CM_RELATED_PROJECT_EXPERIENCE_FORM_4.10.2021-FILLABLE.pdf

PDF 205 KB Posted

Attached to
CONSTRUCTION MANAGEMENT AT RISK TILLMAN ELEMENTARY CAMPUS WIDE RENOVATION, SDMC No. 2025-12
Solicitation number
2025-12
Issued by
Manatee County, Florida

About this file

This is a Construction Management at Risk (CMaR) related project experience form for the School District of Manatee County, Florida. The form is designed to evaluate proposers' qualifications for SDMC No. 2025-12, a campus-wide renovation project at Tillman Elementary School. Proposers must submit one form for each comparable project to be scored under Short List Criteria 4. The form captures essential project information including project title, location, delivery method (CMaR with GMP, CM, Design-Build, PM, or Traditional D/B/B), firm's contractual relationship to the owner, owner and architect/engineer contact information, project description with supporting photographs, project completion date, construction cost, and project size in gross square feet. Additionally, the form requires identification of the project manager and other key professionals involved, with checkboxes indicating whether proposers intend to assign specific professionals to the proposed SDMC project. The form documents current project status across categories including Punch List, Closeout, Warranty, or Post Warranty phases.

Qualifying projects must be from Florida Public School Systems (K-12) or other comparable public entities, and must not exceed ten years in age. The submission deadline for the overall RFQ response is March 10, 2026 at 12:00 p.m. Eastern Time, with bid opening at 1:00 p.m. A mandatory site visit is scheduled for April 15, 2026 at 2:00 p.m. at Tillman Elementary School, followed by final oral interviews and presentations on May 7, 2026 from 9:00 a.m. to 11:00 a.m. The evaluation process allocates 40 of 100 short-list points to related project experience. The estimated project budget is $31,000,000, with final contract value to be negotiated on a GMP basis following selection. Design completion is targeted for December 2026 and construction completion by July 2028. School Board contract approval is anticipated for June 9, 2026.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The School District of Manatee County CM, CMR and PM

RELATED PROJECT EXPERIENCE FORM

(Submit one form for each comparable project – to be scored under Short List Criteria 4, factors a and b)

PROJECT TITLE: RFQ #:

PROPOSER (PRIME): RFQ Response Due Date:

Joint Venture

PROJECT TITLE: RELATED Project EXP: (check only one box) ❑ a. Florida Public School Systems (K-12) ❑ b. Other PROJECT LOCATION:

PROJECT DELIVERY METHOD: (check only one box) ❑ CM Design-Build PM CMR Misc. (w/GMP) ❑ CMR (w/GMP) Traditional (D/B/B) Other:

FIRM’S CONTRACTUAL RELATIONSHIP TO

OWNER ON THIS PROJECT:

OWNER (project user / agency’s representative)

Name:

Address: City: State: Zip:

Current Phone Number: Current Fax Number:

E-mail Address:

ARCHITECT OR ENGINEER (project owner’s representative)

Name:

Address: City: State: Zip:

Current Phone Number: Current Fax Number:

E-mail Address:

DESCRIPTION OF THE PROJECT AND SERVICES: (attach photos that represent the work performed by the firm)

PROJECT COMPLETION DATE:

month / day / year

CONSTRUCTION COST: $

SIZE OF PROJECT: (gsf of construction)

CURRENT STATUS OF THIS PROJECT: ❑ Punch List ❑ Closeout Warranty Post Warranty

PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT:

(check box only if proposer intends to assign this professional to the proposed SDMC project)

NAME: PROJECT RESPONSIBILITIES:

CM, CMR and PM
RELATED PROJECT EXPERIENCE FORM
PROJECT TITLE:
RFQ:
PROPOSER PRIME:
RFQ Response Due Date:
PROJECT TITLE_2:
a F: Off
b Other: Off
PROJECT LOCATION:
fill_1:
FIRMS CONTRACTUAL RELATIONSHIP TO OWNER ON THIS PROJECT:
OWNER project user agency s representat ve Name:
Address:
C ty:
State:
Z p:
Current Phone Number:
Current Fax Number:
Ema Address:
ARCHITECT OR ENGINEER pro ect owner s representat ve Name:
Address_2:
C ty_2:
State_2:
Z p_2:
Current Phone Number_2:
Current Fax Number_2:
Ema Address_2:
DESCRIPTION OF THE PROJECT AND SERVICES attach photos that represent the work performed by the f rm:
PROJECT COMPLETION DATE:
CONSTRUCTION COST:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1_2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2_2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3_2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4_2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5_2:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6:
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6_2:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Text8:
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box8: Off

File details come from the government source that posted it. Updated .