CM_PROPOSED_STAFF_FORM-FILLABLE.pdf
PDF 168 KB Posted
- Attached to
- CONSTRUCTION MANAGEMENT AT RISK TILLMAN ELEMENTARY CAMPUS WIDE RENOVATION, SDMC No. 2025-12
- Solicitation number
- 2025-12
- Issued by
- Manatee County, Florida
About this file
This is a Proposed Staff Form used by the School District of Manatee County (SDMC), Florida for the selection of Construction Management at Risk (CM at-Risk) services for the Tillman Elementary Campus Wide Renovation project (SDMC No. 2025-12). The form is a fillable template designed to document proposed project staff qualifications and experience, with one form required for each employee assigned to the project. Proposers must submit responses electronically via VendorLink by March 10, 2026 at 12:00 p.m. Eastern Time, with bid opening at 1:00 p.m. the same day. A mandatory site visit is scheduled for April 15, 2026 at 2:00 p.m. at Tillman Elementary School, followed by final oral interviews and presentations on May 7, 2026 from 9:00 a.m. to 11:00 a.m. The School Board is anticipated to approve contract negotiation on June 9, 2026, with design completion targeted for December 2026 and construction completion by July 2028.
The proposed staff form requires documentation of employee name, title, employment status (professional/technical or office staff), percentage of time assigned to the project, years of experience with the proposing firm and other firms, education credentials, professional registrations and licenses, and demonstrated abilities across multiple project delivery methods including Construction Management, Design-Build, CM at-Risk, Traditional Design-Bid-Build, CM at-Risk Miscellaneous, Program Management, and Others. Employees must document specific competencies such as option analysis, design review, budget estimating, value engineering, constructability analysis, life cycle cost analysis, construction scheduling, quality control (design and construction), cost control, fast-track techniques, construction supervision, building code inspection, and project closeout/warranty. The form also requires proposers to identify the delivery method code, project title, dollar value, gross square footage, and the employee's specific involvement in the project.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM/CM at-Risk/PM Selection Procedures
PROPOSED STAFF FORM
(Make copies of this form for use for Shortlist Criteria 5, Factors a and b – Submit one form for each employee)
SDMC PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
EMPLOYEE NAME: TITLE: CHECK ONLY ONE:
❑ Professional/Tech Office Staff ❑ Proposed On-Site Staff
% of time to be assigned to the proposed project: Years with firm: Years with other firms:
DE
LI
VE
RY
ME
TH
OD
Delivery Method Codes: CM = Construction Management DB = Design-Build OT = Others CMR = CM at-Risk TR = Traditional (D/B/B) CMR(M) = CM at-Risk Miscellaneous PM = Program Management
PROJECT TITLE DOLLAR
VALUE
GSF EMPLOYEE’S
INVOLVEMENT
EDUCATION: (highest level achieved, degree earned, school & year)
REGISTRATION(S) & LICENSE(S):
OTHER QUALIFICATIONS:
EMPLOYEE'S
ABILITIES
(check all that apply):
❑ Option analysis ❑ Design review ❑ Budget estimating ❑ Value engineering ❑ Constructability analysis
❑ Life cycle cost analysis ❑ Construction scheduling ❑ Quality control (Design) ❑ Quality control (Construction) ❑ Cost control
❑ Fast-track techniques ❑ Construction supervision ❑ Building code inspection ❑ Project closeout/warranty ❑ Other:
The School District of Manatee County
| SDMC PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| EMPLOYEE NAME: |
| TITLE: |
| Profess: Off |
| Proposed OnS: Off |
| Years with firm: |
| Years with other firms: |
| of time to be assigned to the proposed projectRow2: |
| PROJECT TITLERow1: |
| DOLLAR VALUERow1: |
| GSFRow1: |
| EMPLOYEES INVOLVEMENTRow1: |
| EDUCATION highest eve achieved degree earned school year: |
| REGISTRATIONS LICENSES: |
| OTHER QUALIFICATIONS: |
| Option analysis: Off |
| Design review: Off |
| Budget estimating: Off |
| Va: Off |
| Constructabi: Off |
| L: Off |
| Construct: Off |
| Qual: Off |
| Qual_2: Off |
| Cost control: Off |
| Fasttrack techn: Off |
| Construct_2: Off |
| Bu: Off |
| Pro: Off |
| Other: On |
| ect closeoutwarranty: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Check Box1: Off |
File details come from the government source that posted it. Updated .