This is an addendum revision document related to the City Center Sport Complex Ballfields Restoration project in Florida. The project involves excavation and removal of the upper three feet of soil throughout the project area, identification and removal of solid waste or landfill materials encountered during excavation, installation of a reinforced geotextile membrane, replacement and compaction of suitable fill and topsoil, and reconstruction of ballfields, parking lot, and associated site improvements. The objective is to restore site functionality, provide long-term stability, and improve safety and usability of the City Center recreational facilities while managing legacy landfill conditions encountered during construction.

The specific details regarding bidding procedures, response dates, due dates, site visits, bidders' meetings, award dates, contract term, pricing terms, set-asides, incumbent information, and funding sources are not detailed in this addendum revision document. Further documentation from the original solicitation and related contract opportunity files would be necessary to provide comprehensive information on these contractual elements.

View the file

Other files

File Type Posted
Attachment_D_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_Bonding_Capacity_and_Payment_and_Performance_Bond.pdf PDF
Attachmernt_C_Standard_Construction_Contract_-_Architect_Template.pdf PDF
Attachment_A_City_Center_Sports_Complex_Specifications.pdf PDF
Attachment_1___Schedule_of_Unit_Pricing.xlsx XLSX spreadsheet
Attachment_B_City_Center_Sports_Complex_Ballfield_Restoration_Drawings_(1).PDF PDF
APPENDIX_A_-_44_C.F.R_PART_18_CERTIFICATION_REGARDING_LOBBYING.pdf PDF
Exhibit_A_-_Description_of_Confidential_Materials.pdf PDF
Form_7.13_-_Debarment_Suspension_and_Other_Responsibility_Matters.pdf PDF
Form_7.9_-_List_of_Subcontractors.pdf PDF
Forn_7.2_-_Bidder's_Acknowledgement.pdf PDF
Human_Trafficking_Affidavit.pdf PDF
Leased_Employee_Affidavit.pdf PDF
Current_Bonding_Capacity_Letter_(as_outlined_in_Section_6).pdf PDF
Form_7.10_-_Scrutinized_Companies_Certification.pdf PDF
Form_7.15_-_No_Submittal.pdf PDF
Form_7.16_-_Representative_Certification_Form.pdf PDF
Form_7.5_-_Public_Entity_Crimes_Statement.pdf PDF
Form_7.7_-_Statement_of_Bidder's_Qualification.pdf PDF
Form_7.8_-_Professional_References_for_Previous_Experience.pdf PDF
Affidavit_Regarding_Workers'_Compensation.pdf PDF
Form_7.11_-_Local_Business_Affidacit_of_Eligibility.pdf PDF
Form_7.12_-_E-Verify_Affidavit.pdf PDF
Form_7.14_-_Affidavit_of_Compliance_with_F.S._287.138.pdf PDF
Form_7.4_-_Drug_Free_Preference_Statement.pdf PDF
Form_7.6_-_Anti-Collusion.pdf PDF
Form_7.1_-_Bid_Submittal_Checklist.pdf PDF
Form_7.3_-_Addendum_and_Change_Order_Procedure_Acknowledgement.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/portorangefl

City of Port Orange

ITB-26-22-CW

CITY CENTER SPORT COMPLEX BALLFIELDS RESTORATION

RELEASE DATE: October 2, 2026

RESPONSE DEADLINE: November 2, 2026, 2:30 pm

Please refer to the project timeline in this document for all important deadlines.

#ITB-26-22-CW

Title: City Center Sport Complex Ballfields Restoration

Table Of Contents

1. LEGAL NOTICE TO BIDDERS (MANDATORY)

2. SECTION 1 - PURPOSE AND OVERVIEW

3. SECTION 2 - INSTRUCTION TO BIDDERS

4. SECTION 3 - SCOPE OF WORK

5. SECTION 4 - STANDARD PURCHASING DEFINITIONS

6. SECTION 5 - GENERAL TERMS AND CONDITIONS

7. SECTION 6 - SPECIAL REQUIREMENTS / INSTRUCTIONS

8. SECTION 7 - REQUIRED DOCUMENTATION

9. ATTACHMENT 1 - SCHEDULE OF UNIT PRICING

10. VENDOR QUESTIONNAIRE

Attachments:

B - Form 7.1 - Bid Submittal Checklist

C - Forn 7.2 - Bidder's Acknowledgement

D - Form 7.3 - Addendum and Change Order Procedure Acknowledgement

E - Form 7.4 - Drug Free Preference Statement

F - Form 7.5 - Public Entity Crimes Statement

G - Form 7.6 - Anti-Collusion

H - Form 7.7 - Statement of Bidder's Qualification

I - Form 7.8 - Professional References for Previous Experience

J - Form 7.9 - List of Subcontractors

K - Form 7.10 - Scrutinized Companies Certification

L - Form 7.11 - Local Business Affidacit of Eligibility

M - Form 7.12 - E-Verify Affidavit

N - Form 7.13 - Debarment_Suspension and Other Responsibility Matters

O - Form 7.14 - Affidavit of Compliance with F.S. 287.138

P - Form 7.15 - No Submittal

Q - Form 7.16 - Representative_Certification Form

R - Exhibit A - Description of Confidential Materials

S - Current Bonding Capacity Letter (as outlined in Section 6)

T - Affidavit Regarding Workers' Compensation

U - APPENDIX A - 44 C.F.R PART 18 CERTIFICATION REGARDING LOBBYING

V - Human Trafficking Affidavit

W - Leased Employee Affidavit

X - Attachment_1___Schedule_of_Unit_Pricing

Z - Attachment_A_City_Center_Sports_Complex_Specifications

AA - Attachment B_City_Center_Sports_Complex_Ballfield_Restoration_Drawings (1)

BB - Attachmernt C_Standard Construction Contract - Architect Template

CC - Attachment D_EXAMPLE FOR SOLICITATION PUBLICATION - Bonding Capacity and

Payment and Performance Bond

1. LEGAL NOTICE TO BIDDERS (MANDATORY)

ITB-26-22-CW - City Center Sport Complex Ballfields Restoration

Notice is hereby given that the City of Port Orange is soliciting proposals for ITB-26-22-CW - City Center

Sport Complex Ballfields Restoration. Bids will be accepted in until 2:30 pm Eastern Standard Time (EST) on Monday, November 2, 2026, which may be amended by addendum issued by the City. All untimely bids will be rejected. All bids will be evaluated to ensure they contain all the required forms in order to deem the Bidder responsive or non-responsive. Bids will be opened and bidder(s) names and price will be read aloud at 2:30 pm EST in the Council Chambers located on the first floor of City Hall, 1000 City Center Circle, Port

Orange, Florida 32129.

Note: Bids read aloud at the bid opening is not binding until there has been a responsive and responsible review by Purchasing in determining who is the lowest price, responsible, and responsive bidder.

A Microsoft teams link has been added for those Bidder(s) who would like to attend virtually. Refer to the

Timeline for the Microsoft Teams Link.

There will be a mandatory Pre-Bid Conference and site visit for the project at 10:00 am EST on Monday, October

12, 2026 at Council Chambers, located at the City of Port Orange at 1000 City Center Circle, Port Orange, FL

32129.. In order to be eligible to submit a bid, prospective bidders must attend the mandatory Pre-Submittal

Conference and Site Visit. All attendees to the Pre-Submittal Conference MUST sign in. The representative of each Bidder shall be an authorized employee of the Bidder and shall sign in accordingly. Bidders are urged to obtain bid documents and familiarize themselves with the documents prior to the Pre-Submittal Conference.

Site Visit Location: 4625 City Center Drive, Port Orange, Florida 32129

DESCRIPTION: City Center Sport Complex Ballfields Restoration

Bidders must be a commercial entity licensed to do business in the State of Florida and perform the services identified herein. Bidder(s) shall be a certified General Contractor. Bidders must be properly registered and licensed to provide the services identified in the scope of work, by all applicable state and local agencies.

All Invitation to Bid (ITBs) are solicited and will be evaluated on the requirements outlined in the ITB.

Copies of the bid documents, requirements, scope of service and all other pertinent information necessary to submit a complete package may be obtained electronically from the City of Port Orange Purchasing web page at www.port-orange.org/bids.aspx and OpenGov at https://procurement.opengov.com/portal/portorangefl.

All questions must be submitted electronically via https://procurement.opengov.com/portal/portorangefl. Last day for questions will be Monday, October 19, 2026 at 4:00 pm EST.

The Cone of Silence begins with the issuance of the solicitation document and continues until City Council meets to make a final decision on an award. During this time respondents, suppliers, contractors and sub-contractors are prohibited from all communications regarding the solicitation with City staff, City consultants, City legal counsel, City agents, or elected officials. Any respondent who initiates any discussions or attempts to influence a member or members of the aforementioned shall be disqualified from continued participation in the procurement process with regard to that particular solicitation. While the Cone of Silence is in effect, all http://www.port-orange.org/bids.aspx communications from potential respondents, suppliers, contractors and sub-contractors must be directed to the

Purchasing Division @ purchdiv@port-orange.org.

SPECIAL NOTE: The City of Port Orange has transition from DemandStar to OpenGov for our solicitations.

Bidders who are not listed in OpenGov, will need to be register as soon as possible so in order to submit on this project electronically. Bidders shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login. Once you have completed account information, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic submittal.

Bidders are required to submit an electronic submittal. The City invites bidders to respond to this Initiation to

Bid (ITB) for theCity Center Sport Complex Ballfields Restoration. The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be 395-days, substantial completion is true to the days.

Bids received after the submission deadline will be rejected.

It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.

On-line Provider Disclaimer

The City of Port Orange Purchasing Department is the official source to obtain information relating to the City solicitations. All documents regarding this solicitation are posted utilizing an online bid management system, OpenGov. There is no charge to register with OpenGov and/or to participate in the solicitation process.

This is a third-party provider that provides a platform to communicate solicitation information to the Public.

OpenGov does not represent the City nor does communications through this provider constitute communications to the City. The City of Port Orange is not responsible for errors and omissions occurring in the transmission or downloading of any documents from the online website.

[Remainder of this page left intentionally blank] mailto:purchdiv@port-orange.org https://procurement.opengov.com/login

2. SECTION 1 - PURPOSE AND OVERVIEW

The purpose of this Invitation to Bid (ITB) is to solicit competitive bids from Firms or Companies (Bidders) for the City Center Sport Complex Ballfields Restoration.

It is the intent and purpose of the City of Port Orange (City) that this ITB promotes competitive selection. It shall be the Bidder’s responsibility to advise the Purchasing Division if any language, requirements, etc. or any combination thereof, inadvertently restricts or limits the requirements stated in the ITB to a single source.

[Remainder of this page left internationally blank]

3. SECTION 2 - INSTRUCTION TO BIDDERS

Firms or companies (Bidders) desiring to provide services, as described herein, shall submit an electronic bid in conformance with the detailed submittal instructions.

TIMELINE (Eastern Standard Time)

The City reserves the right to alter dates as needed.

Release Project Date: October 2, 2026

Pre-Bid Meeting/Site Visit (Mandatory): October 12, 2026, 10:00am

Council Chambers, located at the City of

Port Orange at 1000 City Center Circle, Port

Orange, FL 32129.

Question Submission Deadline: October 19, 2026, 4:00pm

Question Response Deadline: October 26, 2026, 4:00pm

Bid Submission Deadline: November 2, 2026, 2:30pm

Council Chambers, located at the City of

Port Orange at 1000 City Center Circle, Port

Orange, FL 32129

Microsoft Teams meeting

Join:

https://teams.microsoft.com/meet/29446575

7851849?p=rOPcJWmqTjOzFk5hHm

Meeting ID: 294 465 757 851 849

Passcode: ik6vd3zq

The City of Port Orange is now using OpenGov for soliciting city projects. Bidders who are not listed in

OpenGov, will need to be register as soon as possible so in order to submit on this project electronically. Bidders shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login. Once you have completed account information, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic submittal.

https://teams.microsoft.com/meet/294465757851849?p=rOPcJWmqTjOzFk5hHm https://teams.microsoft.com/meet/294465757851849?p=rOPcJWmqTjOzFk5hHm

Bidders are required to submit an electronic submittal. The City invites bidders to respond to this Initiation to

Bid (ITB) for theCity Center Sport Complex Ballfields Restoration. The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be 395-days, substantial completion and true to the days.

Bids received after the submission deadline will be rejected.

It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.

On-line Provider Disclaimer

The City of Port Orange Purchasing Department is the official source to obtain information relating to the City solicitations. All documents regarding this solicitation are posted utilizing an online bid management system, OpenGov. There is no charge to register with OpenGov and/or to participate in the solicitation process.

This is a third-party provider that provides a platform to communicate solicitation information to the Public.

OpenGov does not represent the City nor does communications through this provider constitute communications to the City. The City of Port Orange is not responsible for errors and omissions occurring in the transmission or downloading of any documents from the online website.

In the event of any discrepancy between information on this website and the hard copy specifications, the terms of the hard copy specification will control.

Offers by telephone, email or fax will not be accepted.

All bids shall be read aloud. All conferences and meetings regarding this bid are recorded electronically (audio only). The

City of Port Orange reserves the right to reject any or all proposals if it is in the best interest of the City.

Note: Bids read aloud at the bid opening is not binding until there has been a responsive and responsible review by

Purchasing in determining who is the lowest price, responsible, and responsive bidder.

Offers by telephone, email or fax will not be accepted.

OPENGOV TECHNICAL SUPPORT

For Technical Support, Respondents can reach the OpenGov Service Desk: Chat (preferred): Click the button in the lower right-hand corner of the portal.

Email: procurement-support@opengov.com Phone: 1 (605) 336-7176 Hours: Mon-Fri 7am - 10pm ET

Timely Questions Regarding this Solicitation

The questions and answer module of OpenGov is being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, October

19, 2026 4:00 pm ET. Respondents are instructed not to contact the initiating division directly. Consideration for modification or alternation of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other contract documentation shall be considered binding. The City shall be bound by mailto:procurement-support@opengov.com information and statements only when such statements are written and executed under the authority of the

Manager, Purchasing Division. Answers for timely questions will be addressed in the OpenGov questions and answer module and an addendum to those questions will be issued and uploaded onto OpenGov.

Beyond questions and answers, any and all modifications, clarifications, interoperations and supplemental instructions will be in the form of a written addenda which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documentation and receipt shall be acknowledged of any addenda before formally submitting a bid for this project.

Untimely questions are unable to be submitted in the question-and-answer module, thereafter, Respondents raising critical concerns must email purchdiv@port-orange.org. Critical clarifications may be made via addenda; however, untimely questions may not be considered.

ADDENDA

The City will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the bid due date. Bidders should not rely on any representations, statements or explanations other than those made in this ITB or in any addendum to this ITB. Where there appears to be a conflict between the ITB and any addenda issued, the last addendum issued will prevail. The Bidder should verify prior to submitting a bid that all addenda have been received and reviewed. All addenda will be published on the City Purchasing web page at www.port‐orange.org/bids.aspx and the OpenGov website at https://procurement.opengov.com/login .

The City of Port Orange reserves the right to consider the omission of an acknowledgment of addendum as cause for rejection of the ITB submittal.

This provision exists solely for the convenience and administrative efficiency of the City of Port Orange. No

Bidder or other third party gains any rights by virtue of this provision or the application thereof, nor shall any

Bidder or third party have any standing to sue or cause of action arising therefrom.

CLARIFICATIONS

It is the Bidder’s responsibility to become familiar with and fully informed regarding the terms, conditions and specifications of this ITB. Lack of understanding and/or misinterpretation of any portions of this ITB shall not be cause for withdrawal of your bid after opening or for subsequent protest of award.

MINIMUM QUALIFICATIONS

Bidders shall be licensed to do business in the State of Florida. Submit Sunbiz report showing your company registered as “Active”.

Bidders must provide a minimum of three (3) verifiable references from similar scopes of work as identified in this ITB on the provided Professional References form (Form 7.8). Failure to provide verifiable references may cause the Bidder to be deemed non‐responsive. The City of Port Orange is not to be used as a reference.

NO LOBBYING

All Bidders are hereby placed on notice that the City of Port Orange Council, City Employees/Staff, nor

Members of the Evaluation Committee (with the exception of the City of Port Orange Purchasing Division personnel designated to receive requests for interpretations or corrections) are not to be lobbied, directly or indirectly either individually or collectively, regarding this ITB. During the entire procurement process, all mailto:purchdiv@port-orange.org http://www.port‐orange.org/bids.aspx

Bidders and their subcontractors, sub‐consultants, or agents are hereby placed on notice that they are not to contact any persons listed above for such purposes as holding meetings of introduction, dinners, etc. if they intend to submit or have submitted bids for this project. Any Bidder contacting individuals mentioned herein in violation of this warning may automatically be disqualified from further consideration for this ITB.

SCHEDULE OF UNIT PRICING

Schedule of Unit Pricing is to be completed as directed and without modification and returned as part of the ITB submittal prior to the ITB deadline for submission. Failure to fill out the Schedule of Unit Pricing as directed and without modification will negatively affect the evaluation of your bid. If the City has a need to revise the

Schedule of Unit Pricing prior to the bid submittal deadline, it will do so in a published addendum. If the City does revise the Schedule of Unit Pricing, bidders must complete and return the City issued revised version of the Schedule of Unit Pricing. If bidder does NOT complete and return the City issued revised version of the

Schedule of Unit Pricing their bid submittal will be deemed non-responsive.

EXCEPTIONS TO SPECIFICATIONS

If taking exception to any portion of the ITB specifications, the Bidder must indicate those exceptions as stated on the Bidder’s Acknowledgement (Form 7.2).

BID SUBMISSION AND WITHDRAWAL

Unless otherwise specified, Bidder shall use the forms supplied by the Purchasing Division. Bids, once opened, become the property of the City, cannot be withdrawn, and will not be returned to the Bidders. Upon opening, bids become subject to public disclosure in accordance with Chapter 119, Florida Statutes.

CORRECTION OF BIDS

Correction of inadvertently erroneous bids shall be permitted up to the time of ITB opening. Bidders shall not be allowed to modify their bids after the opening time and date.

WITHDRAWAL OF BIDS

NO bid shall be withdrawn for a period of one-hundred-twenty (120) days subsequent to the bid opening without the consent of the City of Port Orange. Negligence on the part of the Bidder’s firm in preparing their bid confers no right of withdrawal or modification after the bid has been opened at the appointed time and place by the City of Port Orange. Any such withdrawn bid shall not be resubmitted.

OPENING OF BIDS

Bids will be received until the date and time stated in this ITB and will be publicly opened and read at the place, time and date stated. The City bears no responsibility for the premature opening of a bid not properly addressed and identified.

LITIGATION HISTORY

The City will consider a Bidder’s litigation history information in its review and determination of responsibility.

All Bidders are required to disclose to the City all “material” cases filed, pending, or resolved during the last five (5) years prior to the solicitation response due date, whether such cases were brought by or against the

Bidder, any parent or subsidiary of the Bidder, or any predecessor organization. If the Bidder is a joint venture, the information provided should encompass the joint venture (if it is not newly formed for purposes of responding to the solicitation) and each of the entities forming the joint venture. Although the review of a

Bidder’s litigation history is an issue of responsibility, the failure to provide litigation history as required in the

Evaluation Criteria may result in a recommendation of non‐ responsive by the Purchasing Manager.

DEBARMENT HISTORY

The City will consider a Bidder’s debarment history information in its review and determination of responsibility. All Bidders are required to disclose to the City all cases of debarment filed, pending, or resolved by the City or other public entity during the last five (5) years prior to the solicitation response due date, whether such actions were brought by or against the Bidder, any parent or subsidiary of the Bidder, or any predecessor organization. If the Bidder is a joint venture, the information provided should encompass the joint venture (if it is not newly formed for purposes of responding to the solicitation) and each of the entities forming the joint venture. Although the review of a Bidder’s debarment history is an issue of responsibility, the failure to provide debarment history as required on the Certification Regarding Debarment, Suspension and Other

Responsibility Matters (contained herein) may result in a recommendation of non‐responsive by the Purchasing

Manager.

REJECTION OF BIDS

The City reserves the right to reject any and/or all bids when such rejection is in the best interest of the City.

BIDS MAY BE REJECTED AND/OR BIDDER(S) DISQUALIFIED FOR THE FOLLOWING

REASONS:

(a) Failure to update the information on file including address, product, service or business descriptions.

(b) Failure to perform according to contract provisions.

(c) Conviction in a court of law of any criminal offense in connection with the conducting of business.

(d) Evidence of a violation of any federal or state antitrust law based on the submission of bids or proposals, or the awarding of contracts.

(e) Evidence that the Bidder has attempted to give a City employee a gratuity of any kind for the purpose of influencing a recommendation or decision in connection with any part of the City’s purchasing activity.

(f) Other reasons deemed appropriate by the City.

OWNERSHIP OF DOCUMENTS

All documents resulting from this solicitation will become the sole property of the City of Port Orange. The

Bidder must meet all requirements for retaining public records and transfer, at no cost, to the City all public records in the possession of the Bidder upon termination of this Agreement and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the City in a format that is compatible with the information technology systems of the City.

AMERICANS WITH DISABILITIES ACT (ADA)

If you need special services provided under the Americans with Disabilities Act, contact the ADA Coordinator in our Human Resources office at 386‐506‐5560 at least 48 hours before the scheduled event.

REQUIRED DOCUMENTS FOR AWARDED BIDDER

The awarded Bidder shall return all the required post‐award documents within 10 days after the issuance of the

Notice of Intent to Award in order to execute the contract

4. SECTION 3 - SCOPE OF WORK

4.1. Scope of Work

The City of Port Orange is looking for qualified contractors who can provide the services for the Restoration of the City Center Sport Complex Ballfields. The work generally consists of excavation and removal of the upper three (3) feet of soil throughout the project area; identification, removal, characterization, and lawful disposal of any solid waste or landfill materials encountered during excavation; installation of a reinforced geotextile membrane across the site; replacement and compaction of suitable fill and topsoil; and reconstruction of the ballfields, parking lot, and associated site improvements. Only one (1) contractor will be awarded the contract.

The objective of the project is to restore site functionality, provide long-term stability, and improve the safety and usability of the City Center recreational facilities while appropriately managing legacy landfill conditions encountered during construction.

The City Center Ballfields are located on a former municipal landfill that operated during the 1950s, 1960s, and early 1970s. Due to the presence of historic buried waste and ongoing settlement concerns, the City is undertaking a comprehensive restoration and reconstruction project across approximately 8 acres of developed parkland.

To access the drawings and specification for this solicitation refer to "Attachment A" - Drawings and

"Attachment B" - Specifications attached to this solicitation.

Please refer to this solicitation in order to access all necessary technical documentation and attachments related to this solicitation.

5. SECTION 4 - STANDARD PURCHASING DEFINITIONS

The City will use the following definitions in instructions to respondents, terms and conditions, special provisions, technical specifications and any other solicitation documents.

1. Addendum is a formal written document, released prior to the public opening that modifies any aspect of a solicitation. Plural: Addenda

2. Alternate Bid means multiple bids with substantive variations from the same Bidder in response to a

Solicitation.

3. Amendment is a formal written agreement, signed by both parties, that modifies and existing contractual agreement.

4. Appropriate, Appropriated or Appropriation means the adoption by the City Council of the City of a budget for a fiscal year that includes payments to be made under the Contract during the respective fiscal year.

5. Best Value means the highest overall value to the City based on factors that include, but are not limited to, price, quality, design and workmanship.

6. Bid is a complete, properly signed response to an Invitation to Bid, which if accepted, would bind the

Bidder to perform the resultant Contract.

7. Bid Guaranty (Bid Bond) guarantees that the Bidder will not withdraw the Bid within the period specified for acceptance and will execute a Contract and furnish required bonds and any necessary insurance within the time specified in the solicitation unless a longer time is allowed by the City. The guarantee will be returned to the Bidder upon execution of a Contract.

8. Bidder, Proposer or Respondent is a person, firm or entity that submits a Response to a Solicitation.

Any Bidder, Proposer or Respondent may be represented by an agent after submitting evidence demonstrating the agent’s authority. The agent cannot certify as to his own agency status.

9. City means the City of Port Orange.

10. Competitive (Formal) Solicitation is the process of requesting and receiving two or more sealed bids, proposals, statements of qualifications or replies submitted by responsive Bidders or Respondents in accordance with the terms of a competitive process, regardless of the method of procurement.

11. Competitive Negotiation means a method for acquiring good, services and construction for public use in which discussions or negotiations may be conducted with responsible offerors who submit Responses through a competitive process, regardless of the method or procurement.

12. Competitive Range means the responsive submissions that meet the evaluation criteria and are considered to be reasonably susceptible of award.

13. Construction means the process of building, repairing, improving and alterations, conversion or extension of buildings, parks, utilities, streets or other improvements or alterations to real property.

14. Contract is a written agreement or purchase order issued for the purchase of goods or services.

15. Contractor means the person, firm or entity selling goods or services to the City under a Contract.

16. Deliverables means the goods, products, materials and/or services to be provided the City by a Bidder or

Respondent.

17. Due Date means the date and time specified for the receipt of responses to a solicitation.

18. End User is a person, program, agency or other eligible user who uses a contract to purchase a commodity or contractual service.

19. Evaluation Committee/Team is a temporary group of City personnel who are responsible for the evaluation of proposals as part of a Request for Proposals (RFP), Request for Statements of Qualifications

(RFSQ) or competitive grant process.

20. Evaluator is a member of the evaluation committee/team

21. Goods are supplies, materials, or equipment.

22. Intent to Award is a document that informs the public and respondents of the City’s decision to award a contract pursuant to a previously issued competitive solicitation.

23. Invitation to Bid (ITB) or Bid means a formal request to prospective Bidders requesting pricing for a specified Good or Service which has been advertised for bid in a newspaper.

24. Invitation to Negotiate (ITN) means a formal request to prospective proposers requesting proposed specifications and pricing of a product and/or service which has been advertised for replies in a newspaper.

25. Issues means points, matters or concerns to be addressed during negotiations.

26. Lead Negotiator is the negotiator responsible for leading and facilitating the formal negotiation discussions and selecting other required negotiation team members. Is often the “driver of change” and seeks alternatives/options.

27. Lowest Responsible Bid means the responsive bid meeting all requirements of the specifications, terms, and conditions of the Invitation to Bid resulting in the lowest cost to the City in a total cost concept or based solely on price, taking into consideration the financial and practical ability of the Bidder to perform the Contract, past performance of the Bidder, and compliance with all City ordinances concerning the purchasing process.

28. Lowest Responsible Bidder means the Bidder submitting lowest responsible bid.

29. Negotiation Team is a temporary group of City personnel who are responsible for negotiations as part of an Invitation to Negotiate (ITN).

30. Negotiator is a member of the negotiation team.

31. Non-Professional Services are services performed that are not of a professional nature such as lawn care, security, janitorial, etc.

32. Offer means a complete signed Response submitted to the City in response to a Solicitation including, but not limited to, a bid submitted in response to an Invitation to Bid, a proposal submitted in response to a

Request for Proposal, a quote submitted in response to a Request for Quotation, a Statement of

Qualifications and interest submitted in response to a Request for Statements of Qualifications or a reply submitted in response to an Invitation to Negotiate.

33. OpenGov is the official online repository for all City competitive solicitations.

34. Outlier is a proposal which is determined by the Purchasing Director or Manager to be significantly dissimilar to or inconsistent with competing bids or offers.

35. Pre-Bid/Proposal/Statement/Reply Conference means a meeting conducted by the Purchasing Office, held in order to allow Respondents to ask questions regarding the proposed Contract and particularly the

Contract specifications with the City Department requesting the goods/services.

36. Price Analysis is an evaluation of the total cost of a contract in order to determine if the price is reasonable.

37. Procurement (Process) is a term used in the governmental sector for the combined functions of acquiring

(purchasing) needed goods and/or services, receiving and inspection, inventory management, contract administration and disposal/service.

38. Professional Services means those services within the scope of the practice of architecture, professional engineering, landscape architecture or registered surveying and mapping, as defined by the laws of the

State, or those performed by any architect, professional engineer, landscape architect or registered surveyor and mapper in connection with his or her professional employment or practice.

39. Proposal is a complete, properly signed response to a Request for Proposal, based on performance that is offered rather than on that of price alone, which if accepted, would bind the Respondent to perform the resultant Contract.

40. Protest is a formalized process by which respondents have an opportunity to challenge a procurement practice or contract award.

41. Purchase Order is an order placed by the Purchasing Division for the purchase of goods or services written on the City’s standard Purchase Order form and which, when accepted by the Respondent, becomes a contract. The Purchase Order is the Bidder’s authority to deliver and invoice the City for the goods or services specified and the City’s commitment to accept the goods or services for an agreed upon price.

42. Request for Proposal (RFP) means a formal request to prospective Respondents requesting qualifications of the Respondent and pricing for a specified good or service which has been advertised for

Proposal in a newspaper.

43. Request for Statement of Qualifications (RFSQ) means a formal request to prospective proposers requesting statements of qualifications pursuant to Florida Statute 287.055 “Consultant’s Competitive

Negotiation Act” which has been advertised for Statement in a newspaper.

44. Respondent means an entity that has (or will, i.e. “prospective respondents”) submitted a response to a competitive solicitation conducted to create a contractual relationship for the provision of commodities or services.

45. Response/Submission means all materials submitted to the City by a Respondent as part of a solicitation.

A response may be called a bid, proposal, statement of qualifications or a reply, depending on the type of competitive solicitation being issued.

46. Responsible (Bidder/Proposer/Respondent) is a Bidder, Proposer or Respondent who has the capability in all respects to fully perform the contract requirements and the integrity and reliability that will assure good faith performance.

47. Responsive (Bidder/Proposer/Respondent) is a Bidder, Proposer or Respondent that has submitted a bid, proposal, statement of qualifications or reply that conform in all material respects to the solicitation.

48. Scope means the extent of the area or subject matter that something deals with or to which is relevant.

49. Scope of Work means a description of the work activities, deliverable and/or timeline that a Respondent must execute in terms of delivering specific commodities or in performance of contractual services.

50. Services include all work or labor performed for the City on an independent contractor basis other than construction.

51. Solicitation means a formal request, as applicable, for prospective Bidders, Proposers or Respondents to submit a response to an Invitation to Bid, Request for Proposal, Request for Statement of Qualifications, Invitation to Negotiate or Request for Quotation.

52. Solicitation Document means a document or collection of documents, either paper or electronic, that contains all information required to conduct a competitive procurement project according to §287.057, Florida statutes.

53. Stakeholder means an individual, who is not likely to become a Respondent, who has and interest in the commodities/contractual services needed.

54. Subcontractor means a person, firm or entity providing goods or services to a Respondent to be used in the performance of the Respondent’s obligations under the Contract.

55. Subject Matter Expert means a person who has working or expert knowledge about a particular topic or field.

56. Unbalanced Bid means a bid that is based on prices which are significantly less than cost for some bid items and significantly more than cost for others.

6. SECTION 5 - GENERAL TERMS AND CONDITIONS

These terms and conditions are standard for and apply to all solicitations for commodities or services issued through the City of Port Orange Purchasing Division; however, said terms and conditions are hereby superseded, in whole or in part, by Section 6, Special Requirements/Instructions. Any conflict between Section 5 and 6, then

Section 6, shall prevail.

READ THIS ENTIRE DOCUMENT CAREFULLY. FOLLOW ALL INSTRUCTIONS. YOU ARE

RESPONSIBLE FOR FULFILLING ALL REQUIREMENTS AND SPECIFICATIONS. BE SURE YOU

UNDERSTAND THEM.

6.1. ACCEPTANCE BY CITY

The City shall have a reasonable time (but not less than 30 days) after receipt to inspect the goods and services tendered by the Bidder. The City at its option may reject all or any portion of such goods or services which do not, in City’s sole discretion, comply in every respect with all terms and conditions of the contract. The City may elect to reject the entire goods and services tendered even if only a portion thereof is nonconforming. If the City elects to accept nonconforming goods and services, the City, in addition to its other remedies, shall be entitled to deduct a reasonable amount from the price thereof to compensate the City for the nonconformity. Any acceptance by the City, even if non‐conditional, shall not be deemed a waiver or settlement of any defect in such goods and services. The material delivered as a result of this solicitation shall remain the property of the seller until a physical inspection and actual usage of the item(s) is made and thereafter deemed acceptable to the satisfaction of the City, in compliance with the terms and specifications contained herein. In the event that the item(s) supplied to the City is/are found to be defective, or does/do not conform to specifications, the City reserves the right to cancel the order upon written notice to the seller and return the item(s) to the seller at the seller's expense.

6.2. ADDENDA

When specifications are revised, the City of Port Orange Purchasing Division will issue an addendum addressing the nature of the change. Respondents should acknowledge all addenda by completing Form 9.3 contained herein. Failure to acknowledge the correct number of addenda issued may result in rejection of the Response. It is the responsibility of the Respondent to ensure all addenda have been received prior to submitting a proposal.

All Addenda shall be posted by the City on https://procurement.opengov.com/portal/portorangefl and City of Port

Orange Purchasing Web page at www.port-orange.org/bids.aspx. The City shall issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the Solicitation

Response Due Date. Respondents should not rely on any representations, statements or explanations other than those made in this Solicitation or in any addendum to the Solicitation. Where there appears to be a conflict between the Solicitation and any addenda issued, the last addendum issued shall prevail.

6.3. ADDITIONAL GOODS

Products, materials and goods not specifically identified in this bid request may be added to any resultant contract upon mutual consent of the contracting parties. The City reserves the right to add or delete products or materials of similar nature, within the family of products of “ITB Item(s)” and their commodity codes, to those items requested in this bid.

6.4. ANTI-COLLUSION STATEMENT

http://www.port-orange.org/bids.aspx

By submitting this Response to a Formal Solicitation, the Respondent affirms that this Response is without previous understanding, agreement or connection with any person, business or corporation submitting a Response for the same materials, supplies or equipment, and that this Response is in all respects fair and without collusion or fraud. Additionally, Respondent agrees to abide by all conditions of this Solicitation and certifies that they are authorized to sign this Response for the Respondent. In submitting a Response to the City of Port Orange, the

Respondent offers and agrees that if the Response is accepted, the Respondent shall convey, sell, assign or transfer to the City of Port Orange all rights, title and interest in and to all causes of action it may now or hereafter acquire under the Anti-trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the City of Port Orange. At the City’s discretion, such assignment shall be made and become effective at the time the City tenders final payment to the Respondent.

6.5. APPLICABLE LAWS

In connection with the furnishing of supplies or performance of work under the Contract, the Respondent agrees to comply with the Fair Labor Standards Act, Equal Opportunity Employment Act and all other applicable federal and state laws, regulations and executive orders to the extent that the same may be applicable.

6.6. ASSIGNMENT

The successful Respondent shall not sell, assign, transfer or convey this contract in whole or in part, without the prior written consent of the City of Port Orange. Any such assignment or transfer shall not release Respondent from all contractual obligations.

6.7. AUTHORITY TO CONDUCT BUSINESS IN FLORIDA

A Florida corporation or partnership is required to provide evidence with its response that the Respondent is authorized to transact business in Florida and is in good standing with the Florida Department of State. If not with the response from the successful Respondent, such evidence must be submitted to the City no later than five (5) business days from request of the Purchasing Manager. A foreign (out-of-state) corporation or partnership is required to provide evidence with its response that the Respondent is authorized to transact business in Florida and is in good standing with the Florida Department of State. If not with the response from the successful

Respondent, such evidence must be submitted to the City no later than five (5) business days from request of the

Purchasing Manager. A joint venture is required to provide evidence with its response that the joint venture, or at least one of the joint venture partners, is authorized to transact business in Florida and is in good standing with the Florida Department of State. If not with its response, such evidence must be submitted to the City no later than five (5) business days from request of the Purchasing Manager. However, the joint venture is required to provide evidence prior to contract execution that the joint venture is authorized to transact business in Florida and provide the City with a copy of the joint venture Agreement. A joint venture is also required to provide with its response a Statement of Authority indicating that the individual submitting the joint venture’s proposal has the legal authority to bind the joint venture. If not with its response, such evidence must be submitted to the City no later than five (5) business days from the request of the Purchasing Manager.

6.8. AWARDS

Recommendation for award will be considered by the City of Port Orange City Council at the earliest possible regular meeting subsequent to the evaluation process. This ITB is issued in accordance with and shall be governed by the provisions of the City’s Purchasing Manual. The City of Port Orange City Council reserves the right to make award(s) by individual sections, groups, all or none, or a combination thereof, with one or more Bidders; to reject any and all bids, or to waive any informality or technicality in bids received as deemed to be in the best interest of the City. The City does not award publicly funded contracts to those who knowingly employ unauthorized alien workers in violation of section 274A(e) of the Immigration and Naturalization Act, 8 United

States Code s1324a(e). Such employment deprives legal workers of job opportunities. Violation of section

274A(e) shall be grounds for unilateral cancellation of the contract, bid or quote for purchase of services and goods by the City of Port Orange.

6.9. AWARD AND EXECUTION OF CONTRACT

When a bid received has been determined to be satisfactory, a contract will be awarded, or Purchase Order issued to the lowest responsive and responsible Bidder within the time designated in the contract documents. The

Bidder(s) to whom the award is made shall execute the contract(s) and return it, together with the properly executed bonds and insurance certificates to the City within the time specified.

6.10. BID RETURNS

Bidders shall return all completed responses to the City of Port Orange at the address set forth in Section 2 of this document on the date and at the time specified. Late submissions will not be accepted and shall be returned to

Bidders unopened.

6.11. BID PROTEST

Any person who is adversely affected by the City’s decision or intended decision shall file with the City

Purchasing Manager a notice of protest in writing within 72 hours after the posting of the notice of decision or intended decision. With respect to a protest of the terms, conditions, and specifications contained in a solicitation, including any provisions governing the methods for ranking bids, proposals, statements, or replies, awarding contracts, reserving rights of further negotiation, or modifying or amending any contract, the notice of protest shall be filed in writing within 72 hours after the posting of the solicitation. Saturdays, Sundays, and state holidays shall be excluded in the computation of the 72‐hour time established herein. The formal written protest shall be filed with the Purchasing Manager in writing within ten (10) days after the date the notice of protest is filed. The formal written protest shall state with particularity the facts and law upon which the protest is based. Failure to file a notice of protest or failure to file a formal written protest shall constitute a waiver of proceedings. Upon receipt of the formal written protest that has been timely filed, the City shall stop the solicitation or contract award process until the subject of the protest is resolved by final City action. However, the City may continue the solicitation or award process, provided the City Manager sets forth in writing particular facts and circumstances which require the continuance of the solicitation or contract award process without delay in order to avoid an immediate and serious danger to the public health, safety, or welfare. The City shall provide an opportunity to resolve the protest by mutual agreement between the parties. The policy this City has established is as follows:

1. As soon as possible after receipt, the Purchasing Manager shall provide written bid protest to City

Manager, City Attorney, Department Head involved, and Supervisor directly involved in the acquisition.

2. Purchasing Manager shall schedule within seven (7) business days, excluding weekends and holidays, a meeting with the above‐mentioned individuals or designee and protestor. The intent of the meeting is to provide a review and/or solution prior to going before Council. After reviewing all relevant information, the City Manager shall render a decision.

3. If the protestor disagrees, he/she may appeal to the City Council at a formal council meeting. After reviewing the evidence, the City Council will issue their decision. The City Council's decision is final;

however, the protestor can appeal the decision to the Circuit Court in Volusia County, Florida within thirty

(30) days of the City Council’s final decision. Decisions at all levels shall be in writing to the protester.

6.12. BID TABULATION

Bidders who wish to receive a copy of the bid tabulation may obtain it via OpenGov at https://procurement.opengov.com/portal/portorangefl or on the City Purchasing web page at www.port‐ orange.org/bids.aspx.

6.13. BIDDER’S PRODUCT OR SERVICES

The Bidder’s product (if applicable) delivered to the City shall be free of all liens, claims or encumbrances, and the Bidder warrants that it has a clear title to the product being delivered.

1. If the Bidder is contracted to provide services, such services shall be fully satisfactory to the City as determined by the City.

2. The Bidder shall provide the City with any data, reports or other information as required and requested by the City to enable it to utilize the product or service furnished by the Bidder.

3. In furnishing the service or product to the City, the Bidder shall comply with all federal, state, county laws, and city rules, regulations and codes and their successors or amendments. Violation of such laws, rules, regulations and codes may be grounds for delaying or reducing the amount due, or in rescinding the contract, proposal or quote.

6.14. BONDS

If this solicitation requires submission of bid guarantee and payment and performance bonds, there will be a separate section explaining those requirements. When the Purchasing Manager deems it necessary, bid bonds/deposits shall be prescribed and are advertised in the public notices inviting bids. Responses submitted without the required bid bond or certified check shall be deemed non-responsive. Normally, if a bid bond/deposit is requested, it is in the amount of five percent (5%) of the bid amount.

Depending on the amount and/or nature of the work to be performed, a Payment and Performance Bond may be requested and shall be in an amount equal to one hundred percent (100%) of the total contract amount which will be recorded by the City, at the awarded Bidder’s sole cost and expense, with the Clerk of the Circuit Court, Volusia County, Florida. After recording, the City will furnish to the awarded Bidder the recording information for the bond to evidence that the Bidder has met the requirements of Florida law. The City will bill the cost of recording to the awarded Bidder. Unsuccessful respondents are entitled to the return of their bid bond. A successful respondent shall forfeit any surety required by the Purchasing Manager upon failure of the respondent to enter into a contract within the time specified after the award of bid.

6.15. CERTIFICATE OF INSURANCE

If required upon notice of intent to award contract resulting from this solicitation, the selected Respondent will be required to submit a Certificate of Insurance showing proof of adequate coverage for professional general https://procurement.opengov.com/portal/portorangefl https://www.port‐orange.org/bids.aspx https://www.port‐orange.org/bids.aspx liability, errors and omissions and workers’ compensation as identified under the insurance…

This is the start of the file's text. The full file is on GovTribe.