CN-370000-HW557-DC054C.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW557|6d20a3cd85832f58780db610589fb2f8
Contract number
HW557
Issued by
Florida

About this file

This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. HW557. The task assignment (DC054C) involves Arcadis U.S., Inc. as the primary contractor, with William Vogelsong serving as the contractor representative and Theresa C. Pepe as the DEP Contract Manager. The project concerns the site remediation closure of Cotney's All Pro Cleaners Inc., located at 15305 Amberly Drive, Tampa, Hillsborough County, Florida (Facility ID ERIC_4704). The site has been designated for "Delist" status following FDEP's issuance of a Site Rehabilitation Completion Order for No Further Action without Institutional Controls on May 28, 2021.

The task assignment requires Arcadis to properly abandon all groundwater monitor wells (12 total, 1-inch diameter) and Modified Active Gas Sampling (MAGS) wells (6 total, 2-inch diameter, screened 0.5-5.5 feet below ground) installed during the site assessment, in accordance with Rule 62-532.500(5), F.A.C. Work activities include well grouting and abandonment, removal and patching of well pads and concrete structures with black dyed concrete, site restoration, and submittal of a Well Abandonment/Site Closure Report. The total task assignment value is $6,828.67 on a fixed price basis, comprising $316.33 in project management costs and $6,512.34 in site closure/reporting costs. Arcadis selected Preferred Drilling Solutions, Inc. (PDS) as the drilling subcontractor at $3,502.00 based on competitive bidding from three vendors. The final deliverable—the Well Abandonment/Site Closure Report—is due November 19, 2021, with task execution through December 17, 2021. Payment is contingent upon FDEP approval of the Well Abandonment/Site Closure Report and project management completion.

View the file

Other files

File Type Posted
CN-370000-HW557-A1.pdf PDF
CN-370000-HW557-CSS1BCO1.pdf PDF
CN-370000-HW557-CSS2B.pdf PDF
CN-370000-HW557-CSS3BCO2.pdf PDF
CN-370000-HW557-CSS4A.pdf PDF
CN-370000-HW557-DC007N.pdf PDF
CN-370000-HW557-DC009L.pdf PDF
CN-370000-HW557-DC010E.pdf PDF
CN-370000-HW557-DC010I.pdf PDF
CN-370000-HW557-DC013M.pdf PDF
CN-370000-HW557-DC014H.pdf PDF
CN-370000-HW557-DC018J.pdf PDF
CN-370000-HW557-DC019M.pdf PDF
CN-370000-HW557-DC01ACO5.pdf PDF
CN-370000-HW557-DC01D.pdf PDF
CN-370000-HW557-DC021I.pdf PDF
CN-370000-HW557-DC021J.pdf PDF
CN-370000-HW557-DC029i.pdf PDF
CN-370000-HW557-DC02D.pdf PDF
CN-370000-HW557-DC02E.pdf PDF
CN-370000-HW557-DC02K.pdf PDF
CN-370000-HW557-DC02M.pdf PDF
CN-370000-HW557-DC02NCO1.pdf PDF
CN-370000-HW557-DC030H.pdf PDF
CN-370000-HW557-DC030L.pdf PDF
CN-370000-HW557-DC030P.pdf PDF
CN-370000-HW557-DC031H.pdf PDF
CN-370000-HW557-DC033H.pdf PDF
CN-370000-HW557-DC033J.pdf PDF
CN-370000-HW557-DC033P.pdf PDF
CN-370000-HW557-DC036D.pdf PDF
CN-370000-HW557-DC039D.pdf PDF
CN-370000-HW557-DC039i.pdf PDF
CN-370000-HW557-DC03HCO1.pdf PDF
CN-370000-HW557-DC03J.pdf PDF
CN-370000-HW557-DC03M.pdf PDF
CN-370000-HW557-DC03N.pdf PDF
CN-370000-HW557-DC040D.pdf PDF
CN-370000-HW557-DC041H.pdf PDF
CN-370000-HW557-DC041J.pdf PDF
CN-370000-HW557-DC045D.pdf PDF
CN-370000-HW557-DC046C.pdf PDF
CN-370000-HW557-DC048D.pdf PDF
CN-370000-HW557-DC049E.pdf PDF
CN-370000-HW557-DC050C.pdf PDF
CN-370000-HW557-DC052C.pdf PDF
CN-370000-HW557-DC054A.pdf PDF
CN-370000-HW557-DC07ECO1.pdf PDF
CN-370000-HW557-DC07G.pdf PDF
CN-370000-HW557-DC07HCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW557

D000 N/ADC054C

Arcadis U.S., Inc.

William Vogelsong

(850) 245-8705Theresa C. Pepe

ERIC_4704

Cotney's All Pro Cleaners Inc

15305 Amberley Dr., Tampa, Hillsborough County

Delist

FDEP has issued a Site Rehabilitation Completion Order for No Further Action without Institutional Controls. Therefore, Arcadis will properly abandon all monitor wells and MAGS wells installed during the Site Assessment.

All activities will be performed according to the August 20,2021, Work Plan submitted by Arcadis.

Well Abandonment/Site Closure Report

11/19/2021

12/17/2021

$ 6,828.67 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.08.20 16:17:49 -04'00'

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.08.20 16:18:00 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.08.23 10:24:43 -04'00'

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2021.08.23 11:24:04 -04'00'

$ 6,828.67

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW557 Task Assignment #: DC054C

Deliverables:

Deliverable Deliverable Due Date Well Abandonment/Site Closure Report 19-Nov-21

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

FDEP approval of Well Abandonment/Site Closure Report & Project Management $6,828.67

TOTAL COST $6,828.67

BWC TAFORM 01/18

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: Negotiation File Cotney’s All Pro Cleaners Inc.

Facility ID No. 29-9500710; ERIC_4704 Tampa, Hillsborough County FROM: Theresa C. Pepe

Project Manager SUBJECT: Task Assignment HW557-DC054C DATE: August 20, 2021

The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on May 28, 2021. Therefore, Arcadis U.S., Inc. will properly abandon all groundwater monitor wells and MAGS wells to close out the site. Work will be performed as described in the August 20, 2021, Work Plan from Brian Burke of Arcadis.

The final task assignment total is $6,828.67. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.

Arcadis labor hours were updated to the most recent approved rates in the HW557 Contract.

Subtask 2: Site Closure/Reporting This subtask provides costs for abandoning twelve monitor wells and six MAGs wells installed during the site assessment. Asphalt patching and other site restoration activities will be conducted as needed with approval from the property manager.

Arcadis will submit a brief report and site photos to document the above activities.

PDS was chosen as the drilling subcontractor based on their low bid of three bids solicited.

FDEP COST ESTIMATE

Contractor: Arcadis U.S., Inc.

Date: 8/12/2021

Task #: DC054C SubTask 1 Project Management

Site: Cotney's All Pro Cleaners SubTask 2 Well Abandonments and Summary Letter

Activity/Phase: Site Assessment SubTask 3

Project Manager: Bill Vogelsong SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category Staff Member

$82.29 Project Manager Vogelsong, William (WDV) 1 1.3

$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0

$82.29 Principal Scientist Vogelsong, William (WDV) 0 0 0 0 0

$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0

$61.69 Principal Scientist Burke, Brian (BRB) 2 2 0 0 0

$61.25 Principal Engineer Perella, John (JFP) 0 0 0 0 0$50.00 Senior Scientist O'Sullivan, Michael (MOS) 0 0 0 0 0$41.35 Project Engineer Hays, Timothy (TPH) 0 0 0 0 0

$45.81 Staff Engineer Hanna, Chad (CMH) 8 8 0 0 0

$29.14 Technician Dankerl, David (DJD) 10 10 0 0 0

$26.52 Document Technician Embras, Susan (SRE) 3 3 0 0 0

$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0

$0.00 0 0 0 0 0

$0.00 0 0 0 0 0

Total Hours 24 1 23 0 0 0

Direct Labor $968.42 $107.60 $860.82 $0.00 $0.00 $0.00

Overhead 57.95% $769.57 $85.51 $684.06 $0.00 $0.00 $0.00

Gen & Admin 21.29% $446.57 $49.62 $396.95 $0.00 $0.00 $0.00

Fringe 37.13% $359.57 $39.95 $319.62 $0.00 $0.00 $0.00

Total Labor $2,544.13 $282.68 $2,261.45 $0.00 $0.00 $0.00

Other Direct Costs $48.42 $5.38 $43.04 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $97.00 $97.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

PDS Drilling (Conventional) $3,502.00 $3,502.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,502.00 $3,502.00 $0.00 $0.00 $0.00

Handling Fee $350.20 $350.20 $0.00 $0.00 $0.00

Total Subcontractor Cost $3,852.20 $3,852.20 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $32.50 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other - MAGS, recon) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00

Subtotal $6,574.25 $288.06 $6,286.19 $0.00 $0.00 $0.00

Completion Fee $254.42 $28.27 $226.15 $0.00 $0.00 $0.00

Total Estimated Cost $6,828.67 $316.33 $6,512.34 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE: Cotney's All Pro Cleaners

SUBTASK 2: Well Abandonments and Summary Letter

DATE: 8/12/21

LABOR

Category/Staff Work Description Hours

Well Abandonment Field Activities Principal (BRB) Project oversight and communications 1

Staff Eng (CMH) Subcontractor and property manager coordination 2

Technician (DJD) Driller oversight and documentation 10

Summary Letter Principal (BRB) Report review 1

Staff Eng (CMH) Prepare summary letter and documentation 6

Doc Tech (SE) QA/QC and project support 3

TOTAL LABOR: 23

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 1 $97.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $97.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $97.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

PDS Drilling $3,502.00 Lump Sum 1 $3,502.00

Total Services: $3,502.00

TOTAL SUB: $3,502.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB: $0.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

Expendables Miscellaneous Expendables $32.50 Per Day 1 $32.50

Total Expendables: $32.50

Equipment Items Total Equipment Items: $0.00

Equipment Kits Total Equipment Kits: $0.00

TOTAL EQUIPMENT: $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

3109 West Dr. Martin Luther King

Jr. Boulevard

Suite 350

Tampa

Florida 33607

Tel 813 903 3100

Fax 813 903 9115 www.arcadis.com

Page:

1/2

Theresa Pepe, Contract Manager

Hazardous Waste Cleanup Section

Florida Department of Environmental Protection

Bob Martinez Center, MS 4520

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Subject:

Proposal for Well Abandonment Event

Cotney’s All-Pro Cleaners

15305 Amberly Drive, Tampa, Hillsborough County, Florida

Facility ID No. ERIC_4704

Task Assignment: #DC054C

Dear Ms. Pepe:

Arcadis is pleased to provide the Florida Department of Environmental Protection

(FDEP) this proposal to abandon the monitor wells and modified active gas sampling (MAGS) points at the Cotney’s All-Pro Cleaners Site, located at 15305

Amberly Drive, Tampa, Florida (Site). On May 28, 2021 the FDEP issued a Site

Rehabilitation Completion Order for the Site. This proposal includes a description of the proposed scope of work, the associated estimated cost, and schedule for completion.

SCOPE OF WORK

Well Abandonment Field Activities

The proposed field event will include the abandonment all site monitoring wells and six MAGS wells (2-inch diameter, screened 0.5 – 5.5 feet below ground) presented on the attached Figure 1 in accordance with the requirements of Rule

62-532.500(5), F.A.C. After the abandonments, the well vaults and concrete pads within asphalt paved areas will be removed and replaced by concrete flush to the existing pavement. Based on costs of the three bidders, Arcadis recommends that Florida licensed driller PDS perform the work with Arcadis oversight.

ENVIRONMENT

Date:

August 20, 2021

Contact:

Brian Burke

Phone:

813.353.5755

Email:

Brian.burke@arcadis.com

Our ref:

TBD

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Cotneys\Proposals\2021 - Well Abandonment proposal\2021.08.20 - Cotneys Well Abandonment Proposal.docx

Theresa Pepe

August 20, 2021

Page:

2/2

Reporting

A Well Abandonment Report will be submitted to the FDEP within 60 days of field activities to document the field activities.

SCHEDULE & COST ESTIMATE

Arcadis will schedule the field activities for September 2021, following receipt of a TA from the FDEP. The

CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $6,609.74 and will be invoiced to FDEP upon approval of the Well Abandonment Report.

CLOSING REMARKS

Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.

Sincerely, Arcadis U.S., Inc.

Chad M. Hanna Brian R. Burke, P.G.

Project Environmental Specialist Project Manager/Principal Geologist

FORMER

COTNEY'S ALL-PRO

CLEANERS

CRUNCH

FITNESS

ALTERATIONS

DROP OFF COUNTER

CLOTHES RACKS

PRESS AREA

BATHROOM

WASHER/DRYER

DRY CLEAN MACHINE

BOILER ROOM

C.C-2B

FH

GAS METER

FIRE SYSTEM RISER

SD

DUMPSTER

ENCLOSURE

SD

H

A

I

R

S

A

L

O

N

P

H

A

R

M

A

C

Y

N

U

T

R

I

T

I

O

N

T

O

R

E

R

E

S

T

A

U

R

A

N

T

COVERED CONC. WALKWAY

ASPHALT

ASPHALT

ASPHALT

FRONT DOOR

BACK DOOR

ASPHALT

SB012

SB001

SB004

SB007

MAGS02

SB006

MAGS01

MW003

MW003D

VP003

MW005

MW005D

VP005

MW006

MW006D

VP004

MW007

MW007D

MW002

VP008

MW004

MW004D

MW001

SB011

MAGS06

SB009

MAGS03

SB003

MAGS04

SB010

MAGS05

SB005

SB002

SB008

VP006

VP007

VP002

VP001

A

A'

B'

B

SITE LAYOUT

COTNEY'S ALL-PRO CLEANERS

15305 AMBERLY DRIVE

TAMPA, HILLSBOROUGH COUNTY, FLORIDA

SITE ASSESSMENT REPORT

C I T

Y

B

B

F

L

D

V

G

R O

U P

E

B

B

O

L I V

O p t

P

C

W

V

O G

E L S

O

G

M

E

B

R O

O K

Y

R O p t O

N

O

F F

R

E F

C U s e r s b o l i v a B

A r c a d i s A

F

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

A L

P

R O

T E

C T

I O

N P r o j e c t

F i l e s C o t n e y s

A l l P r o

D

C D

W G

S

M d w g

Y O

U T

F

E B

S

A R

F

S

I

E

V

E D

C A

D V

E R

M

S

T

E C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L E

A

C S

C

O L O

R A

N A

L Y

T I C

A L C

O

T T

E D

Y

O

L I V

A

B

R I A

N

FIGURE

30'

60'

GRAPHIC SCALE

LEGEND

SOIL BORING LOCATION

SOIL BORING/MAG WELL LOCATION

VERTICAL PROFILE LOCATION

SUBJECT SITE PARCEL BOUNDARY

PARCEL BOUNDARY

SITE SCREENING SOIL SAMPLE LOCATION

MONITOR WELL LOCATION

DEEP MONITOR WELL LOCATION

MAP NOTES:

1. Aerial image from USGS Digital Orthographic Quarter Quadrangle

(DOQQ), 2017.

2. Parcel boundaries from Hillsborough County Property Appraiser

GIS database.

LINE OF CROSS SECTIONA'A

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

Consultant Name: Arcadis

Site Name & Location: Former Cotney's Cleaners Date: 8/18/21 FAC ID#:

15305 Amberly Dr, Tampa, FL

PROPOSED SCOPE OF WORK:

Abandon 12-1" MW's totalling 182.5', remove pads and manholes, restore grade with black dyed concrete

Abandon 6-2" MAG Wells 5.5' in depth, remove pad and manhole, restore grade with black dyed concrete

Remove and dispose of debris

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Rig Type: Auger/Mud Rotary_____

Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Borehole Grouting

4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00

1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Double Cased Well $0.00

6" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)

1"- 2" Well Abandonment (includes grouting) per foot $5.75 216 $1,242.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $95.00 18 $1,710.00

Mobilization roundtrip $450.00 1 $450.00

Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $100.00 1 $100.00

$0.00

$0.00

$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00

TOTAL QUOTE PRICE $3,502.00

Days to Complete Scope of Work: 1 Project No.:

Signature and Title of Person Submitting Quote: _________________________________ Kevin Bonacum, Estimator Date: 8/18/21

Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING

MISCELLANEOUS

Arcadis, Cotney's All Pro Cleaners, Tampa

Sonic Auger DPT Injection Well Abandonment

DATE: 8/18/2021

ESTIMATE #: 821007-1

ID QTY Unit Rate TOTAL

1 1 ls 500.00$ 500.00$

2 Per Diem 1 night 200.00$ 200.00$

3 Up to 2" Well Abandonment (total footage of 212') 212 foot 6.00$ 1,272.00$

4 Removal of 2' x 2' Pad w/8" Flush Completion, Patch 18 each 95.00$ 1,710.00$

5 Offsite Disposal of Concrete Debris and Manholes 1 ls 150.00$ 150.00$

6 Permits (SWFLWMD-Abandonment-Required, No FEE) 1 each No Fee

Completion: 1 Day Subtotal 3,832.00$

Todd Hodgson

Todd Hodgson TOTAL 3,832.00$

Partner

Tampa, Florida 33607 Tampa, Florida 3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350

Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time.

No Work Hour Restrictions to Complete Indoor Work

(12) 1" Well Abandonment (Total of 183') w/2' x 2' Pad w/8" Completion Removal. Offsite Disposal

Concrete patch up to 4" Deep with black dye for all locations located in the asphalt.

PROJECT

Former Cotney's Cleaners 15305 Amberly Drive

CUSTOMER

Brian Burke, P.G.

Arcadis

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com

Well Abandonment

DESCRIPTION

Mobilization

THANK YOU FOR YOUR BUSINESS!

Project Description:

***Damage to utilities on private property during borehole clearance are the responsibility of the client***

"Actual quantities used and days onsite will be invoiced"

(813) 353-5765

MW-1 and MW-2 are inside the building. Remove the ring/lid and concrete patch.

***Utility Locates on Private Property are the responsibility of the client***

(6) 2" MAGS Well Abandonment (Total of 27.5') w/2' x 2' Pad w/8" Completion Removal. Offsite Disposal

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.9742423

Date: 8/17/2021

FAC ID#:

PROPOSED SCOPE OF WORK:

Unit Unit Rate Number of Units Extended Price

Rig Type: Auger/Mud Rotary____ Sonic_____ Other_x Abandonment

Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)

HAND CLEARING to 5' BLS per foot $0.00

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

Borehole Grouting

4 - inch borehole diameter per foot $0.00

6 - inch borehole diameter per foot $0.00

8 - inch borehole diameter per foot $0.00

1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

Recovery Well Diameter: ______ per foot

Double Cased Wells

4" Surface Casing per foot $0.00

6" Surface Casing per foot $0.00

8" Surface Casing per foot $0.00 per well $0.00

1"- 2" Well Abandonment (includes grouting) per foot $12.00 215.5 $2,586.00

3"- 4" Well Abandonment (includes grouting) per foot $0.00

5"- 6" Well Abandonment (includes grouting) per foot $0.00

Manhole Removal and Patch each $135.00 18 $2,430.00

Mobilization roundtrip $1,350.00 1 $1,350.00

Per Diem per crew / per night $475.00 2 $950.00

DOT Approved 55-gal Drum each $0.00

Permits each $0.00 2 $0.00

Permits each $0.00 ls $175.00 1 $175.00

$0.00

$0.00

Standby/Delay/Difficult Access Time per hour $0.00

TOTAL QUOTE PRICE $7,491.00

Project No.: ________________________

Subcontract Company Name: EARTH TECH DRILLING (954) 974-2424

Subcontract Mailing Address: 2703 NW 19th St., Pompano Beach. FL 33069

Signature and Title of Person Submitting Quote: Charles Bucher Date: 8/17/2021

Contractor Name: Arcadis / Brian Burke / 813 353-5755

Site Name: Cotney's Cleaners - 15305 Amberly Dr. Tampa, FL

Well Completion (includes 30 minute development, manhole, concrete pad, locking well cap, DRILLING

MISCELLANEOUS

Days to Complete Scope of Work: 1.5 Days

Dispose of debris offsite

Remove Pads/Manholes & Patch with 6" of Black Dyed concrete

Grout Abandon (12) MW's 1" & (6) MAGS 2" x 5.5' = 215.5' Total

Debris disposal offsite

Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
DC054C negsum.pdf
Project Management is automatically calculated based on a percentage of total labor. Arcadis labor hours were updated to the most recent approved rates in the HW557 Contract.
2021.08.20 - Cotneys Well Abandonment Proposal.pdf
Scope of Work
Well Abandonment Field Activities
Reporting
Schedule & cost Estimate
Closing Remarks
Driller bids.pdf
Drilling
Invoice
Drilling

File details come from the government source that posted it. Updated .