This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. HW557. The task assignment (DC054C) involves Arcadis U.S., Inc. as the primary contractor, with William Vogelsong serving as the contractor representative and Theresa C. Pepe as the DEP Contract Manager. The project concerns the site remediation closure of Cotney's All Pro Cleaners Inc., located at 15305 Amberly Drive, Tampa, Hillsborough County, Florida (Facility ID ERIC_4704). The site has been designated for "Delist" status following FDEP's issuance of a Site Rehabilitation Completion Order for No Further Action without Institutional Controls on May 28, 2021.
The task assignment requires Arcadis to properly abandon all groundwater monitor wells (12 total, 1-inch diameter) and Modified Active Gas Sampling (MAGS) wells (6 total, 2-inch diameter, screened 0.5-5.5 feet below ground) installed during the site assessment, in accordance with Rule 62-532.500(5), F.A.C. Work activities include well grouting and abandonment, removal and patching of well pads and concrete structures with black dyed concrete, site restoration, and submittal of a Well Abandonment/Site Closure Report. The total task assignment value is $6,828.67 on a fixed price basis, comprising $316.33 in project management costs and $6,512.34 in site closure/reporting costs. Arcadis selected Preferred Drilling Solutions, Inc. (PDS) as the drilling subcontractor at $3,502.00 based on competitive bidding from three vendors. The final deliverable—the Well Abandonment/Site Closure Report—is due November 19, 2021, with task execution through December 17, 2021. Payment is contingent upon FDEP approval of the Well Abandonment/Site Closure Report and project management completion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW557
D000 N/ADC054C
Arcadis U.S., Inc.
William Vogelsong
(850) 245-8705Theresa C. Pepe
ERIC_4704
Cotney's All Pro Cleaners Inc
15305 Amberley Dr., Tampa, Hillsborough County
Delist
FDEP has issued a Site Rehabilitation Completion Order for No Further Action without Institutional Controls. Therefore, Arcadis will properly abandon all monitor wells and MAGS wells installed during the Site Assessment.
All activities will be performed according to the August 20,2021, Work Plan submitted by Arcadis.
Well Abandonment/Site Closure Report
11/19/2021
12/17/2021
$ 6,828.67 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.08.20 16:17:49 -04'00'
Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.08.20 16:18:00 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.08.23 10:24:43 -04'00'
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2021.08.23 11:24:04 -04'00'
$ 6,828.67
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW557 Task Assignment #: DC054C
Deliverables:
Deliverable Deliverable Due Date Well Abandonment/Site Closure Report 19-Nov-21
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
FDEP approval of Well Abandonment/Site Closure Report & Project Management $6,828.67
TOTAL COST $6,828.67
BWC TAFORM 01/18
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: Negotiation File Cotney’s All Pro Cleaners Inc.
Facility ID No. 29-9500710; ERIC_4704 Tampa, Hillsborough County FROM: Theresa C. Pepe
Project Manager SUBJECT: Task Assignment HW557-DC054C DATE: August 20, 2021
The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on May 28, 2021. Therefore, Arcadis U.S., Inc. will properly abandon all groundwater monitor wells and MAGS wells to close out the site. Work will be performed as described in the August 20, 2021, Work Plan from Brian Burke of Arcadis.
The final task assignment total is $6,828.67. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.
Arcadis labor hours were updated to the most recent approved rates in the HW557 Contract.
Subtask 2: Site Closure/Reporting This subtask provides costs for abandoning twelve monitor wells and six MAGs wells installed during the site assessment. Asphalt patching and other site restoration activities will be conducted as needed with approval from the property manager.
Arcadis will submit a brief report and site photos to document the above activities.
PDS was chosen as the drilling subcontractor based on their low bid of three bids solicited.
FDEP COST ESTIMATE
Contractor: Arcadis U.S., Inc.
Date: 8/12/2021
Task #: DC054C SubTask 1 Project Management
Site: Cotney's All Pro Cleaners SubTask 2 Well Abandonments and Summary Letter
Activity/Phase: Site Assessment SubTask 3
Project Manager: Bill Vogelsong SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category Staff Member
$82.29 Project Manager Vogelsong, William (WDV) 1 1.3
$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$82.29 Principal Scientist Vogelsong, William (WDV) 0 0 0 0 0
$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0
$61.69 Principal Scientist Burke, Brian (BRB) 2 2 0 0 0
$61.25 Principal Engineer Perella, John (JFP) 0 0 0 0 0$50.00 Senior Scientist O'Sullivan, Michael (MOS) 0 0 0 0 0$41.35 Project Engineer Hays, Timothy (TPH) 0 0 0 0 0
$45.81 Staff Engineer Hanna, Chad (CMH) 8 8 0 0 0
$29.14 Technician Dankerl, David (DJD) 10 10 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 3 3 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
$0.00 0 0 0 0 0
$0.00 0 0 0 0 0
Total Hours 24 1 23 0 0 0
Direct Labor $968.42 $107.60 $860.82 $0.00 $0.00 $0.00
Overhead 57.95% $769.57 $85.51 $684.06 $0.00 $0.00 $0.00
Gen & Admin 21.29% $446.57 $49.62 $396.95 $0.00 $0.00 $0.00
Fringe 37.13% $359.57 $39.95 $319.62 $0.00 $0.00 $0.00
Total Labor $2,544.13 $282.68 $2,261.45 $0.00 $0.00 $0.00
Other Direct Costs $48.42 $5.38 $43.04 $0.00 $0.00 $0.00
Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $97.00 $97.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
PDS Drilling (Conventional) $3,502.00 $3,502.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,502.00 $3,502.00 $0.00 $0.00 $0.00
Handling Fee $350.20 $350.20 $0.00 $0.00 $0.00
Total Subcontractor Cost $3,852.20 $3,852.20 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $32.50 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other - MAGS, recon) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00
Subtotal $6,574.25 $288.06 $6,286.19 $0.00 $0.00 $0.00
Completion Fee $254.42 $28.27 $226.15 $0.00 $0.00 $0.00
Total Estimated Cost $6,828.67 $316.33 $6,512.34 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE: Cotney's All Pro Cleaners
SUBTASK 2: Well Abandonments and Summary Letter
DATE: 8/12/21
LABOR
Category/Staff Work Description Hours
Well Abandonment Field Activities Principal (BRB) Project oversight and communications 1
Staff Eng (CMH) Subcontractor and property manager coordination 2
Technician (DJD) Driller oversight and documentation 10
Summary Letter Principal (BRB) Report review 1
Staff Eng (CMH) Prepare summary letter and documentation 6
Doc Tech (SE) QA/QC and project support 3
TOTAL LABOR: 23
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 1 $97.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $97.00
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $97.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
PDS Drilling $3,502.00 Lump Sum 1 $3,502.00
Total Services: $3,502.00
TOTAL SUB: $3,502.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB: $0.00
FIELD EXPENSES
Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
Expendables Miscellaneous Expendables $32.50 Per Day 1 $32.50
Total Expendables: $32.50
Equipment Items Total Equipment Items: $0.00
Equipment Kits Total Equipment Kits: $0.00
TOTAL EQUIPMENT: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
3109 West Dr. Martin Luther King
Jr. Boulevard
Suite 350
Tampa
Florida 33607
Tel 813 903 3100
Fax 813 903 9115 www.arcadis.com
Page:
1/2
Theresa Pepe, Contract Manager
Hazardous Waste Cleanup Section
Florida Department of Environmental Protection
Bob Martinez Center, MS 4520
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Subject:
Proposal for Well Abandonment Event
Cotney’s All-Pro Cleaners
15305 Amberly Drive, Tampa, Hillsborough County, Florida
Facility ID No. ERIC_4704
Task Assignment: #DC054C
Dear Ms. Pepe:
Arcadis is pleased to provide the Florida Department of Environmental Protection
(FDEP) this proposal to abandon the monitor wells and modified active gas sampling (MAGS) points at the Cotney’s All-Pro Cleaners Site, located at 15305
Amberly Drive, Tampa, Florida (Site). On May 28, 2021 the FDEP issued a Site
Rehabilitation Completion Order for the Site. This proposal includes a description of the proposed scope of work, the associated estimated cost, and schedule for completion.
SCOPE OF WORK
Well Abandonment Field Activities
The proposed field event will include the abandonment all site monitoring wells and six MAGS wells (2-inch diameter, screened 0.5 – 5.5 feet below ground) presented on the attached Figure 1 in accordance with the requirements of Rule
62-532.500(5), F.A.C. After the abandonments, the well vaults and concrete pads within asphalt paved areas will be removed and replaced by concrete flush to the existing pavement. Based on costs of the three bidders, Arcadis recommends that Florida licensed driller PDS perform the work with Arcadis oversight.
ENVIRONMENT
Date:
August 20, 2021
Contact:
Brian Burke
Phone:
813.353.5755
Email:
Brian.burke@arcadis.com
Our ref:
TBD
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Cotneys\Proposals\2021 - Well Abandonment proposal\2021.08.20 - Cotneys Well Abandonment Proposal.docx
Theresa Pepe
August 20, 2021
Page:
2/2
Reporting
A Well Abandonment Report will be submitted to the FDEP within 60 days of field activities to document the field activities.
SCHEDULE & COST ESTIMATE
Arcadis will schedule the field activities for September 2021, following receipt of a TA from the FDEP. The
CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $6,609.74 and will be invoiced to FDEP upon approval of the Well Abandonment Report.
CLOSING REMARKS
Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.
Sincerely, Arcadis U.S., Inc.
Chad M. Hanna Brian R. Burke, P.G.
Project Environmental Specialist Project Manager/Principal Geologist
FORMER
COTNEY'S ALL-PRO
CLEANERS
CRUNCH
FITNESS
ALTERATIONS
DROP OFF COUNTER
CLOTHES RACKS
PRESS AREA
BATHROOM
WASHER/DRYER
DRY CLEAN MACHINE
BOILER ROOM
C.C-2B
FH
GAS METER
FIRE SYSTEM RISER
SD
DUMPSTER
ENCLOSURE
SD
H
A
I
R
S
A
L
O
N
P
H
A
R
M
A
C
Y
N
U
T
R
I
T
I
O
N
T
O
R
E
R
E
S
T
A
U
R
A
N
T
COVERED CONC. WALKWAY
ASPHALT
ASPHALT
ASPHALT
FRONT DOOR
BACK DOOR
ASPHALT
SB012
SB001
SB004
SB007
MAGS02
SB006
MAGS01
MW003
MW003D
VP003
MW005
MW005D
VP005
MW006
MW006D
VP004
MW007
MW007D
MW002
VP008
MW004
MW004D
MW001
SB011
MAGS06
SB009
MAGS03
SB003
MAGS04
SB010
MAGS05
SB005
SB002
SB008
VP006
VP007
VP002
VP001
A
A'
B'
B
SITE LAYOUT
COTNEY'S ALL-PRO CLEANERS
15305 AMBERLY DRIVE
TAMPA, HILLSBOROUGH COUNTY, FLORIDA
SITE ASSESSMENT REPORT
C I T
Y
B
B
F
L
D
V
G
R O
U P
E
B
B
O
L I V
O p t
P
C
W
V
O G
E L S
O
G
M
E
B
R O
O K
Y
R O p t O
N
O
F F
R
E F
C U s e r s b o l i v a B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
A L
P
R O
T E
C T
I O
N P r o j e c t
F i l e s C o t n e y s
A l l P r o
D
C D
W G
S
M d w g
Y O
U T
F
E B
S
A R
F
S
I
E
V
E D
C A
D V
E R
M
S
T
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L E
A
C S
C
O L O
R A
N A
L Y
T I C
A L C
O
T T
E D
Y
O
L I V
A
B
R I A
N
FIGURE
30'
60'
GRAPHIC SCALE
LEGEND
SOIL BORING LOCATION
SOIL BORING/MAG WELL LOCATION
VERTICAL PROFILE LOCATION
SUBJECT SITE PARCEL BOUNDARY
PARCEL BOUNDARY
SITE SCREENING SOIL SAMPLE LOCATION
MONITOR WELL LOCATION
DEEP MONITOR WELL LOCATION
MAP NOTES:
1. Aerial image from USGS Digital Orthographic Quarter Quadrangle
(DOQQ), 2017.
2. Parcel boundaries from Hillsborough County Property Appraiser
GIS database.
LINE OF CROSS SECTIONA'A
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Consultant Name: Arcadis
Site Name & Location: Former Cotney's Cleaners Date: 8/18/21 FAC ID#:
15305 Amberly Dr, Tampa, FL
PROPOSED SCOPE OF WORK:
Abandon 12-1" MW's totalling 182.5', remove pads and manholes, restore grade with black dyed concrete
Abandon 6-2" MAG Wells 5.5' in depth, remove pad and manhole, restore grade with black dyed concrete
Remove and dispose of debris
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $5.75 216 $1,242.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $95.00 18 $1,710.00
Mobilization roundtrip $450.00 1 $450.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $100.00 1 $100.00
$0.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $3,502.00
Days to Complete Scope of Work: 1 Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Kevin Bonacum, Estimator Date: 8/18/21
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Arcadis, Cotney's All Pro Cleaners, Tampa
Sonic Auger DPT Injection Well Abandonment
DATE: 8/18/2021
ESTIMATE #: 821007-1
ID QTY Unit Rate TOTAL
1 1 ls 500.00$ 500.00$
2 Per Diem 1 night 200.00$ 200.00$
3 Up to 2" Well Abandonment (total footage of 212') 212 foot 6.00$ 1,272.00$
4 Removal of 2' x 2' Pad w/8" Flush Completion, Patch 18 each 95.00$ 1,710.00$
5 Offsite Disposal of Concrete Debris and Manholes 1 ls 150.00$ 150.00$
6 Permits (SWFLWMD-Abandonment-Required, No FEE) 1 each No Fee
Completion: 1 Day Subtotal 3,832.00$
Todd Hodgson
Todd Hodgson TOTAL 3,832.00$
Partner
Tampa, Florida 33607 Tampa, Florida 3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350
Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time.
No Work Hour Restrictions to Complete Indoor Work
(12) 1" Well Abandonment (Total of 183') w/2' x 2' Pad w/8" Completion Removal. Offsite Disposal
Concrete patch up to 4" Deep with black dye for all locations located in the asphalt.
PROJECT
Former Cotney's Cleaners 15305 Amberly Drive
CUSTOMER
Brian Burke, P.G.
Arcadis
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com
Well Abandonment
DESCRIPTION
Mobilization
THANK YOU FOR YOUR BUSINESS!
Project Description:
***Damage to utilities on private property during borehole clearance are the responsibility of the client***
"Actual quantities used and days onsite will be invoiced"
(813) 353-5765
MW-1 and MW-2 are inside the building. Remove the ring/lid and concrete patch.
***Utility Locates on Private Property are the responsibility of the client***
(6) 2" MAGS Well Abandonment (Total of 27.5') w/2' x 2' Pad w/8" Completion Removal. Offsite Disposal
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 8/17/2021
FAC ID#:
PROPOSED SCOPE OF WORK:
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary____ Sonic_____ Other_x Abandonment
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)
HAND CLEARING to 5' BLS per foot $0.00
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00
6 - inch borehole diameter per foot $0.00
8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
Recovery Well Diameter: ______ per foot
Double Cased Wells
4" Surface Casing per foot $0.00
6" Surface Casing per foot $0.00
8" Surface Casing per foot $0.00 per well $0.00
1"- 2" Well Abandonment (includes grouting) per foot $12.00 215.5 $2,586.00
3"- 4" Well Abandonment (includes grouting) per foot $0.00
5"- 6" Well Abandonment (includes grouting) per foot $0.00
Manhole Removal and Patch each $135.00 18 $2,430.00
Mobilization roundtrip $1,350.00 1 $1,350.00
Per Diem per crew / per night $475.00 2 $950.00
DOT Approved 55-gal Drum each $0.00
Permits each $0.00 2 $0.00
Permits each $0.00 ls $175.00 1 $175.00
$0.00
$0.00
Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $7,491.00
Project No.: ________________________
Subcontract Company Name: EARTH TECH DRILLING (954) 974-2424
Subcontract Mailing Address: 2703 NW 19th St., Pompano Beach. FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher Date: 8/17/2021
Contractor Name: Arcadis / Brian Burke / 813 353-5755
Site Name: Cotney's Cleaners - 15305 Amberly Dr. Tampa, FL
Well Completion (includes 30 minute development, manhole, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Days to Complete Scope of Work: 1.5 Days
Dispose of debris offsite
Remove Pads/Manholes & Patch with 6" of Black Dyed concrete
Grout Abandon (12) MW's 1" & (6) MAGS 2" x 5.5' = 215.5' Total
Debris disposal offsite
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| DC054C negsum.pdf |
| Project Management is automatically calculated based on a percentage of total labor. Arcadis labor hours were updated to the most recent approved rates in the HW557 Contract. |
| 2021.08.20 - Cotneys Well Abandonment Proposal.pdf |
| Scope of Work |
| Well Abandonment Field Activities |
| Reporting |
| Schedule & cost Estimate |
| Closing Remarks |
| Driller bids.pdf |
| Drilling |
| Invoice |
| Drilling |
File details come from the government source that posted it. Updated .