This Buy American Certification document establishes federal compliance requirements for the Kenton County Airport Board's 2026 Fall Protection Systems Installation project in Kentucky, which involves three independent bid packages for fall protection systems at Cincinnati/Northern Kentucky International Airport. The project encompasses Storm Water Treatment Plant fall protection and confined space equipment (120-day completion), T3 Parking Deck fall protection components including approximately 160 linear feet of guardrails (45-day completion), and comprehensive Concourse A Roof fall protection systems including approximately 3,200 linear feet of guardrails, six anchor davit systems, and 185 square feet of metal access platforms (300-day completion). A mandatory pre-bid meeting and site visit will be held on March 19, 2026 at 10:00 am at CVG Centre Administrative Offices in Erlanger, Kentucky; written questions must be submitted by 11:59 pm on April 3, 2026 with answers posted by April 7, 2026 at 11:59 pm; and sealed bids are due by April 16, 2026 at 2:00 pm. Bidders must demonstrate a minimum of 3-5 years of relevant fall protection installation experience and at least one successfully completed project at an operational airport facility within the past five years, with qualified personnel including a Project Manager, Site Superintendent with specified certifications, and a dedicated Safety Manager.

The project is financed by local funds with an estimated total installation cost of $2,447,000, comprising approximately $1,910,000 for Concourse A, $113,000 for the T3 Parking Deck, and $424,000 for the Storm Water Treatment Plant, with liquidated damages of $500 per day for schedule delays and a one-year installation warranty required. All work must comply with 49 USC 50101 Buy American requirements, mandating that all steel and manufactured goods be produced in the United States unless the FAA has issued a waiver, the product is listed as an Excepted Article in Federal Acquisition Regulation subpart 25.108, or is included in the FAA Nationwide Buy American Waivers Issued list. Bidders must complete and submit a Buy American Certification statement selecting one of three compliance options: installing only U.S.-produced steel and manufactured products; installing products for which the FAA has issued a waiver; or installing excepted articles listed in FAA regulations. Apparent low bidders selecting a Type 3 or Type 4 waiver option must submit formal waiver requests with required documentation within 15 calendar days of bid opening, with failure to do so resulting in proposal rejection. Selected bidders must furnish a 5 percent proposal bond and, upon award, provide 100 percent performance and payment bonds; insurance requirements include $10,000,000 commercial general liability and automobile liability coverage per occurrence and $10,000,000 per accident respectively.

View the file

Other files

File Type Posted
26-014-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
26-014-ITB_Pre-Bid_Sign_In_Sheets.pdf PDF
26-014-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
2026_Fall_Protection_Systems_Installation.pdf PDF
2026_Fall_Protection_Systems_Installation.pdf PDF
2026_Fall_Protection_Systems_Installation.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Installation_-_Ad.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Installation_-_Ad.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Installation_-_Ad.pdf PDF
26-014-ITB_2026_Fall_Protection_Installation_-_Exhibit_B_-_Contract_&_Bonds.pdf PDF
26-014-ITB_2026_Fall_Protection_Installation_-_Exhibit_A_-_Proposal_Forms.pdf PDF
26-014-ITB_2026_Fall_Protection_Installation_-_Exhibit_A_-_Proposal_Forms.pdf PDF
26-014-ITB_2026_Fall_Protection_Installation_-_Exhibit_B_-_Contract_&_Bonds.pdf PDF
26-014-ITB_2026_Fall_Protection_Installation_-_Exhibit_A_-_Proposal_Forms.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Drawings_&_Photos.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Technical_Specs.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Technical_Specs.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Drawings_&_Photos.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Technical_Specs.pdf PDF
26-014-ITB_2026_Fall_Protection_Systems_Install_-_Drawings_&_Photos.pdf PDF
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
LJB_Concourse_Cost_Estimates_REVISED.pdf PDF
Buy_American_Certification-Construction_Projects.docx DOCX document
PLANS_IFB_R2_2026-02-27.pdf PDF
NonSegregated_Facilities_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
EEO_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
RE__LJB_Engineering_-_Proposal_for_Advisory_Role_-_CVG_Centre_Roof_Project.msg MSG file
Tech_Specs_Rev2.pdf PDF
Buy_American_Certification-Construction_Projects.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Tech_Specs_Rev2.pdf PDF
LJB_Concourse_Cost_Estimates_REVISED.pdf PDF
Tech_Specs_Rev2.pdf PDF
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
EEO_Certification.docx DOCX document
LJB_Concourse_Cost_Estimates_REVISED.pdf PDF
Non_Debarment_or_Suspension_Certification.docx DOCX document
PLANS_IFB_R2_2026-02-27.pdf PDF
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUY AMERICAN CERTIFICATION –

CONSTRUCTION PROJECTS

The contractor shall comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.

As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. The bidder or offeror must indicate how they intend to comply with 49 USC § 50101 by selecting one on the following certification statements. These statements are mutually exclusive. Bidder must select one or the other (not both) by inserting a checkmark (ü) or the letter “X”.

· Bidder or offeror hereby certifies that it will comply with 49 USC § 50101 by:

a) Only installing steel and manufactured products produced in the United States, or;

b) Installing manufactured products for which the FAA has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing, or;

c) Installing products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108.

By selecting this certification statement, the bidder or offeror agrees:

1. To provide to the Owner evidence that documents the source and origin of the steel and manufactured product.

2. To faithfully comply with providing US domestic product

3. To furnish US domestic product for any waiver request that the FAA rejects

4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.

· The bidder or offeror hereby certifies it cannot comply with the 100% Buy American Preferences of 49 USC § 50101(a) but may qualify for either a Type 3 or Type 4 waiver under 49 USC § 50101(b). By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees:

1. To the submit to the Owner within 15 calendar days of the bid opening, a formal waiver request and required documentation that support the type of waiver being requested.

2. That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination may result in rejection of the proposal.

3. To faithfully comply with providing US domestic products at or above the approved US domestic content percentage as approved by the FAA.

4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.

Required Documentation Type 3 Waiver - The cost of the item components and subcomponents produced in the United States is more that 60% of the cost of all components and subcomponents of the “item”. The required documentation for a type 3 waiver is:

a) Listing of all product components and subcomponents that are not comprised of 100% US domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108; products of unknown origin must be considered as non-domestic products in their entirety).

b) Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly at place of manufacture.

c) Percentage of non-domestic component and subcomponent cost as compared to total “item” component and subcomponent costs, excluding labor costs associated with final assembly at place of manufacture.

Type 4 Waiver – Total cost of project using US domestic source product exceeds the total project cost using non-domestic product by 25%. The required documentation for a type 4 of waiver is:

a) Detailed cost information for total project using US domestic product

b) Detailed cost information for total project using non-domestic product False Statements: Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false, fictitious or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code.