C250214_SOWV.pdf

PDF 234 KB Posted

Attached to
Bus Scaffolding Systems
Solicitation number
250214
Issued by
Orange County, California

About this file

This is a Scope of Work Verification Form submitted by the Orange County Transportation Authority (OCTA) in California for a bus scaffolding systems procurement. The Authority is inviting bids from qualified contractors to provide two (2) bus scaffolding systems under requisition number ROO1097. The contract term is two (2) years, with a total budget of $500,000. The Project Manager from Transit Technical Services submitted this verification form on December 23, 2025, certifying that the attached scope of work and specifications were independently prepared to invite competition without reference to brand names, unreasonable restrictions, or intent to favor any specific vendor or product.

The verification form confirms that the scope of work meets the Authority's requirements by identifying all characteristics, specific tasks, and functions of the items to be procured in a clear and concise manner. The Project Manager and Department Manager have certified compliance with the general rules for preparing scopes of work, including the use of performance characteristics and specifications appropriate to the Authority's needs. The document establishes that no consultants who may bid on this procurement were involved in developing or writing the scope of work, ensuring competitive integrity and adherence to Federal Transit Administration regulations under FTA Circular 4220.1F.

View the file

Other files

File Type Posted
Bus_Scaffolding_Systems.pdf PDF
C250214_PP-APPROVED.pdf PDF
250214_IFB_Exhibit_A_SOW.pdf PDF
250214_IFB_Exhibit_A_SOW_GMEDITS.docx DOCX document
C250214_SOWV_gmedits.pdf PDF
C250214_PP_GMEDITS.pdf PDF
C250214_Notice_of_Proof.pdf PDF
250214_PS_v3.pdf PDF
C250214_PP.pdf PDF
250214_IFB_Exhibit_B_Price_Summary_Sheet.pdf PDF
250214_IFB_Exhibit_C_Insurance.pdf PDF
250214_IFB_Exhibit_D_Safety_Specifications.pdf PDF
C250214_250214-001.pdf PDF
C250214_ICE.pdf PDF
DBE_Program_Requirements.docx DOCX document
Davis-Bacon_Labor_Provisions.pdf PDF
C250214_PM_Correspondence.pdf PDF
C250214_Insurance_Review.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK VERIFICATION

This Form Must Be Submitted with Scope of Work (SOW)

FA-CAMM-071.docm (03/16/18) Page 1 of 1

The following general rules shall apply when preparing scopes of work and specifications:

a) Provide a clear and concise Scope of Work (SOW) and not impose unreasonable requirements.

b) Specifications and Scopes of Work shall identify all characteristics and specific tasks and functions of the items or services to be procured, and meet the Authority’s requirements.

c) Whenever possible, the expected quality of services to be provided or the performance characteristics of the item shall be specified.

d) The requestor shall identify all optional items, and the solicitation documents shall set forth the expected needs and the manner in which the related bid prices will be considered.

e) Brand name specifications must be accompanied by an explanation that clearly indicates that the specification is not intended to be restrictive.

f) The salient characteristics represented by the brand names shall be identified to allow for evaluation of possible “or equal” material.

g) Because standard specifications and requirements allow for more efficient operations and result in lower prices, they shall be used wherever suitable.

h) Industry, federal, state and local government specifications and requirements can be used.

Consultants are prohibited from writing the Scope of Work or assisting in the development or writing the Scope of Work in which they may bid.

INSTRUCTIONS

Project Managers (PM) must select one of the following certifications and submit this form with the scope of work/specifications. This form must be signed by the Project Manager and one of the following: the PM’s Department Manager or Director or Executive Director.

☒ I certify that the attached SOW/specifications was independently prepared to invite competition;

does not include reference to a brand name, or include unreasonable restrictions or an intent to favor any specific vendor or brand product.

OR

☐ The SOW/specifications prepared includes a “brand name or equal” description because it was determined to be “impractical or uneconomical” (as referenced in FTA Circular 4220.1F -revised March 18, 2013) to write a clear and accurate description of the technical requirements of the goods or services to be acquired. However, the specific features or salient characteristics of the named brand which must be met by offerors of “an equal” proposal have been clearly stated, as required by Federal Transit Administration regulations. (FTA Circular 4220.1F – revised March 18, 2013)

ROO1097

Requisition Number Dept. Manager/Director/Executive Director Signature

Project Manager Signature

Transit Technical Services 12/23/2025 Department Date

File details come from the government source that posted it. Updated .