeror's Shall fill out Section A.4 & A.5 Price/Cost Schedule | IFB-Contractor Cost Estimate Worksheet & Sub-Contracting Limitation Certification.
BASE CONTRACT TOTAL: $______________________
ADD ALTERNATES TOTAL: $_____________________
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/
1-877-752-0900 Sheryl Palacio-Davis Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.4 PRICE/COST SCHEDULE | 10 |
| ITEM INFORMATION | 10 |
| A.5 PRICE/COST SCHEDULE ADD ALTERNATES | 12 |
| ITEM INFORMATION | 12 |
| A.7 DIGNITY STANDARDS | 13 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, BONDS & VIRTUAL BID INSTRUCTIONS: | 14 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 16 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 16 |
| 2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 16 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 17 |
| 2.4 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (OCT 2019) | 18 |
| 2.5 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) | 18 |
| 2.6 VAAR 852.237-76 AWARD TO SINGLE OFFEROR (OCT 2019) | 19 |
| 2.7 VAAR 852.273-74 AWARD WITHOUT EXCHANGES (JAN 2003) | 19 |
| 2.8 52.228-1 BID GUARANTEE (SEP 1996) | 20 |
| 2.9 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 20 |
| 2.10 52.233-2 SERVICE OF PROTEST (SEP 2006) | 21 |
| 2.11 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 21 |
| 2.12 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) | 22 |
| 2.13 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020) | 22 |
| 2.14 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| 2.15 52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) | 25 |
| 2.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 26 |
| 2.17 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 26 |
| REPRESENTATIONS AND CERTIFICATIONS | 27 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) | 27 |
| 3.2 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 30 |
| 3.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 31 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 34 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021) | 35 |
| GENERAL CONDITIONS | 38 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 38 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 38 |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 39 |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 40 |
| 4.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000) | 41 |
| 4.6 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (INCLUDES TABLE FOR SEPARATE PARTS OR STAGES) (SEPT 2000) | 41 |
| 4.7 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020) | 41 |
| 4.8 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 44 |
| 4.9 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 45 |
| 4.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021) | 46 |
| 4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS | 50 |
| 4.12 52.236-4 PHYSICAL DATA (APR 1984) | 51 |
| 4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 51 |
| 4.14 52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING (JUN 2020) | 53 |
| 4.15 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 54 |
| 4.16 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 56 |
| 4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 56 |
| 4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 58 |
| 4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 59 |
| 4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 59 |
| 4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 59 |
| 4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 61 |
| 4.23 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 63 |
| 4.24 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 63 |
A.3 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT:
Contracting Officer (CO): Sheryl Palacio-Davis U.S. Department of Veterans Affairs National Cemetery Administration (NCA) Contracting Service (43C) 18434 Joplin Rd Triangle, VA 22172 Business NO. 1-703-630-9343 Sheryl.palacio-Davis@va.gov
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor shall be made in accordance with:
[X] 52.232-34, Payment by Electronic Funds Transfer.
3. INVOICES: Invoices shall be submitted in arrears:
Other [X] [Monthly]
4. GOVERNMENT INVOICE ADDRESS:
All invoices from the contractor shall be sent electronically by following instruction as stated at website: http://www.fsc.va.gov/einvoice.asp See VAAR clause 852.232-72 Electronic Submission of Payment Requests (NOV 2012).
5. ACQUISITION: Total (100%) Service-Disabled Veteran Owned Small Business Set-Aside: This is a solicitation for construction services prepared in accordance with the format in FAR Part 14 and FAR Part 36. The contract will be awarded by Government to furnish those construction tasks as stated in the SOW, Specs and Drawings. The Government anticipates awarding this solicitation as a fixed-price contract.
Historical Data:
Incumbent Contractor: None
6. TYPE OF CONTRACT: This is a Firm Fixed-Price requirement contract in accordance with FAR 52.216-1 Type of Contract.
7. CONTRACT AWARD: The contract will become effective as soon as practical with no additional cost to the Government for any elapsed time from the original effective date. It is also, understood and agreed that the effective date of this contract will be contingent upon the availability of appropriated funds and in the event, appropriations are not available.
8. ACKNOWLEDGEMENT OF AMENDMENTS:
The Offeror acknowledges receipt of Amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
9. AUTHORITIES OF GOVERNMENT PERSONNEL: Notwithstanding the Contractors responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Government will provide, at the time of contract award, a list of Government personnel authorized to act as the Contracting Officer's Representatives (COR). Only the Contracting Officer has the authority to make changes to the contract.
10. CONTRACTOR’S FOREMAN/SUPERVISOR: Contractor must provide an English-speaking foreman /Supervisor at all times while performing the duties of the contract. This is to ensure proper communication between the Contractor and COR.
11. SITE VISIT: See 52.236-27 for site visit information
12. PRE-CONSTRUCTION CONFERENCE: Prior to commencement of work, Contractor shall attend a pre-construction conference to assure that all parties understand all contractual obligations and the role that each party serves.
13. FEDERAL HOLIDAYS:
| January |
| New Year’s Day & Martin Luther King’s Birthday |
| February |
| President’s Day |
| May |
| Memorial Day |
| June |
| Juneteenth Independence Day |
| July |
| Independence Day |
| September |
| Labor Day |
| October |
| Columbus Day |
| November |
| Veterans Day & Thanksgiving Day |
| December |
| Christmas Day |
Including any other day specifically declared by the President of the United States to be a national holiday.
14. LIMITATIONS ON SUBCONTRACTING – MONITORING AND COMPLIANCE:
This contract includes (VAAR) 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set- Aside. The Contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor’s compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor’s offices where the contractor’s business records, or other proprietary data are retained and to review such business records regarding the contractor’s compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor’s business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining Access to Proprietary Information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor’s compliance with the limitations on subcontracting or percentage of work performance requirement.
15. RELEASE OF CLAIMS:
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relation to the contract. The Release of Claims form provided by the CO shall be used for this purpose. The form provides for exception of specified claims from the operation of release. Request a copy from the CO.
16. NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM:
a. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
b. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
c. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
d. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
e. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
1. Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
3. All information provided should be reviewed for accuracy prior to submission.
4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
5. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
6. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
f. The following guidelines apply concerning your use of the past performance evaluation:
1. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
2. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
g. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
h. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
[END OF ADMINISTRATION DATA]
A.4 PRICE/COST SCHEDULE
Contractor shall provide all labor, tools, materials, equipment, services, testing. submittals, approvals, and professional supervision related work for the Facility Renovation, Improvements, and Repairs Construction Project (802CM3023), Base Contract, located at the Baltimore National Cemetery, MD. The work Shall be completed In Accordance With (IAW) the Scope of Work (SOW), Specifications, and Drawings.
ITEM INFORMATION
| Contract Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
| 0001 |
| WORK ELEMENT 01, MAINTENANCE/ADMINISTRATION/STORAGE BUILDING |
| 1 |
| JB |
| 0002 |
| WORK ELEMENT 02, EQUIPMENT STORAGE BUILDING |
| 1 |
| JB |
| 0003 |
| WORK ELEMENT 03, WOOD FENCE |
| 1 |
| JB |
| 0004 |
| WORK ELEMENT 04, FLAMMABLE STORAGE BUILDING |
| 1 |
| JB |
| 0005 |
| WORK ELEMENT 05, FUEL STATION |
| 1 |
| JB |
| 0006 |
| WORK ELEMENT 06, CEMETERY SIGNAGE |
| 1 |
| JB |
| 0007 |
| WORK ELEMENT 07, SPOILS STORAGE |
| 1 |
| JB |
| 0008 |
| WORK ELEMENT 08, FLORAL STATIONS |
| 1 |
| JB |
| 0009 |
| WORK ELEMENT 09, IRON FENCE AND GATES |
| 1 |
| JB |
TOTAL FOR CLINS 0001 THRU 0009
TOTAL PRICE (CLINS’ 0001 & 0009)
TOTAL PRICE WRITTEN:
A.5 PRICE/COST SCHEDULE ADD ALTERNATES
Contractor shall provide all labor, tools, materials, equipment, services, testing. submittals, approvals, and professional supervision related work for the Facility Renovation, Improvements, and Repairs Construction, Add Alternates, Project (802CM3023), located at the Baltimore National Cemetery, MD. The work Shall be completed In Accordance With (IAW) the Scope of Work (SOW), Specifications, and Drawings.
ITEM INFORMATION
| Contract Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
| 0001 |
| Contract Option 01 - Iron Fence on retaining wall |
JB
| 0002 |
| Contract Option 02 - Assistant Director’s Lodge building #2002 |
JB
| 0003 |
| Contract Option 03 - Milling and Paving |
JB
| 0004 |
| Contract Option 04 – Director’s Lodge |
JB
TOTAL PRICE TOTAL FOR ADD ALTERNATES
CLINS 0001 THRU 0004
TOTAL PRICE WRITTEN:
END OF PRICE/COST SCHEDULES
A.6 SBA ACT 8(d)(13)(B)
(B) NOTICE. —
(i) IN GENERAL.—A Prime Contractor for a covered contract shall notify in writing the Contracting Officer for the covered contract if the Prime Contractor pays a reduced price to a Subcontractor for goods and services upon completion of the responsibilities of the Subcontractor or the payment to a Subcontractor is more than 90 days past due for goods or services provided for the covered contract for which the Federal agency has paid the Prime Contractor.
(ii) CONTENTS. —A Prime Contractor shall include the reason for the reduction in a payment to or failure to pay a Subcontractor in any notice made under clause (i).
A.7 DIGNITY STANDARDS
1. Every action by contractor personnel at a National Cemetery must be performed with the special care, reverence, dignity, and respect that acknowledge the cemetery as the final resting place that commemorates the service and sacrifice those service members, Veterans, and their families made for our Nation. Critically important is the awareness, required of the contractor employees, of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them. Contractor personnel should use tools approved by the Contracting Officer Representative (COR), such as shovels, pry bars or pinch bars to lift flat markers out of the ground; pick axes are not an acceptable tool.
b. No tools, equipment or other items will be placed or leaned on headstones or markers. Once headstones/markers are removed from the socket, do not place on dirt piles or mud; they should be carefully placed on each associated gravesite and protected in such a way as to prevent any soiling and be out of the way of any other work.
c. Headstones shall be removed from their sockets using wooden and/or metal clamps. If metal clamps are used, the area that contacts the headstone must be protected with a rigid fabric that will prevent damage to and marking of the headstone. Clamps may be attached to a skid steer loader (i.e., Bobcat®) or similar machine to extract the headstone from the socket. When headstones are removed from their sockets, they shall be carefully stored on each associated gravesite; do not lean headstones against each other. Use care not to scratch or damage headstones in any manner. The headstones shall be laid with front inscription side up while the headstone is lying horizontally on the ground. The headstone shall be protected from direct ground contact while lying horizontally. The protection method shall be as approved by the COR and shall be free of deterioration in weather. An approved method is to support each headstone with two wood 4X4’s. Alternate methods can be approved. Cardboard shall not be used. Wood or other suitable appropriate and attractive material shall be used to keep the headstones from contact with the soil while lying horizontally during the construction period. This also shows respect towards the families visiting the gravesites and the remains that are buried.
d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.
e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor must contact the COR, Director/Assistant Director, and Contracting Officer (CO) for guidance.
1. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, and CO for guidance or resolution.
1. The Contractor is required to discuss the guidance with their employees and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.
Page 1 of Page 1 of INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, BONDS & VIRTUAL BID INSTRUCTIONS:
· INFORMATION REGARDING:
· AMENDMENTS
· BIDDING MATERIAL |BID GUARANTEE |BONDS
· VIRTUAL BID INSTRUCTIONS
1. GENDER: Whenever the masculine gender is used in this solicitation and contract documents, it shall be considered to include feminine.
1. AMENDMENTS: Amendments to Solicitation will be posted at https://beta.sam.gov/search?index=opp. Paper copies of the amendments will NOT be individually mailed. Register to the receive email notifications list at https://beta.sam.gov/search?index=opp, and potential bidders will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Potential bidders are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your bid being considered non-responsive.
1. BID SUBMISSION:
a) All bids shall be submitted electronically. All Interested Offerors must be registered with the Department of Veterans Affairs eCMS Vendor Portal at https://www.vendorportal.ecms.va.gov. Offerors who require registration shall proceed to the Vendor Portal’s Login section and shall click on Request a user account to register. In the event an Offeror is unable to submit a proposal through the vendor portal domain, prior to the proposal closing date, contact the VAAS helpdesk at 1-877-634-3739, or via email at VA.Acquisition.Systems@va.gov. Please DO NOT wait until the last day to upload BID Documents. Offerors are highly encouraged to submit BID packages 2-3 days in advance to avoid system lock outs.
b) If an Offeror is still having difficulties in submitting a quote via the Vendor Portal the Contracting Officer may accept an Offeror’s quote via email under the following circumstances:
1. Offeror must provide evidence that an email discussions or verbal discussion with the VAAS helpdesk could not resolve registration issues.
2. Quote submitted must meet the time constraints as set forth in the solicitation.
3. Quotes submitted via email without set requirements will not be accepted and will be considered to be nonresponsive. Late or incomplete Quotes will also be considered to be nonresponsive.
a.) BID package shall be submitted via the Vendor Portal. Late or incomplete Proposals will also be considered to be nonresponsive. Offers are NOT authorized to submit bid packages by US mail; CD versions; Fax; or Email, (Unless portal difficulties have been proven as noted above than email submission may be permitted by the CO prior to the bid opening time).
b.) Document naming convention. S00_Bid $_ (Company Name)_(Solicitation Number)
i. EXAMPLE: S00_Bid $1,000,000.00_ABC Company_36C78622B0001 c.) BID package shall be One (1) PDF document combining the following minimum required documents in the following order:
· Company cover letter with Solicitation number, POC name, phone number, email address, and DUNS number.
· Completed front and back blocks 14-20 of the SF 1442 and signed block 20b
· Completed Price Cost Schedule “A.4 & A.5” Pricing for each CLIN and grand total.
· Completed Attachment of the IFB Contractor Cost Estimate Worksheet.
· Complete and signed SF30 Amendments.
· Scanned digital copy of the Bid Bond. (Ensure to lightly darken all raised seals)
1. VIRTUAL BID INSTRUCTIONS
A Virtual Public BID Opening will occur by phone conference on Bid Opening Date specified within this Solicitation. Once the offeror has submitted their BID into the eCMS Vendor Portal, please RSVP by email to sheryl.palacio-davis@va.gov with a list of participates noting:
Full Name, Company Represented, Phone Number, and Email of those you wish to be on the call.
PLEASE NOTE: CALL LINE: 1-872-701-0185 | CONFERENCE ID NO. 758 605 566#
· 1 872-701-0185 | (EST) UNITED STATES
· PHONE CONFERENCE ID: 758 605 566#
NOTE: Virtual BID Opening for Baltimore National Cemetery (Facility Renovation, Improvements, and Repairs Construction); Project Number 802CM3023, starting at 1:30 P.M. (EST). The 1330 (1:30 P.M. - EST) time will allow the Contracting Officer (CO) to download BIDS ABSTRASCT in a timely manner and for a smoother Bid Opening in this Virtual setting.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 23.00 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
(End of Provision)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.4 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (OCT 2019)
(a) The offeror agrees, if awarded a contract, to use the service-disabled veteran-owned small businesses (SDVOSBs) or veteran-owned small businesses (VOSBs) proposed as subcontractors in accordance with 852.215–70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, or to substitute one or more SDVOSBs or VOSBs for subcontract work of the same or similar value.
(b) Pursuant to 38 U.S.C. 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company’s SDVOSB/VOSB status is subject to debarment for a period of not less than five years. This includes the debarment of all principals in the business.
(End of Clause)
2.5 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019)
(a) In accordance with FAR 52.236–1, the contract work accomplished on the site by laborers, mechanics, and foreman/superintendent on the Contractor’s payroll and under their direct supervision shall be used in establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor’s executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause.
(b) The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor’s own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article.
(c) Changes to established activity/event identifiers or responsibility codes for Contractor activities shall not be made without approval from the Contracting Officer.
(d) In the event the Contractor fails to comply with FAR 52.236–1, Performance of Work by the Contractor, the Contracting Officer will withhold retention in the amount of 15% of the value of any work activity/element being invoiced that was not authorized by the Contracting Officer to be performed by someone other than the prime Contractor’s own workforce.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 852.236-72 |
| PERFORMANCE OF WORK BY THE CONTRACTOR ALTERNATE I (APR 2019) |
| APR 2019 |
| 852.236-80 |
| SUBCONTRACTS AND WORK COORDINATION ALTERNATE I (APR 2019) |
| APR 2019 |
2.6 VAAR 852.237-76 AWARD TO SINGLE OFFEROR (OCT 2019)
(a) Award shall be made to a single offeror.
(b) Offerors shall include unit prices for each item. Failure to include unit prices for each item will be cause for rejection of the entire offer.
(c) The Government will evaluate offers on the basis of the estimated quantities shown.
(d) Award will be made to that responsive, responsible offeror whose total aggregate offer is the lowest price to the Government.
(End of Provision)
| FAR Number |
| Title |
| Date |
| 852.237-77 |
| AREA OF PERFORMANCE |
| OCT 2019 |
| 852.237-78 |
| PERFORMANCE AND DELIVERY |
| OCT 2019 |
| 852.271-74 |
| INSPECTION |
| JAN 2008 |
2.7 VAAR 852.273-74 AWARD WITHOUT EXCHANGES (JAN 2003)
The Government intends to evaluate proposals and award a contract without exchanges with offerors. Therefore, each initial offer should contain the offeror's best terms from a cost or price and technical standpoint. However, the Government reserves the right to conduct exchanges if later determined by the contracting officer to be necessary.
(End of Provision)
| FAR Number |
| Title |
| Date |
| 852.246-71 |
| REJECTED GOODS |
| OCT 2018 |
| 852.212-70 |
| PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS |
| APR 2020 |
2.8 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20% percent of the bid price or , whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.9 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.10 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Sheryl Palacio-Davis Contracting Officer (CO) Hand-Carried Address:
National Cemetery Administration Contracting Service Department 18434 Joplin Rd
Triangle VA 22172 Mailing Address:
National Cemetery Administration Contracting Service Department 18434 Joplin Rd
Triangle VA 22172
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.11 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
Cemetery’s Address:
Baltimore National Cemetery 5501 Frederick Avenue Baltimore, MD 21228
(b) An organized site visit has been scheduled for, 05 November 2021 @ 11:00 A.M. (EST).
(c) Participants will meet at the Admin Building at the Baltimore National Cemetery, MD.
(d) POC: Eric, Solomon (Cemetery Director) Eric.Solomon@va.gov 1-410- 644-9696
2.12 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
| Title |
| Number |
| Date |
| Tailoring |
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of Clause)
2.13 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020)
(a) Definitions. As used in this clause— Common item means an item that has multiple applications versus a single or peculiar application.
Counterfeit item means an unlawful or unauthorized reproduction, substitution, or alteration that has been knowingly mismarked, misidentified, or otherwise misrepresented to be an authentic, unmodified item from the original manufacturer, or a source with the express written authority of the original manufacturer or current design activity, including an authorized aftermarket manufacturer. Unlawful or unauthorized substitution includes used items represented as new, or the false identification of grade, serial number, lot number, date code, or performance characteristics.
Critical item means an item, the failure of which is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the item; or is likely to prevent performance of a vital agency mission.
Critical nonconformance means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission.
Design activity means an organization, Government or contractor, that has responsibility for the design and configuration of an item, including the preparation or maintenance of design documents. Design activity could be the original organization, or an organization to which design responsibility has been transferred.
Major nonconformance means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.
Suspect counterfeit item means an item for which credible evidence (including but not limited to, visual inspection or testing) provides reasonable doubt that the item is authentic.
(b) The Contractor shall—
(1) Screen Government-Industry Data Exchange Program (GIDEP) reports, available at www.gidep.org, as a part of the Contractor’s inspection system or program for the control of quality, to avoid the use and delivery of counterfeit or suspect counterfeit items or delivery of items that contain a major or critical nonconformance. This requirement does not apply if the Contractor is a foreign corporation or partnership that does not have an office, place of business, or fiscal paying agent in the United States;
(2) Provide written notification to the Contracting Officer within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that any end item, component, subassembly, part, or material contained in supplies purchased by the Contractor for delivery to, or for, the Government is counterfeit or suspect counterfeit;
(3) Retain counterfeit or suspect counterfeit items in its possession at the time of discovery until disposition instructions have been provided by the Contracting Officer; and
(4) Except as provided in paragraph (c) of this clause, submit a report to GIDEP at www.gidep.org within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that an item purchased by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .