About this file
This is a Summary of Work document for a construction project involving the Oregon City School District and North Clackamas Parks and Recreation in Jennings Lodge, Oregon. The project involves constructing the Park at Jennings Lodge Campus on the grassy western portion of the Jennings Lodge School property, bounded by SE Wilmot Street to the west, SE Hull Avenue to the south, the school building to the east, and residential areas to the north. The scope of work includes grading and excavation, playground construction, pathways, utilities, landscaping, irrigation, street improvements, and erosion and sediment controls. The contractor is responsible for maintaining overall project coordination, obtaining all required construction permits and licenses, obtaining construction schedules from subcontractors, and coordinating testing and observation activities with the city and design team. The owner will furnish certain products for the contractor to assemble and install, and other parties including utilities and the owner may perform activities within the project limits during construction.
The document does not contain information regarding pricing terms, bid amounts, set asides, funding sources, response deadlines, or contract award dates. No incumbent contractor is identified, and no renewal options or contract terms are specified in this summary document.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 1
GENERAL REQUIREMENTS
SECTION 01010 SUMMARY OF WORK
PART 1
GENERAL
1.1 Scope
A.
This Section provides identification and a summary description of the Work, location, products furnished by OWNER, acquisition of permits and licenses, and coordination.
1.2 The Work
A. The Work consists of constructing the Park at Jennings Lodge Campus related to grading and excavation; the construction of a playground, pathways, utilities, landscaping, irrigation, street improvements, erosion and sediment controls.
B. The Park at Jennings Lodge Campus consists of the grassy, west portion of the Jennings Lodge School within Jennings Lodge, OR. The site is bounded by SE Wilmot St. to the west, SE Hull Ave. to the south, the school proper to the east and residential to the north. Thes site is owned by the Oregon City School District and will be developed and managed through an agreement with North Clackamas Parks and Recreation. The existing site area is made up of grass.
C. Refer to Construction Documents.
1.3 Related Work Specified and Performed Under Other Sections.
Section/Division No.
Item
01015 Work Sequence and Constraints 1.4 Products Furnished By OWNER
A.
OWNER will furnish some products for the Work for Contractor to assemble and/or install per L1.10, L1.11 1.5 Activities By Others
A. OWNER, utilities, and others may perform activities within limits of the Work while the Work is in progress. Schedule the Work with OWNER, utilities, and others to minimize mutual interference.
B.
Owner activities which may affect performance of the Work include:
1. Storage and Delivery of products furnished by Owner
C.
When Work depends on proper execution or results upon Work performed by others, inspect and promptly report apparent discrepancies or defects in Work performed by others.
1.6 Contractor Coordination of Work
A.
Maintain overall coordination of the Work.
B.
Obtain construction schedules from each subcontractor, and require each subcontractor to maintain schedules and coordinate modifications.
C.
Coordinate testing and observation of same by City and design team to meet requirements.
D.
Obtain all required permits for construction of the Work for trades and as identified in the Documents.
END OF SECTION