CN-370000-CN202-TA12CO1.pdf

PDF 250 KB Posted

Attached to
Master Agreement FL|CN202|9b407d6bfa6024fb9fbbd1ce9e29e157
Contract number
CN202
Issued by
Florida

About this file

This document is an amended proposal summary and task order for Contract No. CN202 TA12 CO1 between Michael Baker International, Inc. and the Florida Department of Environmental Protection, Bureau of Design and Construction. The correspondence, dated April 4, 2017, is addressed to Theresa R. Carron, Preconstruction Project Manager, regarding improvements at Sebastian Inlet State Park. The primary contractors are Michael Baker International, Inc. (prime consultant), with subcontractors including Keith & Associates, Inc. for surveying services and Eng Engineering, Inc. for electrical engineering work.

Task Order CN202 61145 covers campsite rehabilitation work at Sebastian Inlet State Park and is structured in three subtasks with a total project cost of $8,937.54. Subtask 1 involves a topographic and tree survey of Campsite 27 with deliverables including three signed survey sets and digital files, priced at $770.00 in fixed costs. Subtask 2 addresses ADA compliance design for Campsite 27, including site layout and construction plans, with a fixed price of $3,046.58 and reimbursable mileage costs of $168.88. Subtask 3 covers electrical upgrades for Campsites 27 and 36-43, priced at $4,952.08 in fixed costs. Payment is contingent upon FDEP approval of deliverables for each subtask. Project schedules indicate completion dates ranging from April 14 through May 5, 2017. Keith & Associates wage rate documentation provides hourly rates of $120.00 for Professional Surveyor & Mapper, $80.00 for CADD Technician, and $110.00 for 2-Man Field Crew, with a total overhead and profit multiplier of 2.34.

View the file

Other files

File Type Posted
CN-370000-CN202-CMC4.pdf PDF
CN-370000-CN202-T10.pdf PDF
CN-370000-CN202-T12.pdf PDF
CN-370000-CN202-T13CO2.pdf PDF
CN-370000-CN202-T15.pdf PDF
CN-370000-CN202-T16.pdf PDF
CN-370000-CN202-T24.pdf PDF
CN-370000-CN202-T25.pdf PDF
CN-370000-CN202-T2CO2.pdf PDF
CN-370000-CN202-T30.pdf PDF
CN-370000-CN202-T31.pdf PDF
CN-370000-CN202-T32CO3.pdf PDF
CN-370000-CN202-T33CO2.pdf PDF
CN-370000-CN202-T36CO2.pdf PDF
CN-370000-CN202-T38.pdf PDF
CN-370000-CN202-T38CO2.pdf PDF
CN-370000-CN202-T40.pdf PDF
CN-370000-CN202-T44CO1.pdf PDF
CN-370000-CN202-T45CO4.pdf PDF
CN-370000-CN202-T8CO4.pdf PDF
CN-370000-CN202-T8CO6.pdf PDF
CN-370000-CN202-TA14CO3.pdf PDF
CN-370000-CN202-TA17CO2.pdf PDF
CN-370000-CN202-TA2.pdf PDF
CN-370000-CN202-TA20CO1.pdf PDF
CN-370000-CN202-TA21.pdf PDF
CN-370000-CN202-TA22.pdf PDF
CN-370000-CN202-TA28 CO3.pdf PDF
CN-370000-CN202-TA7.pdf PDF
CN-370000-CN202-CMC2.pdf PDF
CN-370000-CN202-T10CO1.pdf PDF
CN-370000-CN202-T11.pdf PDF
CN-370000-CN202-T11.pdf.crdownload CRDOWNLOAD file
CN-370000-CN202-T13.pdf PDF
CN-370000-CN202-T14.pdf PDF
CN-370000-CN202-T14CO1.pdf PDF
CN-370000-CN202-T14CO2.pdf PDF
CN-370000-CN202-T17CO1.pdf PDF
CN-370000-CN202-T19.pdf PDF
CN-370000-CN202-T1CO1.pdf PDF
CN-370000-CN202-T20.pdf PDF
CN-370000-CN202-T20CO2.pdf PDF
CN-370000-CN202-T20CO4.pdf PDF
CN-370000-CN202-T26.pdf PDF
CN-370000-CN202-T28CO1.pdf PDF
CN-370000-CN202-T31CO1.pdf PDF
CN-370000-CN202-T32CO4.pdf PDF
CN-370000-CN202-T33.pdf PDF
CN-370000-CN202-T34.pdf PDF
CN-370000-CN202-T34CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Position Hourly Rates Weighted Rates

Professional Surveyor & Mapper $51.28 $120.00

CADD Technician $34.19 $80.00

2 Man Field Crew $47.01 $110.00

General Overhead Rate 82.32%

Fringe Benefit Rate 30.75%

Total overhead rate 113.07%

Profit Percentage on Labor & Overhead 10.00%

Total Multiplier 2.34