This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW557. The task assignment, numbered DC052C, was awarded to Arcadis U.S., Inc., with Gus Suarez serving as the contractor representative and Theresa C. Pepe as the FDEP Contract Manager. The work is being conducted at the Bacons Drive-In Cleaners facility (ERIC_5362), located at 21 N 7th Street, Haines City, Polk County, Florida. The site is in the Assessment phase of environmental remediation.

Arcadis will conduct additional soil sampling at select locations based on data collected during the initial Site Assessment, with all activities performed in accordance with the September 8, 2021 Work Plan. The task involves two subtasks: Project Management and Soil Sampling & Reporting. The primary deliverable is a Soil Sampling Report due December 17, 2021, with the period of performance extending through January 31, 2022. The task assignment is structured as a fixed price contract with a total value of $7,585.05. Invoicing is conditional upon FDEP approval of the Soil Sampling Report and associated project management work. The cost estimate includes direct labor ($3,276.53), subcontractor services including drilling by Preferred Drilling Solutions ($2,145.00), laboratory analysis ($1,644.00), travel expenses ($97.00), and field expenses ($32.50), with an additional completion fee of $327.66. No retainage is assessed on this task.

View the file

Other files

File Type Posted
CN-370000-HW557-A1.pdf PDF
CN-370000-HW557-CSS1BCO1.pdf PDF
CN-370000-HW557-CSS2B.pdf PDF
CN-370000-HW557-CSS3BCO2.pdf PDF
CN-370000-HW557-CSS4A.pdf PDF
CN-370000-HW557-DC007N.pdf PDF
CN-370000-HW557-DC009L.pdf PDF
CN-370000-HW557-DC010E.pdf PDF
CN-370000-HW557-DC010I.pdf PDF
CN-370000-HW557-DC013M.pdf PDF
CN-370000-HW557-DC014H.pdf PDF
CN-370000-HW557-DC018J.pdf PDF
CN-370000-HW557-DC019M.pdf PDF
CN-370000-HW557-DC01ACO5.pdf PDF
CN-370000-HW557-DC01D.pdf PDF
CN-370000-HW557-DC021I.pdf PDF
CN-370000-HW557-DC021J.pdf PDF
CN-370000-HW557-DC029i.pdf PDF
CN-370000-HW557-DC02D.pdf PDF
CN-370000-HW557-DC02E.pdf PDF
CN-370000-HW557-DC02K.pdf PDF
CN-370000-HW557-DC02M.pdf PDF
CN-370000-HW557-DC02NCO1.pdf PDF
CN-370000-HW557-DC030H.pdf PDF
CN-370000-HW557-DC030L.pdf PDF
CN-370000-HW557-DC030P.pdf PDF
CN-370000-HW557-DC031H.pdf PDF
CN-370000-HW557-DC033H.pdf PDF
CN-370000-HW557-DC033J.pdf PDF
CN-370000-HW557-DC033P.pdf PDF
CN-370000-HW557-DC036D.pdf PDF
CN-370000-HW557-DC039D.pdf PDF
CN-370000-HW557-DC039i.pdf PDF
CN-370000-HW557-DC03HCO1.pdf PDF
CN-370000-HW557-DC03J.pdf PDF
CN-370000-HW557-DC03M.pdf PDF
CN-370000-HW557-DC03N.pdf PDF
CN-370000-HW557-DC040D.pdf PDF
CN-370000-HW557-DC041H.pdf PDF
CN-370000-HW557-DC041J.pdf PDF
CN-370000-HW557-DC045D.pdf PDF
CN-370000-HW557-DC046C.pdf PDF
CN-370000-HW557-DC048D.pdf PDF
CN-370000-HW557-DC049E.pdf PDF
CN-370000-HW557-DC050C.pdf PDF
CN-370000-HW557-DC054A.pdf PDF
CN-370000-HW557-DC054C.pdf PDF
CN-370000-HW557-DC07ECO1.pdf PDF
CN-370000-HW557-DC07G.pdf PDF
CN-370000-HW557-DC07HCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW557

D000 N/ADC052C

Arcadis U.S., Inc.

Gus Suarez

(850) 245-8705Theresa C. Pepe

ERIC_5362

Bacons Drive-In Cleaners

21 N 7th St, Haines City, Polk County

Assessment

Arcadis will conduct additional soil sampling in select locations based on data collected during the Site Assessment.

All activities will be performed according to the September 8, 2021, Work Plan submitted by Arcadis.

Soil Sampling Report

12/17/2021

01/31/2022

$ 7,585.05 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.09.17 13:29:48 -04'00'

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.09.17 13:30:02 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.09.17 14:03:59 -04'00'

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2021.09.17 14:46:48 -04'00'

$ 7,585.05

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW557 Task Assignment #: DC052C

Deliverables:

Deliverable Deliverable Due Date

Soil Sampling Report 17-Dec-21

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

FDEP approval of Soil Sampling Report/Project Management $7,585.05

TOTAL COST $7,585.05

BWC TAFORM 01/18

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Bacon’s Drive-In Cleaners Facility ID No. 53-9500573; ERIC_5362 Haines City, Polk County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC052C (HW557) DATE: September 17, 2021

Arcadis U.S., Inc. will conduct confirmatory soil sampling in select locations based on data collected during the Site Assessment. This work will be conducted in accordance with the September 8, 2021, Work Plan submitted by Brian Burke of Arcadis.

The final task assignment total is $7,585.05. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management This subtask is calculated automatically based on a percentage of total labor hours.

Subtask 2: Soil Sampling & Reporting Per the request of FDEP’s geologist, Arcadis will collect seven soil samples from four locations to confirm the presence of PAHs. Care will be taken to avoid asphalt or burned material that may indicate an external source rather than a source related to past drycleaning activity. Arcadis will submit a soil sampling report as the final deliverable which will include recommendations for additional actions as necessary.

Preferred Drilling Solutions (PDS) was chosen as the drilling subcontractor based on their low bid of three bids solicited.

Hours and costs are comparable to past task assignments of similar work.

FDEP COST ESTIMATE

Contractor: Arcadis U.S., Inc.

Date: 9/8/2021

Task #: DC052C SubTask 1 Project Management

Site: Bacons Cleaners & Laundry Service SubTask 2 Field and Reporting Activities

Activity/Phase: Assessment SubTask 3

Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category Staff Member

$79.12 Project Manager Suarez, Gus (GS) 2 1.8

$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0

$82.29 Principal Scientist Vogelsong, William (BV) 0 0 0 0 0

$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0$75.11 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0

$61.69 Principal Scientist Burke, Brian (BRB) 2 2 0 0 0$61.38 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0

$45.81 Senior Engineer Hanna, Chad (CH) 7 7 0 0 0

$28.94 Scientist Brooks, Eric (EAB) 6 6 0 0 0

$33.57 Technician Welch, David (DJW) 0 0 0 0 0

$29.14 Technician Dankerl, David (DJD) 12 12 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 2 2 0 0 0

$26.52 Document Technician Embras, Susan (SRE) 0 0 0 0 0

$30.96 Project Assistant McLemore, Michele (MMc) 2 2 0 0 0

Total Hours 33 2 31 0 0 0

Direct Labor $1,247.21 $138.58 $1,108.63 $0.00 $0.00 $0.00

Overhead 57.95% $991.11 $110.12 $880.99 $0.00 $0.00 $0.00

Gen & Admin 21.29% $575.13 $63.90 $511.23 $0.00 $0.00 $0.00

Fringe 37.13% $463.08 $51.45 $411.63 $0.00 $0.00 $0.00

Total Labor $3,276.53 $364.05 $2,912.48 $0.00 $0.00 $0.00

Other Direct Costs $62.36 $6.93 $55.43 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $97.00 $97.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

PDS Drilling (Conventional) $1,950.00 $1,950.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,950.00 $1,950.00 $0.00 $0.00 $0.00

Handling Fee $195.00 $195.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $2,145.00 $2,145.00 $0.00 $0.00 $0.00

Laboratory

TestAmerica Analytical Costs $1,540.00 $1,540.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00

Total Laboratory $1,644.00 $1,644.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $32.50 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other - MAGS, recon) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00

Subtotal $7,257.39 $370.98 $6,886.41 $0.00 $0.00 $0.00

Completion Fee $327.66 $36.41 $291.25 $0.00 $0.00 $0.00

Total Estimated Cost $7,585.05 $407.39 $7,177.66 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE: Bacons Cleaners & Laundry Service

SUBTASK 2: Field and Reporting Activities

DATE: 9/8/21

LABOR

Category/Staff Work Description Hours

Field Activities Prin Sci - Burke FDEP communications and PG support 1

Senior Eng - Hanna Field coordination and property owner notifications, sub coordination 3

Technician - Dankerl Oversight and soil sampling, travel to/from site 12

Project Assistant - MMc Project assistance, sample management 1

Reporting Prin Sci - Burke Data review and report PG seal 1

Senior Eng - Hanna Reporting and path forward recommendations 4

Scientist - Brooks field summary, data tables, and draft figure 6

Drafter - Oliva Summary figure 2

Project Assistant - MMc Report QA/QC and production 1

TOTAL LABOR: 31

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 1 $97.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $97.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $97.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

PDS Direct-push services $1,950.00 Lump Sum 1 $1,950.00

Total Services: $1,950.00

TOTAL SUB: $1,950.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

SVOCs 8270 Soil/Sediment $220.00 1.00 7 $1,540.00

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $1,540.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 1 $104.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00

Total Shipping: $104.00

TOTAL LAB: $1,644.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

Expendables Miscellaneous Expendables $32.50 Per Day 1 $32.50

Total Expendables: $32.50

Equipment Items Total Equipment Items: $0.00

Equipment Kits Total Equipment Kits: $0.00

TOTAL EQUIPMENT: $0.00

Arcadis U.S., Inc.

4300 W Cypress Street

Suite 450

Tampa

Florida 33607

Phone: 813 903 3100

Fax: 813 350 9046 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

1/2

Theresa Pepe, Contract Manager

Hazardous Waste Cleanup Section

Florida Department of Environmental Protection

Bob Martinez Center, MS 4520

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Date: September 8, 2021

Our Ref: 30061946

Subject: Former Bacons Cleaners & Laundry Service Soil Sampling Proposal

Facility ID No. ERIC_5362

Task Assignment: #DC052C

Dear Ms. Pepe, Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal to conduct supplemental soil sampling activities at the subject facility (Site). The subject property operated as drycleaner for approximately 41 years (~1957 to 1998). A soil sample identified the presence of Mineral Spirits (3,890 mg/kg) in shallow soils collected outside the rear of the facility in June 1996.

Site assessment activities were completed from October 2020 to February 2021 and included the sampling of soil throughout the Site. A total of 10 soil borings (SB001 through SB010) were installed using a hand auger and/or

Direct Push Technology (DPT), along with soil sample collection for soil vapor screening and laboratory analysis of selected volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons (PAHs), and total recoverable petroleum hydrocarbons (TRPH). The results of the soil analyses identified PAHs exceeding Soil Cleanup Target

Levels (SCTLs) at depths of four feet or less from four soil borings: SB001, SB003, SB005, and SB007 (Figure 1).

The presence of PAHs may be associated with asphalt or non-drycleaning operations; therefore, additional soil sampling was proposed in the Site Assessment Report submitted by Arcadis in April 2021 to identify the potential sources of PAHs.

Scope of Work

This proposal includes a description of the proposed scope of work, the associated estimated cost, and schedule for completion.

Field Activities

Arcadis and a drilling subcontractor will mobilize to the Site and cut 18-inch x 18-inch squares in the asphalt adjacent to the four target soil borings: SB001, SB003, SB005, and SB007. After the asphalt and underlying limerock base is carefully removed to expose the native soil, a hand auger will be used to advance utility clearance borings at the four corners of each square. The utility clearance borings will be advanced to at least one-foot below the target depth of

Ms. Theresa Pepe

Florida Department of Environmental Protection

September 8, 2021 www.arcadis.com Bacons Cleaners Soil Sampling Proposal 09082021

2/2 soil samples listed below in Table 1. Other utility avoidance lines of evidence include the subsurface private utility locate performed using ground penetrating radar (GPR) on October 21, 2020, a new Sunshine 811 call, and visual surface evidence of utilities. At the four boring locations, samples will be collected from dedicated liner cores within decontaminated DPT rod for PAHs analysis. Careful attention will be made to ensure that asphalt, burned material etc is not present in the samples to avoid potential influence from external sources of PAHs. Following sample collection, the borings will be backfilled and the asphalt squares replaced with black-dyed concrete.

Table 1 – Proposed Sample Locations and Depths

Boring ID Sample Depths (feet) Analysis

SB001A 0.5 & 2 PAHs

SB003A 0.5 & 2 PAHs

SB005A 0.5 PAHs

SB007A 4 & 6 PAHs

Reporting

A summary letter with data tables and figures will be submitted to the FDEP within 60 days of field activities to document the field activities, results, and recommended path forward for the Site.

Schedule and Cost Estimate

Arcadis will schedule the field activities for September/October 2021, following receipt of a Task Assignment from

FDEP. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $7,585.05 and will be invoiced to FDEP upon approval of the summary letter report. Based on costs from the three bidders, Arcadis recommends that Florida licensed driller Preferred Drilling Solutions (PDS) perform the DPT work.

Closing Remarks

Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.

Sincerely, Arcadis U.S., Inc.

Brian R. Burke, P.G.

Project Manager/Principal Geologist

Email: brian.burke@arcadis.com

Direct Line: 813-353-5755

Mobile: 813-298-2838

V A

C A

N T

O'REILLY

AUTO PARTS

V A

C A

N T

SHOPPING

PLAZA

V A

C A

N T

V

A

C

A

N

T

UP

UP

UP

UP

UP

UP

UP

UP

SD SD

FRONT

ENTRANCE

FRONT

ENTRANCE

FORMER

BOILER ROOM

REST ROOM

STORAGE

CLOSET

FREEZER

FORMER

AST AREA

ASPHALT

C A

N O

P Y

C O

N C

R E

T E

ASPHALT

ASPHALT

GRASS

GRASS

DUMPSTER

N t h

S

T R

E E

T

N h

R

E E

T

BDC-001

FORMER

REAR DOOR

MW004

MG09

MG01

MG02

MG03

MG05 MG04

MG06

MG08

MG07

SB006

SB005

SB007

MW003

MW002

SB008

MW001

SB001

SB010

SB009

SB002

SB004

SB003

SW

SW

SW

SD

A

A'

B

B'

TRPH AND PAH CONCENTRATIONS IN SOIL

OCTOBER 2020 AND FEBRUARY 2021

BACONS CLEANERS & LAUNDRY SERVICE (ERIC_5362)

21 N. 7th STREET, HAINES CITY, POLK COUNTY, FLORIDA

SITE ASSESSMENT REPORT

C I T

Y

B

B

F

L

D

I V

G

R O

U P

E

N

B

B

O

L I V

O p

P

C

W

V

O G

E L

S O

G

M

B

B

U R

K

E

B

R O

O K

Y R

O p t O

N

O

F F

R

E F

C U s e r s b o l i v a

B

A r c a d i s A

F

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

R O

T E

C T

I O

N P r o j e c t

F i l e s B a c o n s

D

C

D

W G

S

M d w g

Y

O U

T

S

A R

F

Q

V

E D

C A

D V

E R

S

L

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

A

C S

C

O L

O R

A

N A

L Y

T I C

A L

C

O

T T

E D

Y

O

L I V

A

B

R I A

N

FIGURE

30'

60'0

GRAPHIC SCALE

LEGEND

SUBJECT SITE PARCEL BOUNDARY

PARCEL BOUNDARY

SITE SCREENING SOIL SAMPLE BDC-001

COLLECTED FROM 0-0.5' IN JUNE 1996

SOIL BORING LOCATION

MAGS WELL LOCATION

MONITOR WELL LOCATION

LINE OF CROSS SECTIONA'A

NOTES

1. Bold indicates SCTL exceedance.

2. FDEP SCTLs - Florida Department of Environmental

Protection Soil Cleanup Target Levels per Chapter 62-777, Florida Administrative Code.

3. "U" indicates compound was analyzed for but not detected

4. "I" indicates result is between laboratory Practical Quantifiable

Limit [PQL] and laboratory Method Detection Limit [MDL].

5. "J" indicates laboratory estimated value.

6. "NS" indicates not sampled.

7. " * " indicates confirmatory result collected on 2/23/2021.

8. TRPH=Total Recoverable Petroleum Hydrocarbons.

9. BaA=Benzo(a)Anthracene.

10. BaP=Benzo(a)Pyrene.

11. BaPe=Benzo(a)Pyrene equivalents

12. BbF=Benzo(b)Fluoranthene

13. All results reported in milligrams per kilogram (mg/kg).

14. "**" Leachability value may be determined using TCLP.

15. "#" Direct Exposure value not applicable except as part of the

Benzo(a)pyrene equivalent

Soil Cleanup Target Level (SCTL) Shading Index

Direct Exposure Residential Soil Cleanup Target Level Exceedance

Direct Exposure Commercial Soil Cleanup Target Level Exceedance

Leachability Based on Groundwater Criteria Exceedance

SCTL

TRPH BaA BaP BaPe BbF

460 # 0.1 0.1 #

2,700 # 0.7 0.7 #

340 0.8 8 ** 2.4

SB001

10/22/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 440 0.29 0.7 1 1.5

0.5* 37 3.8 3.5 5.3 6

36 0.19 0.49 0.7 0.86

17 I 0.0015 U 0.0027 I 0 0.0047 I

12 I 0.0054 I 0.0097 0 0.02

12 U 0.0016 U 0.0017 U 0 0.0029 I

12 U 0.0015 U 0.0017 U 0 0.0017 U

12 U 0.0016 U 0.0017 U 0 0.0017 U

12 U 0.0016 U 0.0017 U 0 0.0017 U

12 U 0.0016 U 0.0017 U 0 0.0017 U

12 U 0.0015 U 0.0017 U 0 0.0016 U

12 U 0.0015 U 0.0016 U 0 0.0016 U

12 U 0.0016 U 0.0017 U 0 0.0017 I

13 U 0.0017 U 0.0019 U 0 0.0019 U

14 U 0.0018 U 0.0022 I 0 0.0051 I

55 22 I 0.0022 U 0.0024 U 0 0.0023 U

SB002

10/21/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 390 0.039 0.11 0.2 0.28

0.5* 34 0.0068 I 0.013 0 0.03

32 0.0047 I 0.011 0 0.022

22 0.0017 I 0.0041 I 0 0.0069

110 0.0033 I 0.0079 0 0.019

SB003

10/22/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 380 0.24 0.26 0.4 0.45

0.5* 180 1.4 J 2 J 3.0 3.9 J

300 0.16 0.27 0.4 0.49

25 0.014 0.022 0 0.037

31 0.033 0.046 0.1 0.078

22 0.0015 U 0.0017 U 0 0.0016 U

15 I 0.0015 U 0.0016 U 0 0.0016 U

13 U 0.0017 U 0.0031 I 0 0.0068 I

13 U 0.0017 U 0.0027 I 0 0.0056 I

14 U 0.0018 U 0.0020 U 0 0.0030 I

13 U 0.0019 I 0.0035 I 0 0.0084

13 U 0.0020 I 0.0041 I 0 0.0083

13 U 0.0037 I 0.0066 I 0 0.016

13 U 0.0018 U 0.0019 U 0 0.0040 I

100 0.0018 U 0.0020 U 0 0.0029 I

14 U 0.0032 I 0.0056 I 0 0.0094

SB006

10/23/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 680 1.4 1.2 1.8 3.2

0.5* 15 I 0.0021 I 0.0028 I 0 0.0059 I

12 U 0.014 0.011 0 0.024

12 U 0.0059 I 0.0066 I 0 0.013

13 U 0.0018 U 0.0019 U 0 0.0019 U

SB004

10/21/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 76 0.0033 I 0.0056 I 0 0.011

12 U 0.0039 I 0.0048 I 0 0.0088

12 U 0.0016 U 0.0017 U 0 0.0017 U

43 0.0017 U 0.0018 U 0 0.0018 U

SB005

10/22/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 59 0.76 J 0.62 J 1 1.6 J

25 0.0092 0.01 0 0.019

12 U 0.01 0.012 0 0.021

14 U 0.0018 U 0.0020 U 0 0.0020 U

SB008

10/23/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 54 0.063 I 0.065 I 0.1 0.11

18 I 0.0016 U 0.0017 U 0 0.0017 U

21 0.0015 U 0.0017 U 0 0.0016 U

18 U 0.0036 I 0.0025 U 0 0.026

SB009

11/13/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 57 0.0031 I 0.0033 I 0 0.0082

74 0.0031 I 0.0044 I 0 0.0097

17 I 0.0015 U 0.0016 U 0 0.0016 U

SB010

11/13/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 21 0.0023 I 0.0026 I 0 0.0047 I

20 0.0015 U 0.0016 U 0 0.0016 U

12 U 0.0015 U 0.0017 U 0 0.0016 U

SB007

10/23/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 12 U 0.0017 I 0.0036 I 0 0.0053 I

12 U 0.0015 U 0.0017 U 0 0.0024 I

39 0.027 I 0.13 0.2 0.23

13 U 0.026 0.074 0.1 0.11

SB010

10/22/2020

Depth

TRPH BaA BaP BaPe BbF

0.5 21 0.0023 I 0.0026 I NS 0.0047 I

20 0.0015 U 0.0016 U NS 0.0016 U

12 U 0.0015 U 0.0017 U NS 0.0016 U

bburke Oval C-001 M M

SB001

A bburke Oval C-001 M M

SB001

A bburke Oval C-001 M M

SB001

A bburke Oval C-001 M M

SB001

Preferred Drilling Solutions, Inc.

11747 87th St. North, Largo, FL 33773 Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Consultant Name: Arcadis

Site Name and Location: Former Bacons Drive in Cleaners, 21 N 7th St Date: 8/4/21 FAC ID#:

Haines City, FL

PROPOSED SCOPE OF WORK:

4 Soil Borings up to 5' using Macro-Core, backfill with grout and restore to grade with black dyed concrete

Grout borings upon completion

Drum remaining cuttings

PDS to hand clear at 4 spots around each boring before advancing macro core to clear utilities

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Equipment Type: Geoprobe 7822DT, Geoprobe 7720DT

Direct Push Daily Rate 1 - on-site day whole day $1,450.00 1 $1,450.00 Direct Push Half-Day Rate 1 - on-site half day half day $1,100.00 $0.00 Auger Attachment, 2" Well Install per foot $12.50 $0.00 Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5" each $75.00 $0.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5" each $25.00 $0.00 Well Riser (includes all materials) ID 1" 5' Length each $15.00 $0.00 Well Completion (includes manhole w/ cover, concrete pad, and locking well cap) per well $100.00 $0.00

Mobilization roundtrip $450.00 1 $450.00 Per Diem per crew / per night $300.00 $0.00 DOT Approved 55-gal Drum each $50.00 1 $50.00 Permits each $50.00 $0.00 Other (specify) $0.00 Other (specify) $0.00 Other (specify) $0.00

TOTAL QUOTE PRICE $1,950.00

Notes:

1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time, steamcleaning decon, and grouting.

Days to Complete Scope of Work: 1 Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address:8820 66th Street North, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 8/4/21

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Sonic Auger DPT Injection Well Abandonment

DATE: 8/3/2021

ESTIMATE #: 821008

ID QTY Unit Rate TOTAL

1 1 ls 500.00$ 500.00$

2 Per Diem 0 night 200.00$ -$

3 DPT Rig and Crew 1 day 1,450.00$ 1,450.00$

4 4 each 100.00$ 400.00$

5 Permits (Not Applicable)

Completion: 1 Day Subtotal 2,350.00$

Todd Hodgson

Todd Hodgson TOTAL 2,350.00$

Partner

Tampa, Florida 33607 Haines City, Florida 3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350

Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time.

(4) Cut 18" x 18" Square in Concrete, Clear Hole to 5', then advance DPT to within Native Soil to Obtain Soil a Soil Sample. Native Backfill and Top of with Sand and Patch with 18" x 18" Black Dye Concrete.

PROJECT

Former Bacon's Cleaners 21 N. 7th Street

CUSTOMER

Brian Burke, P.G.

Arcadis

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com

DPT Soil Borings

DESCRIPTION

Mobilization

THANK YOU FOR YOUR BUSINESS!

Project Description:

***Damage to utilities on private property during borehole clearance are the responsibility of the client***

"Actual quantities used and days onsite will be invoiced"

(813) 353-5765

GP will need to clear ALL borings to a minimum of 5' at each location.

***Utility Locates on Private Property are the responsibility of the client***

Materials: Up to 18" x 18" x 6" Deep Concrete Patch.

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 8/11/2021

FAC ID#:

PROPOSED SCOPE OF WORK:

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig

Direct Push Daily Rate 1 - on-site day whole day $1,500.00 1 $1,500.00

Direct Push Half-Day Rate 1 - on-site half day half day $0.00

2" Well Installation per foot $0.00

Auger Attachment, 4" Surface Casing each $0.00

Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____ each $0.00

Well Riser (includes all materials) ID ___1"___ 5' Length each $0.00

Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap) per well $0.00

Mobilization roundtrip $1,150.00 1 $1,150.00

Per Diem per crew / per night $375.00 1 $375.00

DOT Approved 55-gal Drum each $80.00 0 $0.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $50.00 0 $0.00

Backfill Borings and Patch with Black Dyed Concrete each $125.00 4 $500.00

$0.00

$0.00

TOTAL QUOTE PRICE $3,525.00

Notes:

Days to Complete Scope of Work: 1 Day Project No.: ___________________________

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

Signature and Title of Person Submitting Quote: Charles Bucher Date: 8/11/2021

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Contractor Name: Arcadis / Brian Burke / 813 353-5755

Site Name: Bacon's Cleaners - Haines City, FL

At four (4) locations, cut 18-inch x 18-inch squares in the asphalt, remove asphalt and few inches of road base

At each of the four (4) squares, hand auger four (4) soil borings in the corners to clear utilities up to five feet below ground.

In the center of each square, advance a DPT core up to five feet below ground so that native soil samples can be collected for laboratory analysis

Backfill all borings with soil and top with sand

Replace the four (4) 18-inch x 18-inch asphalt squares with 6-inches of concrete dyed black to match the existing asphalt

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
negsum.pdf
Subtask 1: Project Management
Subtask 2: Soil Sampling & Reporting
Bacons Cleaners Soil Sampling Proposal 09082021.pdf
Scope of Work
Field Activities
Reporting
Schedule and Cost Estimate
Closing Remarks