This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a statewide indefinite delivery contract (CN202) with Michael Baker International, Inc. The change order pertains to environmental permitting services for the Wekiwa Springs State Park erosion control and access project located in Orange County, Florida. Key parties include FDEP (contract authority and oversight), Michael Baker International (consultant), the St. Johns River Water Management District (SJRWMD), and the U.S. Army Corps of Engineers (USACE).

This change order adds comprehensive environmental permitting and field survey services to the existing task assignment (TA 45). The services include protected species surveys limited to 2.0 acres, wetland delineation in accordance with Florida Statutes Chapter 62-330.201, SJRWMD Environmental Resource Permit (ERP) application preparation, and USACE Section 404 permit application preparation. The total cost of the change order is $36,376.04, comprised of $36,126.04 in fixed fees and $250.00 in reimbursable costs. The fixed fee component is broken down as $3,080.25 for environmental field surveys and $15,951.70 for SJRWMD and USACE permitting services. The estimated project duration is 61 calendar days, with an original task execution date of May 17, 2023, and a revised task end date of May 17, 2024. The change order was executed and digitally signed by all authorized representatives on September 6–8, 2023.

View the file

Other files

File Type Posted
CN-370000-CN202-CMC4.pdf PDF
CN-370000-CN202-T10.pdf PDF
CN-370000-CN202-T12.pdf PDF
CN-370000-CN202-T13CO2.pdf PDF
CN-370000-CN202-T15.pdf PDF
CN-370000-CN202-T16.pdf PDF
CN-370000-CN202-T24.pdf PDF
CN-370000-CN202-T25.pdf PDF
CN-370000-CN202-T2CO2.pdf PDF
CN-370000-CN202-T30.pdf PDF
CN-370000-CN202-T31.pdf PDF
CN-370000-CN202-T32CO3.pdf PDF
CN-370000-CN202-T33CO2.pdf PDF
CN-370000-CN202-T36CO2.pdf PDF
CN-370000-CN202-T38.pdf PDF
CN-370000-CN202-T38CO2.pdf PDF
CN-370000-CN202-T40.pdf PDF
CN-370000-CN202-T44CO1.pdf PDF
CN-370000-CN202-T45CO4.pdf PDF
CN-370000-CN202-T8CO4.pdf PDF
CN-370000-CN202-T8CO6.pdf PDF
CN-370000-CN202-TA14CO3.pdf PDF
CN-370000-CN202-TA17CO2.pdf PDF
CN-370000-CN202-TA2.pdf PDF
CN-370000-CN202-TA20CO1.pdf PDF
CN-370000-CN202-TA21.pdf PDF
CN-370000-CN202-TA22.pdf PDF
CN-370000-CN202-TA28 CO3.pdf PDF
CN-370000-CN202-TA7.pdf PDF
CN-370000-CN202-CMC2.pdf PDF
CN-370000-CN202-T10CO1.pdf PDF
CN-370000-CN202-T11.pdf PDF
CN-370000-CN202-T11.pdf.crdownload CRDOWNLOAD file
CN-370000-CN202-T13.pdf PDF
CN-370000-CN202-T14.pdf PDF
CN-370000-CN202-T14CO1.pdf PDF
CN-370000-CN202-T14CO2.pdf PDF
CN-370000-CN202-T17CO1.pdf PDF
CN-370000-CN202-T19.pdf PDF
CN-370000-CN202-T1CO1.pdf PDF
CN-370000-CN202-T20.pdf PDF
CN-370000-CN202-T20CO2.pdf PDF
CN-370000-CN202-T20CO4.pdf PDF
CN-370000-CN202-T26.pdf PDF
CN-370000-CN202-T28CO1.pdf PDF
CN-370000-CN202-T31CO1.pdf PDF
CN-370000-CN202-T32CO4.pdf PDF
CN-370000-CN202-T33.pdf PDF
CN-370000-CN202-T34.pdf PDF
CN-370000-CN202-T34CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

(Revised 9-26-2018) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN202 TA 45 1 61378C

Wekiwa Springs State Park Wekiwa Springs Erosion Control & Access

Michael Baker International

Jeff Roberts, P.E., RSP1 (850) 701-2303 jeff.roberts@mbakerintl.com

Ralph Perkins, or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

Permit requirements have been identified, this change order adds full permitting services to perform site reviews to document protected species, data collection of wetland limits (if present) and permit applications for all required environmental permits per Proposal dated 8/17/2023.

$ 150.00 $ 17,094.09 $ 17,244.09 $ 150.00 $ 17,094.09 $ 17,244.09 $ 100.00 $ 19,031.95 $ 19,131.95 $ 250.00 $ 36,126.04 $ 36,376.04

5/17/2023

5/17/2024

5/17/2024

5/17/2024

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.09.06 14:33:39 -04'00'

Del Cobb Del Cobb Digitally signed by Del Cobb Date: 2023.09.06 14:54:18 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.09.06 15:37:49 -04'00'

Jeff Roberts, P.E., RSP1 Jeff Roberts Digitally signed by Jeff Roberts Date: 2023.09.07 08:55:52 -04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2023.09.08 15:06:11 -04'00'

61378C 37503006080 080039/22 423001 U3200 131500 QK $ 19,131.95

$ 19,131.95

August 17, 2023

Mr. Del Cobb Project Manager Bureau of Design and Construction Division of Recreation and Parks 3900 Commonwealth Boulevard Tallahassee, FL 32399

RE: Statewide Contract: CN202, Task Assignment 45, Change Order 01 Wekiwa Springs Final Design

Wekiwa Springs Erosion Control & Access, Orange County (Apopka), FL

Dear Mr. Cobb:

For your review, Michael Baker International, Inc., is attaching a change order proposal summary and man-hour documentation for a task assignment to include environmental permitting for the referenced project.

Please review the attached Change Order proposal and deliverables and let me know if there are any questions or comments.

Sincerely, Jeff Roberts, PE, RSP1 Vice President

Change Order 01

Wekiwa Springs State Park – Site Grading Improvements

Wekiwa Springs, Apopka, FL

Statewide Contract CN202, Task Assignment 45

Project Objective: Under TA #45, Michael Baker is completing the final Design Plans for grading improvements at the Wekiwa Springs State Park is in Orange County, Florida. Now that likely permit requirements have been identified, this change order adds full permitting services to perform site reviews to document protected species, data collection of wetland limits (if present) and permit applications for all required environmental permits.

This Change Order adds the following tasks to the project:

Subtask 3: Environmental Field Surveys

3.1 General Protected Species Survey

The CONSULTANT will perform a general protected species survey within the limits of the project to look for evidence of use of the project area by protected species and to determine whether suitable habitat for protected species occurs in the project limits. The survey will be limited to the improvements to the canoe launch road, the trail leading to the west side of the swimming area, and the grassy slope adjacent to the spring and will not exceed 2.0 acres in size. If gopher tortoise burrows are found during the general protected species survey, the location of the burrows will be recorded with submeter global positioning system (GPS) equipment. Information collected during the field survey will be used for the ERP permit application as needed.

3.2 Wetland Delineation

The CONSULTANT will flag/stake wetland jurisdictional limits in the field within the project area in accordance with the State of Florida’s wetland delineation methodology contained in Chapter 62-330.201 of the Florida Statutes (FS). Wetland delineation boundary flag locations will be recorded using submeter accurate GPS equipment. The wetland limits will be added to the final design plans. The wetland boundary will be used to minimize/avoid wetland impact in the project design.

Deliverables

• PDF aerial of wetland limits (if present) or email notice of “no wetlands present” findings.

• Documentation of existence (or non-existence) of possible protected species at the project site.

Assumptions:

1. Protected species permitting and special purpose protected species surveys such as a 100 percent Gopher tortoise survey and surveys for crested caracara, Florida scrub-jay, Florida bonneted bat, or federally protected skinks are not included in this scope of services.

2. Endangered Species Act formal Section 7 consultation with the U.S. Fish and Wildlife Service is not included in this scope of services.

3. If it is determined that special purpose protected species surveys, formal consultation, or protected species permitting are required, this will be provided under a separate agreement and is currently not included in this scope of services.

4. Wetland boundary flag locations will be recorded using sub-meter accurate global positioning system equipment.

5. If survey services are required for recording of wetland delineation, this will be provided under a separate agreement. Survey services to record wetland flags are not included in this scope of services.

6. Coordination with the State Historic Preservation Office is not included in this scope of services.

Subtask 3 Fee:

Company Classification Rate Hours Cost

MBI Project Manager $238.84 0 $0.00

MBI Sr. Env. Scientist $172.27 3 $516.81

MBI Environmental Scientist $106.81 24 $2,563.44

Totals (Subtask 3) 27 $3,080.25

Subtask 4: SJRWMD and USACE Permitting

The CONSULTANT will prepare the permit applications and coordinate with two (2) regulatory agencies that have jurisdiction over the project, specifically SJRWMD and USACE.

4.1 – SJRWMD Environmental Resource Permit (ERP) Application

SJRWMD Pre-application Meeting

The CONSULTANT will coordinate, schedule, and attend a pre-application meeting with SJRWMD. A representative of the CLIENT will be invited to attend the meeting. SJRWMD pre-application meeting materials, supporting documentation and graphics for the meeting will be prepared by the Consultant.

Meeting minutes will be developed to record and summarize the details of the meeting.

SJRWMD Environmental Resource Permit (ERP) Application Preparation

The CONSULTANT will prepare either a Request for Verification of Exemption from ERP or a General ERP application. This will be based on direction from the SJRWMD received during the pre-application process.

This will include the design plans and permit drawings/dredge and fill sketches as well as additional graphics as required by the permit application. The application will include an environmental narrative that will provide the justification for the proposed improvements and describe the avoidance and minimization efforts and the environmental impacts. If necessary, the CONSULTANT will prepare the

Uniform Mitigation Assessment Method (UMAM) worksheets for the project impacts.

SJRWMD Wetland Limits Field Verification Meeting

The SJRWMD Wetland Limits Field Verification meeting will be scheduled after the ERP application is submitted. SJRWMD personnel will be contacted to arrange an on-site field meeting to review the jurisdictional lines.

SJRWMD RAI Responses

The CONSULTANT will respond to SJRWMD Requests for Additional Information for issues related to our scope of services. If SJRWMD requires additional services or tasks to obtain the permit which are not included in our scope of services, then an amendment to our contract will be required.

4.2 – U.S. Army Corps of Engineers (USACE) Section 404 Permit Application

USACE Section 404 Permit Application Preparation

The CONSULTANT will prepare USACE Form 4345 Application for Department of the Army Permit. The

CONSULTANT will submit the application to USACE with necessary supporting documentation such as the permit drawings depicting the dredge and fill impacts, a location map, and an environmental narrative addressing 404 permit requirements.

USACE RAI Responses

The CONSULTANT will respond to USACE Requests for Additional Information for issues related to our scope of services. If the USACE requires additional services or tasks to obtain the permit which are not included in our scope of services, then an amendment to our contract will be required.

Deliverables

• SJRWMD and USACE Permit applications will be provided to the CLIENT in PDF for approval/signature prior to submittal to the agencies.

Assumptions:

1. If it is determined that Orange County permitting is required, this will be provided under a separate agreement and is not included in this scope of services.

2. The project is located in an area that is retained for Section 404 jurisdiction by the USACE.

3. The project either qualifies for an ERP General Permit or is exempt from ERP permitting. If it is determined that an individual ERP Permit is required that will be provided under a separate agreement and is currently not included in this scope of services.

4. The project qualifies for a USACE Section 404 Nationwide Permit.

5. If wetland mitigation is required, this requirement will be met by the ClIENT by purchase of mitigation credits from a SJRWMD and USACE approved wetland mitigation bank.

6. Mitigation credits are available from a mitigation bank with a service area that includes the area of the project. Identification of possible mitigation banks will not be the responsibility of the Consultant and is not included in this scope of services.

7. Purchase price of any required wetland mitigation bank credits would be paid for by the CLIENT.

8. If development of a wetland mitigation plan is required, this will be provided under a separate agreement and is not included in this scope of services.

Subtask 4 Fee:

Company Classification Rate Hours Cost

MBI Project Manager $238.84 3 $716.52

MBI Designer $115.88 6 $695.28

MBI Sr. Env. Scientist $172.27 10 $1,722.70

MBI Environmental Scientist $106.81 120 $12,817.20

Totals (Subtask 4) 139 $15,951.70

Reimbursable Cost:

SWFMWD ERP General Permit application fee (TA 45 includes $150 reimbursable permit exemption fee, this additional $100 will cover the full ERP costs - $250)

$100.00

Summary of Fees:

Subtask Subtask Fixed

Price Cost Subtask

Reimbursable

Subtask 3: Environmental Field Review $3,080.25 --

Subtask 4: SJWMD and USACE Permitting $15,951.70 --

Total Fixed Price Cost $19,031.95 --

Total Reimbursable Cost -- $100

Overall Total Cost (This Change Order) $19,131.95

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

Project Schedule:

Project Schedule is based on estimated duration of calendar days to complete each subtask. Schedule dates will be established after approved and executed contract has been received.

Activity

Subtask Duration

(Calendar Days)

Subtask 3: Environmental Field Review 21

Subtask 4: 100% Design Level Review 40

Total Estimated Duration 61

TA45_CO1_Wekiwa Springs Runoff_Permitting_081723 (002).pdf