This is a Buy American Certification document issued by the Kenton County Airport Board for the Cincinnati/Northern Kentucky International Airport's 2026 Fall Protection Systems Installation project. The document outlines federal compliance requirements for steel and manufactured goods used in three distinct bid packages: the Storm Water Treatment Plant fall protection systems with a 120-day completion timeline, the T3 Parking Deck fall protection components requiring 45 days for completion, and the comprehensive Concourse A Roof fall protection systems with a 300-day completion timeline. A mandatory pre-bid meeting and site visit are scheduled for Thursday, March 19, 2026 at 10:00 am at CVG Centre Administrative Offices in Erlanger, Kentucky. Written questions must be submitted by 11:59 pm on Friday, April 3, 2026, with answers posted by Tuesday, April 7, 2026 at 11:59 pm. Sealed bids must be received electronically by Thursday, April 16, 2026 at 2:00 pm, with no late submissions accepted unless extended by addendum. Bidders may propose for any or all three packages and must demonstrate a minimum of 3-5 years of relevant fall protection system installation experience with at least one successfully completed project at an operational airport facility within the past five years.
As a matter of bid responsiveness, all bidders must complete and submit a signed certification statement indicating compliance with 49 USC 50101, which mandates that all steel and manufactured goods be produced in the United States unless the FAA has issued a waiver, the product is listed as an Excepted Article in Federal Acquisition Regulation subpart 25.108, or is included in the FAA Nationwide Buy American Waivers Issued list. Bidders must select one of four certification options: installing only U.S.-produced steel and manufactured products; installing only specified construction materials manufactured in the United States; installing products with FAA-issued waivers; or installing excepted products. Bidders selecting the fourth certification option that cannot comply with 100 percent Buy American preferences may qualify for a Type 2, 3, or 4 waiver but must submit formal waiver requests with supporting documentation within 15 calendar days of being selected as the responsive bidder. The project is financed by local funds with an estimated total installation cost of $2,447,000, comprising approximately $1,910,000 for Concourse A, $113,000 for the T3 Parking Deck, and $424,000 for the Storm Water Treatment Plant. Upon award, bidders must provide 100 percent performance and payment bonds from a surety rated at least "A" by Best Insurance Reports and authorize $10,000,000 commercial general liability and automobile liability coverage per occurrence. Liquidated damages of $500 per day apply for schedule delays, and a one-year installation warranty is required following final acceptance.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KENTON COUNTY AIRPORT BOARD CINCINNATI/NORTHERN KY INTERNATIONAL AIRPORT
PROJECT NAME
BUY AMERICAN CERTIFICATION –
EQUIPMENT/BUILDING PROJECTS
The contractor shall comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.
As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. The bidder or offeror must indicate how they intend to comply with 49 USC § 50101, and other Made in America Laws, U.S. statutes, guidance, and FAA policies by selecting one on the following certification statements. These statements are mutually exclusive. Bidder must select one or the other (not both) by inserting a checkmark () or the letter “X”.
· Bidder or offeror hereby certifies that it will comply with 49 USC § 50101, BABA and other related U.S. statutes, guidance, and policies of the FAA by:
a) Only installing steel and manufactured products produced in the United States;
b) Only installing construction materials defined as: an article, material, or supply – other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives that are or consist primarily of non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); lumber or drywall that have been manufactured in the United States.
c) Installing manufactured products for which the Federal Aviation Administration (FAA) has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing; or
d) Installing products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108.
By selecting this certification statement, the bidder or offeror agrees:
a) To provide to the Airport Sponsor or FAA evidence that documents the source and origin of the steel and manufactured product.
b) To faithfully comply with providing U.S. domestic product.
c) To furnish U.S. domestic product for any waiver request that the FAA rejects.
d) To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.
· The bidder or offeror hereby certifies it cannot comply with the 100 percent Buy American Preferences of 49 USC § 50101(a) but may qualify for a Type 3 waiver under 49 USC § 50101(b). By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees:
a) To submit to the Airport Sponsor or FAA within 15 calendar days of being selected as the responsive bidder, a formal waiver request and required documentation that supports the type of waiver being requested.
b) That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination that may result in rejection of the proposal.
c) To faithfully comply with providing U.S. domestic products at or above the approved U.S. domestic content percentage as approved by the FAA.
d) To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.
Required Documentation Type 2 Waiver (Nonavailability) - The iron, steel, manufactured goods or construction materials are not available in sufficient quantity or quality in the United States. The required documentation for the Nonavailability waiver is:
a) Completed Content Percentage Worksheet and Final Assembly Questionnaire
b) Record of thorough market research, consideration where appropriate of qualifying alternate items, products, or materials including;
c) A description of the market research activities and methods used to identify domestically manufactured items capable of satisfying the requirement, including the timing of the research and conclusions reached on the availability of sources.
Type 3 Waiver – The cost of the item components and subcomponents produced in the United States is more that 60 percent of the cost of all components and subcomponents of the “item”. The required documentation for a Type 3 waiver is:
a) Completed Content Percentage Worksheet and Final Assembly Questionnaire including;
b) Listing of all product components and subcomponents that are not comprised of 100 percent U.S. domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108 (products of unknown origin must be considered as non-domestic products in their entirety).
c) Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly at place of manufacture.
d) Percentage of non-domestic component and subcomponent cost as compared to total “item” component and subcomponent costs, excluding labor costs associated with final assembly at place of manufacture.
Type 4 Waiver (Unreasonable Costs) - Applying this provision for iron, steel, manufactured goods or construction materials, would increase the cost of the overall project by more than 25 percent. The required documentation for this waiver is:
a) Completed Content Percentage Worksheet and Final Assembly Questionnaire from
b) At minimum two comparable equal bidders and/or offerors;
| c) | Receipt or record that demonstrates that supplier scouting called for in Executive Order 14005, indicates that no domestic source exists for the project and/or component; |
| d) | Completed waiver applications for each comparable bid and/or offer. |
False Statements: Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code.
Date Signature