C1_Cost Workbook.xlsx

XLSX spreadsheet 214 KB Posted

Attached to
NAWCAD WOLF EPF REQUEST FOR OFFER
Solicitation number
N0042126R1024
Issued by

About this file

This is a Cost Workbook template and instruction document for federal contract proposals submitted to the Naval Air Warfare Center at NAWCAD WOLF. The workbook is designed to capture and calculate all direct labor costs, indirect costs, fees, and other direct costs (ODCs) for both prime contractors and subcontractors over a multi-year period of performance, with provisions for up to five option years plus a base year.

The workbook contains multiple integrated worksheets: an Indirect Rates and Fee worksheet for entering overhead, fringe benefits, G&A, material handling, and profit margins; a Cost Summary worksheet for detailing individual employee labor costs by labor category with BLS (Bureau of Labor Statistics) or SCA (Service Contract Act) classifications and site locations (government facility or contractor facility); a Fully Burdened Labor Rates worksheet for consolidating total labor costs inclusive of all indirect charges; a Firm Fixed Price Summary worksheet for fixed-price labor arrangements; and a CLIN Summary sheet correlating costs to specific contract line items. The template includes pre-populated escalation rates of 3.40% for BLS categories and 2.76% for SCA categories, with provisions for adjustment and narrative explanation. Labor categories are drawn from the RFO and include trades such as machinists, sheet-metal workers, welders, electricians, inspectors, and project management specialists, with specific minimum direct labor rates established for each category. All cells are designed to remain unprotected with formulas intact for government evaluation, dollar figures are limited to two decimal places, and the workbook accommodates multiple subcontractors with separate cost buildups. The document emphasizes proper formula application and prohibits certain editing methods (such as drag-down features) that would compromise calculation integrity.

View the file

Other files

File Type Posted
Solicitation Amendment N0042126R10240002 SF 30.pdf PDF
EPF Final RFO_QAr1.pdf PDF
Solicitation Amendment - N0042126R10240001.pdf PDF
Att 01 EPF PWS-SOW.pdf PDF
Solicitation Amendment N0042126R10240001 SF 30.pdf PDF
L1_SECTION L - Instructions Conditions and Notices (Amd 0001).docx DOCX document
EPF Final RFO_QA.pdf PDF
Att 06_EPF OCI List.docx DOCX document
EPF Draft RFO_QA.pdf PDF
Att 01_EPF PWS SOW.pdf PDF
N00421-26-R-1024_DD254_Signed.pdf PDF
Att 03_EPF_Award Fee Determination Plan (AFDP).docx DOCX document
Att 04_EPF QASP CSP.docx DOCX document
C4_Government Labor Hours.xlsx XLSX spreadsheet
Att 05_Data Item Transmittal Form.docx DOCX document
Att 07_WD 2015-4279 Rev32.pdf PDF
P1_Key Personnel.docx DOCX document
Solicitation - N0042126R1024.pdf PDF
L1_SECTION L - Instructions Conditions and Notices.docx DOCX document
M1_SECTION M - Evaluation Factors for Award.docx DOCX document
Att 08_TDL Admin Plan.docx DOCX document
Att 09_Labor Mix and Allocation.pdf PDF
Att 10_SBPCD.docx DOCX document
EPF CDRL.pdf PDF
C2_Cost Reimbursable Narrative.docx DOCX document
C3_Fixed T and M Price Narrative.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Attachment C1 Instructions
Green Cells are Formula Based
Yellow Cells require an Input
Only one workbook shall be prepared for the entire period of performance (one workbook for each Prime and one for each Subcontractor)

The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait.

DO NOT FORMAT FOR LEGAL SIZE PAPER.

All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
All dollar figures shall be carried out no further than two decimal places. (ex $25.50)
Instructions for Prime Contractor:
Base Year ColumnSubsequent Year Columns
Indirect Rates and Fee Worksheet Instructions
1Enter Prime Contractor's name into cell A3.
2Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet, these rates will be pulled into the Cost Summary Spreadsheet, ensure formula are still intact.DE, F, G, H, I
Cost Summary Worksheet Instructions
3Enter Prime Contractor's name into cell A3.AN/A
4Enter all Prime current or contingent employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 10). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if the Contractor proposes four Computer Systems Analysts, then the labor category Computer Systems Analysts shall be listed four times along with their applicable rates and information.AN/A
5Use the drop down in Column B to enter the Labor Category from the RFO that you will be utilizing. By utilizing this drop-down, the minimum realistic rate, as stated in the Minimum Direct Labor Rates worksheet will fill in, in Column H. Please see the RFO for additional guidance regarding the minimum realistic rate. Note - DO NOT use the drag feature to pull down a labor category to a subsequent row. This will not allow the formulas to work properly.BN/A
6In Column C (beginning row 10), the Contractor shall select "Performance" if Column B is a performance based labor category or "Non-performance" if Column B is a non-performance based labor category. Note - DO NOT use the drag feature to pull down a performance based selection to a subsequent row. This will not allow the formulas to work properly.CN/A
7In Column D, the Contractor shall select "BLS" if Column B is a BLS labor category or "SCA" if Column B is an SCA labor category. This dropdown will allow the escalation formulas in Columns O, T, Y, AD, and AI to calculate properly.DFormula Driven - O, T, Y, AD, AI
8In Column E, the Contractor shall insert a "K" if the employee will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If this procurement has various Govt Site locations (example, WOLF and Pax River), utilize "G" for both locations, a distinction does not need to be made between these sites for evaluation purposes.EN/A
9In Column F, identify the geograpical location of the position for each row. This input shall match the geograpic location specified within the Government Labor Category (column B).FN/A
10In Column G, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time.GN/A
11In Column I, insert the direct labor rate for each row. If the rate proposed is less than the minimum direct labor rate as included in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this happens for a prospecitive employee, an explanation should be included in your cost narrative. Note, subsequent rate Columns (N, S, X, AC, and AH) are formula based and are calculated using the escalation for that year. Ensure Formulas are intact.IFormula Driven - N, S, X, AC, AH
12In Column J, enter the labor hours for each row. Enter hours for each subsequent year (Columns O, T, Y, AD, and AI)JO, T, Y, AD, AI
13This workbook includes hidden columns to assist with the correct application of indirect rates (two Columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you can delete the calculations included in the hidden columns that assist with adding overhead to Fringe.Formula Driven - L, MFormula Driven - Q, R, V, W, AA, AB, AF, AG, AK, AL
14Escalation has been autopopulated based on the RFO. If, in accordance with the RFO, you are utilizing a rate that differs than that has already been filled in, you may change the value in the cell and provide an explanation in your cost narrative.N/AO, T, Y, AD, AI
15For each Subcontractor, enter the employee name (or the word "Prospective"), labor category, Performaance or Non-Performance, BLS or SCA, site, location, f/p, fully burdened rate and hours (for all years)A, B, D, E, F, G, I, JN, O, S, T, X, Y, AC, AD, AH, AJ
16The minimum rate is blacked out in Column H for the subcontractors within the Prime's section. The minimum rate is analyzed at the direct labor rate, however, the rates included for the subcontractor's in the Prime's submission will be fully burdened labor rates.HN/A
17Please note if more subcontractors are needed, the Contractor may add additional rows to accommodate them, but ensure integrity of formulas. If fewer subcontractors are needed, hide the rows instead of deleting them.
18Under Other Direct Costs, the Prime Contractor should enter the proposed ODC costs in Columns K, P, U, Z, AE, AJKP, U, Z, AE, AJ
19Check to ensure the indirects are applied appropriately to ODCs. If the formulas that are utilized do not match your accounting practices, either adjust in the Indirects Rates and Fee tab or adjust the formula and note why changes and what specific changes were made in the Attachment C2 - Cost/Price Narrative.KP, U, Z, AE, AJ
Fully Burdened Labor Rates Worksheet Instructions
20Enter Prime Contractors's name into cell A3.AN/A
21Enter employee names (starting at row 10). For Prospective hires enter the cell reference from Column A of the Cost Summary Worksheet under applicable Prime Contractor or Subcontractor header. If necessary, insert additional rows--but ensure integrity of formulas.AN/A
22Use the drop down in Column B to enter the Labor Category which matches the Cost Summary Worksheet. Note - the Labor Category used in B10 of the Cost Summary worksheet should match the Labor Category used in B10 of the Fully Burdened Labor Rates worksheet.BN/A
22Enter the Fully Burdened Labor Rate rounded to two decimal places for each year for every employee.
Fully Burdened Labor Rates shall include indirect rates, fee, and subcontractor pass-through costs where applicable. For Subcontractor labor, the fully burdened labor rates shall be inclusive of any pass-through charges (e.g., subcontractor handling, fixed fee on subcontractor labor, etc.) applied by the Prime Contractor. They should not include Fully Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs.CF, I, L, O, R
23Enter the labor hours for each year for every employee ensuring the values match the Cost Summary Worksheet.DG, J, M, P, S
24The Annual Fully Burdened amount by employee is calculated by multiplying the Fully Burdened Labor Rate by the number of hours proposed by year. This should auto calculate however, if additional rows are added please ensure the formulas are intact.EH, K, M, Q, T
Fixed Price Summary Worksheet Instructions
25Enter Prime Contractors's name into cell A3.AN/A
26Enter employee names (starting at row 10). For Fixed Prospective hire enter the cell reference from Column A of the Fully Burdened Labor Rates Worksheet under applicable Prime Contractor or Subcontractor header. If necessary, insert additional rows--but ensure ingegrity of formulasAN/A
27Use the drop down in Column B to enter the Labor Category which matches the Fully Burdened Labor Rates Worksheet. Note - the Labor Category used in B10 of the Fully Burdened Labor Rates Worksheet should match the Labor Category used in B10 of the Fixed Price Labor Worksheet.BN/A
28In Column C, the Contractor shall select "BLS" if Column B is a BLS labor category or "SCA" if Column B is an SCA labor category.CN/A
29In Column D, the Contractor shall insert a "K" if the employee will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If this procurement has various Govt Site locations (example, WOLF and Pax River), utilize "G" for both locations, a distinction does not need to be made between these sites for evaluation purposes.DN/A
30In Column E, identify the geograpical location of the position for each row. This input shall match the geograpic location specified within the Government Labor Category (column B).EN/A
31In Column F, enter the labor hours for each row. Enter hours for each subsequent year (Columns H,J, L,N)FH, J, L, N
32In Column G, enter the Firm Fixed Price rounded to two decimal places for each year for every Firm Fixed Price employee.
Firm Fixed Price Labor shall be fully burdened to include their indirect rates, profit, and subcontractor pass-through costs where applicable. For Subcontractor labor, the firm fixed price labor shall be inclusive of any pass-through charges (e.g., subcontractor handling, fixed fee on subcontractor labor, etc.) applied by the Prime Contractor. They should not include Fully Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs.GI, K, M, O
Section B Worksheet Instructions
33In Column C, input proposed hours for each CLIN.CN/A
34In Column D, input total proposed Cost or Fixed Fee amount for each CLIN, as applicable.DN/A
35In Column E, input total Award Fee amount for each CLIN if applicable.EN/A
36In Column F, input total CLIN value for all Firm Fixed Price or Cost Plus Award Fee CLINs, as applicable.F
Instructions for Subcontractors:
Green Cells are Formula Based
Yellow Cells require an Input
For your (the subcontractor) cost build up, you will utilize the "Prime" section of the Cost Summary worksheet. For all intents and purposes (other than A3) where it says Prime, you can replace "Prime" with subcontractor, or your company name.
Base Year ColumnSubsequent Year Columns
Indirect Rates and Fee Worksheet Instructions
1Enter Prime Contractors's name into cell A3.

Enter Subcontractor's name into cell A4.

2Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet, these rates will be pulled into the Cost Summary Spreadsheet, ensure formula are still intact.DE, F, G, H, I
Cost Summary Worksheet Instructions
3Enter Prime Contractors's name into cell A3.
Enter Subcontractor's name into cell A4.AN/A
4Enter all Subcontractor employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 10). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if the Contractor proposes four Computer Systems Analysts, then the labor category Computer Systems Analysts shall be listed four times along with their applicable rates and information.AN/A
5Use the drop down in Column B to enter the Labor Category from the RFO that you will be utilizing. By utilizing this drop-down, the minimum realistic rate, as stated in the Minimum Direct Labor Rates worksheet will fill in, in column H. Please see RFO for additional guidance regarding the minimum realistic rate.BN/A
6Enter all Subcontractor labor categories in Column C (starting at row 10). In Column C, the Contractor should insert the title of the labor category it will be utilizing. The Contractor is not required to utilize the Government's labor categories, however, each proposed labor category should appear in the column beside the government labor category it is comparable to. Please note, in evaluation, the Contractor's proposal will be compared to the RFO in terms of hours and labor categories.CN/A
7In Column D, the Contractor shall select "BLS" if Column B is a BLS labor category or "SCA" if Column B is an SCA labor category. This dropdown will allow the escalation formulas in Columns O, T, Y, AD, and AI to calculate properly.DFormula Driven - O, T, Y, AD, AI
8In Column E, the Contractor shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If this procurement has various Govt Site locations (example, WOLF and Pax River), utilize "G" for both locations, a distinction does not need to be made between these sites for evaluation purposes.EN/A
9In Column F, identify the geograpical location of the position for each row. This input shall match the geograpic location specified within the Government Labor Category (column B).FN/A
10In Column G, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time.GN/A
11In Column I, insert the direct labor rate for each row. If the rate proposed is less than the minimum direct labor rate as included in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this happens for a prospecitive employee, an explanation should be included in your cost narrative. Note, subsequent rate Columns (N, S, X, AC, and AH) are formula based and are calculated using the escalation for that year. Ensure Formulas are intact.IFormula Driven - N, S, X, AC, AH
12In Column J, enter the labor hours for each row. Enter hours for each subsequent year (Columns O, T, Y, AD, and AI)JO, T, Y, AD, AI
13This workbook includes hidden columns to assist with the correct application of indirect rates (two Columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you can delete the calculations included in the hidden columns that assist with adding overhead to Fringe.Formula Driven - L, MFormula Driven - Q, R, V, W, AA, AB, AF, AG, AK, AL
14Escalation has been autopopulated based on the RFO. If, in accordance with the RFO, you are utilizing a rate that differs than that has already been filled in, you may change the value in the cell and provide an explanation in your cost narrative.N/AN, S, X, AC

Indirect Rates and Fee

INDIRECT COST SUMMARY

Prime Contractor Name:
Subcontractor Name (if applicable):
Indirect Rates (%)
Indirect Cost CategoryYear 1Year 2Year 3Year 4Year 5Year 6
Fringe
FFringe: Full Time
PFringe: Part Time
Overhead*
KTRKTR Site OH
GGov Site OH
TOther Site OH
G&A
G&A
G&A on ODCs
Subcontractor Handling
Material Handling (on ODC)
Material Handling (on sub)
SubcontractsHandling
Fee
Fee on Prime labor
Fee on Sub labor

*Note, this procurement does not designate any other sites than Government and KTR site. The "Other Site" Overhead option is included in case the Contractor has multiple OH rates beyond Government and KTR site.

Cost Summary

COST REIMBURSABLE SUMMARY SPREADSHEET

Prime Contractor Name:
Subcontractor Name (if applicable):BLS Escalation3.40%BLS Escalation3.40%BLS Escalation3.40%BLS Escalation3.40%
SCA Escalation2.76%SCA Escalation2.76%SCA Escalation2.76%SCA Escalation2.76%
Year 1Extra columns to apply overhead to FringeYear 2Extra columns to apply overhead to FringeYear 3Extra columns to apply overhead to FringeYear 4Extra columns to apply overhead to FringeYear 5Extra columns to apply overhead to FringeExtra columns to apply overhead to FringeTotal for All Years
Cost ElementsGovernment Labor CategoryPerformance Based/Non-performance BasedBLS or SCASite (K, G, T)LocationF/PMinimum Direct Labor RateRate | 1Hours | 1Amount | 1Overhead on Fringe Calc. | 1Fringe Amount | 1Rate | 2Hours | 2Amount | 2Overhead on Fringe Calc. | 2Fringe Amount | 2Rate | 3Hours | 3Amount | 3Overhead on Fringe Calc. | 3Fringe Amount | 3Rate | 4Hours | 4Amount | 4Overhead on Fringe Calc. | 4Fringe Amount | 4Rate | 5Hours | 5Amount | 5Overhead on Fringe Calc. | 5Fringe Amount | 5Overhead on Fringe Calc. | 6Fringe Amount | 6Hours | TotalAmount | TotalRowColumn1Column2Column3Column4Column5Column6Column7
Prime Contractor Labor Cost8
Prime Contractor Direct Labor9
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 010
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 011
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 012
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 013
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 014
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 015
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 016
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 017
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 018
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 019
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 020
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 021
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 022
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 023
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 024
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 025
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 026
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 027
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 028
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 029
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 030
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 031
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 032
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 033
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 034
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 035
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 036
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 037
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 038
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 039
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 040
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 041
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 042
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 043
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 044
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 045
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 046
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 047
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 048
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 049
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 050
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 051
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 052
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 053
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 054
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 055
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 056
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 057
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 058
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 059
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 060
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 061
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 062
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 063
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 064
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 065
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 066
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 067
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 068
Employee Name or Prospective$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0$0.00$ - 0- 0$ - 069
$0.00$0.00$0.00$0.0070
Total Direct Labor Cost- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 071
Overhead on Fringe Calculation$0.00Overhead on Fringe CalculationOverhead on Fringe CalculationOverhead on Fringe CalculationOverhead on Fringe CalculationOverhead on Fringe Calculation72
Prime Indirect Labor CostBaseFringe Base KTR SiteFringe AmountBaseFringe Base KTR SiteFringe AmountBaseFringe Base KTR SiteFringe AmountBaseFringe Base KTR SiteFringe AmountBaseFringe Base KTR SiteFringe AmountFringe Base KTR SiteFringe Amount73
OverheadKTRK0.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 0$ - 074
OverheadGovtG0.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 0$ - 075
OverheadOtherT0.00%$ - 0$ - 0Fringe Base Govt SiteFringe Amount0.00%$ - 0$ - 0Fringe Base Govt SiteFringe Amount0.00%$ - 0$ - 0Fringe Base Govt SiteFringe Amount0.00%$ - 0$ - 0Fringe Base Govt SiteFringe Amount0.00%$ - 0$ - 0Fringe Base Govt SiteFringe AmountFringe Base Govt SiteFringe Amount$ - 076
Subtotal Overhead$ - 0$ - 0$ - 0$ - 0$ - 077
Fringe BenefitsFull TimeF0.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 0$ - 078
Fringe BenefitsPart TimeP0.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 00.00%$ - 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 0$ - 079
Subtotal Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 080
Subtotal$ - 0Fringe Base TeleworkFringe Amount$ - 0Fringe Base TeleworkFringe Amount$ - 0Fringe Base TeleworkFringe Amount$ - 0Fringe Base TeleworkFringe Amount$ - 0Fringe Base TeleworkFringe AmountFringe Base TeleworkFringe Amount$ - 081
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 082
Premium
Hanson, Jennifer T CIV AIR, 2.0: This is a placeholder to add a formula for overtime.Overtime Premium- 0$ - 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0ERROR:#REF!$ - 0$ - 083
G&AG&A0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 084
Total Indirect Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 085
Total Direct and Indirect Labor cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 086
BaseBaseBaseBaseBase87
FCCOM$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 088
Total Prime Contractor Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 089
90
Subcontractor Labor Cost91
92
0000000093
Subcontractor (Name)- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 094
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 095
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 096
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 097
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 098
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 099
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0100
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0101
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0102
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0103
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0104
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0105
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0106
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0107
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0108
Subcontractor (Name)- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0109
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0110
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0111
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0112
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0113
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0114
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0115
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0116
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0117
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0118
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0119
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0120
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0121
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0122
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0123
Subcontractor (Name)- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0124
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0125
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0126
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0127
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0128
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0129
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0130
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0131
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0132
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0133
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0134
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0135
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0136
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0137
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0138
Subcontractor (Name)- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0139
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0140
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0141
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0142
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0143
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0144
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0145
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0146
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0147
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0148
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0149
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0150
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0151
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0152
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0153
Subcontractor (Name)- 0$ - 0- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0154
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0155
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0156
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0157
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0158
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0159
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0160
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0161
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0162
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0163
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0164
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0165
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0166
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0167
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0168
Subcontractor (Name)- 0$ - 0- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0169
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0170
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0171
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0172
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0173
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0174
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0175
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0176
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0177
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0178
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0179
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0180
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0181
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0182
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0183
Subcontractor (Name)- 0$ - 0- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0184
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0185
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0186
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0187
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0188
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0189
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0190
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0191
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0192
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0193
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0194
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0195
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0196
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0197
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0198
Subcontractor (Name)- 0$ - 0- 0$ - 00- 0$ - 00- 0$ - 00- 0$ - 0- 0$ - 0199
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0200
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0201
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0202
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0203
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0204
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0205
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0206
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0207
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0208
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0209
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0210
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0211
Employee Name or Prospective$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0212
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0213
$ - 0$ - 0$ - 0$ - 0$ - 0- 0$ - 0214
00000000215
Total proposed subcontractor cost (w/sub fee)- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0216
Prime contractor pass through (not including prime fee)217
HandlingMaterial Handling (on sub)0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0218
HandlingSubcontractsHandling(SH)0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0219
G&AG&A0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0220
Other (if any)221
Total pass through (not including fee)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0222
Total Subcontractor Cost including pass through$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0223
224
Total Labor Cost (Prime and Subcontractor Labor)- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0225
226
FeeBaseBaseBaseBaseBase227
Prime Contractor Fee for Prime Contractor Labor0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0228
Prime Contractor Fee for Subcontractor Labor *0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0229
Total Fee (for Prime and Subcontractor Labor)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0230
231
Total Labor Cost Plus Award Fee (CPAF)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0232
233
Other Direct Costs234
Other Direct Costs (ODCs)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0235
Travel$ - 0236
Field Services$ - 0237
Material$ - 0238
239
Any adders to ODCs such as G&A (cost only - no fee)BaseBaseBaseBaseBase240
HandlingMaterial Handing (on ODC)0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0241
G&AG&A0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0242
Total ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0243
244
245
Total CPAF and COST CLINs (Labor and ODCs)- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0246
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0ERROR:#DIV/0!
Award Fee Analysis - Total for All YearsAmountPercent
Total CPAF Labor Cost (Prime and Sub)$0
Total Fee (Prime and Prime on Sub Labor)$0ERROR:#DIV/0!
Total Award Fee BreakdownBase Fee per Hour
Year 1 Fee$ - 0Not Applicable
Base Fee$ - 0
Award Fee$ - 0
Year 2 Fee$ - 0Not Applicable
Base Fee$ - 0
Award Fee$ - 0
Year 3 Fee$ - 0Not Applicable
Base Fee$ - 0
Award Fee$ - 0
Year 4 Fee$ - 0Not Applicable
Base Fee$ - 0
Award Fee$ - 0
Year 5 Fee$ - 0Not Applicable
Base Fee$ - 0
Award Fee$ - 0
Total Base Fee$ - 0Not Applicable
Total Award Fee$ - 0

&"Times New Roman,Bold"UNCLASSIFIED

&"Times New Roman,Regular"&8 Source Selection Information - See FAR 2.101 and 3.104 &"Times New Roman,Bold"UNCLASSIFIED &"Times New Roman,Regular"&P of &N

Fully Burdened Labor Rates

FULLY BURDENED LABOR RATES SPREADSHEET

Prime Contractor Name:
Subcontractor Name (if applicable):
Fully Burdened Labor RatesYear 1Year 2Year 3Year 4Year 5Year 6
Government Labor CategoryRate | 1Hours | 1Amount | 1Rate | 2Hours | 2Amount | 2Rate | 3Hours | 3Amount | 3Rate | 4Hours | 4Amount | 4Rate | 5Hours | 5Amount | 5Rate | 6Hours | 6Amount | 6
Prime Contractor
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00
Employee Name or Prospective$0.00$0.00$0.00$0.00$0.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .