BID 2025-91 Clarifying Questions 2.pdf
PDF 5 MB Posted
- Solicitation number
- S-C01010-00017129
- Issued by
- Clackamas County, Mission CDP, Oregon
About this file
This is a Response to Clarifying Questions document for Invitation to Bid #2025-91 issued by the North Clackamas Parks and Recreation District for the Neighborhood Park at Jennings Lodge Campus, located at 18521 SE River Road, Milwaukie, Oregon. The document, dated June 29, 2026, addresses bidder inquiries regarding missing landscaping plan sheets from the original bid documents. In response to a clarifying question, the District confirmed the inclusion of previously missing plan sheets LR1.0 through LR5.1 and Sheet EC7.0, which contain the erosion control and landscaping plan details necessary for project completion.
The attached plan sheets provide comprehensive landscaping specifications and details for the park development, including planting plans, landscape details, irrigation requirements, and soil preparation standards. The documents specify contractor responsibilities for confirming existing conditions, calling before excavation to locate underground utilities, protecting existing trees and vegetation, and ensuring landscape materials meet American Standards for Nursery Stock (ANSI Z60.1-2004). The landscape materials carry a one-year guarantee from installation date, with the contractor required to provide either a signed maintenance contract or performance surety bond for this period. Irrigation system specifications include shop drawing submittal requirements, static water pressure determination, winterization procedures, and gravity drainage systems. The project site includes bike parking facilities and requires coordination with the owner's representative regarding controller placement and utility connections.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2025-91
Neighborhood Park at Jennings Lodge Campus (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #2
June 29, 2026
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. The index on the cover of the Jennings Lodge Right of Way Plan Set shows 4 landscaping plan sheets after the erosion control plans. However, these plan pages do not appear to be included in the plan set. Can you please add plan sheets LR1.0 - LR5.1 to the bid documents?
Answer: Yes, see attached.
Attachments: Sheet EC7.0 and Sheet LR1.0-5.1
End of Clarifying Questions #2
ALL RIGHTS RESERVED
MACKENZIE 2026
SHEET TITLE:
JOB NO.
SHEET:
THESE DRAWINGS ARE THE PROPERTY OF
MACKENZIE AND ARE NOT TO BE USED
OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
THIS SHEET IS SHOWN FOR REFERENCE ONLY AND IS BASED ON
A SURVEY BY:
THE SURVEY INFORMATION SHOWN AS A BACKGROUND SCREEN ON
DATE: RQ4D 09/08/23
2220400.00
PERMIT RESUBMITTAL 03/06/2026
Client
NORTH CLACKAMAS
PARKS AND
RECREATION
DISTRICT
150 BEAVERCREEK RD
OREGON CITY, OR 97405
Project
THE PARK AT
JENNINGS LODGE
CAMPUS
18521 SE RIVER RD
MILWAUKIE, OR 97267
EC7.0
ESCP -
DETAILS
REVISION SCHEDULE
Issued AsDelta Issue Date
STMSTMSTM
STM
STMSTM
S
TM
S
TM
STM
STM
STM STM STM
STM
STMSTMSTM
STM
STMSTM
S
TM
S
TM
STM
STM
STM STM STM
STM
PP
6"
9"8"8"
9"
9"
S A
N S
A N
S A
N S
A N
S A
N S
A N
S A
N S
A N
S A
N
SANSANSANSANSANSANSANSANSANSANSANSAN
SAN
SAN
SAN
SAN
ST
M
ST
M
S
TM
S
TM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STMSTMSTM
S
TM
S
TM
S
TM
S
TM
STM STM
STM
STM
W W
W W
W W
W W
W W
W W
W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W
2 - GB1 - CR 3 - CC 1 - GB 1 - GB 3 - CC 2 - GB
1 - GB
1 - CR
1 - AG
1 - CR
1 - CR
1 - AG
1 - CR
1 - CR
SYMBOL CODE BOTANICAL / COMMON NAME SIZE QTY REMARKS
TREES
PERENNIALS
GROUND COVERS
LIMIT OF WORK
SE
H
U
LL
A
VE
REVISION SCHEDULE
Issued AsDelta Issue Date
A PLAN CHECK 11/17/2025
ALL RIGHTS RESERVED
MACKENZIE 2026
SHEET TITLE:
JOB NO.
SHEET:
THESE DRAWINGS ARE THE PROPERTY OF
MACKENZIE AND ARE NOT TO BE USED
OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
2220400.00
PERMIT RESUBMITTAL 03/06/2026
Client
NORTH CLACKAMAS
PARKS AND
RECREATION
DISTRICT
150 BEAVERCREEK RD
OREGON CITY, OR 97405
Project
THE PARK AT
JENNINGS LODGE
CAMPUS
18521 SE RIVER RD
MILWAUKIE, OR 97267
SE WILMOT ST
PLANT SCHEDULE
PLANTING PLAN1
LR1.0
( IN FEET )
1 inch = ft.
020 2010 40
LR1.0
PLANTING PLAN
PUBLIC UTILITY EASEMENT
GENERAL
1. CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS PRIOR TO
COMMENCING WORK.
2. CALL BEFORE YOU DIG. CONTRACTOR SHALL VERIFY INVERT
ELEVATIONS OF ALL UNDERGROUND UTILITIES AND NOTIFY LANDSCAPE
ARCHITECT IF THERE ARE ANY DISCREPANCIES WITH PLANTING ROOT
ZONES. TO REQUEST LOCATES FOR PROPOSED EXCAVATION CALL
1-800-332-2344 (OR 811) IN OREGON.
3. NOTIFY THE OWNER OR OWNER'S REPRESENTATIVE OF ANY
DISCREPANCIES OR CONFLICTS WITH EXISTING CONDITIONS PRIOR TO
COMMENCEMENT OF ANY WORK.
4. LOCATION OF EXISTING TREES SHALL BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO COMMENCEMENT OF WORK.
5. DAMAGE TO EXISTING CONCRETE CURB, ASPHALT PAVING, OR OTHER
STRUCTURE SHALL BE REPAIRED OR REPLACED TO PRE CONSTRUCTION
CONDITIONS.
6. CONTRACTOR SHALL COORDINATE WITH THE OWNER ANY DISRUPTION
TO VEHICULAR CIRCULATION PRIOR TO COMMENCEMENT OF ANY WORK.
7. LANDSCAPE MATERIALS SHALL BE GUARANTEED BY CONTRACTOR FOR
A PERIOD OF ONE YEAR FROM THE DATE OF INSTALLATION. THE
DEVELOPER SHALL EITHER SUBMIT A SIGNED MAINTENANCE CONTRACT
FOR THE ONE YEAR PERIOD OR PROVIDE A PERFORMANCE SURETY
BOND PURSUANT TO SECTION 1311 OF CLACKAMAS COUNTY ZDO.
PLANTING
1. ALL EXISTING TREES, PLANTS, AND ROOTS SHALL BE PROTECTED FROM
DAMAGE FROM ANY CONSTRUCTION PREPARATION, REMOVAL OR
INSTALLATION ACTIVITIES WITHIN AND ADJACENT TO PROJECT LIMITS.
2. SHRUBS ADJACENT TO PARKING AREAS SHALL BE PLANTED 2 FT
MINIMUM AWAY FROM THE BACK OF CURB. SHRUBS AND GROUNDCOVER
ALONG OTHER PAVEMENT EDGES SHALL BE PLANTED A MINIMUM OF
ONE HALF THEIR ON CENTER SPACING AWAY FROM PAVEMENT EDGE.
3. ALL PLANT MATERIAL SHALL BE HEALTHY NURSERY STOCK, WELL
BRANCHED AND ROOTED, FULL FOLIAGE, FREE FROM INSECTS,
DISEASES, WEEDS, WEED ROT, INJURIES AND DEFECTS WITH NO LESS
THAN MINIMUMS SPECIFIED IN AMERICAN STANDARDS FOR NURSERY
STOCK, ANSI Z60.1-2004.
4. DO NOT PLANT TREES ABOVE WATERLINES, UTILITIES, OR OTHER
UNDERGROUND PIPING.
5. IF DISTURBANCE IS NECESSARY AROUND EXISTING TREES,
CONTRACTOR SHALL PROTECT THE CROWN AND ALL WORK WITHIN THE
TREE DRIPZONE SHALL BE LIMITED TO THE USE OF HAND TOOLS AND
MANUAL EQUIPMENT ONLY.
6. REPLACE, REPAIR AND RESTORE DISTURBED LANDSCAPE AREAS DUE TO
GRADING, TRENCHING OR OTHER REASONS TO PRE-CONSTRUCTION
CONDITION AND PROVIDE MATERIAL APPROVED BY THE OWNER AND
OWNER'S REPRESENTATIVE.
7. EXISTING AREAS PROPOSED FOR NEW PLANT MATERIAL SHALL BE
CLEARED AND LEGALLY DISPOSED UNLESS SO NOTED.
8. A SOILS ANALYSIS, BY AN INDEPENDENT SOILS TESTING LABORATORY
RECOGNIZED BY THE STATE DEPARTMENT OF AGRICULTURE, SHALL BE
USED TO RECOMMEND AN APPROPRIATE PLANTING SOIL AND/OR
SPECIFIED SOIL AMENDMENTS.
9. TOPSOIL IS AVAILABLE ON SITE FOR REUSE. DO NOT EXCAVATE OR
STORE TOPSOIL DURING WET WEATHER. SOIL SHOULD BE DRY AND
FRIABLE WHEN HANDLED AND STORED. PROVIDE COVER TO STORED
SOIL; DO NOT MOUND GREATER THAN 6' FOR STORAGE.
10. ALL LANDSCAPED AREAS SHALL BE COVERED BY A LAYER OF ORGANIC
MULCH TO A MINIMUM DEPTH OF 2-INCHES.
IRRIGATION
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (IRRIGATION PLANS) TO
LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. DRAWINGS TO
INDICATE HEAD TYPE, GALLONS PER MINUTE, LATERAL LINES, AND BE AT
MINIMUM SCALE OF 1"=20'
2. CONTRACTOR TO DETERMINE STATIC WATER PRESSURE AT THE P.O.C.
PRIOR TO PREPARING SHOP DRAWINGS.
3. CONTRACTOR SHALL ESTABLISH MINIMUM PRESSURE AND MAXIMUM
DEMAND REQUIREMENTS FOR IRRIGATION SYSTEM DESIGN, AND
PROVIDE INFORMATION IN AN IRRIGATION SCHEDULE.
4. IRRIGATION SYSTEM AS DESIGNED AND INSTALLED SHALL PERFORM
WITHIN THE TOLERANCES AND SPECIFICATIONS OF THE SPECIFIED
MANUFACTURERS.
5. SYSTEM SHALL BE DESIGNED TO SUPPLY MANUFACTURER'S SPECIFIED
MINIMUM OPERATING PRESSURE TO FARTHEST EMITTER FROM WATER
METER.
6. ALL IRRIGATION PIPE MATERIAL AND INSTALLATION SHALL CONFORM TO
APPLICABLE CODE FOR PIPING AND COMPONENT REQUIREMENTS.
7. PROVIDE SLEEVING AT ALL AREAS WHERE PIPE TRAVELS UNDER
CONCRETE OR HARD SURFACING.
8. VALVES SHALL BE WIRED AND INSTALLED PER MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES AND CONNECTED TO THE
IRRIGATION CONTROLLER.
9. REFER TO CIVIL DETAILS AND DETAILS ON L5.14 FOR POINT OF
CONNECTION AND BACKFLOW PREVENTION INFORMATION.
10. MAINLINE LAYOUT IS DIAGRAMMATIC ONLY.
11. CONTROLLER TO BE MOUNTED [ON BUILDING EXTERIOR / IN ELECTRICAL
ROOM]. GENERAL CONTRACTOR TO COORDINATE LOCATION WITH
OWNER'S REPRESENTATIVE.
12. QUICK COUPLERS TO BE PLACED EVERY 200 LINEAR FEET MAX.
13. IRRIGATION SHALL BE WINTERIZED THROUGH LOW PRESSURE, HIGH
VOLUME AIR BLOWOUT CONNECTION THROUGH QUICK COUPLER.
14. THE SYSTEM SHALL BE GRAVITY DRAINED. THE CONTRACTOR SHALL
PROVIDE APPROPRIATE MANUAL DRAINS AT LOW POINTS.
LANDSCAPE NOTES
BIKE PARKING, QTY 3
BIKE PARKING, QTY 3
IRRIGATION
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (IRRIGATION PLANS) TO
LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. DRAWINGS TO
INDICATE HEAD TYPE, GALLONS PER MINUTE, LATERAL LINES, AND BE AT
MINIMUM SCALE OF 1"=20'
2. CONTRACTOR TO DETERMINE STATIC WATER PRESSURE AT THE P.O.C.
PRIOR TO PREPARING SHOP DRAWINGS.
3. CONTRACTOR SHALL ESTABLISH MINIMUM PRESSURE AND MAXIMUM
DEMAND REQUIREMENTS FOR IRRIGATION SYSTEM DESIGN, AND
PROVIDE INFORMATION IN AN IRRIGATION SCHEDULE.
4. IRRIGATION SYSTEM AS DESIGNED AND INSTALLED SHALL PERFORM
WITHIN THE TOLERANCES AND SPECIFICATIONS OF THE SPECIFIED
MANUFACTURERS.
5. SYSTEM SHALL BE DESIGNED TO SUPPLY MANUFACTURER'S SPECIFIED
MINIMUM OPERATING PRESSURE TO FARTHEST EMITTER FROM WATER
METER.
6. ALL IRRIGATION PIPE MATERIAL AND INSTALLATION SHALL CONFORM TO
APPLICABLE CODE FOR PIPING AND COMPONENT REQUIREMENTS.
7. PROVIDE SLEEVING AT ALL AREAS WHERE PIPE TRAVELS UNDER
CONCRETE OR HARD SURFACING.
8. VALVES SHALL BE WIRED AND INSTALLED PER MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES AND CONNECTED TO THE
IRRIGATION CONTROLLER.
9. REFER TO CIVIL DETAILS AND DETAILS ON L5.14 FOR POINT OF
CONNECTION AND BACKFLOW PREVENTION INFORMATION.
10. MAINLINE LAYOUT IS DIAGRAMMATIC ONLY.
11. QUICK COUPLERS TO BE PLACED EVERY 200 LINEAR FEET MAX.
12. IRRIGATION SHALL BE WINTERIZED THROUGH LOW PRESSURE, HIGH
VOLUME AIR BLOWOUT CONNECTION THROUGH QUICK COUPLER.
13. THE SYSTEM SHALL BE GRAVITY DRAINED. THE CONTRACTOR SHALL
PROVIDE APPROPRIATE MANUAL DRAINS AT LOW POINTS.
REVISION SCHEDULE
ALL RIGHTS RESERVED
MACKENZIE 2026
SHEET TITLE:
JOB NO.
SHEET:
THESE DRAWINGS ARE THE PROPERTY OF
MACKENZIE AND ARE NOT TO BE USED
OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
2220400.00
PERMIT RESUBMITTAL 03/06/2026
Client
NORTH CLACKAMAS
PARKS AND
RECREATION
DISTRICT
150 BEAVERCREEK RD
OREGON CITY, OR 97405
Project
THE PARK AT
JENNINGS LODGE
CAMPUS
18521 SE RIVER RD
MILWAUKIE, OR 97267
LR5.0
LANDSCAPE
DETAILS
IMPORTED TOPSOIL SCALE: NTS
STANDARD SOIL PREPARATION
2" 6"
TI
LL
TI
LL
T O
NOTES
1. REMOVE ALL ROCK, DEBRIS AND OTHER FOREIGN MATTER
OVER 1" IN DIAMETER FROM TOP 12" OF SOIL.
2. RIP AND TILL SUBGRADE TO MIN 6'' DEEP PRIOR TO INSTALLING
TOPSOIL AND TILL INTERFACE OF SUBGRADE AND TOPSOIL.
3. TILL TOPSOIL AND SOIL AMENDMENTS TO A MIN 12" DEPTH.
4. SUBMIT SAMPLE OF MULCH & TOPSOIL FOR ACCEPTANCE
PRIOR TO PLACEMENT.
EX SUBGRADE
IMPORTED TOPSOIL
SOIL AMENDMENT
MULCH
FG. ESTABLISH AT 1" BELOW
ADJACENT PAVING
SURFACES
2"
1 SCALE: NTS
DECIDUOUS TREE PLANTING
1. SCARIFY AND ROUGHEN BOTTOM
OF PLANTING PIT PRIOR TO
PLACING TREE AND TOPSOIL.
2. CUT AND REMOVE TWINE, BURLAP,
AND WIRE BASKET FROM TOP AND
SIDES OF ROOT BALL
NOTES
5' -6
" M
IN SOIL MIX PER SPECS AND NOTES
MULCH (SEE PLANTING NOTES
L0.01) SET ROOT BALL 2" ABOVE
ADJACENT GRADES. FINISH
GRADE OF SOIL 1 1/2" BELOW
GRADE OF ADJACENT SURFACE
2"x2"x8' WOOD STAKES SET
OUTSIDE ROOT BALL (REMOVE
AFTER ONE YEAR)
FLEXIBLE RUBBER TREE TIES IN
FIGURE EIGHT FASION
D E
P
TH
O F
R O
O
TB
A
LL
M
IN
U S
3 X DIAMETER ROOTBALL
SET ROOTBALL ON COMPACT
NATIVE SOIL TO PREVENT
SETTLEMENT
2"
TI
LL
T O
8"
NOTES
1. REMOVE ALL ROCK, DEBRIS AND OTHER FOREIGN MATTER OVER 1" IN
DIAMETER FROM TOP 6" OF SOIL.
2. RIP AND TILL SUBGRADE TO 6'' DEEP (MIN.) PRIOR TO INSTALLING
AMENDMENTS.
3. TILL SOIL AMENDMENTS TO A MIN. 8" DEPTH.
EXISTING SUBGRADE
COMPOST AND SPECIFIED
SOIL AMENDMENTS
SOIL PREP. AT HYDROSEED
SCALE: NTS
FINISH GRADE ESTABLISH 1"
BELOW ADJACENT PAVING
SURFACES
SPECIFIED HYDROSEED
" M
IN
" M
IN
6"
NOTES
1. SNAKE ALL HDPE PIPING IN TRENCHING.
2. TIE LOOSE 3' LOOP IN ALL IRRIGATION WIRING AT
CHANGES IN DIRECTION GREATER THAN 30 DEGREES.
UNTIE AFTER ALL CONNECTIONS HAVE BEEN MADE.
3. WHERE ELECTRICAL WIRING DOES NOT SHARE
COMMON TRENCH, OVER EXCAVATE TRENCH 2" MIN
AND BACKFILL WITH SPECIFIED BEDDING MATERIAL.
4. LOCATE ALL WIRING NOT IN COMMON TRENCHES
ACCURATELY ON RECORD DRAWINGS.
SPECIFIED BACKFILL
SPECIFIED PIPE BEDDING
LATERAL LINE
MAIN LINE
IRRIGATION TRENCHING (TYP)
SCALE: NTS
IRRIGATION WIRING
SAND BACKFILL BY ELECTRICAL
CONTRACTOR WHERE TRENCH
IS COMMON
V A
R
IE
S S
E E
N O
TE
V
A R
IE
S
M
IN
6" 6"
IRRIGATION SLEEVES
SCALE: NTS
PAVING
FILL AS SPECIFIED
TRACE WIRE
SLEEVE
SECTION AT PAVING
SECTION AT WALLS
NOTES
1. SLEEVES TO BE TWICE DIAMETER OF LINE OR LINES
PASSING THROUGH.
2. EXTEND IRRIGATION SLEEVE 6" BEYOND EDGE OF
PAVING, EACH SIDE.
3. INSTALL SLEEVES AT SAME TIME AS WALL OR PAVING
INSTALLATION.
4. INSTALL PIPE IN SLEEVE BEFORE BACKFILLING AND
CAP BOTH ENDS WITHOUT GLUE.
WALL
SLEEVE
FINISHED GRADE
IRRIGATION MAINLINE
OR LATERAL
MIN DEPTH OF PIPE
MAINLINE 18"
LATERAL AT PAVING 14"
AT DRIVING SURFACE 24"
5 MULTI-TRAJECTORY SPRAY HEAD
SCALE: NTS
FG
ROTATOR
LATERAL PIPE
LATERAL TEE OR ELL
SWING JOINT
MULCH
7SCALE: NTS
ISOLATION VALVE
4" M
IN
VALVE BOX WITH
LOCKABLE LID.
INSTALL FLUSH
WITH FINISH GRADE
NOTE
1. ADAPTER AND FITTINGS TO BE SAME SIZE AS ISOLATION VALVE.
FG
MALE ADAPTER /
REDUCER, BOTH SIDES
MAIN LINE
ISOLATION VALVE
EQUIPPED FOR KEYED
OPERATION
4" MIN DEPTH OF
DRAIN ROCK
BRICK OR CONCRETE
BLOCK (TYP)
#4 X 24" REBAR WITH
SS GEAR CLAMPS
ELL
MAINLINE PIPE
VALVE BOX WITH LID. INSTALL
FLUSH WITH FINISH GRADE
FG
QUICK COUPLING VALVE
NIPPLE
4" MIN DEPTH OF DRAIN ROCK
BRICK OR CONC BLOCK (TYP)
NIPPLE
TEE OR ELL
STREET ELL
SCALE: NTS
QUICK COUPLER VALVE
GEOTEXTILE
ALL RIGHTS RESERVED
MACKENZIE 2026
SHEET TITLE:
JOB NO.
SHEET:
THESE DRAWINGS ARE THE PROPERTY OF
MACKENZIE AND ARE NOT TO BE USED
OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
2220400.00
PERMIT RESUBMITTAL 03/06/2026
Client
NORTH CLACKAMAS
PARKS AND
RECREATION
DISTRICT
150 BEAVERCREEK RD
OREGON CITY, OR 97405
Project
THE PARK AT
JENNINGS LODGE
CAMPUS
18521 SE RIVER RD
MILWAUKIE, OR 97267
LR5.1
LANDSCAPE
DETAILS
1 2
REVISION SCHEDULE
A PLAN CHECK 11/17/2025