C-2 Attachment 3 Project Drawings.pdf
PDF 14 MB Posted
- Attached to
- JRD Compound Heating - Ventilation - Air Conditioning & Envelope Improvements Federal contract opportunity
- Solicitation number
- 1240BJ26Q0001
- Issued by
- Department of Agriculture Forest Service
About this file
This file is a comprehensive set of construction documents for an HVAC modernization project at the ANM-JRD Compound (Admiralty National Monument - Juneau Ranger District) within the Tongass National Forest in Alaska, prepared for the U.S. Department of Agriculture Forest Service, R10 Alaska Region.
The project encompasses modernization of heating, ventilation, and control systems across three buildings: an Office Building, Warehouse, and Dry Storage Building. Key mechanical work includes: removal of existing fuel oil boiler system and installation of two 210 kW electric boilers with associated pumps and expansion tanks; establishment of a district heating system with direct bury piping connecting all three buildings; replacement of all hydronic heating balance valves; installation of a heat recovery ventilator in the Storage Building; and comprehensive upgrades to the DDC (Direct Digital Controls) control system. The electrical scope involves providing a new 480V/3-phase electrical service to the Office Building with two 210 kW boilers requiring approximately 505 amps total demand, installation of underground conduits and fiber optic cables for controls, new data cabinets at the Warehouse and Storage Building, and integration with existing panelboards. Major deliverables include system flushing and purification of glycol-based heating water to under 3% concentration, complete testing and balancing of all HVAC systems, commissioning of the district heating plant and control systems, and submission of as-built drawings. The project location coordinates are 58.39931, -134.57070 near Juneau, Alaska, with work designated "For Construction" and approved by Forest Engineer Michael Downs and District Ranger Rueben Graves.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Forest Service
ALASKA
JUNEAU
(R10) ALASKA REGION
TONGASS NATIONAL FOREST
ADMIRALTY NATIONAL MONUMENT - JUNEAU RANGER DISTRICT (ANM-JRD)
ANM-JRD COMPOUND
HVAC MODERNIZATION
FOREST LOCATION
TRAVEL DIRECTIONS: VICINITY MAP
FOR
CONSTRUCTION
RECOMMENDED BY:
FOREST FACILITIES PROGRAM MANAGER DATE
APPROVED:
FOREST ENGINEER DATE
DISTRICT RANGER DATE
58.39931 , -134.57070
SHEET 01 OF 43
INDEX OF SHEETS
SHEET PAGE SHEET TITLE
G-01 01 TITLE SHEET, INDEX OF SHEETS
C-1 02 SITE PLAN
C-2 03 CONSTRUCTION DETAILS
A0.0 04 GENERAL NOTES, ABBREVIATIONS
A1.0 05 FLOOR 1, OFFICE BUILDING
A2.0 06 FLOOR 2, OFFICE BUILDING
A3.0 07 FLOOR 1, DRY STORAGE BUILDING
A4.0 08 FLOOR 1, WAREHOUSE
A5.0 09 DETAILS
A6.0 10 FLOOR 1, OFFICE BUILDING RCP
A7.0 11 FLOOR 2, OFFICE BUILDING RCP
M101 12 SYMBOLS AND GENERAL NOTES
M102 13 SCHEDULES
M201 14 SITE DEMO PLAN
M202 15 SITE PLAN
M203 16 SITE DETAILS
M301 17 OFFICE BUILDING FIRST FLOOR DEMO PLAN
M302 18 OFFICE BUILDING MECHANICAL A102 DEMO PLAN
M303 19 OFFICE BUILDING FIRST FLOOR PLAN
M304 20 OFFICE BUILDING SECOND FLOOR PLAN
M305 21 OFFICE BUILDING ATTIC PLAN
M306 22 OFFICE BUILDING MECHANICAL A102 PLAN
M401 23 WAREHOUSE PLAN
M501 24 STORAGE BUILDING PLAN
M601 25 HEATING SYSTEM DIAGRAM
M701 26 OFFICE BUILDING CONTROLS
M702 27 WAREHOUSE AND STORAGE BUILDING
CONTROLS
M801 28 BALANCE VALVE PHOTOS
E-0 29 LEGENDS AND ABBREVIATIONS
E-1 30 SCHEDULES
ED1 31 OFFICE BUILDING FLOOR 1 - DEMOLITION
ES1 32 ELECTRICAL SITE PLAN
E-2 33 OFFICE BUILDING FLOOR 1
E-3 34 OFFICE BUILDING FLOOR 2
E-4 35 OFFICE BUILDING AIR HANDLER ROOM
E-5 36 DRY STORAGE BUILDING
E-6 37 WAREHOUSE
E-7 38 SINGLE LINE DIAGRAM - OFFICE BUILDING
E-8 39 PANEL SCHEDULES
E-9 40 PANEL SCHEDULE
E-10 41 DETAILS
E-11 42 PHOTOS - OFFICE BUILDING
E-12 43 PHOTOS - OFFICE BUILDING
12" DI WATER
6" PVC SEWER
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
R10
ALASKA REGION
I1694.24002
Juneau, AK 9109 Mendenhall Mall Rd, Ste 4 Juneau, AK 99801 Phone: 907.780.6060 www.respec.com
AECC163270
06.20.2025
FOR CONSTRUCTION
JUNEAU RANGER DISTRICT
ANM-JRD
COMPOUND HVAC
MODERNIZATION
TONGASS NATIONAL
FOREST
REGISTERED PROFESSIONA L ENGINEER
KEVIN A. PUUSTINEN
CE 12474
06-20-2025
OFFICE BUILDING
FF = 58.00'
DRY STORAGE BUILDING
FF = 64.00'
WAREHOUSE
FF = 64.00'
SCALE IN FEET
10 5 0 10 20 30
APPROX. LOCATION OF
HEATING SUPPLY/RETURN
LINES, SEE MECHANICAL
LEGEND
CUT AND PATCH HEAVY DUTY ASPHALT PAVEMENT
CUT AND PATCH LIGHT DUTY ASPHALT PAVEMENT
CUT AND PATCH CEMENT CONCRETE WALKWAY
SAWCUT & MATCH
TO EXISTING, TYP
M
AT
C H
LI
N
E (S
EE
B
EL
O
W
M
AT
C H
LI
N
E (S
EE
A
BO
VE
GENERAL NOTES:
1. NO FIELD SURVEY WAS PERFORMED FOR THIS PROJECT. EXISTING CONDITIONS SHOWN ARE
BASED ON OWNER FURNISHED DRAWINGS AND HAVE NOT BEEN FULLY FIELD VERIFIED.
2. CONTRACTOR IS REQUIRED TO LOCATE EXISTING UNDERGROUND UTILITIES AS NECESSARY TO PERFORM THE WORK. CONTRACTOR SHALL NOTIFY THE ENGINEER IF A CONFLICT IS DISCOVERED
BETWEEN THE EXISTING UTILITIES THAT ARE TO REMAIN AND THE NEW UTILITIES.
3. CONTRACTOR IS REQUIRED TO MEASURE AND RECORD LOCATIONS OF EXISTING FEATURES
WITHIN AREAS TO BE DISTURBED, TO FACILITATE RESTORING TO ORIGINAL CONDITION AND
LOCATIONS AFTER EARTHWORK IS COMPLETED. REVIEW RECORD WITH COR AND RECEIVE
CONCURRENCE PRIOR TO DISTURBING EXISTING CONDITIONS.
4. PROTECT AND MAINTAIN ALL UTILITIES NOT IDENTIFIED FOR REMOVAL.
5. POWER AND TELECOM CONDUITS NOT SHOWN FOR CLARITY, SEE ELECTRICAL DRAWINGS.
6. RELOCATE TWO LARGE BOULDERS TO ELSEWHERE ON SITE. COORDINATE NEW LOCATION WITH
COR PRIOR TO RELOCATION.
7. RESURFACE UNPAVED AREAS WITH 6" DEPTH BASE COURSE, GRADING D-1.
C-2
C-2
C-2
HEATING SUPPLY/RETURN LINES
SEE MECHANICAL FOR CONTINUATION
HEATING SUPPLY/RETURN LINES
SEE MECHANICAL FOR CONTINUATION
SEWER CLEANOUT, TYP.
HEATING SUPPLY/RETURN LINES
SEE MECHANICAL FOR CONTINUATION
REMOVE FUEL OIL TANK,
SEE MECHANICAL
C-2
C-2
REPAINT PARKING STRIPES AT
PATCH, COLOR AND WIDTH TO
MATCH EXISTING, TYP
SAWCUT & MATCH
TO EXISTING, TYP
REMOVE BURIED CONCRETE
VAULT, SEE MECHANICAL
SITE PLAN
KAP
JMK
KAP
C-1
REPAINT PARKING STRIPES AT
PATCH, COLOR AND WIDTH TO
MATCH EXISTING, TYP
12" DI WATER
6" PVC SEWER
SEE NOTE 6
SEE NOTE 7
SAWCUT & MATCH
TO EXISTING, TYP
PROTECT & MAINTAIN
EXISTING WATER LINE
& THRUST BLOCKS, TYP
SEE NOTE 7
12" DI WATER
6" PVC SEWER
6" STORM PIPE
4" D I W
ATER
1.5" W
ATER
SER
VIC
E
CATCH BASIN
4" FOOTING DRAIN
2" WATER SERVICE
8" STORM PIPE
APPROX. LOCATION OF HEATING
SUPPLY/RETURN LINES, SEE
MECHANICAL
SAWCUT & MATCH
TO EXISTING, TYP
RELOCATE CONCRETE BARRIER
ONTO FUEL TANK SLAB AFTER
REMOVAL OF TANK
6" FIRE LINE
2" WATER SERVICE
1" WATER SERVICE
CONTRACTOR
STAGING AREA
MIN.
1'
SAWCUT NOTE:
FINAL SAWCUT OF EXISTING PAVEMENT SHALL NOT
BE MADE UNTIL 24 HOURS PRIOR TO FINAL PAVING.
NEW ASPHALT PAVEMENT,
MATCH EXISTING THICKNESS
NEW BASE COURSE,
GRADING D-1, 95%
COMPACTION
COMPACTED USABLE TRENCH
BACKFILL OR SUITABLE
IMPORTED MATERIAL
NEAT LINE SAWCUT,
SEE NOTE BELOW
EXISTING ASPHALT PAVEMENT
TO REMAIN
EXISTING BASE COURSE
TACK COAT PRIOR TO PAVING,
SEAL SURFACE AT COLD JOINTS
WITH PG 58-28 ASPHALT OIL AFTER
PAVING
SURFACE AND BASE MATERIAL TYPE
AND DEPTH VARIES, SEE SITE PLAN
AND TRENCH NOTES
6"
6"
IMPORT PIPE BEDDING
SAWCUT
LIMITS
SAWCUT
LIMITS
6" 6"
6"
3'-6" MIN
3' M
IN
INSULATED HEATING
SUPPLY/RETURN LINES,
SEE MECHANICAL
UTILITY WARNING TAPE, TYP
TRENCH BACKFILL
8' MIN
6" 6"
2' -6
IMPORT PIPE BEDDING
OPTIC FIBER CONDUIT
TRENCHING NOTES:
1. EXISTING PAVEMENT SECTIONS (DETAILS 2, 3, & 4) SHOWN ON
THIS SHEET DEPICT EXISTING PAVEMENT SECTIONS FROM
OWNER FURNISHED DRAWINGS.
2. DISPOSE OF EXISTING ASPHALT AND CONCRETE PAVEMENT
REMOVED DURING TRENCHING FOR INSTALLATION OF NEW
UTILITIES.
3. EXISTING D-1 BASE COURSE AND SELECTED EMBANKMENT
MATERIALS REMOVED MAY BE SALVAGED AND REUSED AS
TRENCH BACKFILL AS APPROVED BY COR.
4. IMPORT NEW D-1 BASE COURSE TO MATCH DEPTHS SHOWN,
COMPACT TO AT LEAST 95% OF MAXIMUM DENSITY.
5. ASPHALT AND CONCRETE PAVEMENT PATCH MATERIALS SHALL
BE PER THE APPLICABLE SPECIFICATION SECTION. DEPTH OF
PAVEMENT PATCHES SHALL MATCH THE DEPTH OF EXISTING
PAVEMENT REMOVED.
6. IMPORT PIPE BEDDING MATERIAL SHALL BE PER SPECIFICATION
SECTION 312002 - TRENCHING AND BACKFILLING.
4"
MECHANICAL CONTROL CONDUIT
4"4"
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
R10
ALASKA REGION
I1694.24002
Juneau, AK 9109 Mendenhall Mall Rd, Ste 4 Juneau, AK 99801 Phone: 907.780.6060 www.respec.com
AECC163270
06.20.2025
FOR CONSTRUCTION
JUNEAU RANGER DISTRICT
ANM-JRD
COMPOUND HVAC
MODERNIZATION
TONGASS NATIONAL
FOREST
REGISTERED PROFESSIONA L ENGINEER
KEVIN A. PUUSTINEN
CE 12474
06-20-2025
C-2
PAVEMENT MATCH DETAIL
SCALE: NTS
C-2
EXISTING HEAVY DUTY ASPHALT PAVEMENT SECTION
SCALE: NTS
3" DEPTH ASPHALT CONCRETE
PAVEMENT
9" D-1 BASE COURSE
36" SELECTED EMBANKMENT (NFS)
12" SHOT ROCK BORROW
COMPACTED SUBGRADE
C-2
EXISTING LIGHT DUTY ASPHALT PAVEMENT SECTION
SCALE: NTS
2" DEPTH ASPHALT CONCRETE
PAVEMENT
6" D-1 BASE COURSE
36" SELECTED EMBANKMENT (NFS)
12" SHOT ROCK BORROW
COMPACTED SUBGRADE
C-2
EXISTING CEMENT CONCRETE WALKWAY SECTION
SCALE: NTS
4" CEMENT CONCRETE WITH WIRE
MESH REINFORCEMENT (6"x6" No.
10 GAUGE). CONCRETE MIN 3,000
PSI @ 28 DAYS
48" SELECTED
EMBANKMENT (NFS)
COMPACTED SUBGRADE
WIDTH TO MATCH
SECTION REMOVED
C-2
PIPE / CONDUIT TRENCH DETAIL
SCALE: NTS
CONSTRUCTION DETAILS
KAP
JMK
KAP
C-2
6" D-1 BASE COURSE
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A0.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
GENERAL NOTES,
ABBREV.
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
ZMJ
CJN
PEV
JUNEAU RANGER DISTRICT
GENERAL ABBREVIATIONS (SEE ENGINEERING SHEETS FOR ADDITIONAL)
@ AT
AB ANCHOR BOLT(S)
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
APC ACOUSTICAL PANEL CEILING
APPRX APPROXIMATE
ASPH ASPHALT
AT ACOUSTICAL TILE
BATT MINERAL FIBRE BLANKET
BLDG BUILDING
BLKG BLOCKING
BOC BOTTOM OF CONCRETE
BOD BOTTOM OF DECK
BO BOTTOM OF
BOS BOTTOM OF STEEL
CENTERLINE
CG CORNER GUARD
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONFIG CONFIGURATION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CSNK COUNTERSINK
DIA DIAMETER
DISP DISPENSER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
DWG DRAWING
(E) EXISTING
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH
SYSTEM
ELEC ELECTRIC(AL)
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EPS EXPANDED POLYSTYRENE
INSULATION BOARD
EQ EQUAL
EQUIP EQUIPMENT
EXTG EXISTING
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FFB FINISH FLOOR BREAK
FIN FINISH
FL FLOOR(ING)
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FSS FOLDING SHOWER SEAT
FOS FACE OF STUD
FRT FIRE-RETARDANT TREATED
FT FOOT, FEET
FTG FOOTING
FURR FURRING
GA GAUGE, GYPSUM ASSOCIATION
GALV GALVANIZED
GB GRAB BAR
GL GLASS, GLAZING
GLU-LAM GLUED-LAMINATED
GWB GYPSUM WALL BOARD
GWS GYPSUM WALL SHEATHING
GYP GYPSUM
H HIGH
HDWD HARDWOOD
HM HOLLOW METAL
HSS HOLLOW STEEL SECTION
HT HEIGHT
HORZ HORIZONTAL
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING, INCLUDED
INSUL INSULATION, INSULATED
JST JOIST
KIT KITCHEN
L LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LB POUND
LF LINEAL FEET
LVR LOUVER
MAT MATERIAL
MAX MAXIMUM
MB MARKERBOARD
MECH MECHANICAL
MEZZ MEZZANINE
MH MOP HOLDER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
MUL MULLION
MW MICROWAVE UNIT
N NORTH
NIC NOT IN CONTRACT
NO/# NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISH CONTRACTOR
INSTALL
OFOI OWNER FURNISH OWNER INSTALL
OH OVERHEAD, OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PDF POWER DRIVEN FASTENER
PERF PERFORATED
PIC POLYISOCYANURATE BOARD
INSULATION
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
POLY POLYETHYLENE
PREFAB PREFABRICATED
PREFIN PREFINISHED
PT PRESSURE TREATED
PTA, PT1 PAINT TYPE "A", PAINT TYPE "1", ETC.
PTD PAPER TOWEL DISPENSER
PVC POLY VINYL CHLORIDE
RAD RADIUS
RB RESILIENT WALL BASE
REINF REINFORCED, REINFORCING
REQ'D REQUIRED
RESIL RESILIENT
RESIST RESISTANT
REV REVISION, REVISE
R/F REFRIGERATOR/FREEZER
RM ROOM
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RTN RETURN
S SOUTH
S-AWPM SELF-ADHERED WATERPROOF
MEMBRANE
SCHED SCHEDULE
SD SOAP DISPENSER
SECT SECTION(AL)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATIONS(S)
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE, STRUCTURAL
SS STAINLESS STEEL
SYMM SYMMETRIC(AL)
T TREAD(S), TOILET
T&G TONGUE AND GROOVE
TOC TOP OF CONCRETE
TEL TELEPHONE
TEMP TEMPORARY
TOC TOP OF CONCRETE
TOD TOP OF DECK(ING)
TOF TOP OF FOOTING
TOS TOP OF STEEL
TP TOWEL PIN
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UON UNLESS OTHERWISE NOTED
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VF VERIFY IN FIELD
VOL VOLUME
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WP WATERPROOF
WM WALK-OFF MAT
WR WATER RESISTANT
WSCT WAINSCOT
WT WEIGHT
XPS EXTRUDED PLASTICBOARD
INSULATION
YD YARD, YARD DRAIN
MRV ARCHITECTS GENERAL NOTES:
1. ALL CONSTRUCTION SHALL CONFORM TO THE MINIMUM
STANDARDS OF THE APPLICABLE CODES INDICATED IN THE CODY
STUDY AND ALL LOCAL CODES IN EFFECT UNLESS MORE
STRINGENT REQUIREMENTS ARE INDICATED.
2. ALL NEW CONSTRUCTION SHALL COMPLY W/THE AMERICANS
WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) AND
CHAPTER 11 OF THE INTERNATIONAL BUILDING CODE (INCLUDES ICC
A117.1 PER IBC)
3. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL
OBTAIN AND PAY FOR ALL REQUIRED PERMITS, LICENSES, AND ALL
UTILITY CHARGES, AND ARRANGE FOR ALL REQUIRED INSPECTIONS.
4. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING BUILDING & SITE UTILITIES BETWEEN CIVIL & MEP
DRAWINGS. THE CONTRACTOR SHALL ALSO CONTACT ALL
APPLICABLE UTILITY COMPANIES & PROVIDE CONDUIT & OTHER
FACILITIES AS REQUIRED.
5. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL
VERIFY ALL DIMENSIONS & CONDITIONS ON THE JOB SITE PRIOR TO
THE BIDDING OF THE CONTRACT DOCUMENTS. THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES. IN CASES OF DISCREPANCY CONCERNING
DIMENSIONS, QUANTITIES AND LOCATION, THE CONTRACTOR
SHALL, IN WRITING, CALL TO THE ATTENTION OF THE ARCHITECT
ANY
DISCREPANCIES BETWEEN SPECIFICATIONS, PLANS, DETAILS OR
SCHEDULES. THE ARCHITECT WILL THEN INFORM THE
CONTRACTOR, IN WRITING, WHICH DOCUMENT TAKES
PRECEDENCE. THERE SHALL BE NO ADJUSTMENT TO THE COST OR
TIME OF THE WORK RESULTING FROM CLARIFICATION OF SUCH
DISCREPANCIES.
6. DIMENSIONS ON DRAWINGS ARE SHOWN TO FINISHED FACE OF
WALLS AND PARTITIONS OF EXISTING OR NEW CONSTRUCTION
UNLESS OTHERWISE NOTED. CEILING HEIGHT DIMENSIONS AND ALL
OTHER VERTICAL DIMENSIONS ARE TO THE FINISHED FLOOR
SURFACE UNLESS OTHERWISE NOTED.
7. ALL MATERIALS SPECIFIED OR NOTED SHALL BE INSTALLED IN
ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING
SHOP DRAWINGS, PRODUCT DATA, OR SAMPLES FOR CASEWORK,
FINISHES, DOORS, FRAMES, HARDWARE, MECHANICAL, ELECTRICAL,
AND PLUMBING FIXTURES, AND OTHER ITEMS REQUIRING
ARCHITECT'S REVIEW FOR CONFORMANCE WITH THE CONTRACT
DOCUMENTS, AND FOR ALL ITEMS WHICH ALLOW CONTRACTOR
OPTIONS. PRIOR TO FORWARDING TO THE ARCHITECT FOR REVIEW.
THESE SUBMITTALS MUST BE REVIEWED BY THE CONTRACTOR
FOR CONFORMANCE WITH THE MEANS, METHODS, TECHNIQUES,
SEQUENCES, AND OPERATIONS OF CONSTRUCTION AND SAFETY
PRECAUTIONS AND PROGRAMS SELECTED BY THE CONTRACTOR,
ALL OF WHICH ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL AFFIX A STAMP TO
SUBMITTAL INDICATING THIER REVIEW. SUBMITTALS FORWARDED
WITHOUT A STAMP WILL BE RETURNED. ALL SUBMITTALS MUST BE
REVIEWED BY THE ARCHITECT PRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL GUARANTEE ALL WORK AGAINST FAULT OF
ANY MATERIAL OR WORKMANSHIP FOR A PERIOD OF NOT LESS
THAN ONE YEAR AFTER COMPLETION OR ACCEPTANCE. FAULTY
WORK SHALL BE REPLACED OR REPAIRED AS REQUIRED AT NO
COST TO THE OWNER.
10. CONTRACTOR SHALL COORDINATE WITH OWNER ALL ITEMS TO
BE SALVAGED PRIOR TO SUBMISSION OF BIDS AND START OF
CONSTRUCTION. OWNER SHALL HAVE SALVAGE RIGHTS TO RETAIN
ALL REMOVED ITEMS.
11. ALL CHANGES PROPOSED DURING CONSTRUCTION WHICH
RESULT IN A CHANGE TO THE CONTRACT TIME AND/OR SUM SHALL
BE SUBMITTED TO THE ARCHITECT IN WRITING AND APPROVED BY
THE ARCHITECT AND OWNER BEFORE SUCH WORK SHALL
COMMENCE.
12. CONTRACTOR SHALL COORDINATE CLEAR OPENINGS FOR ALL
APPLIANCES PRIOR TO CONSTRUCTION OF CASEWORK.
13. CONTRACTOR SHALL FURNISH AND INSTALL CONCEALED WOOD
BLOCKING BEHIND ALL CABINETS, TOILET ACCESSORIES, PLUMBING
FIXTURES, AND OTHER WALL MOUNTED ITEMS AS REQUIRED FOR
ADEQUATE SUPPORT.
14. CONTRACTOR SHALL COORDINATE ALL LOCK AND LATCH SETS
AND FINAL KEYING WITH OWNER. DOUBLE KEYED LOCKS ARE NOT
PERMITTED ON ANY REQUIRED OR MARKED EXIT. MATCH EXISTING
KEYING SYSTEM IF ONE IS EXISTING.
15. ALL DOOR HARDWARE ON EXIT DOORS SHALL BE READILY
OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY,
SPECIAL KNOWLEDGE, OR EFFORT.
16. CONTRACTOR SHALL PREPARE ALL NEW AND EXISTING
SURFACES SCHEDULED TO RECEIVE NEW FINISHES IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS
FOR THE SUBSTRATE & FINISH BEING APPLIED.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL
EXISTING CONSTRUCTION INDICATED TO REMAIN AND SHALL
REPAIR AND/OR REPLACE ALL AREAS AND/OR MATERIALS DAMAGED
DURING CONSTRUCTION AT A MINIMUM TO THE CONDITION WHICH
EXISTED PRIOR TO CONSTRUCTION.
18. CONTRACTOR SHALL COORDINATE FINAL QUANTITY AND
LOCATIONS OF FIRE EXTINGUISHERS WITH THE FIRE DEPARTMENT
AND/OR BUILDING DEPARTMENT. SEE SYMBOLS LEGEND FOR TYPE
OF EXTINGUISHER.
19. IF THE CONTRACTOR FAILS TO SUBMIT A MATERIAL FOR
APPROVAL, THE MATERIAL MAY BE REQUIRED TO BE REMOVED BY
THE CONTRACTOR EITHER BY DIRECTION OF THE OWNER OR
ARCHITECT.
20. THE CONTRACTOR IS TO PROVIDE AS BUILT DRAWINGS IN HARD
COPY TO THE OWNER AT THE CONCLUSION OF THE PROJECT.
21. INSTALL ELASTOMERIC JOINT SEALER AROUND ALL PIPES,
DUCTWORK, & STRUCTURE PASSING THRU INTERIOR NON-RATED
CONCRETE AND MASONRY WALLS, GYPSUM BOARD PARTITIONS,
AND CONCRETE FLOOR/ROOF SLABS. FOR FIRE RATED INTERIOR
CONCRETE AND MASONRY WALLS, GYPSUM BOARD PARTITIONS,
AND CONCRETE FLOOR/ROOF SLABS SEAL ALL PIPES, DUCTWORK,
AND STRUCTURE. INSTALL FIRESTOP MATERIALS IN ALL GAPS
PRIOR TO SEALANT APPLICATION. INSTALL SEALER ACCORDING TO
MANUFACTURER'S WRITTEN INSTRUCTIONS.
GENERAL NOTES
38434
UP
FEC
F
D
C
E
B
A
1 2 3 4 5 86 7 9 10 11
28' - 3" 25' - 4" 22' - 3" 14' - 4" 21' - 9" 10' - 8" 9' - 6" 10' - 6" 13' - 4" 16' - 10"
172' - 9"
CORR.
A-112
RECEPT.
RADIO
A-125
WILDERNESS
A-101
WILD.
OFFICE
A-101A
CORR.
A-117
STAIR
A-119
LANDS &
SPEC. USES
A-120
OFF.
A-120A
SUPPORT
SERVICES
A-122
OFFICE
A-122A
FILE
ROOM
A-121
CONF.
A-124
A-123
ARCHEOLOGY
A-106
MECHANICAL
A-102
CONF.
ROOM
A-103
SUPP.
A-104
COPY
ROOM
A-105
JAN.
A-107
WOMEN
A-108
MEN
A-109 SECURITY
A-111
CORR.
A-118
ENTRY
A-127
LOBBY
A-126
RANGER
A-128
ELEC.
A-114
STAIR
A-116
COMM.
A-113
ELEV.
ROOM
A-115
LAW
ENFORCEMENT
A-129
EXTERIOR SIDING TO BE
CAREFULLY CUT TO FIT NEW
EQUIPMENT. NEW FLASHING,
WEATHER BARRIERS AND
WATERPROOFING TO HAVE
POSITIVE LAP (IN DIRECTION
OF DRAINAGE) OF MIN 2"
WITH EXISTING CONST. SEE
ELEC FOR LOCATIONS
(E) BASE REMAINS
NEW BASE ADDITION
PER MECH NEW CONCRETE
BASE, SEE MECH
FOR SIZE
DEMO BASES
DEMO BASE
PER MECH 3
A5.03
(E) CHASE TO
FLOORS ABOVE
PATCH/MATCH EXISTING
FURRED OUT GWB WALL
NEW MDP
A5.0
A5.0
A5.0
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A1.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 1, OFFICE
BUILDING
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
ZMJ
CJN
PEV
JUNEAU RANGER DISTRICT0' 8' 16'4'1/8" = 1'-0"
FLOOR 1, OFFICE BUILDING
NOTES:
PATCH AND REPAIR ALL
INTERIOR AND EXTERIOR
FINISHES TO MATCH EXISTING.
SEE MECHANICAL AND
ELECTRICAL FOR CONCRETE
PENETRATIONS. SEAL
CONCRETE PENETRATION
WITH ELASTOMERIC SEALANT
TO PREVENT WATER
INFILTRATION.
REMOVE CONCRETE BASES TO
1" BELOW FLOOR SURFACE
AND RESTORE FLOOR
SURFACE TO MATCH EXISTING
WITH EPOXY FLOOR LEVELER.
PHOTO OF EXISTING MECH ROOM
DN
DN
R E F
VENDVEND
R E F
DN
F
D
C
E
B
A
1 2 3 4 5 86 7 9 10 11
28' - 3" 25' - 4" 22' - 3" 14' - 4" 21' - 9" 10' - 8" 9' - 6" 10' - 6" 13' - 4" 16' - 10"
A5.0
CORR.
A-211
ENTRY
A-207
RECREATION
A-201
JAN.
A-204
SECURITY
A-208
OFFICE
A-203A
MEN
A-206
CORR.
A-217
STAIR
A-218
FISH & WILDLIFE
A-216
OFFICE
A-216A
ENGINEERING
A-215
MINERALS
A-202
REC.
OFF.
A-201A
OFFICE
A-202A
TIMBER
& FIRE
A-203
WOMEN
A-205
STAIR
A-213
RANGER
A-214
CORR.
A-212
LUNCH
A-209
CONF.
A-210
SEE ELEC, NEW
CONDUIT TO FIT
CLOSE TO WALL,
PAINT TO MATCH
F
D
E
86 7 9
10' - 8" 9' - 6" 10' - 6"
34' - 10"
4' - 2"
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A2.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 2, OFFICE
BUILDING
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
ZMJ
CJN
PEV
JUNEAU RANGER DISTRICT
0' 8' 16'4'1/8" = 1'-0"
FLOOR 2, OFFICE BUILDING
0' 8' 16'4'1/8" = 1'-0"
FLOOR 3, OFFICE BUILDING
NOTES:
PATCH AND REPAIR ALL
INTERIOR AND EXTERIOR
FINISHES TO MATCH EXISTING.
DEMO ONE SIDE OF CHIMNEY
CHASE TO ALLOW FOR
ACCESS TO REMOVE CHIMNEY
AND INSTALL ELECTRICAL
CONDUITS. REPAIR CHASE TO
MATCH EXISTING CONDITION
ONCE WORK IS COMPLETE
1 32 4 5 6 7 8 9 10
D
C
B
A
19' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 19' - 0"
185' - 0"
REC &
TRAILS
S-01
REC &
TRAILS
S-02
REC &
TRAILS
S-03
STAGING
BAY
S-04
SURPLUS
S-05
MIN.
S-06
SPEC.
USE
S-07
BUSINESS
S-09
DISTRICT
LEO
S-10
R.O.
LEO
S-11
FIRE
S-13
TIMBER
S-14
ENG/
FAC
S-15
WILDERNESS
S-16
JRD FISH &
WILDLIFE
S-17
ANM-
FISH
S-18
ARCH
S-19
TMH
S-20
MGVC
& ANHA
S-21
A5.0
SLAB DEMO AND REPAIR AS REQ. FOR
WORK. KEEP EXTENT MINIMAL.
REPAIR CEILING VAPOR BARRIER
AT DUCT SUPPORT AND BRACING
PENETRATIONS. USE SIMILAR
WHITE COLORED PATCH OR TAPE
FOR SEAMLESS APPEARANCE
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A3.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 1, DRY
STORAGE
BUILDING
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
CJN
CJN
ZMJ
JUNEAU RANGER DISTRICT
0' 8' 16'4'1/8" = 1'-0"
FLOOR 1, DRY STORAGE BUILDING
NOTES:
PATCH AND REPAIR VAPOR
BARRIER AND FINISHES TO MATCH
EXISTING. MAINTAIN THERMAL
ENVELOPE. SEE MECHANICAL AND
ELECTRICAL FOR EXTENT OF
WORK. CONTRACTOR TO VERIFY IN
FLOOR RADIANT LINES IN AREA OF
WORK BEFORE COMMENCING
WORK.
437PHOTO OF RADIANT LINES DURING
CONSTRUCTION. FOR REFERENCE
ONLY, CONTRACTOR TO VERIFY
LINES BEFORE DEMOLITION
C
B
A
D
21 4 5
WOOD SHOP
W-01
RADIO SHOP
W-08
MECH
W-02
WELLNESS ROOM
W-06
VEHICLE SHOP
W-09
LAB
W-05
HALL
W-07
MEN
W-03
WOMEN
W-04
19' - 6" 21' - 0" 13' - 6" 19' - 0"
73' - 0"
SLAB DEMO AND REPAIR AS REQ.
FOR WORK, KEEP DEMO EXTENT
MINIMAL, CONTRACTOR TO VERIFY
IN FLOOR RADIANT LINES IN AREA OF
WORK BEFORE COMMENCING
WORK.
A5.0
SEE ELEC FOR
PENETRATIONS
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A4.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 1,
WAREHOUSE
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
CJN
CJN
ZMJ
JUNEAU RANGER DISTRICT
0' 8' 16'4'3/16" = 1'-0"
FLOOR 1, WAREHOUSE
NOTES:
SEE ELEC E-6. PATCH AND REPAIR ALL
INTERIOR AND EXTERIOR FINISHES TO
MATCH EXISTING.
SEE ELECTRICAL FOR ANY CONCRETE
PENETRATIONS. SEAL CONCRETE
PENETRATION WITH ELASTOMERIC
SEALANT TO PREVENT WATER
INFILTRATION FOR WATERTIGHT SEAL.
EXISITNG TRUSS
CHORD BEYOND
EXISITNG PLY
SHEATHING
EXISITNG ASPHALT
SHINGLE ROOFING
DEMO OF CHIMNEY
OR ROOF ELEMENT
NEW SELF-ADHERED
WATERPROOF MEMBRANE, LAP
UNDER EXISTING ROOFING MIN
4". NEW SHINGLING UNDER
EXISTING SHINGLES. MATCH
EXISTING FINISH.
NEW PLYWOOD PATCH TO
MATCH EXSTING PLY
SHEATHING, USE 10D NAILS
4" O.C.
2X BLOCKING AT ALL
PATCH EDGES. ATTACHED
WITH SIMPSON A34
FRAMING ANGLE
MECHANICAL
A-102
MINERALS
OFFICE
A-202A
RECREATION
OFFICE
A-201A
DEMO CHIMNEY PER MECH.
COORDINATE SELECTIVE DEMO OF
CHASE FOR CHIMNEY REMOVAL AND
ELECTRICAL INSTALLATION. PATCH AND
REPAIR WALL WHEN COMPLETE.
A5.0
DEMO'D CHIMNEY
INFILL CHIMNEY CHASE WITH INSULATION
TO ENSURE CONT. THERMAL ENVELOPE.
SEAL GAPS WITH SPRAY FOAM.
PROVIDE BLOCKING AND CONT. SHEATHING
LAYER AS NEEDED TO HOLD INSULATION.
EXTEND/CONNECT OR PROVIDE VAPOR BARRIER
CUT WIDTH, W
NOTE 1 NOTE 2
NOTES:
1. FOR CUTS WITH LEAST DIMENSION "W" LESS THAN 2 FT:
APPLY PRIMER TO EXISTING SLAB EDGE. NO DOWELS
REQUIRED.
2. FOR CUT AREAS WITH A LEAST DIMENSION GREATER
THAN 2 FT.: INSTALL #3 ADHESSIVE ANCHOR HORIZ
DOWELS @ 16" O.C. AT CORNERS, OMIT ADJACENT DOWEL
TO ELIMINATE OVERLAP CONGESTION
3. AT ALL CUTS ADD WWR 1-1/4" TO 1-1/2" CLR OF TOP.
4. WHERE PRESENT UNDER ADJACENT SLAB, PROVIDE 10
MIL VAPOR RETARDER OVER FULL CUT AREA.
5. WHERE CUT WIDER THAN 4'-0", USE TYP SOG CJ DETAIL.
6. SEE SPEC FOR DUST CONTROL
NOTES:
1. CONSTRUCTION JOINTS MAY BE USED AT ANY CONTROL JOINT.
2. LOCATE JOINTS BTWN 24x & 36x SLAB THICKNESS "t" IN BOTH DIRECTIONS.
3. CREATE SQUARE OR RECTANGULAR SPACES BTWN JOINTS (NOT
TRIANGULAR). DO NOT EXCEED 1.5:1 ASPECT RATIO IN RECTANGULAR PORTIONS.
DO NOT CREATE T OR L SHAPED PORTIONS. LOCATE JOINTS AT EACH RE-
ENTRANT CORNER OR REINF. W/ #4 X 4'-0" DIAG BAR.
CONSTRUCTION JOINT
PREVIOUS SLAB
NEW CAST SLAB
TOP OF SLAB
DOWELS: 1/2"X14" SMOOTH
BAR @ 16 OC
TYP SLAB REINF STOP ALL
REINF 1" FROM JOINT
#4 EACH SIDE
SEE MECH
NOTES:
1. DETAIL REPRESENTS THE MINIMUM REQUIREMENTS FOR A TYPICAL
HOUSEKEEPING PAD FOR MECHANICAL AND/OR ELECTRICAL EQUIPMENT.
2. COORDINATE SIZE AND LOCATION OF ANCHOR RODS AND BOLTS WITH
EQUIPMENT MANUFACTURER'S REQUIREMENTS AND/OR A INSTALLATION
TEMPLATE.
3. FOR NEW CONSTRUCTION SEE ARCHITECTURAL AND/OR STRUCTURAL
PLANS AND DETAILS FOR SLAB THICKNESS.
4. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL INFORMATION
5. PRIOR TO EQUIPMENT INSTALL, SEAL CONCRETE WITH CONCRETE
HARDENER/SEALER.
DOWEL HOOK ANCHORS 18"
O.C. AND 6" FROM
PERIMETER. EPOXY INTO
EXISTING SLAB. USE
SIMPSON ET-3G ANCHOR
EPOXY OR EQ.
COORDINATE EQUIP
ANCHORING PER MANUF.
4" THICK CONC PAD
CHAMPHER
CORNERS
CONT WATERPROOF
SEALANT JOINT
MIN 3"
REBAR #4@12"OC EW
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A5.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
DETAILS
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
CJN
CJN
ZMJ
JUNEAU RANGER DISTRICT
0' 6" 1'3"3" = 1'-0"
CHIMNEY ROOF PATCH
0' 4' 8'2'3/8" = 1'-0"
CHIMNEY SECTION
0' 1' 2'6"1" = 1'-0"
TYP. SOG POUR-BACK AND REPAIR
0' 1' 2'6"1" = 1'-0"
TYP SOG JOINT DETAILS
0' 1' 2'6"1" = 1'-0"
TYP HOUSKEEPING PAD
G : \2 00 4\ 20 42 6- US F S Ju ne au Ad m in\ D ra wing s\ us fs -b s- f 2- ad m in- rc p. dw g
CORR.
A-112
RECEPT.
RADIO
A-125
WILDERNESS
A-101
WILD.
OFFICE
A-101A
CORR.
A-117
STAIR
A-119
LANDS &
SPEC. USES
A-120
OFF.
A-120A
SUPPORT
SERVICES
A-122
OFFICE
A-122A
FILE
ROOM
A-121
CONF.
A-124
A-123
UNFINISHED
A-106
MECHANICAL
A-102
CONF
A-103
SUPP.
A-104
COPY
A-105
JAN.
A-107
WOMEN
A-108
MEN
A-109
SECURITY
A-111
CORR.
A-118
ENTRY
A-127
LOBBY
A-126
RANGER
A-128
ELEC.
A-114
STAIR
A-116
STOR.
A-113
ELEV.
ROOM
A-115
LAW
ENFORCEMENT
A-129
F
D
C
E
B
A
1 2 3 4 5 86 7 9 10 11
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A6.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 1, OFFICE
BUILDING RCP
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
ZMJ
CJN
PEV
JUNEAU RANGER DISTRICT
0' 8' 16'4'1/8" = 1'-0"
FLOOR 1, OFFICE BUILDING RCP
NOTES:
PATCH AND REPAIR ALL INTERIOR AND
EXTERIOR FINISHES TO MATCH EXISTING
WHERE WORK OCCURS. SEE ELEC
SEE MECHANICAL AND ELECTRICAL FOR
CONCRETE PENETRATIONS. SEAL
CONCRETE PENETRATION WITH
ELASTOMERIC SEALANT TO PREVENT
WATER INFILTRATION TIGHT.
INFILL DEMO'D CHIMNEY CHASE AT
CEILING PLANE. MATCH EXISTING FINISH.
DN
R E F
VENDVEND
R E F
CORR.
A-211
ENTRY
A-207
RECREATION
A-201
CORR.
A-217
STAIR
A-218
FISH & WILDLIFE
A-216
OFFICE
A-216A
ENGINEERING
A-215
MINERALS
A-202
REC.
OFF.
A-201A
OFFICE
A-202A
OFFICE
A-203A
JAN.
A-204
SPECIAL USES
A-203
MEN
A-206
WOMEN
A-205
SECURITY
A-208
RANGER
A-214
CORR.
A-212
LUNCH
A-209
STAIR
A-213
CONF.
A-210
F
D
C
E
B
A
1 2 3 4 5 86 7 9 10 11
PLENUM ACCESS
3" MIN
3' - 0" MIN.
FTU, SIZE VARIES
MAINTENANCE SIDE
FOAM SEAL AROUND DUCTS AND PIPES
NOTE:
1. PLAN IS AN APPROXIMATION OF SIZE
AND GENERAL REQUIREMENTS. SIZE MAY
VARY TO ACCOMMODATE FRAMING
MEMBER LOCATIONS AND CLEARANCE
FOR MAINTENANCE OPERATIONS. SUBMIT
PLAN FOR EACH ENCLOSURE SIZE TO COR
FOR APPROVAL PRIOR TO ORDERING
MATERIALS.
2. ENSURE MIN 3" CLEAR FROM TOP OF
FTU. BOTTOM REMAINS OPEN TO HEAT
FROM BELOW.
M
IN
M
IN
M
IN
A7.0
10" RIGID INS. ALL SIDES
SEAL ALL JOINTS WITH
ADHESIVE/SPRAY FOAM
AND TAPE
3"
(E) 2ND FLOOR ACT
VAPOR RETARDER, LAP
INTO ENCLOSURE
PIPES AND VALVES
PER MECH
FTU, SIZE VARIES
10" RIGID INS.
10" RIGID INS.
ALL SIDES.
MAINTENANCE SIDE
KEEP 3'-0" CLEAR
DEMO VAPOR BARRIER,
OPEN TO BELOW
EXISTING ACCESS
HATCH
CHECKED:
SHEET
DRAWN:
DATE:
SHEET TITLE:
PROJECT NO. OF
DESIGNER
ARCHIVE NO.
(R10)
ALASKA REGION
DATEREVISION/ISSUENO.
A7.0
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
MRV #2420
FLOOR 2, OFFICE
BUILDING RCP
CONSTRUCTION DDOCUMENTS
FOR CONSTRUCTION
TONGASS NATIONAL
FOREST
07/25/2025
CJN
CJN
ZMJ
JUNEAU RANGER DISTRICT
0' 8' 16'4'1/8" = 1'-0"
FLOOR 2, OFFICE BUILDING RCP
NOTES:
GENERAL: MECHANICAL
EQUIPMENT SHOWN FOR CLARITY
PATCH AND REPAIR FINISHES TO
MATCH EXISTING.
ENCLOSE FTU WITH 10" EPS
INSULATION APPROXIMATELY AT
DASH. NO INSULATION UNDER THE
BOTTOM OF THE FTU TO ALLOW
WARM AIR TO CIRCULATE AROUND
THE FTU. ENSURE ENOUGH
CLEARANCE FOR MAINTENANCE.
SEAL ALL GAPS IN INSULATION
ENCLOSURE WITH SPRAY FOAM
INSULATION.
DEMO CHIMNEY. SEE MECH. SEE
ELEC FOR ELECTRICAL WORK IN
CHASE.
2 2
2 2
0' 2' 4'1'3/4" = 1'-0"
FTU ENCLOSURE, PLAN 4311
0' 2' 4'1'3/4" = 1'-0"
FTU ENCLOSURE, SECTION
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER E D P R O F E S S I O NA L ENGINEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M101
SYMBOLS AND
GENERAL NOTES
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
SCOPE OF WORKABBREVIATIONS
[1] DRAWING NOTE REFERENCE
(E) EXISTING
A AMPS
AAV AUTOMATIC AIR VENT
ADA AMERICANS WITH DISABILITIES ACT
AMCA AIR MOVEMENT AND CONTROL ASSOCIATION
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASSE AMERICAN SOCIETY OF SAFETY ENGINEERS
BT BUFFER TANK
CFM CUBIC FEET PER MINUTE
COP COEFFICIENT OF PERFORMANCE
CV CONTROL VALVE
CW COLD WATER
EAD EXHAUST AIR DAMPER
EFF EFFICIENCY
EFT ENTERING FLUID TEMPERATURE
EG EXHAUST GRILLE
ET EXPANSION TANK
F FAHRENHEIT
FD FLOOR DRAIN
GPM GALLONS PER MINUTE
HB HOSE BIBB
HC HEATING COIL
HP HORSEPOWER, HEAT PUMP
HRU HEAT RECOVERY UNIT
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HW HOT WATER
IDU INDOOR UNIT
KW KILOWATT
L LAVATORY
LFT LEAVING FLUID TEMPERATURE
M METER
MAX MAXIMUM
MBH 1,000 BTU PER HOUR
MCA MINIMUM CIRCUIT AMPS
MOP MAXIMUM OVERCURRENT PROTECTION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
ODU OUTDOOR UNIT
P PUMP
PD PRESSURE DROP
PH PHASE
PSIG POUNDS PER SQUARE INCH GAUGE
RM RADIANT MANIFOLD
SIM SIMILAR
SG SUPPLY GRILLE
SS SERVICE SINK, STAINLESS STEEL
TP TRAP PRIMER
TYP TYPICAL
V VOLTS
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET, WATER COLUMN
YCO YARD CLEANOUT
A. Scope of Work: The scope includes, but is not limited to, the following:
1. Demolition
a. Site: Remove direct bury pipelines, concrete vault, fuel oil tank and fuel piping.
b. Office Building: Remove heating plant consisting of:
1) Fuel oil boiler, heating piping, pumps, expansion tanks, air separator, and appurtenances.
2) Remove boiler and hot water heater flue and chimney from boiler room to above roof.
3) Remove daytank, fuel oil piping, and appurtenances
2. District Heating System
a. Site: Provide direct bury pipelines that connect the Office Building heating plant to the heating systems in the Warehouse and Storage Buildings.
b. Office Building Heating Plant: Provide two electric boilers, heating piping, pumps, expansion tanks, air separators, and appurtenances.
c. Warehouse Building: Provide a cabinet unit heater in the Radio Shop.
d. Replace all hydronic heating system balance valves in the three buildings.
e. Flush: Purge the glycol and TSP from the district heating system and building heating systems, including radiant tubing, heating units and bypass lines, by draining, flushing and refilling the system. Repeat until filled system has a glycol percentage under 3%.
1) Hydronic Heating Water Disposal: The hydronic heating water may contain up to 50% propylene glycol and TSP solution. Glycol waste is classified as hazardous waste. Handle, transport, and dispose of the heating glycol water and/or TSP in accordance with local hazardous waste regulations.
3. Storage Building Ventilation: Install a heat recovery ventilator to provide continuous ventilation and modify the DDC controls for purge ventilation mode that operates the existing exhaust fans and makeup air coil.
4. Testing, Adjusting and Balancing
a. District Heating System: Balance the heating pumps and piping mains serving each building
b. Existing Hydronic Heating System and Units
1) Balance and adjust the flow through each heating unit.
2) Replace the ports on the existing balance valves.
c. Ventilation Systems
1) Office Building AHU3-1: Adjust the minimum outside airflow
2) Warehouse Building HV-1: Adjust the minimum outside airflow
3) Storage Building HRV-1: Adjust the supply and exhaust airflow
4) Storage Building EF-1 and EF-2: Measure exhaust airflow
5. Control Systems: Upgrade and modify the existing Automated Logic DDC control system.
a. District Heating Plant and Cabinet Unit Heater: Provide control, monitoring and alarm for the district heating plant and cabinet unit heater CUH-1 in the Warehouse Building.
b. Existing DDC Control: Update controls for the existing HVAC systems in accordance with revised control sequences.
c. Submit DDC control system documentation for all three buildings including drawings, control sequences and equipment data. Submit the DDC as-builts 14-days prior to commissioning functional testing.
6. Commissioning: Commission the district heating plant, heating and ventilation systems in each building and TAB work and DDC controls.
B. Code Compliance: Comply with the approved edition of the following codes:
1. International Building Code - 2024
2. International Mechanical Code - 2024
3. International Fire Code - 2024
4. International Plumbing Code - 2024
A. General
1. Existing Conditions: The design is based on Owner drawings, has not been fully field-verified, and does not represent as-built conditions. Field verify all information required for construction including pipe, duct, equipment sizes and locations and control and appurtenance locations prior to start of work.
2. Ceilings: Remove, modify and reinstall existing ceiling tiles and grids as required to perform the work. Replace tiles and grids that are damaged during the work.
3. Concrete Pads: Provide concrete pads under mechanical equipment in mechanical spaces. Coordinate size and location with equipment.
4. Seismic Supports and Restraints: Piping and equipment shall be supported based on seismic category 'D'. Submit seismic support systems designed by a licensed structural engineer.
5. Variable Frequency Drives: Variable frequency drives are provided by the mechanical contractor and installed by the electrical contractor.
6. Substitutions: Equipment substitutions are allowed and shall demonstrate by submittal of shop drawings and product data that they meet or exceed the basis of design.
7. Hydronic Heating System: Drain and flush the entire heating piping system, including the existing piping in each building. Clean heating piping system with heated TSP solution or approved alternate. Clean all strainers.
8. Install equipment per the manufacturer's installation instructions. Submit conflicts with the contract documents prior to installation.
a. Coordinate the location of mechanical systems with existing and new work, rated assemblies, construction phasing and structural requirements.
b. Arrange work to provide workable access to serviceable or operable equipment by a person standing on the floor. Provide access doors for concealed items rated for the assembly.
9. Cut and Patch: Repair all damaged surfaces, insulation, ceiling tiles, and fire-proofing.
Plug, patch and repair holes and penetrations of surfaces. Refinish surfaces and repair assemblies to match adjacent finishes and retain fire, temperature, and/or smoke ratings.
Seal room penetrations to maintain pressure relationships between spaces.
B. Demolition: Remove all items that are associated with equipment noted for removal including, but not limited to, supports, brackets, stems, hangers, conduit, conductors, devices, appurtenances and accessories. All items shown as removed become the property of the contractor.
C. Hydronic Systems
1. Coordination: All rises and drops in piping are not shown. Layout routing and coordinate work with other trades before construction.
2. Air Vents and Drains: Install ¾” drain valves at low points and automatic air vents with isolation valve at high points.
3. Thermometers: Extend thermowells halfway into the flow stream, extend sensor to bottom of well and fill with thermo-conductive paste. For insulated piping, insulate the piping tee and thermowell.
4. Pressure Relief Valves: Extend pressure relief valve discharge pipe to within 6-12” of floor.
D. HVAC Systems
1. Coordination: Coordinate diffuser and grille locations with light fixtures, sprinkler heads and other ceiling features and in accordance with the ceiling pattern.
2. All rises and drops in ductwork are not necessarily shown. Layout routing and coordinate work with other trades before construction.
3. Duct Offsets: Provide radius elbows for all duct offsets and turns greater than 15°. Miter elbows with turn vanes are only allowed where specifically shown.
SYMBOLS & ABBREVIATIONS
CW COLD WATER
HW HOT WATER
HWC HOT WATER CIRCULATION
PHW PREHEATED HOT WATER
V VENT
W WASTE, SOIL, DRAINAGE
HS HEATING SUPPLY
HR HEATING RETURN
R2 REFRIGERANT
POINT OF CONNECTION OR REMOVAL
AV AUTOMATIC VALVE
PRV PRESSURE REDUCING VALVE
ELBOW PLAN, UP , DOWN
GATE VALVE
CHECK VALVE
UNION
HOSE BIBB
AAV AUTOMATIC AIR VALVE
GLOBE VALVE OR ISOLATING BALL
VALVE
BV BALANCE VALVE
DV DRAIN VALVE
REDUCER
PRESSURE GAGE
P-1 PUMP
CENTRIFUGAL PUMP
PRESSURE RELIEF VALVE
FLOW DIRECTION
RADIANT TUBING
1/M2.0 DETAIL REFERENCE
ZONE A / LOOP 2
THERMOSTAT - IMMERSION, ROOM
PRESSURE SENSOR
THERMOMETER
Ø DIAMETER
AIR VOLUMN .
DIFFUSER/GRILL TYPE
AIRFLOW DIRECTION INDICATOR
CEILING RETURN/EXHAUST GRILLE
CEILING SUPPLY DIFFUSER
RETURN/EXHAUST DUCT UP, DOWN
SUPPLY DUCT UP, DOWN
WALL SUPPLY GRILLE
LINE BREAK
PHW
R2
M2.0
A2
T
P
SA
GENERAL NOTES
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER E D P R O F E S S I O NA L ENGINEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M102
SCHEDULES
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
BOILER SCHEDULE
Symbol Building Location Capacity Operating Control Electrical Safeties Design Basis
B-1 Office Mechanical A-102 210 kW Honeywell T775 / Seven 30 kW Steps 480V / 3-ph / 210kW High Limit / High Limit with Reset / LWCO / Flow Switch Precision PCW3-210-480 B-2 Office Mechanical A-102 210 kW Honeywell T775 / Seven 30 kW Steps 480V / 3-ph / 210kW High Limit / High Limit with Reset / LWCO / Flow Switch Precision PCW3-210-480
EXPANSION TANK SCHEDULE
Symbol Building Location Service Volume Acceptance Charge Design Basis / Description
ET-1 Office Mechanical A-102 District Heating 21 gallons 10 gallons 12 psig Amtrol Extrol AX-40V-DD / Vertical steel with butyl diaphragm; 125 psig ASME
HEATING EQUIPMENT SCHEDULE
Symbol Building Description Location Capacity Design Basis / Description
(R) AS-1 Office Air Separator Mechanical A-102 114 gpm / 3" Amtrol 3-ASL / Relocate AS-1
HEAT RECOVERY UNIT SCHEDULE
Symbol Building Location SF CFM / ESP EF CFM / ESP Fan Drive HX Type Supply Air Exhaust Air Sensible
Effectiveness Electrical Manufactuer / Description
HRU-1 Office Staging Bay S-04 200 / 0.75" 200 / 0.75" Direct / EC Motor Enthalpy wheel -10Fdb / -12Fwb 60Fdb / 48Fwb 75% 120V / 1-ph /
MCA=7A
FanTech ATMO 300C-EC / Energy Recovery Ventilator with EC motors and polymer enthalpy core
VENTILATION EQUIPMENT
Symbol Description Material Duct Connection Design Basis/Description
WC-1 Wall Cap 304 Stainless Steel 8" Diameter AllVent Dome Grille / Round hood with 45-degree angled outlet; mesh screen
PUMP SCHEDULE
Symbol Description Building Location Service Fluid / Temp Capacity Min Efficiency Electrical Design Basis / Options
P-1 Inline circulator with EC motor and variable speed controller and DDC interface Office Mechanical A-102 Boiler B-1 Water / 180F 72 gpm / 12 feet 60% 208V / 1-ph / 3/4 HP Taco VR20M / Controller capable control sequence P-2 Inline circulator with EC motor and variable speed controller and DDC interface Office Mechanical A-102 Boiler B-2 Water / 180F 72 gpm / 12 feet 60% 208V / 1-ph / 3/4 HP Taco VR20M / Controller capable control sequence
P-3A Base-mounted, end-suction pump coupled to motor Office Mechanical A-102 District Heating Water / 180F 114 gpm / 60 feet 69% 208V / 3-ph / 3 HP / VFD Taco FI2009D / Suction diffuser P-3B Base-mounted, end-suction pump coupled to motor Office Mechanical A-102 District Heating Water / 180F 114 gpm / 60 feet 69% 208V / 3-ph / 3 HP / VFD Taco FI2009D / Suction diffuser
CABINET UNIT HEATER SCHEDULE
Symbol Description Capacity Water-side Air-side Electrical Make/Model Notes CUH-1 Wall-mounted cabinet fan heater with integral intake and discharge grilles, 1-row coil 20 MBH Water; 180F EWT; 2.0 GPM 65F EAT; 370 CFM (low speed) 120V / 1-ph / MCA = 1A Modine CW-006 Arrangement 08; 3-speed Motor Controller
BALANCE VALVE SCHEDULE
Building Location Equipment Flow GPM Balance Valve Size
District Heating System
Office Mechanical A-102 Pump P-1 72.0 3 Office Mechanical A-102 Pump P-2 72.0 3 Office Mechanical A-102 Pumps P-3A / P-3B 114.0 3 Office Mechanical A-102 Office Building 65.0 2-1/2
Warehouse Radio Shop W-08 Warehouse Building 28.0 2 Storage Staging Bay S-04 Storage Building 21.0 1-1/4 [1]
Office Building
Office Third Floor Penthouse AHU3-1 HC 11.0 1-1/4 [1] Office Third Floor Penthouse AHU3-1 HC 11.0 1-1/4 [1] Office Third Floor Penthouse AHU3-1 HC Bypass 22.0 2 [1] Office Wilderness A-101 FTU-1 1.7 1/2 [1] Office Wilderness A-101 FTU-1 Bypass 1.7 1/2 [1] Office Wilderness A-101 FTU-2 2.0 3/4 [1] Office Wilderness A-101 FTU-2 Bypass 2.0 3/4 [1] Office Mechanical A-102 FTU-3 1.4 1/2 [1] Office Mechanical A-102 FTU-3 Bypass 1.4 1/2 [1] Office Unfinished A-105 FTU-4 1.5 1/2 [1] Office Unfinished A-105 FTU-4 Bypass 1.5 1/2 [1] Office Timber and Fire A-120 FTU-5 1.3 1/2 [1] Office Timber and Fire A-120 FTU-5 Bypass 1.3 1/2 [1] Office Education and Outreach A-121 FTU-6 1.0 1/2 [1] Office Education and Outreach A-121 FTU-6 Bypass 1.0 1/2 [1] Office Support Services A-122 FTU-7 1.5 1/2 [1] Office Support Services A-122 FTU-7 Bypass 1.5 1/2 [1] Office Support Services A-122 FTU-8 0.9 1/2 [1] Office Support Services A-122 FTU-8 Bypass 0.9 1/2 [1] Office Conference Room A-124 FTU-9 1.4 1/2 [1] Office Conference Room A-124 FTU-9 Bypass 1.4 1/2 [1] Office Ranger Office A-128 FTU-10 1.4 1/2 [1] Office Ranger Office A-128 FTU-10 Bypass 1.4 1/2 [1] Office Corridor A-118 FTU-11 1.2 1/2 [1] Office Corridor A-118 FTU-11 Bypass 1.2 1/2 [1] Office Law Enforcement A-129 FTU-12 1.3 1/2 [1] Office Law Enforcement A-129 FTU-12 Bypass 1.3 1/2 [1] Office Corridor A-117 FTU-13 0.9 1/2 [1] Office Corridor A-117 FTU-13 Bypass 0.9 1/2 [1] Office Recreation A-201 FTU-14 3.8 1/2 [1] Office Recreation A-201 FTU-14 Bypass 3.8 1/2 [1] Office Recreation A-201 FTU-15 3.8 3/4 [1] Office Recreation A-201 FTU-15 Bypass 3.8 3/4 [1] Office Minerals A-202 FTU-16 1.4 1/2 [1] Office Minerals A-202 FTU-16 Bypass 1.4 1/2 [1] Office Special Uses A-203 FTU-17 1.9 3/4 [1] Office Special Uses A-203 FTU-17 Bypass 1.9 3/4 [1] Office Corridor A-211 FTU-18 1.4 1/2 [1] Office Corridor A-211 FTU-18 Bypass 1.4 1/2 [1] Office Fish and Wildlife A-216 FTU-19 2.2 3/4 [1] Office Fish and Wildlife A-216 FTU-19 Bypass 2.2 3/4 [1] Office Engineering A-215 FTU-20 1.9 3/4 [1] Office Engineering A-215 FTU-20 Bypass 1.9 3/4 [1] Office Ranger Office A-214 FTU-21 1.4 1/2 [1] Office Ranger Office A-214 FTU-21 Bypass 1.4 1/2 [1] Office Corridor A-212 FTU-22 2.0 3/4 [1] Office Corridor A-212 FTU-22 Bypass 2.0 3/4 [1] Office Corridor A-212 FTU-23 1.9 3/4 [1] Office Corridor A-212 FTU-23 Bypass 1.9 3/4 [1] Office Entry A-127 CH3-1 1.9 1/2 [1] Office Entry A-127 CH3-1 Bypass 1.9 1/2 [1] Office West Stair A-109 UH3-1 1.5 1/2 [1] Office West Stair A-109 UH3-1 Bypass 1.5 1/2 [1]
Warehouse Building
Warehouse Mechanical W-02 HV-1 13.0 1-1/2 [1] Warehouse Mechanical W-02 Heating Manifold 14.2 1-1/2 [1] Warehouse Vehical Shop W-09 UH-1 4.7 3/4 [1] Warehouse Radio Shop W-08 CUH-1 2.4 3/4 [1] Warehouse Wood Shop W-01 UH-3 4.7 3/4 [1] Warehouse Mechanical W-02 Radiant 2.4 3/4 [1]
Storage Building Storage Staging Bay S-04 HC-1 16.0 1-1/4 [1] Storage Staging Bay S-04 Radiant Floor 5.0 1 [1]
DRAWING NOTES
[1] Replace existing balance valve.
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
STORAGE BUILDING LOOPFIELDEIGHT BOREHOLES,
(X) DIRECT BURY 1-1/2" HS/HR
4/M203 [1]
(X) DIRECT BURY 2" HS/HR
3/M203 [1]
(X) VAULT
1/M203
(X) DIRECT BURY
2" HS/HR [1]
(X) 2000 GALLON FUEL OIL TANK [2]
(X) DDC CONTROL CONDUIT AND CONDUCTORS [4]
(X) 1/2" FOS
(X) 3/4" FOR [3]
N
DRAWING NOTES
[1] The location of the existing direct bury piping and vault is estimated and has not been field verified.
[2] Notify the USFS a minimum of 30-days prior to disabling the fuel oil boiler so they can stop fuel deliveries. Remove aboveground tank and supports. Tank and fuel become the property of the Contractor and shall be disposed of in accordance with applicable state and federal regulations.
[3] Remove FOS/FOR and galvanized channel support rack adjacent to tank and along building wall. Repair support wall penetrations.
[4] Remove the control conduit and conductors between PNL-3 in the Office Building and PNL-1 in the Warehouse and between PNL-1 and PNL-2 in the Storage Building. Routing is not known.
GENERAL NOTES
· Refer to the Record Drawings for information on site utilities.
· Provide utility locates prior to excavation.
SITE DEMO PLAN
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER ED P R O F E S S IO NA L ENGINEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M201
SITE DEMO PLAN
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
SCALE: 0 80'20' 40'M201
AutoCAD SHX Text
STORAGE BUILDING
AutoCAD SHX Text
WAREHOUSE BUILDING
AutoCAD SHX Text
OFFICE BUILDING
AutoCAD SHX Text
MENDENHALL LOOP ROAD
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
STORAGE BUILDING LOOPFIELDEIGHT BOREHOLES,
DIRECT BURY 2" HS/HR [1] [2]
4/M203
DIRECT BURY 3" HS/HR [1] [2]
4/M203
EXPANSION LOOPS [3]
ROUTE HS/HR UNDER
SLAB 3/M203
WALL PENETRATION 2/M203
DIRECT BURY PIPING
ANCHOR 5/M203
1/M304
1/M501
1/M401
ROUTE HS/HR UNDER
SLAB 3/M203
DIRECT BURY PIPING
ANCHOR 5/M203
PROVIDE DDC CONTROL
CONDUCTORS [4]
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER ED P R O F E S S IO NA L ENGINEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M202
SITE PLAN
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
DRAWING NOTES
[1] Locate the direct bury piping along the same routing as the existing piping. Refill excavations to allow vehicle use when work is not occurring.
[2] Install direct bury piping per manufacturer's instructions.
[3] Expansion loops sized by piping manufacturer. Install per manufacturer's instructions.
[4] Install control conduit and conductors from PNL-3 in the Office
Building to PNL-1 in the Warehouse and from PNL-1 to PNL-2 in the Storage Building. Install conduits in piping trench as detailed in the Civil Drawings and route through building as required.
GENERAL NOTES
· Refer to the record drawings for information on site utilities.
· Provide utility locates prior to excavation.
N
SITE PLAN
SCALE: 0 80'20' 40'M202
AutoCAD SHX Text
STORAGE BUILDING
AutoCAD SHX Text
WAREHOUSE BUILDING
AutoCAD SHX Text
OFFICE BUILDING
AutoCAD SHX Text
MENDENHALL LOOP ROAD
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
(X) DIRECT BURY 1-1/2" HS/HR
TO STORAGE BLDG
VAULT
ACCESS
HATCH
(X) EXPANSION LOOP 3
TYP OF 2
(X) EXPANSION LOOP 1
TYP OF 2
(X) EXPANSION LOOP 2
TYP OF 2
(X) ALL PIPING IN VAULT, TYP
(X) ALL CHANNEL SUPPORTS
IN VAULT, TYP
(X) DIRECT BURY 2" HS/HR
TO OFFICE BLDG
(X) DIRECT BURY 2" HS/HR
TO WAREHOUSE BLDG
(X) VAULT
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER ED P R O F E S S IO NA L ENGINEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M203
SITE DETAILS
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
N
VAULT DEMO PLAN
SCALE: 0 1' 2'6" 4' SCALE: NONE SCALE: NONE
DIRECT BURY PIPING
CORE DRILL WALL
FILL ANNULAR SPACE
WITH QUICK SET MORTAR
(E) CONCRETE WALL
6" MIN 6" MIN 6" MIN
MIN 36"
6" MIN
DIRECT BURY HS/HR
6" MIN
PIPE MARKERS
12" FROM SURFACE
SCALE: NONE
DIRECT BURY PIPE TRENCH DETAIL
10"
MIN
TYP
10" MIN
36" LONG CONCRETE
ANCHOR BLOCK
DIRECT BURY PIPING
1/2" THICK ANCHOR PLATE
SCALE: NONE
DIRECT BURY PIPING ANCHOR DETAIL
10" MIN
DIRECT BURY PIPING
WALL PENETRATION DETAIL
DIRECT BURY PIPING
BUILDING BRANCH DETAIL
HS/HR
(E) SLAB
(E) WALL
SEE CIVIL FOR PIPE
TRENCH REQUIREMENTS
CORE DRILL STEM WALL
PENETRATIONS. SEAL WITH GROUT.
TYPE K COPPER
CARRIER PIPE
SCALE: NONE
DIRECT BURY PIPE DETAIL
HPPE JACKET
3" HS/HR - 10" ID
2" HS/HR - 8" ID
POLYISOCYANURATE
FOAM
SEE CIVIL FOR PIPE TRENCH
REQUIREMENTS
DIRECT BURY
HS/HR
(E) FOOTING
REMOVE AND REPLACE
SLAB AS REQUIRED TO
INSTALL PIPING.
SEE ARCH DRAWINGS
M203
M203
M203
M203
M203
M203
SEE CIVIL FOR PIPE TRENCH
REQUIREMENTS
DIRECT BURY PIPING
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
6"
FEC
FEC
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
(X) 1/2" FOS
(X) 3/4" FOR
M302
1/M201[1]
UP
UP
FEC
FEC
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801 jim@alaskaenergy.us
Energy
JR
JR / KB
JR
James A. Rehfeldt
ME-8987
REG IS T ER ED PR O F E S S IO NA L ENG INEER
NOTE: 11"x 17" PRINT IS HALF SIZE
TONGASS NATIONAL
FOREST
JUNEAU RANGER DISTRICT
M301
OFFICE BUILDING FIRST
FLOOR DEMO PLAN
ANM-JRD
COMPOUND
HVAC
MODERNIZATION
FOR
CONSTRUCTION
06/20/2025
4'SCALE: 0 1' 2'
N
4'SCALE: 0 16'8'
N
OFFICE BUILDING FIRST FLOOR DEMO PLAN
DRAWING NOTES
[1] Remove 1/2” FOS/FOR to (X) oil tank. seal hole in exterior wall per architectural.
M301
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
(X) DIRECT BURY
2" HS/HR
(E) 1/2"
(E) WATER
AND FIRE
HEADER
(X) ET [3]
(X) 1/2
(X) 2 (X) 2(E) WH
(X) 6" FLUE
(X) ET
(X) 2-1/2
REMOVE 60x5 COMBUSTION
AIR DUCT DOWN TO FLOOR
AND CAP AT CEILING [1]
(X) B-1
(X) CP-3
(X) 3
(R) AS-1 [4]
(X) 10" FLUE
(X) 3
(X) 16" FLUE
(X) 3
(X) 1/2" FOS
(X) CP-2
(X) CP-1
(X) 3
(E) 2-1/2
(E) 1-1/2
(E) 2
(X) DAYTANK
(X) 2" OIL VENT
(X)14" CHIMNEY [2]
(X) 1/2" FOS
(X) 3/4" FOR
MECHANICAL
A-102
(X) GT
(E) FD
(E) FD
(X) 3
(E) RPBP
CAP 60x5 COMBUSTION
AIR DUCT AT CEILING [1]
(R) CHEMICAL
FEEDER
(X) 1/2
F
E
DATENO.
REVISION / ISSUE
(R10)
ALASKA REGION
06.20.2025
Alaska
ENGINEERING LLC
25200 Amalga Harbor Phone: 907-789-1226 Juneau, Alaska 99801…