Summary
This is a Task Assignment Notification Form (DC048D) issued by the Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for supplemental site assessment activities at the former Sun Village Cleaners facility located at 4540 W. Village Drive, Tampa, Hillsborough County, Florida (Facility ID ERIC_4757). The contract is under the parent contract HW557, with Theresa C. Pepe serving as the FDEP Contract Manager and William Vogelsong as the Contractor Representative. This task assignment represents an indefinite delivery vehicle used to authorize specific work under the existing statewide contract framework.
The task assignment authorizes three subtasks totaling $18,713.04 with a fixed price structure and zero retainage. Subtask 1 covers project management calculated as a percentage of total labor ($1,177.73); Subtask 2 addresses supplemental field activities including installation of one downgradient monitoring well (MW009), two vapor monitoring points, MAGS testing, and groundwater sampling ($14,611.80); and Subtask 3 provides for reporting deliverables including a Site Assessment Report Addendum and electronic submittals in FDEP-approved format ($2,923.51). Field work activities were due September 30, 2020, with the final deliverable due November 20, 2020, and execution extending through December 18, 2020. Subcontractors include Preferred Drilling Solutions for drilling services ($2,290.00), BloodHound for utility location and GPR survey ($880.00), and Clark for investigation derived waste management ($150.00). Labor costs incorporated updated Arcadis rates from April 2020, and analytical services were provided by Xenco Laboratories in Tampa.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW557
D000 N/ADC048D
Arcadis U.S., Inc.
William Vogelsong
(850) 245-8705Theresa C. Pepe
ERIC_4757
Sun Village Cleaners
4540 W. Village Drive, Tampa, Hillsborough
Assessment
Per FDEP's request, Arcadis will perform additional site assessment activities according to the approved scope of work.
Site Assessment Report Addendum/IDW manifests
11/20/2020
12/18/2020
$ 18,713.04 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.04.22 11:45:20 -04'00'
Theresa C Pepe Digitally signed by Theresa C Pepe Date: 2020.04.22 11:45:45 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.22 17:56:51 -04'00'
William D. Vogelsong Digitally signed by William D. Vogelsong Date: 2020.04.23 13:49:53 -04'00'
$ 18,713.04
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW557 Task Assignment #: DC048D
Deliverables:
Deliverable Deliverable Due Date Fieldwork activities 30-Sep-20
Site Assessment Report Addendum/IDW manifests 20-Nov-20
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
FDEP approval of Fieldwork Activities $14,611.80
FDEP approval of Site Assessment Report Addendum/IDW manifests/Project Management $4,101.24
TOTAL COST $18,713.04
BWC TAFORM 01/18
Florida Department of Memorandum Environmental Protection
“Protect, Conserve and Manage Florida’s Environment and Natural Resources”
Printed on recycled paper.
TO: Negotiation File Sun Village Cleaners Facility ID No. 29-9502247; ERIC_4757 Tampa, Hillsborough County
FROM: Theresa C. Pepe, Project Manager
DATE: April 22, 2020
SUBJECT: Task Assignment DC048D (HW557)
This Task Assignment is for completing additional site assessment activities at the former Sun Village Cleaners according to the approved scope of work and comments from FDEP’s geologist. A Site Assessment Report Addendum (SARA) will be submitted as the final deliverable.
The final task assignment total is $18,713.04. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor. Labor rates for Arcadis were updated in April 2020 and this Task Assignment uses the new updated rates.
Subtask 2: Supplemental Site Assessment This subtask provides funds for installing an additional downgradient monitoring well, installing two vapor monitoring points, repeating the MAGS test, and performing another round of groundwater sampling. Lab costs, equipment, IDW management and travel costs are also included in this subtask.
Preferred Drilling Solutions was chosen as the drilling subcontractor based on their low bid of three bids solicited.
Subtask 3: Reporting Arcadis will submit a written report as the final deliverable that includes data from subtask 2 above presented with appropriate figures, tables, etc. Additionally, Arcadis will provide electronic deliverables in the approved FDEP format.
Costs are comparable to task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis U.S., Inc.
Date: 4/9/2020
Task #: DC048D SubTask 1 Project Management
Site: Sun Village Cleaners SubTask 2 Field Activities
Activity/Phase: Assessment SubTask 3 Reporting
Project Manager: Bill Vogelsong SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category Staff Member
$81.47 Project Manager Vogelsong, William (WDV) 5 4.9
$59.89 Principal Scientist Burke, Brian (BRB) 8 5 3 0 0
$39.34 Staff Engineer Hanna, Chad (CMH) 6 6 0 0 0
$27.60 Scientist Brooks, Eric (EAB) 59 41 18 0 0
$32.59 Technician Welch, David (DJW) 13 13 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0
$29.91 Project Assistant McLemore, Michele (MMc) 8 4 4 0 0
Total Hours 104 5 69 30 0 0
Direct Labor $3,605.47 $400.61 $2,210.40 $994.46 $0.00 $0.00
Overhead 57.95% $2,865.14 $318.35 $1,756.53 $790.26 $0.00 $0.00
Gen & Admin 21.29% $1,662.61 $184.74 $1,019.29 $458.58 $0.00 $0.00
Fringe 37.13% $1,338.71 $148.75 $820.72 $369.24 $0.00 $0.00
Total Labor $9,471.93 $1,052.45 $5,806.94 $2,612.54 $0.00 $0.00
Other Direct Costs $180.27 $20.03 $110.52 $49.72 $0.00 $0.00
Travel
Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $291.00 $291.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
PDS Drilling (Conventional) $2,290.00 $2,290.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Clark IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
BloodHound Utility Locate / GPR Survey $880.00 $880.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,320.00 $3,320.00 $0.00 $0.00 $0.00
Handling Fee $332.00 $332.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $3,652.00 $3,652.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,260.00 $1,260.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $189.00 $189.00 $0.00 $0.00 $0.00
Total Laboratory $1,449.00 $1,449.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $97.50 $97.50 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $495.85 $495.85 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other - MAGS, recon) $2,128.30 $2,128.30 $0.00 $0.00 $0.00
Total Field Expenses $2,721.65 $2,721.65 $0.00 $0.00 $0.00
Subtotal $17,765.85 $1,072.48 $14,031.11 $2,662.26 $0.00 $0.00
Completion Fee $947.19 $105.25 $580.69 $261.25 $0.00 $0.00
Total Estimated Cost $18,713.04 $1,177.73 $14,611.80 $2,923.51 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE: Sun Village Cleaners
SUBTASK 2: Field Activities
DATE: 4/9/20
LABOR
Category/Staff Work Description Hours
Well Install and Sampling Principal - BRB Contact owners, field coordination, & lab contracting/coord, FDEP updates 2
Staff Sci - EAB Prep (2 hr), mobilization (1 hr), GPR (2 hr), Well install and development (5 hr), Survey (1 hr), sampling (3 hr) 14
MAGS Testing Principal - BRB Field coordination, sub management, data review, communications, data updates 2
Staff Eng - CMH Data review, Field support, coordination 4
Staff Sci - EAB prep (2), mobilization (1), MAGS Test (10) 13
Technician - DJW prep (2), mobilization (1), MAGS Test (10) 13
Project Assistant / MMc sample tracking/database management 2
Groundwater Sampling Principal - BRB Field Coordination and Support, FDEP Communications 1
Staff Eng - CMH Field Prep, support 2
Staff Sci - EAB Prep (1 hr), mobilization (1 hr), gauge wells (3 hr), sample 8 wells (8 hrs), IDW management (1 hr) 14
Project Assistant / MMc sample tracking/database management 2
TOTAL LABOR: 69
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 3 $291.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $291.00
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $291.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 Lump Sum 0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00
PDS Drilling services (DPT, VMPs) $2,290.00 Lump Sum 1 $2,290.00 Clark IDW $150.00 Drum 1 $150.00 BloodHound Utility Locate / GPR Survey $880.00 Lump Sum 1 $880.00
Total Services: $3,320.00
TOTAL SUB: $3,320.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 10 $660.00
VOC Soil Vapor TO-15 Aqueous/Non $200.00 1.00 3 $600.00
TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $1,260.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 3 $189.00
Total Shipping: $189.00
TOTAL LAB: $1,449.00
FIELD EXPENSES
Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
Expendables Miscellaneous Expendables $32.50 Per Day 3 $97.50
Total Expendables: $97.50
Equipment Items Survey Station transit/rod/level/tape $41.75 Per Day 1 $41.75
Tubing, Poly/HDPE $0.25 Per Foot 100 $25.00
Tubing, Silicon 3/16x3/8 $2.00 Per Foot 6 $12.00
PID (ppbRae) $87.30 Per Day 1 $87.30 SVE/MAGs Trailer eWe $1,750.00 Lump Sum 1 $1,750.00
Total Equipment Items: $1,916.05
Equipment Kits Shallow Groundwater Sampling Kit $208.55 Day 2 $417.10
Construction/O&M/Pilot Test Kit $291.00 Day 1 $291.00
Total Equipment Kits: $708.10
TOTAL EQUIPMENT: $2,721.65
SITE: Sun Village Cleaners
SUBTASK 3: Reporting
DATE: 4/9/20
LABOR
Category/Staff Work Description Hours
SAR Addendum Principal - BRB PG review/certification of SARA; communication of results with FDEP 3
Staff Sci - EAB SARA writing (10 hrs); SARA figures/graphs generation (4 hrs); SARA tables (4 hrs) 18
Designer - Database Mgr / BO SAR figures/graphs generation (4 hrs); data mgmt, import to CAD (1 hrs) 5
Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, reprt submittal 4
TOTAL LABOR: 30
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 0 $0.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $0.00
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
Total Services: $0.00
TOTAL SUB: $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 0 $0.00
TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB: $0.00
FIELD EXPENSES
Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00PPE Level C $110.00 Per Man Day 0 $0.00
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
ExpendablesMiscellaneous Expendables $32.50 Per Day 0 $0.00
Total Expendables: $0.00
Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00Terra Cores $7.30 Each 0 $0.00
Total Equipment Items: $0.00
Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
3109 West Dr. Martin Luther King
Jr. Boulevard
Suite 350
Tampa
Florida 33607
Tel 813 903 3100
Fax 813 903 9115 www.arcadis.com
Page:
1/3
Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Proposal for Supplemental Assessment and Interim Source Removal Sun Village Cleaners, Tampa, Hillsborough County, Florida Facility ID No. ERIC_4757
Dear Ms. Pepe:
Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal to complete supplemental assessment activities and an interim source removal event at the Sun Village Cleaners Site, located at 4540 West Village Drive in Tampa, Florida (Site). Initial Site assessment activities conducted in November 2018 concluded that soil and groundwater impacts were not present above FDEP cleanup target levels. However, subsequent grab groundwater sampling of the modified active gas sampling (MAGS) wells indicated tetrachloroethene (PCE) and trichloroethene (TCE) concentrations above FDEP groundwater cleanup target levels (GCTLs). A FDEP memorandum dated October 30, 2019 recommended installation of a downgradient permanent monitoring well and an interim source removal measure in the vicinity of the former boiler room where MAGS01 is located.
SCOPE OF WORK
The scope of work is comprised of three tasks. The tasks include project management, field activities (well installation, sampling and MAGS testing), and reporting. A brief description of each task follows.
ENVIRONMENT
Date:
April 10, 2020
Contact:
Brian Burke
Phone:
813.353.5755
Email:
Brian.burke@arcadis.com
Our ref:
TF001803
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Sun Village\Proposals\2020.04_MAGS, Well Install, Sampling\2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.docx
Theresa Pepe April 10, 2020
Page:
2/3
Task 1: Project Management
This task consists of project management activities and health and safety efforts in relation to the completion of Tasks 2, and 3.
Task 2: Field Activities
Field activities include a utility locate, well installation, sampling and a MAGS test described further below.
Well Installation
Prior to breaking ground, a state one call ticket will be entered and a private utility locate will be conducted utilizing ground penetrating radar. Arcadis will coordinate with licensed driller, Preferred Drilling Solutions, to install a permanent microwell (proposed MW009) via direct push technology (DPT) approximately 90 feet (ft) downgradient of the MAGS02 well location (Figure 1). The 1-inch diameter microwell will be installed with 10-ft of 0.010-inch slotted pre-pack screen, between 2 to 12 ft below ground surface (bgs). The well will be properly developed until relatively silt free water is obtained.
Two vacuum monitoring points (proposed VMP001 and VMP002) will be installed by hand auger to a total depth of approximately 5 ft bgs. Each VMP will be constructed of 4.5 ft of 0.010-inch slotted well screen.
The installation of the VMPs will be attempted approximately 5 ft and 7.5 ft from the MAGS01 location to refine the radius of influence achievable during the MAGS test. The actual location of the VMPs will be field determined based on utility and building restrictions (Figure 1).
Groundwater Sampling
Following installation, MW009 will be sampled no sooner than 24 hrs after development to confirm downgradient delineation of chlorinated volatile organic compounds (CVOCs) in the shallow surficial aquifer. An additional groundwater monitoring event will be scheduled during high water table conditions (August/September 2020) to allow sampling of the MAGS and VMP points. Additionally, monitoring wells MW005, MW006, and MW009 will be sampled during the same high water table event. All wells will be sampled using the conventional low-flow sampling methods described in the FDEP SOP 001/01.
Samples will be shipped to Xenco Laboratories located in Tampa, Florida, and analyzed for CVOCs by United States Environmental Protection Agency (USEPA) Method 8260. The purge water will be sparged onsite using a compressor and sampled to confirm results below FDEP GCTLs. Upon receipt of analytical data confirming results, the purge water will be discharged on an impervious surface per FDEP-approved best practice. As a result, development and purge water disposal is not included in this proposal.
MAGS Test/Interim Source Removal
An additional 8 hour MAGS test utilizing MAGS01 as the sole extraction point will be scheduled during the dry season (April/May 2020). The additional test will be conducted in general accordance with the Modified Active Gas Sampling Manual, dated October 12, 2004. The new VMPs and nearby monitoring
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com G:\ENV\TF\FDEP Drycleaners\FDEP Drycleaner Program\Sun Village\Proposals\2020.04_MAGS, Well Install, Sampling\2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.docx
Theresa Pepe April 10, 2020
Page:
3/3 wells MW006 and MW008 will be monitored for vacuum influence during the test. MAGS02 and MAGS03 will not be monitored to limit disruption to business activities. Up to three vapor samples (20 minutes, peak PID reading, and end of test) will be collected from MAGS01 during the test and analyzed for VOCs by EPA Test Method TO-15.
Task 3: Reporting
A Site Assessment Report Addendum (SARA) will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report. The SARA will contain tables and figures summarizing the results of the supplemental assessment activities and include conclusions and recommendations based upon findings.
SCHEDULE & COST ESTIMATE
Arcadis will schedule the well installation, sampling (MW009) and MAGS testing in April/May 2020, following receipt of a TA from the FDEP. The additional sampling event will be conducted in August/September 2020. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $18,581.95. Arcadis proposes the following invoicing schedule:
Completion of field activities $14,595.17
SARA submittal and PM $3,986.78
CLOSING REMARKS
Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.
Sincerely, Arcadis U.S., Inc.
Chad M. Hanna Brian R. Burke, P.G.
Project Environmental Specialist Project Manager/Principal Geologist
ASPHALT PARKING
FORMER
DRY CLEAN MACHINE
LOCATION
FORMER
BOILER ROOM
S T
O R
A G
E
FORMER
PRESS AREA
GRAVEL
FORMER
CHILLER
ELECTRIC
TRANSFORMERS
FORMER
DUMPSTER
REAR
DOOR
OFFICE
CONCRETE/BRICK
SIDEWALK
C O
N C
R E
T E
B
R I C
K
A L L E
Y
CONCRETE/BRICK
SIDEWALK
CONCRETE/BRICK
SIDEWALK
CONCRETE SIDEWALK
STUDIO
STUDIO
CONCRETE WALL
LANDSCAPED AREA
ASPHALT ACCESS ROAD
ADJACENT PROPERTY PARKING AREA
(Village Towers)
FORMER
SUN VILLAGE CLEANERS
B A
T H
R O
O M
S
SLICE MASTERS
PIZZA
KEENE VETERINARY
HOSPITAL
FRONT
DOOR
SIDE
DOOR
OUTSIDE STAIRS TO
ROOF DECK/BRIDGE
MW008
MW003
MW001
SB006
SB008
SB010
SB004
SB005
VP001
VP005
MAGS03
MAGS01
MAGS04
VP002
DENTIST
NEW YORK
BAGEL
MYERS
TUTORING
ONTOUCH
NAILS &
SPA
PET
SALON
COUNSELING
CENTER
OF TAMPA
MAGS02
SB009
SB002
SB001
SB007
AC AC
AC
AC
CO
MW002D
MW007D
MW006
SB003
VP003
MW004D
MW005
VP006
AC
BRIDGE
A'
A
PCE CONCENTRATIONS IN GROUNDWATER
NOVEMBER 2018 AND AUGUST 2019
FIGURE
Gulf of Mexico
Atlantic Ocean
Florida
SITE LOCATION
(Hillsborough County)
C I T
Y
B
B F
L
D
I V
G
R O
U P
E
N
B
B
O
L I V
A
P
C
W
V
O G
E L S
O
G
M
B
B
U R
K E
T
E
B
R O
O K
S
Y
R O p t O
N
O
F F
R
E F
C U s e r s b o l i v a B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
A L
P
R O
T E
C T
I O
N P r o j e c t
F i l e s S u n
V i l l a g e
D
C T
F D
W G
T
F S
M d w g
Y O
U T
S
E P
F
G
W
A
N A
L Y
T I C
V
E D
C A
D V
E R
M
S
T
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L E
A C
S C
O L O
R A
N A
L Y
T I C
A L C
T
O
T T
E D
Y
O
L I V
A
B
R I A
N
15'
30'0
GRAPHIC SCALE
FORMER SUN VILLAGE CLEANERS
4540 W. VILLAGE DR.
TAMPA, HILLSBOROUGH COUNTY, FLORIDA
LEGEND
OVERHEAD ELECTRIC
SANITARY SEWER
COMMUNICATIONS
NATURAL GAS
UNDERGROUND ELECTRIC
STORM WATER
PARCEL BOUNDARY
SHALLOW MONITOR WELL
DEEP MONITOR WELL
SOIL BORING LOCATION
MAGS LOCATION
VERTICAL PROFILE LOCATION
NOTES
1. Bold indicates GCTL exceedance.
2. Bold italic indicates NADC exceedance.
3. "I" indicates result is between laboratory Practical Quantifiable
Limit [PQL] and laboratory Method Detection Limit [MDL].
4. "U" indicates compound was analyzed for but not detected.
5. " * " indicates fixed-base laboratory result.
6. PCE=Tetrachloroethene.
APPROXIMATE EXTENT OF VOH
IN GROUNDWATER ABOVE GCTL
SAMPLE INTERVAL (FT. BG) AND
PCE CONCENTRATION (µg/L)
SAMPLE DATE
MW001
11/7/18
3-13 1 U
3-13* 0.160 U*
SAMPLE I.D.
LINE OF CROSS SECTIONA'A
VP001
11/5/18
5-9 1 U
15-19 1 U
25-29 1 U
35-39 1 U
VP002
11/5/18
5-9 1 U
15-19 1 U
25-29 1 U
35-39 1 U
VP003
11/6/18
5-9 1 U
15-19 1 U
25-29 1 U
35-39 1 U
VP005
11/7/18
5-9 1 U
5-9* 0.160 U*
15-19 1 U
15-19* 0.160 U*
25-29 1 U
25-29* 0.160 U*
35-39 1 U
35-39* 0.160 U*
VP006
11/6/18
5-9 1 U
15-19 1 U
25-29 1 U
35-39 1 U
MW001
11/7/18
3-13 1 U
3-13* 0.160 U*
MW008
11/12/18
2-12* 0.160 U*
MW002D
11/7/18
25.4-30.4 1 U
25.4-30.4* 0.160 U*
MW006
11/12/18
2-12* 0.160 U*
MW007D
11/12/18
34-39* 0.160 U*
MW003
11/7/18
2.9-12.9 1 U
2.9-12.9* 0.160 U*
MW004D
11/12/18
35.0-40.0* 0.160 U*
MW005
11/12/18
2.0-12.0* 0.160 U*
MAGS02
8/28/19
0.5-5.5 4.08
MAGS01
8/28/19
0.5-5.5 16.5
MAGS03
8/28/19
0.5-5.5 9.40 channa Oval channa Callout Proposed MW009 channa Distance Measurement
5.16 ft channa Distance Measurement
7.47 ft channa Oval
Oval
Callout Proposed VMP002 channa Callout Proposed VMP001 channa Distance Measurement
89.25 ft
Sonic Auger DPT Horizontal Directional Drilling
DATE: 4/15/2020
ESTIMATE #: 420050
ID QTY Unit Rate TOTAL
1 1 ls 500.00$ 500.00$
2 Per Diem 0 night 200.00$ -$
3 1 < Day 1,250.00$ 1,250.00$
4 Materials: 1" well installation 12 foot 3.00$ 36.00$
5 Materials: 1"x5' PrePack Screen 1 each 65.00$ 65.00$
6 Materials: 3" Expendable Point 1 each 20.00$ 20.00$
7 Materials: 2" Well Materials 10 foot 10.00$ 100.00$
8 8" Flush Completion 1 each 100.00$ 100.00$
8 8" Flush Manhole (Donut Pad) 2 each 75.00$ 150.00$
9 Well development (Up to 1/2 hr w/pump) 1 each 75.00$ Included
10 Drums (Soil) (Estimated) 1 each 55.00$ 55.00$
11 Drums (Water) (Estimated) 1 each 55.00$ 55.00$
12 Permits (Not required for FDEP projects in SWFWMD) 0 each 52.00$ -$
Completion: < Day Subtotal 2,331.00$
Todd Hodgson
Todd Hodgson TOTAL 2,331.00$
Partner
***Utility Locates on Private Property are the responsibility of the client***
PROJECT
Former Sun Village Cleaners 4540 W. Village Drive
CUSTOMER
Tampa, Florida 33607 Tampa, Florida 3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350
(Hand Install two VMP's to 5')
Chad Hanna Arcadis
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com
Daily Rate: DPT Rig w/ crew
DPT Rig - DPT Well Installation
DESCRIPTION
Mobilization
THANK YOU FOR YOUR BUSINESS!
Project Description:
(2) Vapor Monitoring Point- 2" x 5' w/ '5 of .020 Slot Screen & 8" Bolt Down (Donut Pad) - No Soil Sampling
(1) MW 1" x 12' w/ 10' Pre-Pack Screen & 8" Bolt Down Completion - No Soil Sampling
***Damage to utilities on private property during borehole clearance are the responsibility of the client***
"Actual quantities used and days onsite will be invoiced"
(813) 353-5765
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Cascade Technical Services • 1020 South 82nd Street • Tampa, FL 33619 • (813) 626-1717
This quote is based on information provided by you and is valid for 45 days from the bid date. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. On-site soil disposal, unless Cascade expressly assumes responsibility in writing.Cascade shall not be responsible for damages to underground improvements not clearly and accurately marked.
$2,895.00Quote Total
$0.00Taxes
0.0000%Tax Percentage
$2,895.00Pre-Tax Total
Install MW009 via DPT as a prepacked 10 slot microwell screened 2-12 ft bgs? Include 8 inch diameter manhole and pad.
Also, please include hand installation of the two vapor monitoring points to the southwest installed to 5 f bgs with 4.5 ft of 20 slot, 2 inch diameter well screen. Annular space filled with 20/30 sand and completed with type I/II Portland cement to near grade and completed in an 8 inch diameter manhole (no pad).
Soils and development water shall be drummed.
ccain@cascade-env.comEmailChase CainPrepared By
FORMER SUN VILLAGE CLEANERS
4540 W. VILLAGE DR.
TAMPA, HILLSBOROUGH COUNTY, FLORIDA
Tampa, FL 33624
Work Site
Arcadis U.S. Inc - Tampa - Sun Village - DPT Microwell and Vapor Monitoring Point Installation
- DPT - 00143170
Opportunity Name
4/15/2020 9:18 AMQuote Revision Date
00053542Quote Number
4/15/2020Bid Date
2ARCADI129Bill To Account Number
(813) 353-5765Phone chad.hanna@arcadis-us.comEmail
Chad HannaContact Name
3109 W Dr. Martin Luther King Jr. Blvd, Suite Tampa, Florida 33607
Address
Arcadis U.S. IncAccount Name
Cascade Rep Contact Information
Scope of Work
Product Description Quantity Unit Sales Price Optional Subtotal
Mobilization/Demobilization 1.00 Lump Sum $150.00 $150.00
7822, 2 Man Crew 1.00 Day $1,750.00 $1,750.00
Install Well - 2", Sch. 40- Pre Pack 12.00 Ft $25.00 $300.00
Surface Completion (8" well vault and pad) 1.00 Each $150.00 $150.00
Soil Vapor point 5' bgs with 4.5 ft of 20 slot, 2 inch diameter 2.00 Each $75.00 $150.00
Well completion - flush mount (8" well vault) (no pad) 2.00 Each $100.00 $200.00
Soil/Water Drum 3.00 Each $65.00 $195.00
Well permits 1.00 Each $45.00 $0.00
Cascade Technical Services • 1020 South 82nd Street • Tampa, FL 33619 • (813) 626-1717
Cascade provides management of investigation derived waste. Call us today for information on a full range of additional options to meet your drilling needs.
Signature of Authorized Cascade Representative
Name & Title of Authorized Cascade Representative
Date
Signature of Client/ Owner Authorized Representative
Name & Title of Authorized Representative and Company
Date
If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade. Additional costs may apply if scope is significantly changed. Prices assume standard labor rates and no work hour restrictions. Proposal is subject to final review of terms and conditions.
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| 2020.04.10 - Sun Village Cleaners Supplemental Assessment Proposal.pdf |
| DC048D.pdf |
| Subtask 2: Supplemental Site Assessment |
| Subtask 3: Reporting |
File details come from the government source that posted it. Updated .