This is a Contract Data Requirements List (CDRL) appendix specifying a single data item requirement for a CH-53K Organizational Level Support Equipment contract. The contractor is required to submit a Request for Information (RFI) Technical Data Package as data item A001, categorized as Other (XX), with delivery in Microsoft Word format. The data item references SOW Paragraph 3.5.1 and is intended for the requiring office BL22100 with Distribution Statement D authorization limited to DoD and DoD Contractors only.

The RFI must be submitted as soon as possible to avoid manufacturing delays whenever the contractor requires further information or clarification on the Technical Data Package provided to perform fabrication processes. The Government cognizant CH-53K Support Equipment Engineer, identified as POC Ed Ceralde, must respond within two business days of each contractor submission. Government final inspection and acceptance of all production units must be accomplished at the source by a Government representative prior to DD-250 completion. Deliverables should be directed to Ed Ceralde at (732) 323-4664 or edward.v.ceralde.civ@us.navy.mil. The CDRL was prepared and approved on 03/03/26.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDEX A: CONTRACT DATA REQUIREMENTS LIST (CDRL)

17. PRICE GROUP

Group IV

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER XX

D. SYSTEM/ITEM

CH-53K Organizational Level

SE

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Request for Information (RFI) Technical Data Package

3. SUBTITLE

See Block 16

4. AUTHORITY (Data Acquisition Document No.)

See Block 16

5. CONTRACT REFERENCE

SOW Paragraph 3.5.1

6. REQUIRING OFFICE

BL22100

7. DD 250 REQ

YES

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

N/A Draft

Final

Reg. Repro

16. REMARKS

Block 3: The contractor shall submit a Request for Information whenever further information or clarification on the Technical Data Package (TDP) provided is needed in order to perform the fabrication process. The Government shall reply within two (2) business days of the request.

Block 4: Request for Information Documentation shall be delivered in Microsoft word format.

Block 7: Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250. Government Inspection and Acceptance of all production units shall be accomplished at the source by a Government representative.

Block 9: Use Distribution Statement D. Distribution authorized to DoD and DoD Contractors only, (30 January 2007) other U.S. requests shall be referred to Code 486300B

Block 12: Submission shall be done as soon as possible in order to avoid any manufacturing delays. The cognizant CH-53K Support Equipment Engineer will respond within two (2) business days after the contractor's submission.

Block 14: Certificates shall be delivered to POC Ed Ceralde(CH-53K SE Engineering)

(732) 323-4664 Email Address: edward.v.ceralde.civ@us.navy.mil

POC 0 1 1

15. TOTAL 0 1

G. PREPARED BY : H. DATE I. APPROVED BY : J. DATE

03/03/26 03/03/26

2026-03-03T13:21:51-0500
CERALDE.EDWARD.VILLARANTE.1165969878
2026-03-03T13:57:57-0500
SHAH.TAHIR.A.1228640880

File details come from the government source that posted it. Updated .