About this file

This is a construction document sheet (A7.0) for an HVAC modernization project at the Tongass National Forest Juneau Ranger District, prepared by the USDA Forest Service Alaska Region (R10).

The project involves Floor 2 of the Office Building and focuses on enclosing and insulating Forced Thermal Units (FTUs) with 10 inches of expanded polystyrene (EPS) rigid insulation on all sides, sealed with adhesive, spray foam, and tape. Key specifications include maintaining a minimum 3-inch clearance from the top of the FTU and keeping the bottom open to allow warm air circulation. The work requires 22x36-inch fire-rated insulated access panels (JL Industries FD basis of design) positioned between truss members at approximately 30 inches above finished floor, along with 24x36-inch wood frame platforms inside the truss space to allow for 18 inches of insulation underneath. Additional work includes demolishing an existing chimney, sealing all gaps in the insulation enclosure, and patching/repairing finishes to match existing conditions. The document contains a reflected ceiling plan for Floor 2 showing mechanical equipment locations, FTU enclosure plan and section details, and access panel specifications. The project number is MRV #2420, dated July 25, 2025, with a revision issued via Addendum 2 on March 18, 2026. All plans are noted as approximations requiring submission to the Contracting Officer Representative for approval prior to ordering materials.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

DN

R E

F

VENDVEND

R E

FCORR.

A-211

ENTRY

A-207

RECREATION

A-201

CORR.

A-217

STAIR

A-218

FISH & WILDLIFE

A-216

OFFICE

A-216A

ENGINEERING

A-215

MINERALS

A-202

REC.

OFF.

A-201A

OFFICE

A-202A

OFFICE

A-203A

JAN.

A-204

SPECIAL USES

A-203

MEN

A-206

WOMEN

A-205

SECURITY

A-208

RANGER

A-214

CORR.

A-212

LUNCH

A-209

STAIR

A-213

CONF.

A-210

F

D

C

E

B

A

1 2 3 4 5 86 7 9 10 11

PLENUM ACCESS

4 4 4

3" MIN

3' - 0" MIN.

FTU, SIZE VARIES

MAINTENANCE SIDE

FOAM SEAL AROUND DUCTS AND PIPES

NOTE:

1. PLAN IS AN APPROXIMATION OF SIZE

AND GENERAL REQUIREMENTS. SIZE MAY

VARY TO ACCOMMODATE FRAMING

MEMBER LOCATIONS AND CLEARANCE

FOR MAINTENANCE OPERATIONS. SUBMIT

PLAN FOR EACH ENCLOSURE SIZE TO COR

FOR APPROVAL PRIOR TO ORDERING

MATERIALS.

2. ENSURE MIN 3" CLEAR FROM TOP OF

FTU. BOTTOM REMAINS OPEN TO HEAT

FROM BELOW.

M

IN

M

IN

M

IN

A7.0

10" RIGID INS. ALL SIDES

SEAL ALL JOINTS WITH

ADHESIVE/SPRAY FOAM

AND TAPE

3"

(E) 2ND FLOOR ACT

VAPOR RETARDER, LAP

INTO ENCLOSURE

PIPES AND VALVES

PER MECH

FTU, SIZE VARIES

10" RIGID INS.

10" RIGID INS.

ALL SIDES.

MAINTENANCE SIDE

KEEP 3'-0" CLEAR

DEMO VAPOR BARRIER,

OPEN TO BELOW

EXISTING ACCESS

HATCH

CUT PLY SHEATHING TO

OPENING. (ONLY ON SOUTH

WALL) DO NOT CUT TRUSS

MEMBERS. INCREASE NAILING TO

4" O.C. AT PERIMETER. PROVIDE

SOLID PERIMETER BLOCKING AND

FOIL TAPE INSULATION CUTS

PANEL ATTACHMENT FLANGE

AT SOLID BLOCKING OR TRUSS.

EXISTING FOIL FACE

INSULATION TO REMAIN CONT.

UP TO FLANGE

INSULATED ACCESS PANEL, SEE

SHEET NOTE FOR SPEC AND

LOCATION

CHECKED:

SHEET

DRAWN:

DATE:

SHEET TITLE:

PROJECT NO. OF

DESIGNER

ARCHIVE NO.

(R10)

ALASKA REGION

A7.0

ANM-JRD

COMPOUND

HVAC

MODERNIZATION

MRV #2420

FLOOR 2, OFFICE

BUILDING RCP

CONSTRUCTION DDOCUMENTS

FOR CONSTRUCTION

TONGASS NATIONAL

FOREST

07/25/2025

CJN

CJN

ZMJ

JUNEAU RANGER DISTRICT

0' 8' 16'4'1/8" = 1'-0"

1 FLOOR 2, OFFICE BUILDING RCP

NOTES:

GENERAL: MECHANICAL

EQUIPMENT SHOWN FOR CLARITY

PATCH AND REPAIR FINISHES TO

MATCH EXISTING.

ENCLOSE FTU WITH 10" EPS

INSULATION APPROXIMATELY AT

DASH. NO INSULATION UNDER THE

BOTTOM OF THE FTU TO ALLOW

WARM AIR TO CIRCULATE AROUND

THE FTU. ENSURE ENOUGH

CLEARANCE FOR MAINTENANCE.

SEAL ALL GAPS IN INSULATION

ENCLOSURE WITH SPRAY FOAM

INSULATION.

DEMO CHIMNEY. SEE MECH. SEE

ELEC FOR ELECTRICAL WORK IN

CHASE.

PROVIDE 22X36 ACCESS PANEL AT

EACH ATTIC BAY. BASIS OF

DESIGN; JL INDUSTRIES FD - FIRE-

RATED INSULATED FLUSH ACCESS

PANEL. LOCATE BETWEEN TRUSS

MEMBERS APPROX 30" A.F.F.

COORDINATE LOCATION TO AVOID

EXISTING MECH. COORDINATE

LOCATION WITH OWNER. PROVIDE

24X36 WOOD FRAME PLATFORM

INSIDE TRUSS SPACE FOR LANDING

BELOW ACCESS PANEL. ATTACH

TO TRUSS FRAMING AND DO NOT

COMPRESS EXISTING INSULATION.

ALLOW FOR 18" OF INSULATION

UNDER PLATFORM.

2 2

2 2

0' 2' 4'1'3/4" = 1'-0"

FTU ENCLOSURE, PLAN 4311

0' 2' 4'1'3/4" = 1'-0"

FTU ENCLOSURE, SECTION

NO. REVISION / ISSUE DATE

1 Addendum 2 03.18.2026

0' 1' 2'6"1 1/2" = 1'-0"

ACCESS PANEL

File details come from the government source that posted it. Updated .