Att 04_EPF QASP CSP.docx

DOCX document 70 KB Posted

Attached to
NAWCAD WOLF EPF REQUEST FOR OFFER
Solicitation number
N0042126R1024
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) and Contract Surveillance Plan (CSP) document for Engineering, Prototyping, and Fabrication Support Services under a Naval Air Warfare Center Aircraft Division (NAWCAD) WOLF task order. The hybrid QASP/CSP establishes Government-developed methods to ensure systematic quality assurance oversight of contractor performance delivering both performance-based and non-performance-based services. The document defines roles and responsibilities for the Contracting Officer (KO), Contracting Officer's Representative (COR), Alternate COR (ACOR), and Government Project Leads (GPLs) in administering and surveilling the task order, which will operate under a Cost Plus Award Fee (CPAF) and Firm Fixed Price Level of Effort (FFP LOE) pricing structure with a five-year base period and option years.

The surveillance plan establishes performance standards requiring 95 percent of services and products be deemed comprehensive, timely, and technically acceptable based on Government Project Lead feedback, with 100 percent inspection by Government representatives. Key service requirements include providing sufficient industrial space, fabrication support, compliance support (including Modeling and Simulation, machining, sheet metal, welding, assembly, composite repairs, woodworking, and painting), and personnel as required. Contract Data Requirements List (CDRL) deliverables include monthly management reports for Technical Direction Letters, Government Property Reports, Phase-Out Transition Plans, Accident Incident Reports, Manufacturing Non-Conformance Support, Certification Data Reports, NAVAIR Operations Security Plans, and Small Business Utilization Reports. The plan employs quarterly surveillance assessments and annual evaluations using the Contractor Performance Assessment Reporting System (CPARS) format, with acceptable "Satisfactory" performance across all measurement areas (quality, schedule, cost control, business relations, management, and small business utilization) serving as a condition for exercising future option years.

View the file

Other files

File Type Posted
EPF Final RFO_QAr1.pdf PDF
Solicitation Amendment N0042126R10240002 SF 30.pdf PDF
Solicitation Amendment N0042126R10240001 SF 30.pdf PDF
L1_SECTION L - Instructions Conditions and Notices (Amd 0001).docx DOCX document
EPF Final RFO_QA.pdf PDF
Solicitation Amendment - N0042126R10240001.pdf PDF
Att 01 EPF PWS-SOW.pdf PDF
Solicitation - N0042126R1024.pdf PDF
L1_SECTION L - Instructions Conditions and Notices.docx DOCX document
M1_SECTION M - Evaluation Factors for Award.docx DOCX document
Att 08_TDL Admin Plan.docx DOCX document
Att 09_Labor Mix and Allocation.pdf PDF
Att 10_SBPCD.docx DOCX document
EPF CDRL.pdf PDF
C2_Cost Reimbursable Narrative.docx DOCX document
C3_Fixed T and M Price Narrative.docx DOCX document
Att 06_EPF OCI List.docx DOCX document
C1_Cost Workbook.xlsx XLSX spreadsheet
EPF Draft RFO_QA.pdf PDF
Att 01_EPF PWS SOW.pdf PDF
N00421-26-R-1024_DD254_Signed.pdf PDF
Att 03_EPF_Award Fee Determination Plan (AFDP).docx DOCX document
C4_Government Labor Hours.xlsx XLSX spreadsheet
Att 05_Data Item Transmittal Form.docx DOCX document
Att 07_WD 2015-4279 Rev32.pdf PDF
P1_Key Personnel.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED Enclosure (6)

Quality Assurance Surveillance Plan and Contract Surveillance Plan for Comment by Poston, Michael E CIV USN NAVAIRWARCENACDIV MD (USA): The ordering of terms matches the PWS/SOW or SOW/PWS (i.e. if PWS/SOW then QASP/CSP, if SOW/PWS then CSP/QASP) Engineering, Prototyping, and Fabrication Support Services

1. Purpose

This requirement consists of both performance-based and non-performance-based tasking; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are both required. This hybrid QASP/CSP is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Task Order (TO). The intent is to ensure the Contractor performs In Accordance With (IAW) the Performance Work Statement/Statement of Work (PWS/SOW), and the Government receives the quality of services called for in the Seaport NxG TO.

The NAWCAD WOLF Engineering & Prototyping (EP) Operations provides rapid organic engineering, prototyping, reverse-engineering, environmental testing, antenna repairs/life cycle extensions, and production capabilities in support of NAWCAD, Naval Air Systems Command (NAVAIR), and the NAWCAD WOLF Divisions. The EP Operations, operating under the oLSI® model, has requirements to provide fabrication support and compliance support to include Modeling and Simulation (M&S); machining; sheet-metal design, layout, and fabrication; welding; assembly; composite repairs and fabrication of composite components and structures; woodworking; painting, including preparation and application of corrosion control coatings and powder coating; management of a stockroom (e.g., tooling, hand tools, and fasteners), facilities and personnel safety management and preparedness to include Hazardous Materials (HAZMAT).

This TO will have Cost Plus Award Fee (CPAF) and FFP LOE (Firm Fixed Price Level of Effort). The TO will have a five year period of performance base and option years. A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this hybrid QASP/CSP is provided under TO Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the TO that will be executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the QASP/CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the TO.

The hybrid QASP/CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the TO.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The ACO will be designated in the resulting TO. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the TO. The COR will be appointed in the resulting TO. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the TO. The ACOR will be appointed in the resulting TO. The limitations of authority are contained in a written letter of appointment.

Government Project Lead (GPL): The COR designates individual GPLs to assist in administering specific efforts under the TO.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this hybrid QASP/CSP:

KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the TO, and safeguards the interests of the United States in the contractual relationship. The KO assures that the Contractor receives impartial, fair, and equitable treatment under the TO. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the TO and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the TO price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the TO and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the TO price, terms, or conditions shall be referred to the KO for action.

GPL: The GPL is responsible for assisting in administering specific efforts under the TO. A GPL cannot, in any manner, alter the scope of the TO, make commitments, or authorize any changes on the Government’s behalf.

6.Methods of QA Surveillance
a.Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this TO. Additionally, an evaluation using the CPARS format will be performed at the end of each base or option year. This evaluation will be one determinant in the award of future TOs or option exercises. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid QASP/CSP.

b. QASP/CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this TO. In addition to the below instructions, the form to be used for documentation of QA surveillance is the hybrid checklist provided herein.

7. Surveillance

Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the Contractor, COR, ACOR, and GPLs while Enclosures (4) through (6) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the TO. The COR shall forward these records to the KO at termination or completion of the TO.

9. Enclosures

Enclosure (1): Quality Standards – Performance Work Statement and Statement of Work Enclosure (2): Contract Data Requirements List (CDRL) Data Quality Standards Enclosure (3): Incentives Enclosure (4): Contract Surveillance Plan (CSP) Enclosure (5): Contract Surveillance by Contract Data Requirements List (CDRL) Enclosure (6): Annual Surveillance Summary

UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED Version 6.2

UNCLASSIFIED 2

ENCLOSURE (1): QUALITY STANDARDS - BY PERFORMANCE WORK STATEMENT

Required Service (Performance Requirements)
Standard (Performance Standards)/Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance (QA)
Incentives
Provide a sufficient industrial space for influx of work IAW SOW/PWS Para 3.1.2.5
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 3.
Provide Fabrication Support IAW SOW/PWS Para 3.3.1
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 3.
Provide Compliance Support IAW SOW/PWS Para 3.3.2
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 3.

ENCLOSURE (1): QUALITY STANDARDS - BY STATEMENT OF WORK

Required Service (Performance Requirements)
Standard (Performance Standards)/Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance (QA)
Incentives
Provide Fabrication Support IAW SOW/PWS Para 3.3.1
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 3.
Provide Compliance Support IAW SOW/PWS Para 3.3.2
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 3.
Provide Personnel as required IAW SOW/PWS Para 3.4
Based upon feedback from the GPLs, 95% of the staffing needs to be provided up front at the time of award, as well as maintain tenure.
100% Inspection by COR, ACOR, and/or GPLs
See Enclosure 3.

UNCLASSIFIED Enclosure (1)

UNCLASSIFIED 4

ENCLOSURE (2): CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA QUALITY STANDARDS

Description
Standard
AQL
Surveillance/Method/Measure
Incentives
Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs) – Segregation of Cost and Invoice Requirements Reporting for TDLs (CDRL A001)
Submission is IAW the DID cited in the CDRL.
100% of required deliverable provided on time. No more than one report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Government Property (GP) Report (CDRL A002)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Phase-Out Transition Plan (CDRL A003)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Accident Incident Report (CDRL A004)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Manufacturing Non-Conformance Support (CDRL A005)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Certification Data Report (CDRL A006)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
NAVAIR Operations Security (OPSEC) Plan (CDRL A007)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.
Small Business Utilization Report (CDRL A008)
Submission is IAW the DID cited in the CDRL
100% of required deliverable provided on time. No more than one revision required.
100% Inspection by COR, ACOR, and/or GPLs.
See Enclosure 4.

UNCLASSIFIED Enclosure (2)

ENCLOSURE (3): INCENTIVES

The following incentives shall apply to performance under this Task Order (TO).

Assessment Period
Acceptable Performance Definition
How Measured
Incentives
Base Year:
All measurement areas rated “Satisfactory” See below.
Midpoint of the assessment period (six month) evaluation using the CPARS format covering the previous six months.
(+) Meet the acceptable performance definition as a condition for further option exercise. *

(-) Does not meet the acceptable performance definition as a condition for further option exercise. *

Option Year 1:
All measurement areas rated “Satisfactory” See below.
Midpoint of the assessment period (six month) evaluation using the CPARS format covering the previous six months.
(+) Meet the acceptable performance definition as a condition for further option exercise. *

(-) Does not meet the acceptable performance definition as a condition for further option exercise. *

Option Year 2:
All measurement areas rated “Satisfactory” See below.
Midpoint of the assessment period (six month) evaluation using the CPARS format covering the previous six months.
(+) Meet the acceptable performance definition as a condition for further option exercise. *

(-) Does not meet the acceptable performance definition as a condition for further option exercise. *

Option Year 3:
All measurement areas rated “Satisfactory” See below.
Midpoint of the assessment period (six month) evaluation using the CPARS format covering the previous six months.
(+) Meet the acceptable performance definition as a condition for further option exercise. *

(-) Does not meet the acceptable performance definition as a condition for further option exercise. *

Option Year 4:
All measurement areas rated “Satisfactory” See below.
Midpoint of the assessment period (six month) evaluation using the CPARS format covering the previous six months.
(+) Meet the acceptable performance definition as a condition for further option exercise. *

(-) Does not meet the acceptable performance definition as a condition for further option exercise. *

* The Government reserves the right not to award option Contract Line Item Numbers (CLINs)/Task Orders (TOs) if the Contractor does not meet the acceptable performance standards, and/or meet all regulatory requirements.

All Performance Work Statement/Statement of Work (PWS/SOW) and Contract Data Requirements List (CDRL) tasks, including sub-tasks, will be assessed focusing on the following.

Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of TO execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or affect the schedule variance. Also address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Cost Control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling TO cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For TOs where the task or TO sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort will be assessed.

Business Relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, adequate staffing, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the TO; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by the TO; and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of Small Business (SB): The Request for Proposal (RFP)/Request for Offer (RFO) and FAR Subpart 19.109 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small-Disadvantaged Businesses (SDBs) (which also includes ANCs and Indian Tribes), Women-Owned SBs (WOSBs), HUBZone, Veteran-Owned SBs (VOSBs), Service-Disabled Veteran Owned SBs (SDVOSBs), and ANCs and Indian Tribes that are not SDBs or SBs to participate in TO performance consistent with efficient performance of the TO. Evaluation will focus on the metrics of actual SB utilization as compared to the TO required targets and the Contractor’s submitted SB plan.

Other areas: Assess additional evaluation areas unique to the TO or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

UNCLASSIFIED Enclosure (3)

ENCLOSURE (4): CONTRACT SURVEILLANCE PLAN (CSP)

Quarterly Surveillance:

The Contracting Officer’s Representative (COR) will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of Small Business (SB), and other areas as applicable utilizing the evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION – BY Performance Work Statement/Statement of Work (PWS/SOW)

Description
Surveillance Method/

Measure

Dates
Quality Assessment
Schedule Assessment
Cost Control Assessment
Business Relations Assessment
Management Assessment
Utilization of SB Assessment
Other Areas Assessment
Provide a sufficient industrial space for influx of work IAW SOW/PWS Para 3.1.2.5
100% inspection by COR, ACOR, and/or GPLs.
Provide Fabrication Support IAW SOW/PWS Para 3.3.1
100% inspection by COR, ACOR, and/or GPLs.
Provide Compliance Support IAW SOW/PWS Para 3.3.2
100% inspection by COR, ACOR, and/or GPLs.
Provide Personnel as required IAW SOW/PWS Para 3.4
100% inspection by COR, ACOR, and/or GPLs.

UNCLASSIFIED Enclosure (4)

ENCLOSURE (5): CONTRACT SURVEILLANCE BY CONTRACT DATA REQUIREMENTS LIST (CDRL)

Description
Surveillance

Method/Measure

Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments
Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs) – Segregation of Cost and Invoice Requirements Reporting for TDLs (CDRL A001)
100% Inspection by COR, ACOR, and/or GPLs.
10th business Day of the month
Government Property (GP) Report (CDRL A002)
100% Inspection by COR, ACOR, and/or GPLs.
One time w/ Revisions as they are applicable
Phase-Out Transition Plan (CDRL A003)
100% Inspection by COR, ACOR, and/or GPLs.
One time 60 days prior to termination of contract
Accident Incident Report (CDRL A004)
100% Inspection by COR, ACOR, and/or GPLs.
As required – due 24 hrs after accident
Manufacturing Non-Conformance Support (CDRL A005)
100% Inspection by COR, ACOR, and/or GPLs.
10th business day of the month
Certification Data Report (CDRL A006)
100% Inspection by COR, ACOR, and/or GPLs.
20 business days after TO award
NAVAIR Operations Security (OPSEC) Plan (CDRL A007)
100% Inspection by COR, ACOR, and/or GPLs.
90 calendar days after TO award
Small Business Utilization Report (CDRL A008)
100% Inspection by COR, ACOR, and/or GPLs.
Five calendar days after contract
Metric Summary:
Current Period
Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

UNCLASSIFIED Enclosure (5)

ENCLOSURE (6): ANNUAL SURVEILLANCE SUMMARY

The Contracting Officer’s Representative (COR) will perform an assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous 12 months.

Description
Surveillance

Method/Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings
Schedule
Review of Quarterly Ratings
Cost Control
Review of Quarterly Ratings
Business Relations
Review of Quarterly Ratings
Management
Review of Quarterly Ratings
Utilization of Small Business (SB)
Review of Quarterly Ratings
Other Areas
Review of Quarterly Ratings

Annual Surveillance Completed by: _______________________

Date Completed: ________________

File details come from the government source that posted it. Updated .