This document is a Task Assignment Notification Form under DEP Contract No. HW557, issued by the Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental assessment work at the Admiral Cleaners facility (ERIC_5186) located at 4645 Gun Club Road, West Palm Beach, Palm Beach County, Florida. The task assignment, designated DC050C, was executed on September 3, 2020, with Theresa C. Pepe serving as the FDEP Contract Manager and William Vogelsong as the Contractor Representative.
The scope of work comprises a Supplemental Site Assessment involving groundwater and soil sampling from five monitor wells, vapor sampling from three MAGS wells, and soil boring installation at two locations. The work is divided into three subtasks: Project Management, Site Assessment (including drilling subcontracted to Earth Tech Drilling for $1,275.00), and preparation of a Supplemental Site Assessment Report with IDW manifests. The total task assignment value is $12,409.47 under a fixed-price arrangement, with invoicing tied to FDEP approval milestones: $8,032.43 for approved fieldwork activities and $4,377.04 for approved reporting and project management. Field activities were scheduled for completion by October 30, 2020, with the final report due December 11, 2020, and the task assignment period extending through January 29, 2021. Laboratory analytical costs of $1,590.00 and shipping costs of $126.00 are included in the overall budget.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW557
D000 N/ADC050C
Arcadis U.S., Inc.
William Vogelsong
(850) 245-8705Theresa C. Pepe
ERIC_5186
Admiral Cleaners
4645 Gun Club Rd, West Palm Beach, Palm Beach
Assessment
Arcadis will complete a Supplemental Assessment to include groundwater & soil sampling, and a MAGS test from select wells.
All activities will be performed according to the September 3, 2020, Work Plan submitted by Arcadis.
Supplemental Site Assessment Report/IDW manifests
12/11/2020
01/29/2021
$ 12,409.47 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.09.03 12:41:48 -04'00'
Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.09.03 12:42:01 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.09.08 11:18:04 -04'00'
William D. Vogelsong Digitally signed by William D. Vogelsong Date: 2020.09.08 12:29:47 -04'00'
$ 12,409.47
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW557 Task Assignment #: DC050C
Deliverables:
Deliverable Deliverable Due Date Completion of Fieldwork Activities 30-Oct-20
Supplemental Site Assessment Report/IDW manifests 11-Dec-20
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
FDEP approval of Fieldwork Activities $8,032.43
FDEP approval of Supplemental Site Assessment Report/IDW manifests/Project Management $4,377.04
TOTAL COST $12,409.47
BWC TAFORM 01/18
Florida Department of Memorandum Environmental Protection
“Protect, Conserve and Manage Florida’s Environment and Natural Resources”
Printed on recycled paper.
TO: Negotiation File Admiral Cleaners Facility ID No. 50-9502906; ERIC_5186 West Palm Beach, Palm Beach County
FROM: Theresa C. Pepe, Project Manager
DATE: September 3, 2020
SUBJECT: Task Assignment DC050C (HW557)
This Task Assignment is for a Supplemental Site Assessment at the Admiral Cleaners site.
Arcadis will conduct additional soil & groundwater sampling as well as perform a MAGS test at select wells. Further information can be found in the September 3, 2020, work plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $12,409.47. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Site Assessment This subtask provides funds for installing two soil borings outside the facility, resampling five existing monitor wells and performing a retest of “hot” MAGS well locations on a day when the drycleaning machine is not in operation. This work is being conducted to address FDEP’s comments from the initial Site Assessment Report received earlier this year.
Earth Tech was selected as the drilling subcontractor based on their low bid of three bids solicited.
Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc.
Additionally, Arcadis will provide electronic deliverables in the approved FDEP format. IDW manifests, if necessary, will also be provided to FDEP as part of the final deliverable.
FDEP COST ESTIMATE
Contractor: Arcadis U.S., Inc.
Date: 9/3/2020
Task #: SubTask 1 Project Management
Site: Admiral Cleaners SubTask 2 GW, MAGS, and Soil Sampling
Activity/Phase: Supplemental Assessment SubTask 3 Reporting
Project Manager: Bill Vogelsong SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category Staff Member
$81.47 Project Manager Vogelsong, William (WDV) 4 3.7
$95.33 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$81.47 Principal Scientist Vogelsong, William (WDV) 1 0 1 0 0
$50.00 Senior Scientist McGlone, Douglas (DMc) 20 5 15 0 0
$41.35 Project Engineer Hays, Timothy (TPH) 0 0 0 0 0
$28.94 Scientist McBath, Brandon (BMc) 29 29 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 6 0 6 0 0
$29.91 Project Assistant McLemore, Michele (MMc) 8 4 4 0 0
$0.00 0 0 0 0 0
$0.00 0 0 0 0 0
Total Hours 68 4 38 26 0 0
Direct Labor $2,697.78 $299.75 $1,208.90 $1,189.13 $0.00 $0.00
Overhead 57.95% $2,143.83 $238.20 $960.67 $944.96 $0.00 $0.00
Gen & Admin 21.29% $1,244.04 $138.23 $557.46 $548.35 $0.00 $0.00
Fringe 37.13% $1,001.68 $111.30 $448.86 $441.52 $0.00 $0.00
Total Labor $7,087.33 $787.48 $3,175.89 $3,123.96 $0.00 $0.00
Other Direct Costs $134.90 $14.99 $60.45 $59.46 $0.00 $0.00
Travel
Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $291.00 $291.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $1,275.00 $1,275.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,275.00 $1,275.00 $0.00 $0.00 $0.00
Handling Fee $127.50 $127.50 $0.00 $0.00 $0.00
Total Subcontractor Cost $1,402.50 $1,402.50 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,590.00 $1,590.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $126.00 $126.00 $0.00 $0.00 $0.00
Total Laboratory $1,716.00 $1,716.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $97.50 $97.50 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (GW Analytical related) $522.35 $522.35 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other - MAGS) $449.15 $449.15 $0.00 $0.00 $0.00
Total Field Expenses $1,069.00 $1,069.00 $0.00 $0.00 $0.00
Subtotal $11,700.73 $802.47 $7,714.84 $3,183.42 $0.00 $0.00
Completion Fee $708.74 $78.75 $317.59 $312.40 $0.00 $0.00
Total Estimated Cost $12,409.47 $881.22 $8,032.43 $3,495.82 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE: Admiral Cleaners
SUBTASK 2: GW, MAGS, and Soil Sampling
DATE: 9/3/20
LABOR
Category/Staff Work Description Hours
Groundwater Sampling Principal / BV 0
Senior / DMc Discussions with owner/operator for site access 1
Project / BMc Mob/demob (1hr) sample 5 wells (6 hrs), treat purge water/pack/ship (2 hrs) 9
Project Assistant / MMc Process field notes, sample tracking 2
MAGS
Principal / BV 0
Senior / DMc Discussions with owner/operator, MAGS support (2 hrs) 2
Project / BMc Mob/demob (1 hrs) MAGS test (8 hrs), pack/ship air samples (2 hrs) 11
Project Assistant / MMc Process field notes, sample tracking 1
Soil Sampling Principal / BV 0
Senior / DMc Discussions with owner/operator, subcontracting, utility clearance 2
Project / BMc Mob/demob (1 hr) soil borings (6 hrs), pack/ship soil samples (2 hrs) 9
Project Assistant / MMc Process field notes, sample tracking 1
TOTAL LABOR: 38
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 3 $291.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $291.00Meals Total Meal/Hotel: $0.00
TOTAL TRAVEL: $291.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Unit pricing 0 $0.00
Earth Tech Drilling services $1,275.00 Lump Sum 1 $1,275.00
Clark IDW $125.00 Drum 0 $0.00
Total Services: $1,275.00
TOTAL SUB: $1,275.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260 Aqueous/Non $66.00 1.00 5 $330.00
VOC (Halocarbons Only) 8260 Soil $66.00 1.00 10 $660.00SPLP ZHE + VOH analysis 1312 + 8260C (VOH) Aqueous $111.00 1.00 0 $0.00
VOC Soil Vapor TO-15 Aqueous/Non $200.00 1.00 3 $600.007 RCRA Metals (As/Ba/Cd/Cr/Pb/Se/Ag) 6020 Aqueous/Non $87.50 1.00 0 $0.00
TAT 24-hr=100% (2.0) 3-day=50% (1.5)1-week=15% (1.15) Total Lab: $1,590.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 2 $126.00
Total Shipping: $126.00
TOTAL LAB: $1,716.00
FIELD EXPENSES
Personal Protection
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
Expendables Miscellaneous Expendables $32.50 Per Day 3 $97.50
Total Expendables: $97.50
Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00
Portable Generator 5KW $66.00 Per Day 1 $66.00
Tubing, Poly/HDPE $0.25 Per Foot 300 $75.00
Tubing, Silicon 3/16x3/8 $2.00 Per Foot 3 $6.00PID (ppbRae) $87.30 Per Day 0 $0.00
Regenerative Blower $92.15 Per Day 1 $92.15
Total Equipment Items: $239.15
Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 1 $208.55
Shallow Groundwater / Soil Vapor Screening Kit $232.80 Day 1 $232.80
Construction/O&M/Pilot Test Kit $291.00 Day 1 $291.00
Total Equipment Kits: $732.35
TOTAL EQUIPMENT: $971.50
SITE: Admiral Cleaners
SUBTASK 3: Reporting
DATE: 9/3/20
LABOR
Category/Staff Work Description Hours
Reporting
Principal / BV PG review/certification of supplemental assessment report, report recommendations 1
Senior / DMc Report writing (8 hrs); figures/graphs generation (3 hrs); tables (4 hrs) 15
Designer - Database Mgr / BO Report figures/graphs generation (4 hrs); data mgmt, ADaPT processing (2 hrs) 6
Project Assistant / MMc Data entry, report assembly, formatting, copies, upload/ADaPT deliverables 4
TOTAL LABOR: 26
TRAVEL
Vehicle
Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 0 $0.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $0.00
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Unit pricing 0 $0.00
Total Services: $0.00
TOTAL SUB: $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=100% (2.0) 3-day=50% (1.5)1-week=15% (1.15) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB: $0.00
FIELD EXPENSES
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00
Total PPE: $0.00
Equipment
Item Rate Unit Usage Totals
Expendables
Miscellaneous Expendables $32.50 Per Day 0 $0.00
Total Expendables: $0.00
Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00
Total Equipment Items: $0.00
Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
arcadis.com C:\Users\Pepe_t\Desktop\Admiral Drycleaner Supplemental Assessment Proposal.docx
Page:
1/2
Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Supplemental Site Assessment Proposal Admiral Cleaners (ERIC_5186) 4645 Gun Club Road, West Palm Beach, Palm Beach County, Florida
Dear Ms. Pepe:
Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal for the former Admiral Cleaners USA site, located in West Palm Beach, Palm Beach County, Florida. This proposal has been prepared in response to FDEP email request dated May 6, 2020. The proposal includes the groundwater sampling of five monitor wells, vapor sampling of three MAGS wells, and reporting.
SCOPE OF WORK
The following sections provide a brief description of the tasks to be completed by Arcadis.
Task 1 – Project Management
This task includes project management activities associated with completion of Tasks 2 and 3.
Task 2 – Monitor Wells, MAGS Wells, and Soil Sampling
As requested, groundwater samples will be collected from five monitor wells (MW-X, MW-Y, MW004, MW006, and MW007) for analysis of VOHs by EPA Method 8260 by an accredited laboratory.
A re-test of MAGS01, MAGS02, and MAGS03 will be completed. The three re-tests will be conducted, equally divided, over a single 8-hour period and an air sample from will be collected at the conclusion of the test and analyzed for TO-
15. The MAGS testing will be completed on a day when the drycleaning machine has not been in operation. Arcadis will also coordinate with the drycleaner to ensure other solvents will not be in use the day of the testing.
ENVIRONMENT
Date:
September 3, 2020
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
30036222
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_t\Desktop\Admiral Drycleaner Supplemental Assessment Proposal.docx
Supplemental Site Assessment Proposal 3 September 2020
Page:
2/2
Two additional soil borings will be installed to approximately two feet into the water-table, 8 feet below grade, utilizing DPT. Soil will be collected in two-foot intervals, including 0-0.5 ft bg, totaling five soil samples from each location. All of the soil samples collected from each of the two soil boring locations and analyzed for VOHs by EPA method 8260. The soil borings proposed locations are one boring along the northern edge of concrete pad north of the drycleaner backdoor and one boring along the eastern edge of the a/c concrete pad. Following sampling, the boreholes will be backfilled and/or filled with clean silica sand and sealed with cement and/or asphalt.
Task 3 – Reporting
A supplemental assessment report documenting the well installations, sampling and results will be prepared and include conclusions and recommendations for future site work.
SCHEDULE
Arcadis will schedule field activities immediately upon receipt of the Task Assignment. The supplemental assessment report will be submitted within 45 days of completion of field work.
COST ESTIMATE
A Cost Estimate Form and Level of Effort (CEF-LOE) Form are attached for the above scope of work (Attachment 1).
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G. William D. Vogelsong, P.G.
Senior Geologist Principal Geologist
Attachments:
CEF-LOE
FORMER
ADMIRAL CLEANERS
PAVED ALLEY
(asphalt)
NATURAL GAS METER
U P
A/C UNIT
COMPRESSOR
CANOPY/BACK DOOR
WATER METER
ELECTRIC METERS
FRONT DOOR
COVERED W
ALKW
AY
COVERED W
ALKW
AY
CONC. PAD
BATHROOM
P R
E S
S
P R
E S
S
P R
E S
S
DRYCLEAN
MACHINE
BOILER ROOM
COUNTER
COUNTER
CHANGING
ROOM
C O
V E
R E
D
W
A L K
W A
Y
C O
V E
R E
D
W
A L K
W A
Y
PAVED PARKING
(asphalt)
PAVED PARKING
(asphalt)
RESIDENTIAL
RESIDENTIAL
RETAIL
BUSINESS
RETAIL
BUSINESS
RETAIL
BUSINESS
DRUM
STORAGE
SB015
MW004
SB009
MW007
MW006
MW005
SB013/VP003
MW-Y
MW-X
MAG01
SB002
MAG02
SB010
MAG03
SB008
MAG04
SB011
MAG05
SB003
SB007
SB006
SB001
SB012
SB014
SB004
SB005
VP002
VP004
VP001
VP005
MW008
MW009
MW010
FORMER
UNDERGROUND
PROPANE TANKS
VP006
SITE LAYOUT
ADMIRAL CLEANERS
4645 GUN CLUB ROAD
WEST PALM BEACH, PALM BEACH COUNTY, FLORIDA
SITE ASSESSMENT REPORT
20'
40'0
GRAPHIC SCALE
FIGURE
C I T
Y
B
B F
L
D
I V
G
R O
U P
E
N
B
B
O
L I V
A
P
C
W
V
O G
E L
S O
G
M
D
M
C G
L O
T
D
M
C G
L O
Y R
O p t O
N
O
F F
R
E F
C U s e r s b o l i v a
B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
R O
T E
C T
I O
N P r o j e c t
F i l e s A d m i r a l
C l e a n e r s
W
F
D
W G
W
F
S
M d w g
Y
O U
T
S
A R
D
E C
F
S I
S
V
E D
C A
D V
E R
S
L
S
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A C
S C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
Y
O
L I V
A
B
R I A
N
Gulf of Mexico
Atlantic Ocean
Florida
SITE LOCATION
(Palm Beach County)
NOTES:
1. Aerial base map from USGS Digital Orthographic
Quarter Quadrangle (DOQQ), 2017.
2. Parcel boundaries from Palm Beach County Property
Appraiser GIS database.
PARCEL BOUNDARY
LEGEND
SOIL BORING LOCATION
SOIL BORING/MAG WELL LOCATION
VERTICAL PROFILE LOCATION
HISTORICAL MONITOR WELL LOCATION
OVERHEAD ELECTRIC UTILITY
UNDERGROUND NATURAL GAS UTILITY
SHALLOW MONITOR WELL LOCATION
INTERMEDIATE MONITOR WELL LOCATION
UNDERGROUND SANITARY SEWER
UNDERGROUND WATER UTILITY
X X
X - proposed soil boring location
Sonic Auger DPT Horizontal Directional Drilling
DATE: 8/24/2020
ESTIMATE #: 820078
ID QTY Unit Rate TOTAL
1 1 ls 800.00$ 800.00$
2 night 200.00$ -$
3 1 <1/2 day 850.00$ 850.00$
4 0 each 55.00$ -$
5 0 each 55.00$ -$
6 Permits: Palm Beach County (N/A Soil Borings)
Completion: < 1/2 Day Subtotal 1,650.00$
Todd Hodgson TOTAL 1,650.00$ Vice President/Partner
West Palm Beach, Florida
Brandon McBath
Boyton Beach, Florida 33426 1500 Gateway Blvd. Suite 200
CUSTOMER
Arcadis
PROJECT
Admiral Dry Cleaners 4645 Gun Club Road
DPT Soil Borings
DESCRIPTION
Mobilization/Demobilization
PROJECT DESCRIPTION:
"Utility locates on Private Property are the responsibility of the client"
***Damage to utilities on private property during borehole clearance are the responsibility of the client***
(2) DPT Soil Borings to 8'-10' - DPT Soil Sampling, Patch to existing (Asphalt or Concrete)
(561) 697-7080
"Borehole clearance beyond 30 minutes each may require a change order for additional time and costs"
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
Per Diem
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or at Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
Daily Rate: DPT Rig w/ Crew
"Actual days onsite will be invoiced" Signature : Todd Hodgson
Drums (Soil) (As Needed)
Drums (Water) (As Needed)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Contractor Name: Arcadis / Brandon McBath / 561 697-7037 Date: 8/21/2020
Site Name : Admiral Drycleaner - 4645 Gun Club Rd. West Palm Beach, Florida FAC ID#:
PROPOSED SCOPE OF WORK:
(2) DPT Soil Borings to 8' - Abandon & Patch (Hand Clear to 5' or REFUSAL)
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig
Direct Push Daily Rate 1 - on-site day whole day $0.00
Direct Push Half-Day Rate 1 - on-site half day half day $900.00 1 $900.00 Auger Attachment, 2" Well Install with 4.25" ID Augers per foot $0.00 Auger Attachment, 4" Surface Casing each $0.00 Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____ each $0.00 Well Riser (includes all materials) ID ___1"___ 5' Length each $0.00 Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap) per well $0.00
Mobilization roundtrip $375.00 1 $375.00 Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $60.00 $0.00
Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $65.00 $0.00
$0.00
$0.00
$0.00
TOTAL QUOTE PRICE $1,275.00
Notes:
Days to Complete Scope of Work: 1/2 Day Project No.: ___________________________
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher Date: 8/21/2020
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Admiral Drycleaner Supplemental Assessment Proposal.pdf |
| Scope of Work |
| Task 1 – Project Management |
| Task 2 – Monitor Wells, MAGS Wells, and Soil Sampling |
| Task 3 – Reporting |
| Schedule |
| Cost Estimate |
| Closing Remarks |
| Driller Quotes.pdf |
| DrillPro 820078 |
| Invoice |
| Earth Tech 8-21-2020 |
| Direct Push |
JAEE 8-21-2020
| neg sum.pdf |
| Subtask 2: Site Assessment |
| Subtask 3: Site Assessment Report (SAR) |
File details come from the government source that posted it. Updated .