PDF 205 KB Posted
- Attached to
- CONSTRUCTION MANAGEMENT AT RISK TILLMAN ELEMENTARY CAMPUS WIDE RENOVATION, SDMC No. 2025-12
- Solicitation number
- 2025-12
- Issued by
- Manatee County, Florida
About this file
This is a Related Project Experience Form for the School District of Manatee County, Florida, used to evaluate Construction Management (CM), Construction Manager at Risk (CMR), and Project Manager (PM) qualifications for SDMC No. 2025-12, a Construction Management at Risk contract for Tillman Elementary Campus Wide Renovation. The form requires proposers to submit one form for each comparable project to be scored under Short List Criteria 4, factors a and b. Projects may be from Florida Public School Systems (K-12) or other comparable projects. The form captures project location, delivery method (CM, Design-Build, PM, CMR with or without Guaranteed Maximum Price, or Traditional Design-Bid-Build), and the proposer's contractual relationship to the owner. Proposers must provide detailed project descriptions including photographs of work performed, project completion dates, construction costs, and project size in gross square footage. The form also requests identification of the project owner, architect or engineer representatives, and current contact information for all parties.
The form requires proposers to list the Project Manager and other key professionals assigned to comparable projects, with notation of which professionals the proposer intends to assign to the proposed SDMC project. The current status of comparable projects must be identified, including whether projects are in punch list, closeout, warranty, or post-warranty phases. The form does not address pricing terms, set-asides, or funding sources, as it is designed solely to document the firm's relevant experience and the qualifications of key personnel who would support the Tillman Elementary renovation project, which encompasses a complete interior renovation including mechanical, plumbing, electrical system replacement, fire alarm removal and replacement, kitchen equipment upgrades, security enhancements, technology infrastructure, LED lighting, new ceilings, flooring, painting, exterior doors, windows, and associated sitework.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM, CMR and PM
RELATED PROJECT EXPERIENCE FORM
(Submit one form for each comparable project – to be scored under Short List Criteria 4, factors a and b)
PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
PROJECT TITLE: RELATED Project EXP: (check only one box) ❑ a. Florida Public School Systems (K-12) ❑ b. Other PROJECT LOCATION:
PROJECT DELIVERY METHOD: (check only one box) ❑ CM Design-Build PM CMR Misc. (w/GMP) ❑ CMR (w/GMP) Traditional (D/B/B) Other:
FIRM’S CONTRACTUAL RELATIONSHIP TO
OWNER ON THIS PROJECT:
OWNER (project user / agency’s representative)
Name:
Address: City: State: Zip:
Current Phone Number: Current Fax Number:
E-mail Address:
ARCHITECT OR ENGINEER (project owner’s representative)
Name:
Address: City: State: Zip:
Current Phone Number: Current Fax Number:
E-mail Address:
DESCRIPTION OF THE PROJECT AND SERVICES: (attach photos that represent the work performed by the firm)
PROJECT COMPLETION DATE:
month / day / year
CONSTRUCTION COST: $
SIZE OF PROJECT: (gsf of construction)
CURRENT STATUS OF THIS PROJECT: ❑ Punch List ❑ Closeout Warranty Post Warranty
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT:
(check box only if proposer intends to assign this professional to the proposed SDMC project)
NAME: PROJECT RESPONSIBILITIES:
| CM, CMR and PM |
| RELATED PROJECT EXPERIENCE FORM |
| PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| PROJECT TITLE_2: |
| a F: Off |
| b Other: Off |
| PROJECT LOCATION: |
| fill_1: |
| FIRMS CONTRACTUAL RELATIONSHIP TO OWNER ON THIS PROJECT: |
| OWNER project user agency s representat ve Name: |
| Address: |
| C ty: |
| State: |
| Z p: |
| Current Phone Number: |
| Current Fax Number: |
| Ema Address: |
| ARCHITECT OR ENGINEER pro ect owner s representat ve Name: |
| Address_2: |
| C ty_2: |
| State_2: |
| Z p_2: |
| Current Phone Number_2: |
| Current Fax Number_2: |
| Ema Address_2: |
| DESCRIPTION OF THE PROJECT AND SERVICES attach photos that represent the work performed by the f rm: |
| PROJECT COMPLETION DATE: |
| CONSTRUCTION COST: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6_2: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Text8: |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box8: Off |
File details come from the government source that posted it. Updated .