CN-370000-HW557-DC048D.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW557|6d20a3cd85832f58780db610589fb2f8
Contract number
HW557
Issued by
Florida

About this file

Summary

This is a Task Assignment Notification Form (DC048D) issued by the Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for supplemental site assessment activities at the former Sun Village Cleaners facility located at 4540 W. Village Drive, Tampa, Hillsborough County, Florida (Facility ID ERIC_4757). The contract is under the parent contract HW557, with Theresa C. Pepe serving as the FDEP Contract Manager and William Vogelsong as the Contractor Representative. This task assignment represents an indefinite delivery vehicle used to authorize specific work under the existing statewide contract framework.

The task assignment authorizes three subtasks totaling $18,713.04 with a fixed price structure and zero retainage. Subtask 1 covers project management calculated as a percentage of total labor ($1,177.73); Subtask 2 addresses supplemental field activities including installation of one downgradient monitoring well (MW009), two vapor monitoring points, MAGS testing, and groundwater sampling ($14,611.80); and Subtask 3 provides for reporting deliverables including a Site Assessment Report Addendum and electronic submittals in FDEP-approved format ($2,923.51). Field work activities were due September 30, 2020, with the final deliverable due November 20, 2020, and execution extending through December 18, 2020. Subcontractors include Preferred Drilling Solutions for drilling services ($2,290.00), BloodHound for utility location and GPR survey ($880.00), and Clark for investigation derived waste management ($150.00). Labor costs incorporated updated Arcadis rates from April 2020, and analytical services were provided by Xenco Laboratories in Tampa.

View the file

Other files

File Type Posted
CN-370000-HW557-A3.pdf PDF
CN-370000-HW557-A7.pdf PDF
CN-370000-HW557-A8.pdf PDF
CN-370000-HW557-CO1.pdf PDF
CN-370000-HW557-CO3.pdf PDF
CN-370000-HW557-CSS1A.pdf PDF
CN-370000-HW557-CSS1B.pdf PDF
CN-370000-HW557-CSS2A.pdf PDF
CN-370000-HW557-CSS2C.pdf PDF
CN-370000-HW557-CSS3B.pdf PDF
CN-370000-HW557-CSS4BCO1.pdf PDF
CN-370000-HW557-CSS4BCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW557-CSS4BCO2.pdf PDF
CN-370000-HW557-DC009K.pdf PDF
CN-370000-HW557-DC010G.pdf PDF
CN-370000-HW557-DC013L.pdf PDF
CN-370000-HW557-DC013Q.pdf PDF
CN-370000-HW557-DC014I.pdf PDF
CN-370000-HW557-DC01A.pdf PDF
CN-370000-HW557-DC01ACO1.pdf PDF
CN-370000-HW557-DC01ACO3.pdf PDF
CN-370000-HW557-DC01C.pdf PDF
CN-370000-HW557-DC022H.pdf PDF
CN-370000-HW557-DC02J.pdf PDF
CN-370000-HW557-DC02JCO2.pdf PDF
CN-370000-HW557-DC02L.pdf PDF
CN-370000-HW557-DC02NCO2.pdf PDF
CN-370000-HW557-DC030K.pdf PDF
CN-370000-HW557-DC031A.pdf PDF
CN-370000-HW557-DC032H.pdf PDF
CN-370000-HW557-DC032M.pdf PDF
CN-370000-HW557-DC033I.pdf PDF
CN-370000-HW557-DC033O.pdf PDF
CN-370000-HW557-DC033Q.pdf PDF
CN-370000-HW557-DC038G.pdf PDF
CN-370000-HW557-DC038i.pdf PDF
CN-370000-HW557-DC039C.pdf PDF
CN-370000-HW557-DC039E.pdf PDF
CN-370000-HW557-DC03E.pdf PDF
CN-370000-HW557-DC03F.pdf PDF
CN-370000-HW557-DC03FCO1.pdf PDF
CN-370000-HW557-DC03G.pdf PDF
CN-370000-HW557-DC03GCO2.pdf PDF
CN-370000-HW557-DC03KCO2.pdf PDF
CN-370000-HW557-DC041F.pdf PDF
CN-370000-HW557-DC041K.pdf PDF
CN-370000-HW557-DC042E.pdf PDF
CN-370000-HW557-DC045B.pdf PDF
CN-370000-HW557-DC046A.pdf PDF
CN-370000-HW557-DC046D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW557

D000 N/ADC048D

Arcadis U.S., Inc.

William Vogelsong

(850) 245-8705Theresa C. Pepe

ERIC_4757

Sun Village Cleaners

4540 W. Village Drive, Tampa, Hillsborough

Assessment

Per FDEP's request, Arcadis will perform additional site assessment activities according to the approved scope of work.

Site Assessment Report Addendum/IDW manifests

11/20/2020

12/18/2020

$ 18,713.04 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.04.22 11:45:20 -04'00'

Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.04.22 11:45:45 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.04.22 17:56:51 -04'00'

William D. Vogelsong Digitally signed by William D. Vogelsong Date: 2020.04.23 13:49:53 -04'00'

$ 18,713.04

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW557 Task Assignment #: DC048D

Deliverables:

Deliverable Deliverable Due Date Fieldwork activities 30-Sep-20

Site Assessment Report Addendum/IDW manifests 20-Nov-20

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

FDEP approval of Fieldwork Activities $14,611.80

FDEP approval of Site Assessment Report Addendum/IDW manifests/Project Management $4,101.24

TOTAL COST $18,713.04

BWC TAFORM 01/18

Florida Department of Memorandum Environmental Protection

“Protect, Conserve and Manage Florida’s Environment and Natural Resources”

Printed on recycled paper.

TO: Negotiation File Sun Village Cleaners Facility ID No. 29-9502247; ERIC_4757 Tampa, Hillsborough County

FROM: Theresa C. Pepe, Project Manager

DATE: April 22, 2020

SUBJECT: Task Assignment DC048D (HW557)

This Task Assignment is for completing additional site assessment activities at the former Sun Village Cleaners according to the approved scope of work and comments from FDEP’s geologist. A Site Assessment Report Addendum (SARA) will be submitted as the final deliverable.

The final task assignment total is $18,713.04. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor. Labor rates for Arcadis were updated in April 2020 and this Task Assignment uses the new updated rates.

Subtask 2: Supplemental Site Assessment This subtask provides funds for installing an additional downgradient monitoring well, installing two vapor monitoring points, repeating the MAGS test, and performing another round of groundwater sampling. Lab costs, equipment, IDW management and travel costs are also included in this subtask.

Preferred Drilling Solutions was chosen as the drilling subcontractor based on their low bid of three bids solicited.

Subtask 3: Reporting Arcadis will submit a written report as the final deliverable that includes data from subtask 2 above presented with appropriate figures, tables, etc. Additionally, Arcadis will provide electronic deliverables in the approved FDEP format.

Costs are comparable to task assignments of similar scope.

FDEP COST ESTIMATE

Contractor: Arcadis U.S., Inc.

Date: 4/9/2020

Task #: DC048D SubTask 1 Project Management

Site: Sun Village Cleaners SubTask 2 Field Activities

Activity/Phase: Assessment SubTask 3 Reporting

Project Manager: Bill Vogelsong SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category Staff Member

$81.47 Project Manager Vogelsong, William (WDV) 5 4.9

$59.89 Principal Scientist Burke, Brian (BRB) 8 5 3 0 0

$39.34 Staff Engineer Hanna, Chad (CMH) 6 6 0 0 0

$27.60 Scientist Brooks, Eric (EAB) 59 41 18 0 0

$32.59 Technician Welch, David (DJW) 13 13 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0

$29.91 Project Assistant McLemore, Michele (MMc) 8 4 4 0 0

Total Hours 104 5 69 30 0 0

Direct Labor $3,605.47 $400.61 $2,210.40 $994.46 $0.00 $0.00

Overhead 57.95% $2,865.14 $318.35 $1,756.53 $790.26 $0.00 $0.00

Gen & Admin 21.29% $1,662.61 $184.74 $1,019.29 $458.58 $0.00 $0.00

Fringe 37.13% $1,338.71 $148.75 $820.72 $369.24 $0.00 $0.00

Total Labor $9,471.93 $1,052.45 $5,806.94 $2,612.54 $0.00 $0.00

Other Direct Costs $180.27 $20.03 $110.52 $49.72 $0.00 $0.00

Travel

Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $291.00 $291.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

PDS Drilling (Conventional) $2,290.00 $2,290.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

Clark IDW $150.00 $150.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

BloodHound Utility Locate / GPR Survey $880.00 $880.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,320.00 $3,320.00 $0.00 $0.00 $0.00

Handling Fee $332.00 $332.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $3,652.00 $3,652.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,260.00 $1,260.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $189.00 $189.00 $0.00 $0.00 $0.00

Total Laboratory $1,449.00 $1,449.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $97.50 $97.50 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $495.85 $495.85 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other - MAGS, recon) $2,128.30 $2,128.30 $0.00 $0.00 $0.00

Total Field Expenses $2,721.65 $2,721.65 $0.00 $0.00 $0.00

Subtotal $17,765.85 $1,072.48 $14,031.11 $2,662.26 $0.00 $0.00

Completion Fee $947.19 $105.25 $580.69 $261.25 $0.00 $0.00

Total Estimated Cost $18,713.04 $1,177.73 $14,611.80 $2,923.51 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE: Sun Village Cleaners

SUBTASK 2: Field Activities

DATE: 4/9/20

LABOR

Category/Staff Work Description Hours

Well Install and Sampling Principal - BRB Contact owners, field coordination, & lab contracting/coord, FDEP updates 2

Staff Sci - EAB Prep (2 hr), mobilization (1 hr), GPR (2 hr), Well install and development (5 hr), Survey (1 hr), sampling (3 hr) 14

MAGS Testing Principal - BRB Field coordination, sub management, data review, communications, data updates 2

Staff Eng - CMH Data review, Field support, coordination 4

Staff Sci - EAB prep (2), mobilization (1), MAGS Test (10) 13

Technician - DJW prep (2), mobilization (1), MAGS Test (10) 13

Project Assistant / MMc sample tracking/database management 2

Groundwater Sampling Principal - BRB Field Coordination and Support, FDEP Communications 1

Staff Eng - CMH Field Prep, support 2

Staff Sci - EAB Prep (1 hr), mobilization (1 hr), gauge wells (3 hr), sample 8 wells (8 hrs), IDW management (1 hr) 14

Project Assistant / MMc sample tracking/database management 2

TOTAL LABOR: 69

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 3 $291.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $291.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $291.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 Lump Sum 0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00

PDS Drilling services (DPT, VMPs) $2,290.00 Lump Sum 1 $2,290.00 Clark IDW $150.00 Drum 1 $150.00 BloodHound Utility Locate / GPR Survey $880.00 Lump Sum 1 $880.00

Total Services: $3,320.00

TOTAL SUB: $3,320.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 10 $660.00

VOC Soil Vapor TO-15 Aqueous/Non $200.00 1.00 3 $600.00

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $1,260.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 3 $189.00

Total Shipping: $189.00

TOTAL LAB: $1,449.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

Expendables Miscellaneous Expendables $32.50 Per Day 3 $97.50

Total Expendables: $97.50

Equipment Items Survey Station transit/rod/level/tape $41.75 Per Day 1 $41.75

Tubing, Poly/HDPE $0.25 Per Foot 100 $25.00

Tubing, Silicon 3/16x3/8 $2.00 Per Foot 6 $12.00

PID (ppbRae) $87.30 Per Day 1 $87.30 SVE/MAGs Trailer eWe $1,750.00 Lump Sum 1 $1,750.00

Total Equipment Items: $1,916.05

Equipment Kits Shallow Groundwater Sampling Kit $208.55 Day 2 $417.10

Construction/O&M/Pilot Test Kit $291.00 Day 1 $291.00

Total Equipment Kits: $708.10

TOTAL EQUIPMENT: $2,721.65

SITE: Sun Village Cleaners

SUBTASK 3: Reporting

DATE: 4/9/20

LABOR

Category/Staff Work Description Hours

SAR Addendum Principal - BRB PG review/certification of SARA; communication of results with FDEP 3

Staff Sci - EAB SARA writing (10 hrs); SARA figures/graphs generation (4 hrs); SARA tables (4 hrs) 18

Designer - Database Mgr / BO SAR figures/graphs generation (4 hrs); data mgmt, import to CAD (1 hrs) 5

Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, reprt submittal 4

TOTAL LABOR: 30

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 0 $0.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $0.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $0.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

Total Services: $0.00

TOTAL SUB: $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 0 $0.00

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB: $0.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00PPE Level C $110.00 Per Man Day 0 $0.00

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

ExpendablesMiscellaneous Expendables $32.50 Per Day 0 $0.00

Total Expendables: $0.00

Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00Terra Cores $7.30 Each 0 $0.00

Total Equipment Items: $0.00

Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT: $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

3109 West Dr. Martin Luther King

Jr. Boulevard

Suite 350

Tampa

Florida 33607

Tel 813 903 3100

Fax 813 903 9115 www.arcadis.com

Page:

1/3

Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Subject:

Proposal for Supplemental Assessment and Interim Source Removal Sun Village Cleaners, Tampa, Hillsborough County, Florida Facility ID No. ERIC_4757

Dear Ms. Pepe:

Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal to complete supplemental assessment activities and an interim source removal event at the Sun Village Cleaners Site, located at 4540 West Village Drive in Tampa, Florida (Site). Initial Site assessment activities conducted in November 2018 concluded that soil and groundwater impacts were not present above FDEP cleanup target levels. However, subsequent grab groundwater sampling of the modified active gas sampling (MAGS) wells indicated tetrachloroethene (PCE) and trichloroethene (TCE) concentrations above FDEP groundwater cleanup target levels (GCTLs). A FDEP memorandum dated October 30, 2019 recommended installation of a downgradient permanent monitoring well and an interim source removal measure in the vicinity of the former boiler room where MAGS01 is located.

SCOPE OF WORK

The scope of work is comprised of three tasks. The tasks include project management, field activities (well installation, sampling and MAGS testing), and reporting. A brief description of each task follows.

ENVIRONMENT

Date:

April 10, 2020

Contact:

Brian Burke

Phone:

813.353.5755

Email:

Brian.burke@arcadis.com

Our ref:

TF001803

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Sun Village\Proposals\2020.04_MAGS, Well Install, Sampling\2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.docx

Theresa Pepe April 10, 2020

Page:

2/3

Task 1: Project Management

This task consists of project management activities and health and safety efforts in relation to the completion of Tasks 2, and 3.

Task 2: Field Activities

Field activities include a utility locate, well installation, sampling and a MAGS test described further below.

Well Installation

Prior to breaking ground, a state one call ticket will be entered and a private utility locate will be conducted utilizing ground penetrating radar. Arcadis will coordinate with licensed driller, Preferred Drilling Solutions, to install a permanent microwell (proposed MW009) via direct push technology (DPT) approximately 90 feet (ft) downgradient of the MAGS02 well location (Figure 1). The 1-inch diameter microwell will be installed with 10-ft of 0.010-inch slotted pre-pack screen, between 2 to 12 ft below ground surface (bgs). The well will be properly developed until relatively silt free water is obtained.

Two vacuum monitoring points (proposed VMP001 and VMP002) will be installed by hand auger to a total depth of approximately 5 ft bgs. Each VMP will be constructed of 4.5 ft of 0.010-inch slotted well screen.

The installation of the VMPs will be attempted approximately 5 ft and 7.5 ft from the MAGS01 location to refine the radius of influence achievable during the MAGS test. The actual location of the VMPs will be field determined based on utility and building restrictions (Figure 1).

Groundwater Sampling

Following installation, MW009 will be sampled no sooner than 24 hrs after development to confirm downgradient delineation of chlorinated volatile organic compounds (CVOCs) in the shallow surficial aquifer. An additional groundwater monitoring event will be scheduled during high water table conditions (August/September 2020) to allow sampling of the MAGS and VMP points. Additionally, monitoring wells MW005, MW006, and MW009 will be sampled during the same high water table event. All wells will be sampled using the conventional low-flow sampling methods described in the FDEP SOP 001/01.

Samples will be shipped to Xenco Laboratories located in Tampa, Florida, and analyzed for CVOCs by United States Environmental Protection Agency (USEPA) Method 8260. The purge water will be sparged onsite using a compressor and sampled to confirm results below FDEP GCTLs. Upon receipt of analytical data confirming results, the purge water will be discharged on an impervious surface per FDEP-approved best practice. As a result, development and purge water disposal is not included in this proposal.

MAGS Test/Interim Source Removal

An additional 8 hour MAGS test utilizing MAGS01 as the sole extraction point will be scheduled during the dry season (April/May 2020). The additional test will be conducted in general accordance with the Modified Active Gas Sampling Manual, dated October 12, 2004. The new VMPs and nearby monitoring

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Sun Village\Proposals\2020.04_MAGS, Well Install, Sampling\2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.docx

Theresa Pepe April 10, 2020

Page:

3/3 wells MW006 and MW008 will be monitored for vacuum influence during the test. MAGS02 and MAGS03 will not be monitored to limit disruption to business activities. Up to three vapor samples (20 minutes, peak PID reading, and end of test) will be collected from MAGS01 during the test and analyzed for VOCs by EPA Test Method TO-15.

Task 3: Reporting

A Site Assessment Report Addendum (SARA) will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report. The SARA will contain tables and figures summarizing the results of the supplemental assessment activities and include conclusions and recommendations based upon findings.

SCHEDULE & COST ESTIMATE

Arcadis will schedule the well installation, sampling (MW009) and MAGS testing in April/May 2020, following receipt of a TA from the FDEP. The additional sampling event will be conducted in August/September 2020. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $18,581.95. Arcadis proposes the following invoicing schedule:

Completion of field activities $14,595.17

SARA submittal and PM $3,986.78

CLOSING REMARKS

Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.

Sincerely, Arcadis U.S., Inc.

Chad M. Hanna Brian R. Burke, P.G.

Project Environmental Specialist Project Manager/Principal Geologist

ASPHALT PARKING

FORMER

DRY CLEAN MACHINE

LOCATION

FORMER

BOILER ROOM

S T

O R

A G

E

FORMER

PRESS AREA

GRAVEL

FORMER

CHILLER

ELECTRIC

TRANSFORMERS

FORMER

DUMPSTER

REAR

DOOR

OFFICE

CONCRETE/BRICK

SIDEWALK

C O

N C

R E

T E

B

R I C

K

A L L E

Y

CONCRETE/BRICK

SIDEWALK

CONCRETE/BRICK

SIDEWALK

CONCRETE SIDEWALK

STUDIO

STUDIO

CONCRETE WALL

LANDSCAPED AREA

ASPHALT ACCESS ROAD

ADJACENT PROPERTY PARKING AREA

(Village Towers)

FORMER

SUN VILLAGE CLEANERS

B A

T H

R O

O M

S

SLICE MASTERS

PIZZA

KEENE VETERINARY

HOSPITAL

FRONT

DOOR

SIDE

DOOR

OUTSIDE STAIRS TO

ROOF DECK/BRIDGE

MW008

MW003

MW001

SB006

SB008

SB010

SB004

SB005

VP001

VP005

MAGS03

MAGS01

MAGS04

VP002

DENTIST

NEW YORK

BAGEL

MYERS

TUTORING

ONTOUCH

NAILS &

SPA

PET

SALON

COUNSELING

CENTER

OF TAMPA

MAGS02

SB009

SB002

SB001

SB007

AC AC

AC

AC

CO

MW002D

MW007D

MW006

SB003

VP003

MW004D

MW005

VP006

AC

BRIDGE

A'

A

PCE CONCENTRATIONS IN GROUNDWATER

NOVEMBER 2018 AND AUGUST 2019

FIGURE

Gulf of Mexico

Atlantic Ocean

Florida

SITE LOCATION

(Hillsborough County)

C I T

Y

B

B F

L

D

I V

G

R O

U P

E

N

B

B

O

L I V

A

P

C

W

V

O G

E L S

O

G

M

B

B

U R

K E

T

E

B

R O

O K

S

Y

R O p t O

N

O

F F

R

E F

C U s e r s b o l i v a B

A r c a d i s A

F

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

A L

P

R O

T E

C T

I O

N P r o j e c t

F i l e s S u n

V i l l a g e

D

C T

F D

W G

T

F S

M d w g

Y O

U T

S

E P

F

G

W

A

N A

L Y

T I C

V

E D

C A

D V

E R

M

S

T

E C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L E

A C

S C

O L O

R A

N A

L Y

T I C

A L C

T

O

T T

E D

Y

O

L I V

A

B

R I A

N

15'

30'0

GRAPHIC SCALE

FORMER SUN VILLAGE CLEANERS

4540 W. VILLAGE DR.

TAMPA, HILLSBOROUGH COUNTY, FLORIDA

LEGEND

OVERHEAD ELECTRIC

SANITARY SEWER

COMMUNICATIONS

NATURAL GAS

UNDERGROUND ELECTRIC

STORM WATER

PARCEL BOUNDARY

SHALLOW MONITOR WELL

DEEP MONITOR WELL

SOIL BORING LOCATION

MAGS LOCATION

VERTICAL PROFILE LOCATION

NOTES

1. Bold indicates GCTL exceedance.

2. Bold italic indicates NADC exceedance.

3. "I" indicates result is between laboratory Practical Quantifiable

Limit [PQL] and laboratory Method Detection Limit [MDL].

4. "U" indicates compound was analyzed for but not detected.

5. " * " indicates fixed-base laboratory result.

6. PCE=Tetrachloroethene.

APPROXIMATE EXTENT OF VOH

IN GROUNDWATER ABOVE GCTL

SAMPLE INTERVAL (FT. BG) AND

PCE CONCENTRATION (µg/L)

SAMPLE DATE

MW001

11/7/18

3-13 1 U

3-13* 0.160 U*

SAMPLE I.D.

LINE OF CROSS SECTIONA'A

VP001

11/5/18

5-9 1 U

15-19 1 U

25-29 1 U

35-39 1 U

VP002

11/5/18

5-9 1 U

15-19 1 U

25-29 1 U

35-39 1 U

VP003

11/6/18

5-9 1 U

15-19 1 U

25-29 1 U

35-39 1 U

VP005

11/7/18

5-9 1 U

5-9* 0.160 U*

15-19 1 U

15-19* 0.160 U*

25-29 1 U

25-29* 0.160 U*

35-39 1 U

35-39* 0.160 U*

VP006

11/6/18

5-9 1 U

15-19 1 U

25-29 1 U

35-39 1 U

MW001

11/7/18

3-13 1 U

3-13* 0.160 U*

MW008

11/12/18

2-12* 0.160 U*

MW002D

11/7/18

25.4-30.4 1 U

25.4-30.4* 0.160 U*

MW006

11/12/18

2-12* 0.160 U*

MW007D

11/12/18

34-39* 0.160 U*

MW003

11/7/18

2.9-12.9 1 U

2.9-12.9* 0.160 U*

MW004D

11/12/18

35.0-40.0* 0.160 U*

MW005

11/12/18

2.0-12.0* 0.160 U*

MAGS02

8/28/19

0.5-5.5 4.08

MAGS01

8/28/19

0.5-5.5 16.5

MAGS03

8/28/19

0.5-5.5 9.40 channa Oval channa Callout Proposed MW009 channa Distance Measurement

5.16 ft channa Distance Measurement

7.47 ft channa Oval

Oval

Callout Proposed VMP002 channa Callout Proposed VMP001 channa Distance Measurement

89.25 ft

Sonic Auger DPT Horizontal Directional Drilling

DATE: 4/15/2020

ESTIMATE #: 420050

ID QTY Unit Rate TOTAL

1 1 ls 500.00$ 500.00$

2 Per Diem 0 night 200.00$ -$

3 1 < Day 1,250.00$ 1,250.00$

4 Materials: 1" well installation 12 foot 3.00$ 36.00$

5 Materials: 1"x5' PrePack Screen 1 each 65.00$ 65.00$

6 Materials: 3" Expendable Point 1 each 20.00$ 20.00$

7 Materials: 2" Well Materials 10 foot 10.00$ 100.00$

8 8" Flush Completion 1 each 100.00$ 100.00$

8 8" Flush Manhole (Donut Pad) 2 each 75.00$ 150.00$

9 Well development (Up to 1/2 hr w/pump) 1 each 75.00$ Included

10 Drums (Soil) (Estimated) 1 each 55.00$ 55.00$

11 Drums (Water) (Estimated) 1 each 55.00$ 55.00$

12 Permits (Not required for FDEP projects in SWFWMD) 0 each 52.00$ -$

Completion: < Day Subtotal 2,331.00$

Todd Hodgson

Todd Hodgson TOTAL 2,331.00$

Partner

***Utility Locates on Private Property are the responsibility of the client***

PROJECT

Former Sun Village Cleaners 4540 W. Village Drive

CUSTOMER

Tampa, Florida 33607 Tampa, Florida 3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350

(Hand Install two VMP's to 5')

Chad Hanna Arcadis

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com

Daily Rate: DPT Rig w/ crew

DPT Rig - DPT Well Installation

DESCRIPTION

Mobilization

THANK YOU FOR YOUR BUSINESS!

Project Description:

(2) Vapor Monitoring Point- 2" x 5' w/ '5 of .020 Slot Screen & 8" Bolt Down (Donut Pad) - No Soil Sampling

(1) MW 1" x 12' w/ 10' Pre-Pack Screen & 8" Bolt Down Completion - No Soil Sampling

***Damage to utilities on private property during borehole clearance are the responsibility of the client***

"Actual quantities used and days onsite will be invoiced"

(813) 353-5765

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Cascade Technical Services • 1020 South 82nd Street • Tampa, FL 33619 • (813) 626-1717

This quote is based on information provided by you and is valid for 45 days from the bid date. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. On-site soil disposal, unless Cascade expressly assumes responsibility in writing.Cascade shall not be responsible for damages to underground improvements not clearly and accurately marked.

$2,895.00Quote Total

$0.00Taxes

0.0000%Tax Percentage

$2,895.00Pre-Tax Total

Install MW009 via DPT as a prepacked 10 slot microwell screened 2-12 ft bgs? Include 8 inch diameter manhole and pad.

Also, please include hand installation of the two vapor monitoring points to the southwest installed to 5 f bgs with 4.5 ft of 20 slot, 2 inch diameter well screen. Annular space filled with 20/30 sand and completed with type I/II Portland cement to near grade and completed in an 8 inch diameter manhole (no pad).

Soils and development water shall be drummed.

ccain@cascade-env.comEmailChase CainPrepared By

FORMER SUN VILLAGE CLEANERS

4540 W. VILLAGE DR.

TAMPA, HILLSBOROUGH COUNTY, FLORIDA

Tampa, FL 33624

Work Site

Arcadis U.S. Inc - Tampa - Sun Village - DPT Microwell and Vapor Monitoring Point Installation

- DPT - 00143170

Opportunity Name

4/15/2020 9:18 AMQuote Revision Date

00053542Quote Number

4/15/2020Bid Date

2ARCADI129Bill To Account Number

(813) 353-5765Phone chad.hanna@arcadis-us.comEmail

Chad HannaContact Name

3109 W Dr. Martin Luther King Jr. Blvd, Suite Tampa, Florida 33607

Address

Arcadis U.S. IncAccount Name

Cascade Rep Contact Information

Scope of Work

Product Description Quantity Unit Sales Price Optional Subtotal

Mobilization/Demobilization 1.00 Lump Sum $150.00 $150.00

7822, 2 Man Crew 1.00 Day $1,750.00 $1,750.00

Install Well - 2", Sch. 40- Pre Pack 12.00 Ft $25.00 $300.00

Surface Completion (8" well vault and pad) 1.00 Each $150.00 $150.00

Soil Vapor point 5' bgs with 4.5 ft of 20 slot, 2 inch diameter 2.00 Each $75.00 $150.00

Well completion - flush mount (8" well vault) (no pad) 2.00 Each $100.00 $200.00

Soil/Water Drum 3.00 Each $65.00 $195.00

Well permits 1.00 Each $45.00 $0.00

Cascade Technical Services • 1020 South 82nd Street • Tampa, FL 33619 • (813) 626-1717

Cascade provides management of investigation derived waste. Call us today for information on a full range of additional options to meet your drilling needs.

Signature of Authorized Cascade Representative

Name & Title of Authorized Cascade Representative

Date

Signature of Client/ Owner Authorized Representative

Name & Title of Authorized Representative and Company

Date

If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade. Additional costs may apply if scope is significantly changed. Prices assume standard labor rates and no work hour restrictions. Proposal is subject to final review of terms and conditions.

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.pdf
DC048D.pdf
Subtask 2: Supplemental Site Assessment
Subtask 3: Reporting

File details come from the government source that posted it. Updated .