BAA-RQKPD-2015-0001-Call6-Amd2.pdf

PDF 67 KB Posted

Attached to
CERTIFICATION OF COMPOSITES - COMPOSITE AIRFRAME LIFE EXTENSION Federal contract opportunity
Solicitation number
BAA-RQKPD-2015-0001
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document provides answers to questions regarding Broad Agency Announcement BAA-RQKPD-2015-0001 for the Composite Airframe Life Extension program. The Air Force seeks to develop technologies to predict the residual strength, durability, damage tolerance and reliability of advanced composite structures over the lifespan of various aircraft in the Air Force fleet. The Broad Agency Announcement requests cost proposals for a kickoff meeting at Wright-Patterson Air Force Base, a Technical Interchange Meeting that could take place either at the contractor's facility or at Wright-Patterson Air Force Base, and a contract final review meeting at Wright-Patterson Air Force Base. The document clarifies that the Technical Interchange Meeting is distinct from the two technical conferences or workshops referred to in the Broad Agency Announcement.

BAA Call 6 Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to CERTIFICATION OF COMPOSITES - COMPOSITE AIRFRAME LIFE EXTENSION, newest first.
File Type Posted
BAA-RQKPD-2015-0001 Amendment 7.pdf PDF
BAA-RQKPD-2015-0001-Call7-Amendment 02.pdf PDF
Call #0007 Amendment 01.pdf PDF
BAA-RQKPD-2015-0001-Call7-Atch2.pdf PDF
BAA-RQKPD-2015-0001-Call7-Atch1.pdf PDF
BAA-RQKPD-2015-0001-Call7.pdf PDF
BAA-RQKPD-2015-0001-Call7-Atch3.pdf PDF
NOCA_Call_0007_FINAL_22_Oct_2019.pdf PDF
BAA-RQKPD-2015-0001-Call6-Amd5.pdf PDF
Call__0006_Amendment_04.pdf PDF
Call__0006_-_Amendment_03_-_FINAL.pdf PDF
BAA-RQKPD-2015-0001-Call6-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call6-Atch4.pdf PDF
BAA-RQKPD-2015-0001-Call6.pdf PDF
BAA-RQKPD-2015-0001-Call6-Atch2.pdf PDF
BAA-RQKPD-2015-0001-Call6-Atch1.pdf PDF
BAA-RQKPD-2015-0001-Call6-NOCA.pdf PDF
BAA-RQKPD-2015-0001-Amd5.pdf PDF
BAA-RQKPD-2015-0001-Call0005-Amd3.pdf PDF
BAA-RQKPD-2015-0001-Call0005-Amd2.pdf PDF
BAA-RQKPD-2015-0001-Call0005-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call0005.pdf PDF
BAA-RQKPD-2015-0001-Call5-Model.pdf PDF
BAA-RQKPD-2015-0001-Call5-SecK.pdf PDF
BAA-RQKPD-2015-0001-Call4-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call4-Atch2.pdf PDF
BAA-RQKPD-2015-0001-Call4-Atch4.pdf PDF
BAA-RQKPD-2015-0001-Call4.pdf PDF
BAA-RQKPD-2015-0001-Call4-Atch3.pdf PDF
BAA-RQKPD-2015-0001-Call4-NOCA.pdf PDF
BAA-RQKPD-2015-0001-Amd4.pdf PDF
BAA-RQKPD-2015-0001-Amd3.pdf PDF
BAA-RQKPD-2015-0001-Call3-Amd2.pdf PDF
BAA-RQKPD-2015-0001-Call3-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call3-Atch2.pdf PDF
BAA-RQKPD-2015-0001-Call3-Atch1.pdf PDF
BAA-RQKPD-2015-0001-Call3-Atch3.pdf PDF
BAA-RQKPD-2015-0001-Call3.pdf PDF
BAA-RQKPD-2015-0001-Call2-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call2-Atch3.pdf PDF
BAA-RQKPD-2015-0001-Call2-Atch2.pdf PDF
BAA-RQKPD-2015-0001-Call2.pdf PDF
BAA-RQKPD-2015-0001-Call2-Atch1.pdf PDF
BAA-RQKPD-2015-0001-Call1-Amd1.pdf PDF
BAA-RQKPD-2015-0001-Call1-Atch1.pdf PDF
BAA-RQKPD-2015-0001-Call1.pdf PDF
BAA-RQKPD-2015-0001-Call1-Atch2.pdf PDF
BAA-RQKPD-2015-0001-NOCA-Call1.pdf PDF
BAA-RQKPD-2015-0001.pdf PDF
BAA-RQKPD-2015-0001.doc DOC document
Show all 50

CERTIFICATION OF COMPOSITES - COMPOSITE AIRFRAME LIFE EXTENSION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 02

Questions &Answers Call #0006 BAA-RQKPD-2015-0001

Amendment 02 Note: Q&A numbering is continued from Amendment 01

Q2: On Page 6 of the BAA, below the Cost Volume requirements, it states the following:

(a) The AF requests the following meetings be included in the contractor’s cost proposal:

i. A Kickoff meeting at WPAFB

ii. A Technical Exchange Meeting (TIM) at WPAFB

Please answer the following questions on item ii. the TIM:

• Is the TIM referring to a Final Review?

o If not, does the AFRL require a Final Review at WPAFB?

o If not, is this TIM one of the two technical conference or workshop that the SOO refers to in Page 6?

A2: The AF needs to correct the BAA, Paragraph IV, 3. One Step Proposal Instructions, b, 2, (a) page 6.

The AF requests the following meetings be included in the contractor’s cost proposal:

i. A contract kick off meeting at WPAFB

ii. A Technical Interchange Meeting (TIM) either at the Contractor’s facility or at WPAFB

iii. A Contract Final Review Meeting at WPAFB

No, the TIM is not one of the two technical conferences or workshops that the SOO refers to on page 6.

File details come from the government source that posted it. Updated .