B08_Attachment_2_-_Final_Drawings_WRST_248940_March2024.pdf
PDF 33 MB Posted
- Attached to
- WRST 248940 - Replace Deficient WTP/Systems.
- Solicitation number
- 140P2024R0034
About this file
This document provides details for a federal solicitation to replace deficient water treatment systems. The solicitation number is 140P2024R0034 to replace the visitor center and headquarters water treatment plant and systems for WRST 248940. The Department of the Interior National Park Service National Office is seeking these replacement services. Final drawings for the project are provided in an attachment to aid prospective contractors in responding to the solicitation by the response date to replace deficient infrastructure and ensure proper treatment of water. Key information around requirements, timing, and the involved agency is summarized concisely for an overview of the federal contract opportunity and related file.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ.
3 3
CAN.U.S.
CHISTOCHINA
GULKANA
GAKONA
GLENNALLEN
COPPER
CENTER
NABESNA
JUNCTION
TONSINA
CHITINA
GULKANA
AIRPORT
WILLOW
LAKE
STRELNA
CHOKOSNA
KENNECOTT
McCARTHY
MAY
CREEK
DAN
CREEK
CHITINA RIVER
BR
EM
NE
R RIVER
MILES LAKE
TONGASS
NATIONAL
FORESTMALASPINA
GLACIER
BAGLEY ICE FIELD
YAHTSE
GLACIER
BERING
GLACIER
JEFFERIES
GL
AC
IER
MILES
GLACIER
MOUNT
ST.ELIAS
MARTIN
RIVER
GLACIER
CAPE
YAKATAGA ICY
BAY
YAKUTAT
BAY
LOGAN GLACIER
MT.WRANGELL
MT.
SANFORD
MT.
DRUM
C H
IS
A N A R
IV
E R
PTARMIGAN
LAKE
ROCKLAKE
RUSSELL
GLACIER
BARNARD
GLACIER
JAKES
BAR
NABESNA
GLACIER
C A N A D A
U N
IT
E D
S
TA
TE
S
Y U K O N
TE
R R
ITO
R Y
A
LA
S K A
YAKUTAT
SEWARD
GLACIER
SINONA
LODGE
TO
TOK
SLANA
TO DELTA
JUNCTION
TO
ANCHORAGE
TO
VALDEZ
TETLIN
INDIAN
RESERVATION
KLUANE
NATIONAL
PARK
TETL
IN
NATI
ONA
L
WILD
LIFE
PRE
SERV
E
GUYOT
GLACIER
CHUGACH
NATIONAL
FOREST
C O P P E R
RI
VE
R
BREMNER
GLACIER
CREEK
REEVE FIELD
TANADA
LAKE
COPPER
LAKE
NABESNA ROAD
DUFFYS
TAVERN
FAIRBANKS
CHUGACH MOUNTAINS
WRANGELL
MO
UN
TAI
NS
NUTZOTIN MOUNTAINS
PROJECT
LOCATIONS
WRANGELL-
ST.
ELIAS
NATIONAL
PARK
PRESERVE
GULF
OF
ALASKA
BERING
SEA
FAIRBANKS
ANCHORAGE
PRINCE
RUPERT
WHITEHORSE
JUNEAU
KODIAK
YU
K O N
RI
VE
R
C A N A D A
U N
ITE
D
S T A
TE
S
Y U K O N
A L A S K A
VALDEZ
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
UNITED STATES
TITLE OF DRAWING
OF 120
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
LOCATION WITHIN PARK
NAME OF PARK
COPPER CENTER, ALASKA
WRANGELL ST. ELIAS NATIONAL PARK & PRESERVE
REGION BOROUGH STATE
ALASKA - ALASKA
WRANGELL-ST. ELIAS NATIONAL PARK AND RESERVE
PRESERVE AND WILDERNESS
PARK AND WILDERNESS
PRESERVE
PARK/PRESERVE/WILDERNESS
/ LANDING STRIP
UNPAVED ROAD
PAVED ROAD
PARK HEADQUARTERS
RANGER STATION
PARK
AIRPORT
RIVER
PARK
BOUNDARY
CONTIGUOUS BOUNDARY
LEGEND
HQ.
SCALE OF KILOMETERS
SCALE OF MILES
15 0 15
15 0
20 25
15 30
ALASKA
REGION
SCALE OF MILES
250 250
PMIS
REPLACE DEFICIENT VC/HQ WATER TREATMENT SYSTEM WRST
3/ 4/
0:
:1
A
M B
IM
.0
W
R S
T R ep la ce W at er
S ys te m
/W R
S T
_1
7-
7_
C E
N T
R A
L_ A
R C
H .r vt
REPLACE DEFICIENT VC/HQ WATER TREATMENT
SYSTEM WRST
248940
CONSTRUCTION DOCUMENTS
248940
THE PROJECT INCLUDES WORK AT BOTH THE COPPER CENTER HEADQUARTERS AND THE
GLENNALLEN MAINTENANCE COMPLEX. THE WORK AT COPPER CENTER INCLUDES
UPGRADES AND ADDITIONS TO THE WATER TREATMENT EQUIPMENT, RECONFIGURATION
TO THE EXISTING MAINTENANCE BUILDING TO ACCOMMODATE THE NEW PROCESS
EQUIPMENT, MODIFICATIONS TO THE WATER STORAGE TANKS AND UPGRADES TO THE
FIRE WATER SERVICES. THE WORK AT GLENNALLEN INCLUDES CONSTRUCTION OF A NEW
WATER TREATMENT BUILDING INCLUDING PROTECTED PARKING FOR WATER
TRANSPORTATION VEHICLE, INSTALLATION OF A NEW WELL PUMP, RELOCATION AND
UPGRADES TO THE WATER PROCESS SYSTEMS TO SUPPORT PROJECTED FUTURE NEEDS.
PROJECT DESCRIPTION
PROJECT
LOCATIONS
NO DESCRIPTION DATE
1 ADEC REVIEW
COMMENT
2024.02.08
GENERAL NOTES
1. THE ORGANIZATION OF THESE DRAWINGS IS NOT INTENDED TO CONTROL THE DIVISION OF WORK AMONG THE SUB-CONTRACTORS. THE DIVISION OF WORK SHALL BE THE SOLE RESPONSIBILITY OF
THE GENERAL CONTRACTOR.
2. CONTRACT DOCUMENTS CONSIST OF A COMBINATION OF DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL REQUIREMENTS CONTAINED THEREIN. SPECIFICATIONS
AND DRAWINGS ARE COMPLEMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS
IF REQUIRED BY ALL. PERFORMANCE BY THE GENERAL CONTRACTOR SHALL BE REQUIRED ONLY
TO THE EXTENT CONSISTENT WITH THE CONTRACT DOCUMENTS AND REASONABLY INFERABLE
FROM THEM AS NECESSARY TO PRODUCE THE INTENDED RESULTS. VARYING LEVEL OF DETAIL
BETWEEN DRAWINGS AND SPECIFICATIONS, OR AMONGST PLANS, ELEVATIONS, SECTIONS,
DETAILS, AND SCHEDULES, DOES NOT CONSTITUTE OMISSION OF INFORMATION, NOR DOES IT
RELIEVE THE GENERAL CONTRACTOR FROM OBLIGATION TO CONTRACT DOCUMENTS.
3. THE INTENT OF THE DRAWINGS IS TO PRODUCE THE INTENDED RESULTS UNDER RECOGNIZED
STANDARDS EVEN IF NOT SHOWN, BUT REASONABLY INFERABLE THEREFROM. THE CONTRACTOR
SHALL CHECK ALL DRAWINGS FURNISHED TO HIM/HER IMMEDIATELY UPON THEIR RECEIPT AND
SHALL PROMPTLY NOTIFY THE GOVENMENT OF ANY DISCREPANCIES. LARGER SCALE DRAWINGS
TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS, AND DETAILS TAKE PRECEDENT OVERALL.
THE CONTRACTOR SHALL COMPARE ALL DRAWINGS AND VERIFY THE DETAILS BEFORE LAYOUT OF
THE WORK.
4. THE CONTRACTOR SHALL VERIFY ALL PROJECT-RELATED NEW AND EXISTING CONDITIONS,
DIMENSIONS, PRIOR TO THE COMMENCEMENT OF WORK AND PROMPTLY NOTIFY THE
GOVERNMANT IN WRITING OF ANY DISCREPANCIES. FIELD VERIFICATION AND OBSERVATIONS ARE
THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR COORDINATION OF THE FIELD VERIFIED INFORMATION, CONFORMATION THAT
THE FIELD VERIFIED INFORMATION IS CORRECT, AND DISTRIBUTED TO THE APPROPRIATE
SUBCONTRACTORS, VENDORS, AND THE GOVERNMENT.
5. INFORMATION INDICATED ON THESE DRAWINGS HAS BEEN OBTAINED FROM A LIMITED AMOUNT OF FIELD INVESTIGATION AND AVAILABLE RESOURCES AT THE TIME THE DRAWINGS WERE PREPARED.
THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE
JOB SITE. THE CONTRACTOR SHALL NOTIFY THE TECHNICAL REPRESENTATIVE OF THE
CONTRACTING OFFICER OF ANY DISCREPANCIES, OMISSIONS, AND CONFLICTS BEFORE
COMMENCING WORK.
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 12011
/3
0/
:3 9:
P
M B
IM
.0
W
R S
T R ep la ce W at er
S ys te m
/W R
S T
_1
7-
7_
C E
N T
R A
L_ A
R C
H .r vt
J.LI
J.DOUGHERTY
D.ZIEMER
G1.1
SHEET INDEX
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
E0.1 ELECTRICAL LEGEND, SCHEDULES, AND LOAD CALCULATIONS
E0.2- HQ ELECTRICAL SITE PLAN - COPPER CENTER
E0.3- GL ELECTRICAL SITE PLAN - GLENNALLEN
E1.1- HQ ELECTRICAL DEMOLITION PLAN - COPPER CENTER
E2.1- HQ ELECTRICAL REMODEL PLAN - COPPER CENTER
E2.2- GL LIGHTING PLAN - GLENNALLEN
E2.3- GL POWER AND SIGNAL PLAN - GLENNALLEN
E3.1 POWER ONE LINE DIAGRAMS
E3.2 ELECTRICAL DETAILS
E4.1 PANEL SCHEDULES
M0.1 MECHANICAL LEGEND AND ABBREVIATIONS
M0.2- HQ MECHANICAL SCHEDULES
M1.0- HQ MECHANICAL SITE PLAN
M1.1- HQ FIRST FLOOR PLUMBING DEMOLITION
M1.2- HQ FIRST FLOOR HVAC DEMOLITION
M2.1- HQ PLUMBING REMODEL
M3.1- HQ HEATING REMODEL
M4.1- HQ VENTILATION REMODEL
M5.1- HQ MECHANICAL ENLARGED PLANS
M6.1- HQ MECHANICAL SCHEMATICS
M0.2- GL MECHANICAL SCHEDULES
M0.3- GL MECHANICAL SCHEDULES
M1.1- GL PLUMBING
M2.1- GL FIRST FLOOR HEATING
M3.1- GL FIRST FLOOR VENTILATION
M4.1- GL SCHEMATICS & DETAILS
M4.2- GL DETAILS
IC0.1 INSTRUMENTATION & CONTROLS LEGEND
IC0.2 PROCESS CONTROL NETWORK DIAGRAM
IC1.1- HQ PROCESS CONTROL RISER DIAGRAM COPPER CENTER
IC1.2- GL PROCESS CONTROL EQUIPMENT PLAN COPPER CENTER
IC1.3- GL PROCESS CONTROL RISER DIAGRAM GLENNALLEN
IC1.4- GL PROCESS CONTROL EQUIPMENT PLAN GLENNALLEN
IC2.1- HQ SCADA PANEL SCP - ENCLOSURE LAYOUT COPPER CENTER
IC2.2- HQ SCADA PANEL SCP - PANEL LAYOUT COPPER CENTER
IC2.3- HQ SCADA PANEL SCP - PLC & I/O LAYOUT COPPER CENTER
IC2.4- HQ SCADA PANEL SCP - CONTROL POWER AC COPPER CENTER
IC2.5- HQ SCADA PANEL SCP - CONTROL POWER DC COPPER CENTER
IC2.6- HQ SCADA PANEL SCP - PLC INPUTS/OUTPUTS COPPER CENTER
IC3.1- HQ MOTOR PANEL MP - ENCLOSURE LAYOUT COPPER CENTER
IC3.2- HQ MOTOR PANEL MP - PANEL LAYOUT COPPER CENTER
IC3.3- HQ MOTOR PANEL MP - THREE-LINE POWER COPPER CENTER
IC3.4- HQ MOTOR PANEL MP - CONTROL POWER COPPER CENTER
IC3.5- HQ MOTOR PANEL MP - PLC INPUTS/OUTPUTS COPPER CENTER
IC4.1- HQ CHEMICAL DOSING JBOX - ENCLOSURE LAYOUT COPPER CENTER
IC4.2- HQ CHEMICAL DOSING JBOX - SCHEMATIC DETAIL COPPER CENTER
IC5.1- GL SCADA PANEL SCP - ENCLOSURE LAYOUT GLENNALLEN
IC5.2- GL SCADA PANEL SCP - PANEL LAYOUT GLENNALLEN
IC5.3- GL SCADA PANEL SCP - THREE-LINE POWER GLENNALLEN
IC5.4- GL SCADA PANEL SCP - CONTROL POWER GLENNALLEN
IC5.5- GL SCADA PANEL SCP - PLC INPUTS/OUTPUTS GLENNALLEN
IC6.1- GL CHEMICAL DOSING JBOX - ENCLOSURE LAYOUT GLENNALLEN
IC6.2- GL CHEMICAL DOSING JBOX - SCHEMATIC DETAIL GLENNALLEN
IC7.1 SCHEMATIC DETAILS - ANALOG I/O, DIGITAL I/O
IC7.2 SCHEMATIC DETAILS - VFD
IC7.3- GL SCHEMATIC DETAILS - FVNR
PI0.1 LEGENDS AND ABBREVIATIONS
PI2.1- HQ PRETREATMENT TANK P&ID
PI2.2- HQ SUMP PUMP & GAC FILTER P&ID
PI2.3- HQ TUBULAR MEMBRANE REVERSE OSMOSIS P&ID
PI2.4- HQ DISTRIBUTION P&ID
PI2.5- HQ CHEMICAL DOSING P&ID
PI2.6- HQ CIP P&ID
PI2.7- GL PRETREATMENT P&ID
PI2.8-GL DISTRIBUTION P&ID
P1.0 PROCESS DESIGN ASSUMPTIONS
P1.1- HQ EXISTING EQUIPMENT PLAN
P1.2- HQ DEMO PHOTOS 1
P1.3- HQ DEMO PHOTOS 2
P1.4- HQ DEMO PHOTOS 3
P1.5- HQ PROCESS EQUIPMENT PLAN 1
P1.6- HQ PROCESS EQUIPMENT PLAN 2
P1.7- GL PROCESS EQUIPMENT PLAN
P1.8- HQ PROCESS PIPING PLAN 1
P1.9- HQ PROCESS PIPING PLAN 2
P1.10- HQ PROCESS PIPING PLAN 3
P1.11- GL PROCESS PIPING PLAN
P1.12- GL PIPING ISOMETRIC
P1.13- HQ PROCESS ELEVATIONS 1
P1.14- GL PROCESS ELEVATIONS 3
P1.15- HQ PROCESS DETAIL- PRETREATMENT TANK
P1.16- HQ PROCESS DETAIL- PRETREATMENT TANK
P1.17- HQ PROCESS DETAIL- PRETREATMENT TANK
P1.18- HQ PROCESS DETAILS
P1.19- HQ WATER STORAGE TANK T-4-2 DETAILS
P1.20- GL WATER STORAGE TANK T-10-1 DETAILS
P1.21- GL PROCESS DETAILS
S0.1 SYMBOLS
S0.2 GENERAL NOTES
S0.3 SPECIAL INSPECTION
S1.1 GLENNALLEN WTF FOUNDATION PLAN
S1.2 COPPER CENTER HQ FOUNDATION PLAN
S2.1 GLENNALLEN WTF FOUNDATION DETAILS
S2.2 GLENNALLEN WTF PILASTER & BOLLARD DETAILS
S2.3 GLENNALLEN WTF TRENCH & SUMP DETAILS
S2.4 COPPER CENTER HQ DETAILS
S2.5 GLENNALLEN CANOPY DETAILS
A0.1 ABBREVIATIONS AND SYMBOLS LEGEND
A1.1- HQ FLOOR PLAN
A2.1- GL FLOOR PLAN
A2.2- GL ROOF PLAN AND DETAILS
A3.1- GL EXTERIOR ELEVATIONS & SECTIONS, WALL SECTION
A4.1- GL DETAILS
C1.0- HQ NOTES, LEGEND , AND ABBREVIATIONS
C1.1- HQ EXISTING CONDITIONS AND DEMOLITION
C2.0- HQ SITE PLAN
C3.0- HQ DETAILS
C3.1- HQ DETAILS
C3.2- HQ DETAILS
C1.0- GL NOTES, LEGEND, AND ABBREVIATIONS
C2.0- GL EXISTING CONDITIONS AND DEMOLITION
C3.0- GL SITE LAYOUT
C3.1- GL UTILITY LAYOUT
C3.2- GL UTILITY PROFILES
C4.0- GL DETAILS
C4.1- GL DETAILS
C4.2- GL DETAILS
G1.0 COVER SHEET
G1.1 SHEET INDEX
G1.2 CODE STUDY
SHEET INDEX
GENERAL
ARCHITECTURAL
CIVIL
STRUCTURAL
PROCESS
MECHANICAL
ELECTRICAL
INSTRUMENTATION & CONTROLS LEGEND
SHEET SUB SHEET SHEET NAME
11/30/2023
CODE STUDY - COPPER CENTER HEAD QUARTERS
REFERENCED CODES AND STANDARDS
INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021 EDITION
INTERNATIONAL MECHANICAL CODE (IMC) 2021 EDITION
INTERNATIONAL FUEL GAS CODE (IFGC) 2021 EDITION
INTERNATIONAL FIRE CODE (IFC) 2021 EDITION
UNIFORM PLUMBING CODE (IAPMO) 2018 EDITION
NFPA 70 NATIONAL ELECTRICAL CODE 2017 EDITION
NATIONAL ELECTRICAL SAFETY CODE 2017 EDITION
INTERNATIONAL RESIDENTIAL CODE 2021 EDITION
ASHRAE 90.1 2016 EDITION
NEC 2020 EDITION
INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE 2021 EDITION
NFPA 101 LIFE SAFETY CODE
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
NPS AUTOMATED CONTROLS STANDARDS
NPS REFERENCE MANUAL 58
EXISTING BUILDING ALTERATION LEVEL
LEVEL 2 (IEBC, 603)
OCCUPANCY CLASSIFICATION
OCCUPANCY
VEHICLE AND WORK BAYS S-2
TREATMENT BAY F-1
BUILDING DESCRIPTION
CONSTRUCTION TYPE V-B
ALLOWABLE HEIGHT 40 FT (TABLE 504.3)
ACTUAL HEIGHT 21' - 2 1/2" COMPLIES
ALLOWABLE STORIES (IBC, TABLE 504.4)
F-1 1 S-2 2
ACTUAL STORIES 1 COMPLIES
ALLOWABLE AREA (IBC, TABLE 506.2)
F-1 8,500 SF
S-2 13,500 SF
ACTUAL BUILDING AREA (GROSS)
F-1 720 SF COMPLIES
S-2 360 SF COMPLIES
GROSS BUILDING AREA 1,080 SF
FIRE RESISTANCE RATINGS
PRIMARY STRUCTURAL FRAME 0 HOURS
BEARING WALLS 0 HOURS
NONBEARING WALLS AND PARTITIONS 0 HOURS
FLOOR CONSTRUCTION 0 HOURS
ROOF CONSTRUCTION 0 HOURS
OCCUPANT LOAD CALCULATIONS
OCCUPANCY OCCUPANCY EXIT
FACILITY ROOM CLASS AREA (SF) FACTOR (OLF) OCCUPANCY REQ'D REMARKS
GARAGE/ UTILITY
VEHICLE AND WORK BAYS S3 720 SF 300 2 1
TREATMENT BAY F2 360 SF 200 2 1
TOTAL BUILDING OCC: 4
OTHER REQUIREMENTS
MAXIMUM TRAVEL DISTANCE TO EXIT DISTANCE (IBC, TABLE 1017.2)
F-1 200 FT COMPLIES
S-2 300 FT COMPLIES
CODE STUDY - GLENNALLEN
REFERENCED CODES AND STANDARDS
INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021 EDITION
INTERNATIONAL MECHANICAL CODE (IMC) 2021 EDITION
INTERNATIONAL FUEL GAS CODE (IFGC) 2021 EDITION
INTERNATIONAL FIRE CODE (IFC) 2021 EDITION
UNIFORM PLUMBING CODE (IAPMO) 2018 EDITION
NFPA 70 NATIONAL ELECTRICAL CODE 2017 EDITION
NATIONAL ELECTRICAL SAFETY CODE 2017 EDITION
INTERNATIONAL RESIDENTIAL CODE 2021 EDITION
ASHRAE 90.1 2016 EDITION
NEC 2020 EDITION
INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE 2021 EDITION
NFPA 101 LIFE SAFETY CODE
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
NPS AUTOMATED CONTROLS STANDARDS
NPS REFERENCE MANUAL 58
OCCUPANCY CLASSIFICATION
OCCUPANCY
WATER TREATMENT AREA F-1 (IBC 306.2)
TRUCK STORAGE AREA S-2 (IBC 311.3)
OCCUPANCY SEPARATION NON-SEPARATED OCCUPANCIES (508.3)
SPRINKLERED BUILDING
BUILDING DESCRIPTION
CONSTRUCTION TYPE V-B
ALLOWABLE HEIGHT 40 FT (TABLE 504.3)
ACTUAL HEIGHT 16'-4" COMPLIES
ALLOWABLE STORIES (IBC, TABLE 504.4)
F-1 1 S-2 2
ACTUAL STORIES 1 COMPLIES
ALLOWABLE AREA (IBC, TABLE 506.2)
F-1 8,500 SF
S-2 13,500 SF
ACTUAL BUILDING AREA (GROSS)
F-1 712 SF COMPLIES
S-2 560 SF COMPLIES
GROSS BUILDING AREA 1,271 SF
FIRE RESISTANCE RATINGS
PRIMARY STRUCTURAL FRAME 0 HOURS
BEARING WALLS 0 HOURS
NONBEARING WALLS AND PARTITIONS 0 HOURS
FLOOR CONSTRUCTION 0 HOURS
ROOF CONSTRUCTION 0 HOURS
OCCUPANT LOAD CALCULATIONS (IBC, TABLE 1004.5)
OCCUPANCY OCCUPANCY EXIT
ROOM CLASS AREA (SF) FACTOR (OLF) OCCUPANCY REQ'D REMARKS
101 VEHICLE BAY S-2 88 200 GROSS 1 1
102 PROCESS ROOM F-1 712 100 GROSS 8 1
103 STORAGE ROOM S-2 472 500 GROSS 1 1
TOTAL BUILDING OCC: 10
OTHER REQUIREMENTS
MAXIMUM TRAVEL DISTANCE TO EXIT DISTANCE (IBC, TABLE 1017.2)
F-1 200 FT
S-2 300 FT
ACTUAL TRAVEL DISTANCE 50'-6" COMPLIES
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 12011
/3
0/
:3 9:
P
M B
IM
.0
W
R S
T R ep la ce W at er
S ys te m
/W R
S T
_1
7-
7_
C E
N T
R A
L_ A
R C
H .r vt
M.BARTOLOME
J.DOUGHERTY
D.ZIEMER
G1.2
CODE STUDY
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:12 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-C V-
HQ
.dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
GENERAL CONSTRUCTION NOTES ABBREVIATIONS
1. NO SURVEY WAS PERFORMED FOR THE DESIGN OF THIS PROJECT.
EXISTING CONDITIONS DERIVED FROM WRANGELL-ST.ELIAS NATIONAL
PARK & PRESERVE PROJECT: AHTNA HERITAGE MUSEUM. DRAWING NO
190 / 80,089, DATED 2004. CONTRACTOR SHALL VERIFY SITE CONDITIONS
BEFORE CONSTRUCTION.
2. EXISTING SEPTIC SYSTEM BASED ON WRANGELL-ST.ELIAS NATIONAL
PARK & PRESERVE PROJECT: COPPER CENTER HEADQUARTERS -
BACKWASH & SEPTIC DISPOSAL SYSTEM. DRAWING NO: 190 / 80,120,
DATED 2008. CONTRACTOR SHALL VERIFY CONDITION OF UTILITY
BEFORE CONSTRUCTION.
3. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE ONLY. THE
CONTRACTOR SHALL VERIFY LOCATIONS BY OBTAINING UTILITY
LOCATES PRIOR TO BEGINNING CONSTRUCTION. COORDINATE UTILITY
RELOCATION WITH NATIONAL PARK SERVICES. EXERCISE CAUTION
DURING EXCAVATION.
4. VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF ALL UTILITIES
ENCOUNTERED DURING CONSTRUCTION. RECORD LOCATIONS AND
CHANGES TO UTILITIES IN SURVEY NOTES AND ON AS BUILT DRAWINGS.
5. VERIFY INVERTS AND LOCATIONS OF ALL UTILITY CONNECTION POINTS
PRIOR TO INSTALLING PIPE. REPORT DISCREPANCIES FROM PLANS
IMMEDIATELY TO THE ENGINEER OF RECORD.
6. ELEVATIONS SHOWN ARE TO PIPE INVERT, OR FINISH GROUND SURFACE,
UNLESS NOTED OTHERWISE.
7. DIMENSIONS SHOWN ARE TO FACE OF BUILDING, OR OUTSIDE EDGE OF
PIPE, UNLESS NOTED OTHERWISE.
8. RESTORE ALL DISTURBED PROPERTY OUTSIDE OF WORK LIMITS TO
ORIGINAL CONDITIONS
9. DEWATERING MAY BE REQUIRED FOR ALL EXCAVATIONS THAT
PENETRATE THE GROUND WATER SURFACE. WATER RESULTING FROM
CONTRACTOR'S DEWATERING EFFORT MAY NOT BE PUMPED OR
OTHERWISE DIVERTED INTO EXISTING STORM DRAINS UNLESS
REQUIRED PERMITS ARE OBTAINED BY THE CONTRACTOR. UNDER NO
CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED TO DIVERT
WATER FROM THE EXCAVATION ONTO ROADWAYS. CONTRACTOR SHALL
PROVIDE DISPOSAL SITE FOR EXCESS WATER AND SHALL BE
RESPONSIBLE FOR ALL NECESSARY PERMITS AND APPROVALS.
10. THE CONTRACTOR SHALL FOLLOW NATIONAL PARK SERVICE
REGULATIONS FOR NOISE, HOURS OF OPERATIONS, AND DUST CONTROL.
11. THE AUTOCAD FILE FOR THIS SITE PLAN WILL BE PROVIDED TO THE
CONSTRUCTION SURVEYOR. THE SURVEYOR SHALL INFORM THE
ENGINEER OF ANY DISCREPANCIES IMMEDIATELY.
12. MINIMIZE OFF-SITE VEHICLE TRACKING OF SEDIMENTS, SWEEP SITE
ENTRANCE AND EXIT DURING CONSTRUCTION WHEN SOILS
ACCUMULATE TO DEPTHS GREATER THAN ONE-FOURTH INCH. WATER
EXPOSED SOILS AS NECESSARY TO CONTROL GENERATION OF DUST.
CONSTRUCTION ACTIVITIES SHALL BE MONITORED ON A DAILY BASIS TO
DETERMINE IF TRACKING OF DIRT AND DEBRIS ONTO THE ADJACENT
ROADWAYS HAS OCCURRED. ANY NECESSARY CLEANUP SHALL BE
ACCOMPLISHED ON A DAILY BASIS.
13. THE CONTRACTOR SHALL PROVIDE CONTROLS TO LIMIT SEDIMENT
DISCHARGE DUE TO SOIL EROSION. THESE CONTROLS SHALL INCLUDE
REGULAR SWEEPING OF STREETS ADJACENT TO THE SITE THAT
ACCUMULATE SITE SOILS. ADDITIONAL CONTROLS MAY BE REQUIRED IF
THESE MEASURES PROVE INADEQUATE. THE CONTRACTOR SHALL
IMPLEMENT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP).
14. REVISIONS THAT ALTER THE REVIEWED AND APPROVED DESIGN INTENT
REFLECTED IN THIS SET OF SIGNED CONSTRUCTION DRAWINGS MUST BE
APPROVED BY THE ENGINEER OF RECORD.
15. KEEP SITE FREE OF LITTER
R
I
C
H
A
R
D
S
O
N
H
W
Y
R I C
H A
R D
S O
N
H
W Y
GLENN HWY
GLENNALLEN
COPPERVILLE
TAZLINA
PROJECT
LOCATION
PROJECT
LOCATION
R
I
C
H
A
R
D
S
Y
PARK HEADQUARTERS
NTS
VICINITY MAP: PROJECT AREA
NTS
LEGEND
PROPOSED EXISTING DESCRIPTION
BUILDING OUTLINE
LEACH FIELD PIPING
SANITARY SEWER
SANITARY SEWER CLEANOUT
STORMWATER SWALE
UTILIDOR
EDGE OF VEGETATION
CONCRETE
AAC - ALASKA ADMINISTRATIVE CODE
ARFS - AS REQUIRED FOR SAFETY
AWWA - AMERICAN WATER WORKS ASSOCIATION
CMP - CORRUGATED METAL PIPE
CO - CLEANOUT
GPD - GALLONS PER DAY
FT - FOOT
H - HORIZONTAL
HDPE - HIGH DENSITY POLYETHYLENE
IN - INCH
INV - INVERT
LC - LEVELING COURSE
LF - LINEAR FEET
MIN - MINIMUM
NFS - NON-FROST SUSCEPTIBLE
NPS - NATIONAL PARK SERVICE
NSF - NATIONAL SANITATION FOUNDATION
NTS - NOT TO SCALE
OD - OUTSIDE DIAMETER
PE - POLYETHYLENE
PSI - POUND PER SQUARE INCH
PVC - POLYVINYL CHLORIDE
S - SEWER
SDR - STANDARD DIMENSION RATIO
SF - SQUARE FOOT
TYP - TYPICAL
C1.0-
NOTES, LEGEND, AND
ABBREVIATIONS
GARAGE/
UTILITY
HEADQUARTERS
EXISTING 6" SEWER PIPE
EXISTING CLEANOUT
PROTECT HEADQUARTERS SEWER SYSTEM
EXISTING SEWER FROM
GARAGE/UTILITY TO REMAIN
REMOVE EXISTING SEPTIC TANK
9.0-FT
CUT EXISTING SEWER AT 9.0-FT FROM
EXISTING CLEANOUT, SEE NOTE 1
REMOVE EXISTING CLEANOUT AND PIPING
EXISTING CLEANOUT
REMOVE EXISTING LEACH FIELD
APPROXIMATE LIMITS OF PROPOSED
LEACH FIELD EXCAVATION, REMOVAL OF
ITEMS IN NOTE 1, AND INSTALLATION OF
NEW SEPTIC TANK AND PIPING.
EXISTING SEWER FROM
GARAGE/UTILITY TO REMAIN
APPROXIMATE LIMITS OF EXCAVATION FOR
WATER STORAGE TANK AND PLUMBING
EXISTING 8" UTILIDOR, PROTECT IN PLACE
EXISTING ELECTRICAL EQUIPMENT, PROTECT IN PLACE
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:15 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-D M-
HQ
.dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
EXISTING CONDITIONS
AND DEMOLITION
C1.1-
DEMOLITION NOTES
1. REMOVE ALL EXISTING SEWER SYSTEM COMPONENTS
DOWNSTREAM OF CONNECTION POINT. THE PIPING,
SEPTIC TANK, CLEANOUTS, INSPECTION PIPES, AND
LEACH FILED PIPES SHALL BE REMOVED AND DISPOSED
PER THE ADEC ONSITE WASTEWATER SYSTEM
INSTALLATION MANUAL, ARTICLE 3.17.
2. DO NOT DAMAGE THE HEADQUARTERS BUILDING SEWER
SYSTEM. THE HEADQUARTERS SYSTEM SHALL BE
PROTECTED IN PLACE
GARAGE/
UTILITY
HEADQUARTERS
VISITOR CENTER
MUSEUM
T
H
E
A
T
R
E
E
X
H
I
B
I
T
S
~200-FT WELL RADIUS
PROJECT AREA;
SEE 2/C2.0
EXISTING 6" SEWER PIPE
CONCRETE PAD FOR 5000
GALLON WATER STORAGE
TANK, SEE 1/C2.0
DEEP TRENCH LEACH
FIELD; SEE C3.2
EDGE OF CLEARING
EXISTING CLEANOUT, TYP
CONNECT TO EXISTING
SYSTEM, SEE NOTE 2
HEADQUARTERS SEWER SYSTEM ,
PROTECT IN PLACE
PROJECT AREA;
SEE 1/C2.0
10.0-FT MINIMUM CLEARANCE
GARAGE/
UTILITY
CONCRETE PAD, SEE
NOTE 1 AND DETAIL 1/C3.0
WATER STORAGE TANK,
SEE PLUMBING SHEETS
FOR TANK AND
CONNECTIONS
A
A
10.0-FT
4-IN PERFORATED PIPE,
DEEP TRENCH, TYP
92.0-FT
INSPECTION PIPE, TYP
DOUBLE CLEANOUT, TYP
20-LF 6-IN HDPE IN 15" ARCTIC PIPE
NEW 4,500 GALLON SEPTIC TANK
CLEANOUT AND
4-IN 90° BEND
4-IN 45° BEND, TYP
10.0-FT 4-IN HDPE ARCTIC PIPE
PROTECT IN PLACE
EXISTING SEWER FROM
GARAGE/UTILITY TO REMAIN
45° BEND
10-LF 6-IN HDPE IN 15" ARCTIC PIPE
CUT EXISTING SEWER AND INSTALL
CLEANOUT AND 45° BEND
DISTRIBUTION BOX
46.7-FT
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:11 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-S I-C
OP
PE
RC
EN
TE
R.
dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
C2.0
WATER STORAGE TANK PAD
1" = 20'
GENERAL CIVIL NOTES:
1. CONTRACTOR TO VERIFY LOCATION OF
WATER STORAGE TANK PAD WITH PARK
PERSONNEL PRIOR TO CONSTRUCTION.
LOCATE UTILITIES AND VERIFY
SEPARATION DISTANCES ARE MET. SET
ELEVATION OF PAD PER PLUMBING
REQUIREMENTS, AND HIGH ENOUGH SO
THAT SURROUNDING GROUND DRAINS
AWAY AT 5% FOR 5-FT MINIMUM. DO NOT
DIRECT RUNOFF TOWARDS
GARAGE/UTILITY BUILDING.
2. REMOVE ALL EXISTING SEWER SYSTEM
COMPONENTS DOWNSTREAM OF
CONNECTION POINT. DO NOT DAMAGE
THE HEADQUARTERS BUILDING SEWER
SYSTEM. THE HEADQUARTERS SYSTEM
SHALL BE PROTECTED IN PLACE.
3. ADDITIONAL SPACE FOR CONTRACTOR
STAGING MAY BE PROVIDED IN VISITOR
PARKING LOT. COORDINATE WITH PARK
STAFF.
C2.0
SEPTIC SYSTEM
1" = 20'
LEACH FIELD NOTES:
1. SEE SHEETS C3.1 AND C3.2 FOR SEPTIC TANK AND LEACH
FIELD INSTALLATION.
2. THE CAPACITY OF THE PROPOSED LEACH FIELD IS 4,300
GPD USING AN APPLICATION RATE OF 0.88 GPD/SF.
3. CONTRACTOR SHALL EXCAVATE 6-FT BELOW BOTTOM OF
PROPOSED LEACH FIELD TO DETERMINE IF A CONFINING
LAYER IS PRESENT, DOCUMENT FINDINGS, AND REPORT
TO ENGINEER.
SITE PLAN
C2.0-
CONTRACTOR STAGING AND LAYDOWN
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:17 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-D T-
HQ
.dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
SECTION A - A
EXISTING GROUND
REPLACE 5-FT OF NATIVE SOIL
WITH NFS GRAVEL, 2-IN MINUS
M
I N
T
Y
P
12-IN
NO. 4 REBAR, 12-IN ON CENTER, BOTH WAYS. PLACE
REBAR AT TOP AND BOTTOM OF PAD, 3-IN CLEAR
4-IN INSULATION BOARD
5000 GALLON WATER STORAGE TANK, SEE PLUMBING SHEETS
EDGE OF CONCRETE PAD SHALL BE 16-IN
FROM EDGE OF TANK OR 12-IN FROM
ANCHOR, WHICHEVER IS GREATER
TANK ANCHORS BY DEFERRED
SUBMITTAL, SEE STRUCTURAL
GENERAL NOTES ON SHEET S0.2
C3.0
CONCRETE PAD - WATER STORAGE TANK
NTS
PLAN
A A
5-FT MINIMUM,
GRADE AWAY
3" MIN POLYURETHANE INSULATION
6" HDPE SDR17 SEWER PIPE
HEAT TRACE CHANNEL
END JOINTS CONSTRUCTED WITH BUTT-WELD ON 6" PIPE AND
HALF-SHELL KITS WRAPPED WITH HEAT-SHRINK ON 15" PIPE
3" MIN POLYURETHANE INSULATION
4" HDPE OR PVC SEWER PIPE
HEAT TRACE CHANNEL
12-IN NOMINAL OUTER JACKET (CMP OR HDPE)
C3.0
CLEANOUT
NTS
EXISTING GROUND
EXISTING GROUND
45° BEND
45° BEND
45° WYE
2-FT MINIMUM
2-FT MINIMUM
45° BEND
45° WYE
CLEANOUT CAP CLEANOUT CAP
DOUBLE CLEANOUT SINGLE CLEANOUT
FLOW DIRECTION
C3.0
ARCTIC PIPE AND INSULATION
NTS
INSULATION NOTES:
1. 6-INCH ARCTIC PIPE SHALL BE USED FROM CONNECTION WITH EXISTING SEWER PIPE
TO SEPTIC TANK.
2. 4-INCH PIPE DOWNSTREAM OF SEPTIC TANK MAY BE ARCTIC INSULATED PIPING OR
RECEIVE 4-INCH OF RIGID BOARD INSULATION
INSULATION PER
DETAIL 3/C3.0
6-IN ARCTIC SEWER PIPE
4-IN ARCTIC SEWER PIPE
15" PE DOUBLE-WALL JACKET (18" OD)
C3.0-
DETAILS
NOTES:
1. RIGID BOARD INSULATION SHALL BE DOW STYROFOAM HIGHLOAD 40 OR APPROVED EQUAL
2. SITE CONCRETE SHALL CONFORM TO SPECIFICATION 03 30 00.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:17 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-D T-
HQ
.dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
6-IN
12-IN
BEDDING, 2-IN MINUS
CLASSIFIED MATERIAL
EXCAVATE AS REQUIRED
TO REMOVE ALL
UNSUITABLE MATERIAL
ARCTIC PIPE
CLEAN NATIVE MATERIAL,
COMPACTED TO 90%
ARFS
EXISTING GROUND = FINISH GRADE,
GRADE TO DRAIN
C3.1
TRENCH SECTION
NTS
6-IN
3.5-FT MINIMUM
4-IN RIGID INSULATION BOARD,
4-FT WIDE CENTERED OVER PIPE. (MAY BE
USED IN PLACE OF ARCTIC PIPE, SEE 3/C3.0)
SEWER LOCATE TAPE
2-FT MIN.
COMPACT BOTTOM OF TRENCH
C3.1
SEPTIC TANK INSTALLATION DETAIL
NTS
ANCHORS, (TYP OF 6)
CABLE, (TYP OF 3)
SLO
PE T
O D
RAIN
S
LO
P E
TO
D
R A
IN
24-IN MANWAY WITH
INSULATED FROST LID
COMPACTED BACKFILL
MUST BE MOUNDED
4-IN TO 6-IN TO ALLOW
FOR SETTLEMENT
ARFS
BACKFILL WITH EXCAVATED MATERIAL,
COMPACT TO 90%
FILL TANK 1/2 FULL OF WATER
PRIOR TO BACKFILLING
SEPTIC TANK FOUNDATION MUST BE
THOROUGHLY COMPACTED NON-FROST
SUSCEPTIBLE MATERIAL
2-FT MINIMUM
4,500 GALLON
STEEL TANK
NOTE:
1. ANCHORS SHALL BE SEATED AND PROOF
LOADED TO 120% OF DESIGN LOAD.
6-IN ARCTIC SEWER PIPE
FROM EXISTING SYSTEM
FLEXIBLE LOW PRESSURE COUPLING WITH 2 EACH
SCREW CLAMPS, FERNCO 1056-54 (OR EQUAL) TO
PROVIDE SMOOTH TRANSITION (TYP OF 2)
BACKFILL IN 12" LIFTS,
COMPACT TO 90%
NOTE:
1. 4,500 GALLON, TWO COMPARTMENT STEEL SEPTIC TANK
MANUFACTURED IN COMPLIANCE WITH 18 AAC AND APP. H
OF THE UNIFORM PLUMBING CODE.
2. SEPTIC TANK MUST BE INSTALLED LEVEL.
3. SOLID PIPE WITH NO JOINTS TO SPAN 10 FEET FROM INLET
AND OUTLET OF TANK
END VIEW
PROFILE
4-IN SEWER PIPE TO LEACH FIELD,
SEE 3/C3.0 FOR INSULATION
24-IN MANWAYS
WITH INSULATED
FROST LIDS
EXISTING 6" ARCTIC PIPE
PROPOSED CLEANOUT
AT CONNECTION
PROPOSED 6" ARCTIC PIPE
LEACH FIELD,
SEE SHEET C3.2
C3.1
SEWER SYSTEM OVERVIEW
NTS
DOUBLE CLEANOUT
10-FT
PROPOSED 4" ARCTIC PIPE
NOTE:
RIGID BOARD INSULATION SHALL BE DOW STYROFOAM HIGHLOAD 40 OR APPROVED EQUAL
4-IN URETHANE INSULATION, 30 PSI
MINIMUM COMPRESSIVE STRENGTH
MOUND TO DRAIN
C3.1-
DETAILS
4-IN URETHANE INSULATION, 30 PSI
MINIMUM COMPRESSIVE STRENGTH
6-IN PVC INLET TEE
4-IN PVC TEE WITH EFFLUENT FILTER
RATED FOR 4300 GPD MINIMUM
6-IN INSPECTION PIPE WITH CAP
DISTRIBUTION BOX
PERFORATED LEACH FIELD
PIPING BEYOND, TYP
2-FT MINIMUM
4-IN RIGID BOARD
INSULATION
OVER LEACH
FIELD
DISTRIBUTION
PIPE
7-FT MINIMUM, TYP
2-FT COURSE GRADE SEWER ROCK, TYP
INSPECTION PIPE, TYP,
SEE 2/C3.2
B B
DISTRIBUTION BOX;
SEE DETAIL 3/C3.2
4-IN 90° BEND, TYP
4-IN PERFORATED PIPE, HOLES DOWN, TYP
92-FT MINIMUM, TYP
CLEANOUT AND
90° BEND, TYP
4.5-FT
EXISTING GROUND
4-IN RIGID INSULATION BOARD
2-FT MINIMUM
6-IN
2-FT COURSE GRADE SEWER ROCK
4-IN RIGID INSULATION BOARD,
SET 6-IN ABOVE PERF. PIPE
GRADE TO DRAIN
GRADE T
O D
RAIN
7-FT MIN,
TYP 4.5-FT
4-IN PERFORATED PIPE, HOLES DOWN, TYP
3.5-FT FROM EXISTING GROUND
EXCAVATED MATERIAL
COMPACTED TO 90%
EXISTING GROUND
FINISHED GRADE, SLOPE TO DRAIN
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
12012 /1/
8:
:17 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\H Q
- C op pe rC en ter
\S C2
0-
CS
-D T-
HQ
.dw g U
SE
R:
NC
ON
W
AY
HQ
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
C3.2
LEACH FIELD - TYPICAL
NTS
C3.2
INSPECTION PIPE
NTS
LEACH FIELD - PLAN
LEACH FIELD - SECTION B-B
DETAILS
C3.2-
NOTES:
1. TUF-TITE 9HDB (9-HOLE DISTRIBUTION BOX) USED AS BASIS FOR DESIGN, APPROVED
EQUALS ALLOWED.
2. DISTRIBUTION BOX SHALL BE INSTALLED LEVEL. MANUFACTURER SUPPLIED
"LEVELERS" MAY ONLY BE USED IF THE DIAMETER OF INLET AND OUTLET PIPES IS
NOT DECREASED.
INLET
C3.2
DISTRIBUTION BOX
NTS
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:59 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-C V-
GL
EN
NA
LL
EN
.dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
GENERAL CONSTRUCTION NOTES ABBREVIATIONS
1. EXISTING CONDITIONS AND UTILITIES DERIVED FROM
WRANGELL-ST.ELIAS NATIONAL PARK & PRESERVE PROJECT:
GLENNALLEN MAINTENANCE FACILITY: WATER AND SEWER
IMPROVEMENTS. DRAWING NO 190 / 80,127A, DATED 2013. CONTRACTOR
SHALL VERIFY SITE CONDITIONS BEFORE CONSTRUCTION.
2. EXISTING SEPTIC SYSTEM BASED ON PROJECT STATED IN NOTE 1, AND
ADEC PLAN REVIEW D5039. CONTRACTOR SHALL VERIFY CONDITION OF
UTILITY BEFORE CONSTRUCTION.
3. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE ONLY. THE
CONTRACTOR SHALL VERIFY LOCATIONS BY OBTAINING UTILITY
LOCATES PRIOR TO BEGINNING CONSTRUCTION. COORDINATE UTILITY
RELOCATION WITH NATIONAL PARK SERVICES. EXERCISE CAUTION
DURING EXCAVATION.
4. VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF ALL UTILITIES
ENCOUNTERED DURING CONSTRUCTION. RECORD LOCATIONS AND
CHANGES TO UTILITIES IN SURVEY NOTES AND ON AS BUILT DRAWINGS.
5. VERIFY INVERTS AND LOCATIONS OF ALL UTILITY CONNECTION POINTS
PRIOR TO INSTALLING PIPE. REPORT DISCREPANCIES FROM PLANS
IMMEDIATELY TO THE ENGINEER OF RECORD.
6. ELEVATIONS SHOWN ARE TO PIPE INVERT OR FINISH GROUND SURFACE,
UNLESS NOTED OTHERWISE.
7. DIMENSIONS SHOWN ARE TO FACE OF BUILDING, OR OUTSIDE EDGE OF
PIPE UNLESS NOTED OTHERWISE.
8. RESTORE ALL DISTURBED PROPERTY OUTSIDE OF WORK LIMITS TO
ORIGINAL CONDITIONS
9. DEWATERING MAY BE REQUIRED FOR ALL EXCAVATIONS THAT
PENETRATE THE GROUND WATER SURFACE. WATER RESULTING FROM
CONTRACTOR'S DEWATERING EFFORT MAY NOT BE PUMPED OR
OTHERWISE DIVERTED INTO EXISTING STORM DRAINS UNLESS
REQUIRED PERMITS ARE OBTAINED BY THE CONTRACTOR. UNDER NO
CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED TO DIVERT
WATER FROM THE EXCAVATION ONTO ROADWAYS. CONTRACTOR SHALL
PROVIDE DISPOSAL SITE FOR EXCESS WATER AND SHALL BE
RESPONSIBLE FOR ALL NECESSARY PERMITS AND APPROVALS.
10. THE CONTRACTOR SHALL FOLLOW NATIONAL PARK SERVICE
REGULATIONS FOR NOISE, HOURS OF OPERATIONS, AND DUST CONTROL.
11. THE AUTOCAD FILE FOR THIS SITE PLAN WILL BE PROVIDED TO THE
CONSTRUCTION SURVEYOR. THE SURVEYOR SHALL INFORM THE
ENGINEER OF ANY DISCREPANCIES IMMEDIATELY.
12. MINIMIZE OFF-SITE VEHICLE TRACKING OF SEDIMENTS, SWEEP SITE
ENTRANCE AND EXIT DURING CONSTRUCTION WHEN SOILS
ACCUMULATE TO DEPTHS GREATER THAN ONE-FOURTH INCH. WATER
EXPOSED SOILS AS NECESSARY TO CONTROL GENERATION OF DUST.
CONSTRUCTION ACTIVITIES SHALL BE MONITORED ON A DAILY BASIS TO
DETERMINE IF TRACKING OF DIRT AND DEBRIS ONTO THE ADJACENT
ROADWAYS HAS OCCURRED. ANY NECESSARY CLEANUP SHALL BE
ACCOMPLISHED ON A DAILY BASIS.
13. THE CONTRACTOR SHALL PROVIDE CONTROLS TO LIMIT SEDIMENT
DISCHARGE DUE TO SOIL EROSION. THESE CONTROLS SHALL INCLUDE
REGULAR SWEEPING OF STREETS ADJACENT TO THE SITE THAT
ACCUMULATE SITE SOILS. ADDITIONAL CONTROLS MAY BE REQUIRED IF
THESE MEASURES PROVE INADEQUATE. THE CONTRACTOR SHALL
IMPLEMENT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP).
14. REVISIONS THAT ALTER THE REVIEWED AND APPROVED DESIGN INTENT
REFLECTED IN THIS SET OF SIGNED CONSTRUCTION DRAWINGS MUST BE
APPROVED BY THE ENGINEER OF RECORD.
15. KEEP SITE FREE OF LITTER
R
I
C
H
A
R
D
S
Y
R I C
H A
R D
S O
N
H
W Y
GLENN HWY
GLENNALLEN
COPPERVILLE
TAZLINA
PROJECT
LOCATION
LOCATION
PROJECT
G
L
E
Y
GLENNALLEN CAMPUS
NTS
VICINITY MAP: PROJECT AREA
NTS
LEGEND
ADEC - ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION
ARFS - AS REQUIRED FOR SAFETY
AWWA - AMERICAN WATER WORKS ASSOCIATION
BLM - BUREAU OF LAND MANAGEMENT
CMP - CORRUGATED METAL PIPE
CO - CLEANOUT
DIAM. - DIAMETER
EL - ELEVATION
GPD - GALLONS PER DAY
FT - FOOT
H - HORIZONTAL
HDPE - HIGH DENSITY POLYETHYLENE
IBC - INTERNATIONAL BUILDING CODE
IN - INCH
INV - INVERT
LC - LEVELING COURSE
LF - LINEAR FEET
MIN - MINIMUM
NFS - NON-FROST SUSCEPTIBLE
NPS - NATIONAL PARK SERVICE
NSF - NATIONAL SANITATION FOUNDATION
NTS - NOT TO SCALE
OD - OUTSIDE DIAMETER
OSHA - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PE - POLYETHYLENE
PSI - POUND PER SQUARE INCH
PVC - POLYVINYL CHLORIDE
S - SEWER
SDR - STANDARD DIMENSION RATIO
SF - SQUARE FOOT
TYP - TYPICAL
WTP - WATER TREATMENT PLANT
PROPOSED EXISTING DESCRIPTION
BUILDING OUTLINE
FENCE
CULVERT
WATER
VALVE
SANITARY SEWER
LEACH FIELD BOUNDARY
CLEANOUT
EDGE OF GRAVEL
BOLLARD
POWER POLE
GEOTECHNICAL TEST PIT LOCATION
C1.0-
NOTES, LEGEND, AND
REMOVE AND STORE PROPANE TANK. COORDINATE
WITH OWNER/SUPPLIER FOR NEW LOCATION.
REMOVE WATER TREATMENT
PLANT STRUCTURE. PROTECT
WATER WELL IN PLACE
REMOVE ~30 LF OF WATER DISTRIBUTION PIPE
(2" SUPPLY AND 2" RETURN POLYETHYLENE PIPE IN
6" CARRIER PIPE WRAPPED WITH 3" INSULATION)
REMOVE ~45 LF OF SEWER PIPE AND CLEANOUT.
(4" HDPE WITH 4" INSULATION IN 12" HDPE JACKER)
REMOVE ~40 LF OF 1" HDPE SEASONAL WATER LINE
TRAIL CREW BLDG. PARK STAFF WILL
RELOCATE. NOT IN CONTRACTORS SCOPE
REMOVE ~10 LF OF SEWER PIPE
APPROXIMATE LIMITS OF PROPOSED
LEACH FIELD EXCAVATION
EXISTING CLEANOUT TO REMAIN
EXISTING SEPTIC TANK TO REMAIN
EXISTING SEWER PIPE TO REMAIN
EXISTING LEACH FIELD TO REMAIN
EXISTING CLEANOUT TO REMAIN
REMOVE ~55 LF OF SEWER PIPE.
(4" HDPE WITH 4" INSULATION IN 12" HDPE JACKER)
CUT AND CAP ABANDONED PIPE AND FITTING
CAP ABANDONED PIPE
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:53 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-D M-
GL
EN
NA
LL
EN
.dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
NOTES:
1. EXISTING CONDITIONS SHOWN ARE COMPILED FROM
"AS-CONSTRUCTED" DRAWINGS FOR THE GLENNALLEN MAINTENANCE
FACILITY, DATED 2013; DESIGN DRAWINGS FOR THE GLENNALLEN
INTERAGENCY EMPLOYEE HOUSING PROJECT, DATED 1994; AND THE
BLM'S GLENNALLEN ADMINISTRATIVE SITE, EXISTING SITE CONDITIONS
SURVEY, WHICH WAS COMPILED FROM FIELD SURVEY AND DESIGN
DRAWINGS.
2. EXISTING DEPTHS OF BURY:
- 1" HDPE SEASONAL WATER LINE IS BURIED AT ~12"
- 4"x12" ARCTIC INSULATED SEWER PIPE IS BURIED AT ~4 FT TO 5 FT
- 6"x12" ARCTIC INSULATED WATER DISTRIBUTION LINE AT ~3FT TO 5FT
- EXISTING DEPTHS OF BURY PER DESIGN INFORMATION AND IS NOT
CONFIRMED.
C2.0-
EXISTING CONDITIONS
AND DEMOLITION
A B C
PROPOSED
WTP
TRAIL CREW BUILDING RELOCATED BY PARK STAFF, NOT IN CONTRACTORS SCOPE
TRAIL
CREW
BLDG.
20' MIN
PROPOSED LEACH FIELD EXPANSION
SITE GRADING AND FINISHED FLOOR, SEE NOTE 4 AND 5. GRADE
TO DRAIN AROUND BUILDING, DO NOT DIRECT STORMWATER
TOWARDS OTHER STRUCTURES OR DRIVING SURFACES.
CONTRACTOR STAGING AND LAYDOWN
PROPOSED SEPTIC TANK
BOLLARDS, SEE ARCHITECTURAL FOR LAYOUT.
INSTALL PER DETAIL 2/C4.2
200' WELL RADIUS
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
1/3 1/2
4 4
:45 :45
P M
J:\
\63
7-
\65
CA
D\ Sh ee tF ile s\G
L - G len na lle n\S
C2 0-
CS
-S
I-G
LE
NN
AL
LE
N_
V2 .dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
01/31/2024
C3.0-
SITE LAYOUT
NOTES:
1. PROPOSED WATER TREATMENT PLANT (WTP) WILL BE PLACED PER THE
EXISTING WELL LOCATION. CONTRACTOR SHALL FIND CLEAR SPACE
BETWEEN FENCE AND BUILDING AND PROVIDE INFORMATION TO NPS
PROJECT MANAGER BEFORE CONSTRUCTION TO DETERMINE IF FENCE
WILL BE IMPACTED.
2. ORIENTATION OF PROPOSED BUILDING SHALL MATCH ORIENTATION OF
EXISTING BUILDING.
3. SEE STRUCTURAL SHEETS FOR SUBGRADE IMPROVEMENTS FOR
PROPOSED WTP.
4. CONTRACTOR SHALL MEASURE FINISH FLOOR OF EXISTING WTP
BEFORE DEMOLITION AND REPORT ELEVATION TO ENGINEER PRIOR TO
DEMOLITION.
4.1. PROPOSED FINISH FLOOR SHALL BE SET TO ALLOW THE GROUND
IMMEDIATELY ADJACENT TO THE FOUNDATION TO BE SLOPED AWAY
FROM THE BUILDING AT A SLOPE OF NOT LESS THAN 5-PERCENT
FOR A MINIMUM DISTANCE OF 10 FEET MEASURED PERPENDICULAR
TO THE FACE OF THE WALL. (2021 IBC 1804.4)
4.2. SEE SHEET C3.1. CONTRACTOR SHALL SURVEY AND MEASURE
INVERT OF EXISTING SEWER CLEANOUT AT CONNECTION POINT.
FINISH FLOOR OF PROPOSED WTP WILL BE SET TO ACCOMODATE
NEW PIPE SLOPE AND CONNECTION TO SEWER CATCH BASIN AS
SHOWN IN 3/C4.1. COORDINATE WITH ENGINEER.
5. GRAVEL DRIVEWAY SHALL EXTEND FROM EXISTING GRAVEL ACCESS
ROAD TO BUILDING ENTRANCE AND GARAGE DOOR. COMPACT GRAVEL
TO 95% TO CREATE A FIRM, STABLE SURFACE. RESTORE OTHER
DISTURBED AREA AROUND THE BUILDING TO ORIGINAL CONDITION.
6. SITE CONCRETE SHALL CONFORM TO SPECIFICATION 03 30 00.
A B C
50LF 1" HDPE SEASONAL WATER
SERVICE, ~12" BURY DEPTH,
SLOPE TO DRAIN
50LF 4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0
CONNECTION TO BUILDING,
SEE DETAIL 3/C4.1
40LF 6x12 ARCTIC PIPE (2" HDPE SUPPLY
AND 2" HDPE RETURN SERVICE)
SEE DETAIL 2/C4.0
EXISTING CLEANOUT
TO REMAIN
SINGLE CLEANOUT WITH
45-DEGREE BEND,
SEE DETAIL 5/C4.0
45-DEGREE BEND
90-DEGREE BEND
10' MIN.
10' MIN.
TRAIL CREW BLDG.
17'
LEACH FIELD - FOUR 24-FT LONG LATERALS
CONSTRUCTED OF INFILTRATOR CHAMBERS.
SEE DETAILS ON C4.1
24'
~11.3'
DOUBLE CLEANOUT,
SEE DETAIL 5/C4.0
~8 LF 4x12 ARCTIC
PIPE @ 2.0% MIN.,
SEE DETAIL 1/C4.0
DISTRIBUTION BOX,
SEE DETAIL 4/C4.0
TWO RUNS OF ~6LF
4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0
USE DOUBLE WYE OR DISTRIBUTION BOX TO
COMBINE SEWER LINES AND CONNECT TO EXISTING
20'
9.4'
~10 LF 4x12 ARCTIC PIPE @ 2.0% MIN., SEE DETAIL 1/C4.0
45° BEND
DISTRIBUTION BOX,
SEE DETAIL 4/C4.0
11'
EXISTING POWER POLE,
PROTECT IN PLACE
SINGLE CLEANOUT,
SEE DETAIL 5/C4.0
SINGLE CLEANOUT WITH 45-DEGREE
BEND, SEE DETAIL 5/C4.0
GROUND EL≈1444.0
INV≈1440.0
50LF 4x12 ARCTIC PIPE @ 9.6%
SEE DETAIL 1/C4.0
EXISTING CLEANOUT
GROUND EL≈1447.5
INV≈1444.8
24LF 4x12 ARCTIC PIPE @ 2.7%
SEE DETAIL 1/C4.0
10LF 4x12 ARCTIC PIPE @ 2.7%
SEE DETAIL 1/C4.0
1,000 GALLON PE
SEPTIC TANK,
SEE C4.2
EXISTING SEPTIC
TANK TO REMAIN
CONNECT TO
EXISTING SERVICE
GROUND EL≈1443.0
INV≈1438.8
CAP LINE
CAP LINE
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
2/1 /20
3:
:45
P M
J:\
\63
7-
\65
CA
D\ Sh ee tF ile s\G
L - G len na lle n\S
C2 0-
CS
-U
T-
GL
EN
NA
LL
EN
_V 2.d wg U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
01/31/2024
LEACH FIELD NOTES:
1. CONTRACTOR SHALL EXCAVATE 6-FT BELOW BOTTOM OF PROPOSED
LEACH FIELD TO DETERMINE IF A CONFINING LAYER IS PRESENT,
DOCUMENT FINDINGS, AND REPORT TO ENGINEER.
2. THE PROPOSED LEACH FIELD SHALL COVER A MINIMUM OF 270 SF.
3. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED LEACH
FIELD AND SEWER PIPE MODIFICATIONS WITH AS-BUILT NOTES,
ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO
ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD
DRAWINGS.
4. THE CAPACITY OF EXISTING LEACH FIELD IS 511 GPD PER 2013 DESIGN
DOCUMENTS. EXISTING SYSTEM WAS APPROVED BY ADEC (PLAN
REVIEW NO.: 8037). PROPOSED LEACH FIELD WILL ADD 182 GPD
CAPACITY TO SYSTEM, PROVIDING A TOTAL CAPACITY OF 693 GPD.
5. DO NOT CONSTRUCT PROPOSED LEACH FIELD UNDER DRIVEWAYS.
WTP UTILITY NOTES:
1. SLOPE SEWER PIPE AT 2-PERCENT.
CONTRACTOR SHALL DETERMINE INVERT
ELEVATION OF EXISTING SEWER AT
CLEANOUT BEFORE CONSTRUCTING NEW
SEWER CONNECTION. MAINTAIN MAXIMUM
COVER OVER SEWER SERVICE FOR AS
MUCH OF THE RUN AS POSSIBLE. RECORD
INVERT ELEVATIONS AND DEPTH OF COVER
AT HORIZONTAL AND VERTICAL CHANGES.
CONTACT ENGINEER IF 4-FT COVER
CANNOT BE MAINTAINED.
C3.1
WTP UTILITIES
1"=10'
C3.1
SEPTIC TANK AND LEACH FIELD
1"=10'
C3.1-
UTILITY LAYOUT
SEPTIC TANK AND SEWER NOTES:
1. GROUND AND PIPE ELEVATIONS COLLECTED BY NPS STAFF.
CONTRACTOR TO LOCATE EXISTING PIPES AND VERIFY CONNECTION
ELEVATIONS BEFORE EXCAVATION AND INSTALLATION.
2. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED SEWER
SERVICE RE-ROUTE AND SEPTIC TANK WITH AS-BUILT NOTES,
ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO
ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD DRAWINGS.
EXISTING 4" SEWER PIPE IN
ARCTIC INSULATION
EXISTING CLEANOUT,
INSTALL CONCRETE
COLLAR PER DETAIL 5/C4.0
GROUND EL≈1447.5
INV≈1444.8
SINGLE CLEANOUT AND
CONCRETE COLLAR PER
DETAIL 5/C4.0
GROUND EL≈1444.0
INV≈1440.0
SINGLE CLEANOUT PER
DETAIL 5/C4.0
CONNECT TO EXISTING
SERVICE WITH WYE
GROUND EL≈1443.0
INV≈1438.8
L F
X
A
R C
T
IC
P
IP
E
.6
10LF 4X12 ARCTIC PIPE @ 2.7%
24LF 4X12 ARCTIC PIPE @ 2.7%
EXISTING 4" SEWER PIPE IN
ARCTIC INSULATION
FINISHED GRADE =
EXISTING GROUND
NOTE:
1. CONTRACTOR SHALL VERIFY EXISTING PIPE ELEVATIONS AT
CONNECTION POINTS BEFORE BEGINNING INSTALLATION.
2. SLOPES OF EXISTING PIPES IS ASSUMED BASED ON GRADE OF
EXISTING GROUND.
T
L
E
A
C
F
E
L
D
S
FROM WTP
1,000
GALLON
PE SEPTIC
TANK
DOUBLE CLEANOUT PER
DETAIL 5/C4.0
DISTRIBUTION BOX PER
DETAIL 4/C4.0
CONNECT TO EXISTING
SEWER SERVICE, INSTALL
DISTRIBUTION BOX PER
DETAIL 4/C4.0
45° BEND
~10-FT~8-FT
F
R
P
A
D
M
E
C
H
A
N
S
O
P
24-FT
4X12
ARCTIC
PIPE,
2% MIN.
4X12
ARCTIC
PIPE,
2% MIN.
LEACH FIELD
CHAMBERS
LEACH FIELD, SEE
DETAILS ON C4.1
FINISHED GRADE =
EXISTING GROUND
EXISTING 4" SEWER PIPE IN
ARCTIC INSULATION
FLOW FROM WTP
EXISTING 4" SEWER PIPE IN
ARCTIC INSULATION
CONNECT TO EXISTING
SERVICE AT EXISTING
CLEANOUT, INSTALL
CONCRETE COLLAR PER
DETAIL 5/C4.0
SINGLE CLEANOUT AND
CONCRETE COLLAR PER
DETAIL 5/C4.0
FINISHED GRADE =
EXISTING GROUND
45° BEND
SINGLE CLEANOUT AND
CONCRETE COLLAR PER
DETAIL 5/C4.0, AND 45° BEND
NOTE:
1. CONTRACTOR SHALL MEASURE DEPTH OF EXISTING SEWER AT
EXISTING CLEANOUT BEFORE CONSTRUCTION OF WTP BEGINS.
2. FINISH FLOOR ELEVATION OF WTP SHALL BE SET TO OBTAIN THE
MINIMUM SLOPE AND COVER OF THE PROPOSED SEWER SERVICE
CONNECTION FROM THE EXISTING CLEANOUT TO THE WTP. SEE
NOTE 4 ON C3.0 AND THE UTILITY NOTES WITH 1/C3.1
~50-FT
4X12 ARCTIC
PIPE, 2% MIN.
SEE DETAIL 3/C4.1
FOR CONNECTION
TO BUILDING
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:03 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-U T-
GL
EN
NA
LL
EN
_V
2.d wg
U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
C3.2
WTP CONNECTION - PROFILE
NTP
C3.2-
UTILITY PROFILES
C3.2
LEACH FIELD - PROFILE
NTP
C3.2
SEPTIC TANK - PROFILE
NTP
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:01 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-D T-
GL
EN
NA
LL
EN
.dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
4" HDPE, SDR 17 OR 11
POLYURETHANE INSULATION
12" OD THIN WALL HDPE
OUTER JACKET
C4.0
SEWER LINE - 4x12 ARCTIC PIPE
NTS
6" HDPE, SDR 17 CARRIER PIPE
3" THICK POLYURETHANE INSULATION
60 MIL PE OUTER JACKET
C4.0
WATER LINE - 6x12 ARCTIC PIPE
NTS
2" HDPE RETURN LINE
2" HDPE SUPPLY LINE
12"
6" MIN.
6"
M
I N
I M
U
R
A
S
N
O T
E D
6" GRAVEL, COMPACTED TO 95%
CLEAN NATIVE
MATERIAL
COMPACTED TO
90%
ACCESS ROADS,
DRIVING SURFACES
OUTSIDE OF VEHICLE
MANEUVERING AREAS
RESTORE TO ORIGINAL CONDITION
O
D
ARCTIC PIPE
AS REQUIRED FOR
SAFETY BY OSHA
BEDDING, 2" MINUS CLASSIFIED MATERIAL
EXCAVATE AS REQUIRED TO
REMOVE ALL UNSUITABLE MATERIAL
NOTE: COMPACT BOTTOM OF TRENCH
C4.0
UTILITY TRENCH SECTION
NTS
C4.0
DISTRIBUTION BOX
NTS
NOTES:
1. TUF-TITE 6HDB (6-HOLE DISTRIBUTION BOX) USED AS BASIS FOR DESIGN, APPROVED
EQUALS ALLOWED.
2. DISTRIBUTION BOX SHALL BE INSTALLED LEVEL. MANUFACTURER SUPPLIED
"LEVELERS" MAY ONLY BE USED IF THE DIAMETER OF INLET AND OUTLET PIPES IS
NOT DECREASED.
INLET
T
Y P
4.0' MINIMUM
(OR AS NOTED)
4x12 ARCTIC PIPE PER 1/C4.0
45° BEND
45° WYE
T
Y P
4.0' MINIMUM
(OR AS NOTED)
4x12 ARCTIC PIPE PER 1/C4.0
45° BEND
45° WYE
4x12 ARCTIC PIPE PER 1/C4.0
45° BEND
SINGLE CLEANOUT DOUBLE CLEANOUT
C4.0
CLEANOUT
NTS
TRACER WIRE, INSTALL FOR SEWER AND WATER PIPES
DETAILS
C4.0-
EJIW 1574 CLEANOUT BOX
AND COVER, OR EQUIVALENT
6" MIN.
6" MIN.
6" MIN.
2"
ADJACENT GROUND
4" MIN. CONCRETE, 4000 PSI
CLEANOUT COVER AND
CONCRETE COLLAR
NOTE: CLEANOUTS WITHIN DRIVE AREAS
SHALL BE SET RECESSED INTO ADJACENT
GROUND WITH CONCRETE COLLAR
CONCRETE COLLAR -
PLAN VIEW
EJIW 1574 CLEANOUT BOX
AND COVER, OR EQUIVALENT
CLEAN NATIVE MATERIAL
COMPACTED TO 95%
INCOMING
FLOW
4-IN RIGID BOARD
INSULATION OVER LEACH
FIELD DISTRIBUTION PIPES
DISTRIBUTION BOX,
SEE DETAIL 4/C4.0
INSPECTION PIPE, TYP
24'
~11.3'
INFILTRATOR CHAMBERS
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:01 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-D T-
GL
EN
NA
LL
EN
.dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
C4.1
LEACH FIELD - TYPICAL SECTION
NTS
EXISTING GROUND
UNDISTURBED EARTH
DO NOT PLACE MATERIAL WITHIN CHAMBER
NATIVE SOIL AT BOTTOM OF LEACH
FIELD, DO NOT COMPACT
AS REQUIRED FOR
SAFETY BY OSHA
4-FT MINIMUM
NOTES:
1. ANY SOIL AT BOTTOM OF LEACH FIELD THAT IS COMPACTED SHALL BE DISTURBED, DUG, AND REPOSITIONED
SO THAT NATIVE SOIL IS NOT COMPACTED BEFORE PLACING INFILTRATOR CHAMBERS. KEEP EQUIPMENT AND
VEHICLES OUT OF LEACH FIELD.
2. MOUND SOIL OVER LEACH ABOVE ABOVE EXISTING ELEVATION SO THAT STORMWATER WILL DRAIN AWAY AND
AROUND LEACH FIELD
3. BASIS OF DESIGN: INFILTRATOR CHAMBER DIMENSIONS ARE 34" W x 53" L x 12" H
4. PER ADEC ONSITE WASTEWATER SYSTEM INSTALLATION MANUAL (JANUARY 2016), SEPARATOR FABRIC SHALL
BE TYPAR 3401 OR EQUIVALENT.
FINISHED GRADE, MOUND SOIL
TO DRAIN OVER LEACH FIELD
AS REQUIRED FOR
SAFETY BY OSHA
INSPECTION PIPE, TYP
SEPARATOR FABRIC
M
I N
12"
C4.1
INSPECTION PIPE
NTS
SEPARATOR FABRIC
FINISHED GRADE
REMOVABLE CAP
REFLECTIVE TAPE
4" SOLID WALL PVC PIPE
4" PERF. PVC (1/2" DIAM. PERFORATIONS)
INFILTRATOR CHAMBER
C4.1
BUILDING CONNECTION
NTS
DETAILS
C4.1-
C4.1
LEACH FIELD - PLAN
NTS
1-FT
4-FT
4-IN RIGID BOARD INSULATION
4-IN RIGID BOARD INSULATION
C4.1
4X12 ARCTIC PIPE
Z-LOK OR EQUAL PIPE CONNECTION
AT PENETRATION. SEAL WITH
POLYURETHANE SPRAY IN FOAM
NOTE:
CIVIL SCOPE DETAILS CONNECTION TO CONCRETE WASTEWATER "CATCH BASIN". ALL OTHER WORK
SHOWN IN OTHER DISCIPLINE'S DRAWINGS
TO CONNECTION W
ITH EXISTING
PIPE AND LEACH FIELD
EXISTING GROUND
2% MINIMUM TO
CONNECTION
45° BEND
2 FT PIPE BETWEEN FITTINGS.
GROUT FLOOR TO DRAIN
ARCTIC BOOT CONNECTION FASTENED PER MANUFACTURERS INSTRUCTIONS
5LF @ 5% MINIMUM
STUB PIPE 2-INCH MINIMUM
INTO CATCH BASIN
FINISHED GRADE
INSTALL SINGLE CLEANOUT,
SEE 5/C4.0
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF
248940
/1/
8:
:01 A
M J:\
\63
7-
\65
CA
D\
Sh ee tF ile s\G L -
G len na lle n\S C2
0-
CS
-D T-
GL
EN
NA
LL
EN
.dw g U
SE
R:
NC
ON
W
AY
GL
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
N.CONWAY
N.CONWAY
B.DOGGETT
12/01/2023
DETAILS
C4.2-
ANCHORS, (TYP OF 6)
CABLE, (TYP OF 3)
SLO
PE T
O D
RAIN
S
LO
P E
TO
D
R A
IN
24-IN MANWAY WITH
INSULATED FROST LID
COMPACTED BACKFILL
MUST BE MOUNDED
4-IN TO 6-IN TO ALLOW
FOR SETTLEMENT
ARFS
BACKFILL WITH EXCAVATED MATERIAL,
COMPACT TO 90%
FILL TANK 1/2 FULL OF WATER
PRIOR TO BACKFILLING
SEPTIC TANK FOUNDATION MUST BE
THOROUGHLY COMPACTED NON-FROST
SUSCEPTIBLE MATERIAL
2-FT MINIMUM
1,000 GALLON
PE TANK
NOTE:
1. ANCHORS SHALL BE SEATED AND PROOF
LOADED TO 120% OF DESIGN LOAD.
4-IN ARCTIC SEWER PIPE
FROM EXISTING SYSTEM
FLEXIBLE LOW PRESSURE COUPLING WITH 2 EACH
SCREW CLAMPS, FERNCO 1056-54 (OR EQUAL) TO
PROVIDE SMOOTH TRANSITION (TYP OF 2)
BACKFILL IN 12" LIFTS,
COMPACT TO 90%
NOTE:
1. 1,000 GALLON, TWO COMPARTMENT POLYETHYLENE SEPTIC
TANK MANUFACTURED IN COMPLIANCE WITH 18 AAC AND
APP. H OF THE UNIFORM PLUMBING CODE.
2. SEPTIC TANK MUST BE INSTALLED LEVEL.
3. SOLID PIPE WITH NO JOINTS TO SPAN 10 FEET FROM INLET
AND OUTLET OF TANK
END VIEW
PROFILE
4-IN SEWER PIPE TO LEACH FIELD,
SEE 3/C3.0 FOR INSULATION
24-IN MANWAYS
WITH INSULATED
FROST LIDS
4-IN URETHANE INSULATION, 30 PSI
MINIMUM COMPRESSIVE STRENGTH
4-IN URETHANE INSULATION, 30 PSI
MINIMUM COMPRESSIVE STRENGTH
4-IN PVC INLET TEE
4-IN PVC TEE WITH EFFLUENT FILTER
RATED FOR 700 GPD MINIMUM
2-FT MINIMUM
C4.2
SEPTIC TANK INSTALLATION
NTS
SLOPE TO DRAIN
FINISH
GRADE
6" DIA SCHEDULE 40
STEEL PIPE FILLED WITH
CONCRETE AND PAINTED
(SEE NOTE 1)
CONCRETE
2"
4.0'
18"
3000 PSI
CONCRETE
4.0'
6"
NOTE:
1. POSTS SHALL BE PRIMED AND RECEIVE TWO COATS MINIMUM
OF DARK GREEN POWDER COAT PAINT IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. TOPCOAT WITH TWO
COATS YELLOW CARBOLINE 139.
C4.2
STEEL BOLLARD
NTS
4"
YELLOW
REFLECTORIZED
STRIPPING
SYMBOLS LEGEND
ROOM DESIGNATION
WALL TYPE
DOOR DESIGNATION
GRIDLINE
EQUIPMENT DESIGNATION
EXTERIOR ELEVATION DESIGNATION
WINDOW / LOUVER DESIGNATION
DETAIL DESIGNATION
REVISION DESIGNATION
BUILDING SECTION DESIGNATION
PLAN KEYNOTE
INTERIOR ELEVATION DESIGNATION
BREAK LINE
NORTH ARROW / PLAN NORTH
DATUM DESIGNATION
TITLE DESIGNATION
XX
XX
1 VIEW NAME 1
A101
SHT_NO
DET_NO
A101
X'XX" AFF CEILING HEIGHT DESIGNATION
XXXX
RM NO
ROOM NAME
XXXX
FURNITURE DESIGNATION
XXx
WALL SECTION DESIGNATION
XX
DET_NO
SHT_NO
SIM
LEVEL NAME
ELEVATION
GRAPHIC SCALE
XXXX
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DETAIL SECTION DESIGNATION
4 80
ABBREVIATIONS LEGEND
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTADIENE STYRENE
ABV ABOVE
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADDL ADDITIONAL
ADF ACCESSIBLE DRINKING FOUNTAIN
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
A
B
BBQ BARBEQUE
BD BOARD
BFF BELOW FINISH FLOOR
BKBD BACK BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOD BOTTOM OF DECK
BOT F BOTTOM FACE
BOT BOTTOM
BR BEDROOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CG CORNER GUARD
CMPST COMPOSITE
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COP COPPER
CORR CORRIDOR
CPT CARPET
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
CULT CULTURED
CW COLD WATER PIPING
D
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ES EACH SIDE
EQ EQUAL
EQUIP EQUIPMENT
EOS EDGE OF SLAB
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
(E) EXISTING
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE, FIXTURES AND
EQUIPMENT
FGL FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FLR SK FLOOR SINK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRZ FREEZER
FT FEET
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFGI GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GFRG GLASSFIBER REINFORCED GYPSUM
GFRC GLASSFIBER REINFORCED CONCRETE
GL GLASS/GLAZING
GLU LAM GLUE LAMINATED WOOD
GPM GALLONS PER MINUTE
GRAN GRANITE
GSB GYPSUM SHEATHING BOARD
GTV GATE VALVE
GWT GLAZED WALL TILE
GYP GYPSUM
GWB GYPSUM WALL BOARD
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HOT WATER
HWR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .