Attachment_1___Schedule_of_Unit_Pricing.xlsx

XLSX spreadsheet 212 KB Posted

Attached to
City Center Sport Complex Ballfields Restoration
Solicitation number
ITB-26-22-CW
Issued by
Volusia County, Florida

About this file

This is a Schedule of Unit Pricing attachment for Invitation to Bid (ITB) 26-22-CW for the City Center Sports Complex Ballfields Restoration project in Florida. The project involves excavation and removal of the upper three feet of soil, identification and lawful disposal of solid waste or landfill materials, installation of a reinforced geotextile membrane, replacement and compaction of suitable fill and topsoil, and reconstruction of ballfields, parking lot, and associated site improvements. The work scope encompasses general conditions and mobilization, erosion and sediment control, surveying and as-built drawings, site clearing and demolition, subgrade preparation (35,000 cubic yards), subbase installation (15,000 cubic yards), geotextile reinforcement (300,000 square feet), protective cover layer (13,000 cubic yards), topsoil placement (10,000 cubic yards), site concrete work (8,500 square feet), chain link fencing (3,200 linear feet total), backstop installation, asphalt pavement (3,500 square yards), infield development, waste disposal (2,000 tons), sod installation (32,500 square yards), irrigation system, and electrical work including an electronic scoreboard and Musco lighting services.

The pricing schedule requires vendors to complete unit costs for all 23 base bid line items and three bid alternates related to artificial turf installation options for soccer and baseball fields with associated deductions for topsoil, sod, and irrigation not installed. All line items are currently listed at zero dollars, requiring bidder completion. The base bid serves as the sole determining factor for cost evaluation at bid opening, with bid alternates excluded from the cost comparison. Bidders must not modify Attachment 1 or their bid will be deemed non-responsive. The project involves substantial earthwork, site infrastructure, landscape and irrigation systems, and electrical upgrades to restore site functionality, long-term stability, and safety of City Center recreational facilities while managing legacy landfill conditions.

View the file

Other files

File Type Posted
City_Center_Sport_Complex_Ballfields_Restoration_(Addendum_#1_Revision).pdf PDF
Attachment_D_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_Bonding_Capacity_and_Payment_and_Performance_Bond.pdf PDF
Attachmernt_C_Standard_Construction_Contract_-_Architect_Template.pdf PDF
Attachment_A_City_Center_Sports_Complex_Specifications.pdf PDF
Attachment_B_City_Center_Sports_Complex_Ballfield_Restoration_Drawings_(1).PDF PDF
Current_Bonding_Capacity_Letter_(as_outlined_in_Section_6).pdf PDF
Form_7.10_-_Scrutinized_Companies_Certification.pdf PDF
Form_7.15_-_No_Submittal.pdf PDF
Form_7.16_-_Representative_Certification_Form.pdf PDF
Form_7.5_-_Public_Entity_Crimes_Statement.pdf PDF
Form_7.7_-_Statement_of_Bidder's_Qualification.pdf PDF
Form_7.8_-_Professional_References_for_Previous_Experience.pdf PDF
APPENDIX_A_-_44_C.F.R_PART_18_CERTIFICATION_REGARDING_LOBBYING.pdf PDF
Exhibit_A_-_Description_of_Confidential_Materials.pdf PDF
Form_7.13_-_Debarment_Suspension_and_Other_Responsibility_Matters.pdf PDF
Form_7.9_-_List_of_Subcontractors.pdf PDF
Forn_7.2_-_Bidder's_Acknowledgement.pdf PDF
Human_Trafficking_Affidavit.pdf PDF
Leased_Employee_Affidavit.pdf PDF
Affidavit_Regarding_Workers'_Compensation.pdf PDF
Form_7.11_-_Local_Business_Affidacit_of_Eligibility.pdf PDF
Form_7.12_-_E-Verify_Affidavit.pdf PDF
Form_7.14_-_Affidavit_of_Compliance_with_F.S._287.138.pdf PDF
Form_7.4_-_Drug_Free_Preference_Statement.pdf PDF
Form_7.6_-_Anti-Collusion.pdf PDF
Form_7.1_-_Bid_Submittal_Checklist.pdf PDF
Form_7.3_-_Addendum_and_Change_Order_Procedure_Acknowledgement.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

ATTACHMENT 1 SCHEDULE OF UNIT PRICING
ERROR:#VALUE!
TITLE: ITB -26-22-CW - CITY CENTER SPORTS COMPLEX BALLFIELDS
VENDOR NAME:______________________________________________________________
DATE:________________________________________
Modification to "Attachment 1" may cause your bid to be non-responsive
BASE BID
Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
General
1Mobilization, Demobilization, & General Conditions1LS$ - 0
2Erosion and Sediment Control1LS$ - 0
3Surveying, Layout, As-Built Drawings, & Project Closeout1LS$ - 0
Site Improvements
4Site Clearing, Grubbing, & Demolition1LS$ - 0
5Preparation of top of Subgrade35000CY$ - 0
6Subbase15000CY$ - 0
7Geotextile Reinforcement Layer300000SF$ - 0
8Protective Cover Layer13000CY$ - 0
9Onsite Topsoil Layer Placement10000CY$ - 0
10Misc Site Concrete Work (Min 6-inch Thick)8500SF$ - 0
116-Foot Chain Link Fence Including Gates3000LF$ - 0
128-Foot Chain Link Fence Including Gates200LF$ - 0
13Backstop Complete1LS$ - 0
14Asphalt Pavement - Min 2-inch thick FC 12.53500SY$ - 0
15Infield Development of Baseball Field Complete1LS$ - 0
16Off-Site Disposal of Waste2000TN$ - 0
Landscape & Irrigation
17Sod (Celebration Hybrid Bermuda Grass)25000SY$ - 0
18Sod (Bahia Grass)7500SY$ - 0
19Irrigation System Complete1LS$ - 0
Electrical System
20Electrical Demolition Complete1LS$ - 0
21Electronic Scoreboard1LS$ - 0
22Electrical Upgrades Complete1LS$ - 0
23Musco Services1LS$ - 0
Total Base Bid$ - 0
BID ALTERNATES
Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
BID ALTERNATE 1
24Supply and Install Artificial Turf Complete (25 + 26 - 24a)1LS$ - 0
24aDeduct for Topsoil, Sod, and Irrigation not Installed (25a + 26a)1LS$ - 0
Bid Alternate 1 Total$ - 0
BID ALTERNATE 2
25Supply and Install Artificial Turf - Soccer Field (25 - 25a)1LS$ - 0
25aDeduct for Topsoil, Sod, and Irrigation not Installed1LS$ - 0
Bid Alternate 2 Total$ - 0
BID ALTERNATE 3
26Supply and Install Artificial Turf - Baseball Field (26 - 26a)1LS$ - 0
26aDeduct for Topsoil, Sod, and Irrigation not Installed1LS$ - 0
Bid Alternate 3 Total$ - 0

Total Bid Alternates $ - 0

TOTAL BASE BID WITH BID ALTERNATES$ - 0
*The Base Bid only will be the determining factor for cost for this project. The Bid Alternate cost will not be included with the Base Bid in reading of cost for this project at the Bid Opening*
LEGEND
EA - EACH
LF - LINEAR FEET
LS - LUMP SUM
SY - SQUARE YARD
SF - SQUARE FOOT

File details come from the government source that posted it. Updated .