This document is a set of mechanical drawings and equipment schedules related to the WRST 248940 - Replace Deficient Visitor Center / Headquarters Water Treatment System federal contract opportunity.
The key details include mechanical equipment and systems required for the project, such as water heaters, boilers, pumps, air separators, unit heaters, and an energy recovery ventilator. The drawings provide technical specifications, capacities, physical dimensions, and other details for these components. The project location is the Wrangell-St. Elias National Park & Preserve. The solicitation number is 140P2024R0034, and the work is being procured by the Department of the Interior National Park Service National Office. The document appears to be a response to bidder questions, with revisions noted. No pricing terms, set asides, or incumbent information is provided in this specific document.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M0.2
- GL
MECHANICAL SCHEDULES
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
PLUMBING FIXTURE SCHEDULE
SYMBOL FIXTURE MOUNTING REMARKSCW BASIC MODEL COLOR/FINISHHW/TW WASTE VENT TRAP
BASIS OF
DESIGN POWER REQ.
WALLHOSEBIBBHB-1-GL 3/4" ANTI-SIPHON VACUUM BREAKER, WHEEL HANDLE, ROUGH CHROME FINISH.24CP CHROME3/4" -- -- -- WOODFORD --
WALLEYEWASHEW-1-GL 3/4" PROVIDE WITH ASSE 1071 THERMOSTATIC MIXING VALVE.G1814 STAINLESS3/4" -- -- -- GUARDIAN --
ELECTRIC WATER HEATER SCHEDULE
SYMBOL MANUFACTURER/MODEL
EEMAX/SPEX65T EE
REMARKS
EWH-1-GL
ELEMENT
N/A, N/A, 44, 22 6.5 kW
POWER
240V/1PH
LABEL
UL INSTANTANEOUS WATER HEATER.
TEMP RISE (DEG F)
@ 0.35, 0.5, 1.0, 2.0 GPM
ELECTRICAL DATA
BOILER SCHEDULE
SYMBOL
KHB155L
MANUFACTURER MODEL
LOCHINVAR
KHB155LLOCHINVAR
REMARKS
B-1-GL
B-2-GL
HEATED
50% PG
50% PG
PROVIDE WITH PH NEUTRALIZER FOR CONDENSATE DRAIN, SIDEWALL VENT KIT, LOW WATER CUT-OFF, REDUNDANT HIGH LIMIT, AND BOILER SEQUENCING WITH CIRCULATING PUMP CONTROL.
PROVIDE WITH PH NEUTRALIZER FOR CONDENSATE DRAIN, SIDEWALL VENT KIT, LOW WATER CUT-OFF, REDUNDANT HIGH LIMIT, AND BOILER SEQUENCING WITH CIRCULATING PUMP CONTROL.
MEDIUM
LPG
LPG
FUEL
GROSS INPUT
MBH
GROSS I-B-R
OUTPUT (MBH)
ELECTRICAL
FLA POWER LABEL
2.2
2.2
120V/1PH
120V/1PH
ASME H
ASME H
AIR SEPARATOR SCHEDULE
SYMBOL
VDN200
MANUFACTURER MODEL
SPIROTHERM
REMARKS
AS-1-GL
SIZE
2"
CONNECTION MATERIAL FLUID
FLANGED STEEL 50% P.G. INSTALL DRAIN VALVE IN BOTTOM FOR DEBRIS REMOVAL, REMOVABLE BOTTOM HEAD, TOP AIR VENT .
SERVES
HEATING
GLYCOL MIX TANK SCHEDULE
SYMBOL
HEATING SYSTEM
MANUFACTURER FUNCTION
AXIOMGT-1-GL POLYPROPYLENE50% P.G.
MEDIUM REMARKS
INTEGRAL PUMP, CONTROLS, PRESSURE GAUGE, PRESSURE SWITCH, GROUNDED ELECTRICAL CORD AND PLUG, ALARM PANEL. PROVIDE WITH SHELF TO MOUNT OFF FLOOR.
MATERIAL
TANK CAPACITY
DIMENSIONS
12"x12"x16"6.0
(GAL)
WATTS
POWER
VOLTSMODEL
MF200 60
HZ
PH
PUMP SCHEDULE
SYMBOL
UPS 26-150 F
MANUFACTURER MODEL
GRUNDFOS
GRUNDFOS
BCP-1,2-GL
CP-1 A/B-GL
FUNCTION
BOILER CIRCULATION
MAGNA3 50-180 F BUILDING HEAT
MEDIUM
50% P.G.
50% P.G.
GPM
PUMPED
FEET
HEAD
REMARKSWATTS
MOTOR DATA
POWER
VOLTS
HZ
PH
3-SPEED PUMP, CONTRACTOR TO SET SPEED.
VFD PUMP W/ INTEGRAL CONTROLS AND PRESSURE SENSORS.
EXPANSION TANK SCHEDULE
SYMBOL
EX-60
MANUFACTURER MODEL
AMTROLET-1-GL 50% P.G.
MEDIUM
STEEL/BUTYL
MATERIAL
6.7
TOTAL (GAL)
2.6
ACCEPTANCE (GAL) DIMENSIONS
11"ø x 22"
REMARKS
HEATING SYSTEM
FUNCTION
TANK VOLUME
PROVIDE SEISMIC RESTRAINT STRAPS, CHARGE TO SYSTEM OPERATING PRESSURE, INITIALLY 12 PSI.
HYDRONIC UNIT HEATER SCHEDULE
SYMBOL
HC-47
MANUFACTURER MODEL
MODINE
MODINE
REMARKS
UH-1-GL
UH-3-GL
MBH
30.9
GPM
3.2
HC-86 60.2 6.3
MEDIUM
50% P.G.
50% P.G.
CAPACITY
DEG F
EGT
DEG F
LGT
FT HD
WPD
0.4
1.0
CFM
1,340
RPM
1,550
1,625
HP
MOTOR
1/12
1/8
POWER
VOLTS
HZ
PH
SIDE PIPE CONNECTIONS.
SIDE PIPE CONNECTIONS.
FLOORTRENCH DRAINTD-1-GL -- SLOPED TO DRAIN, 4" WIDE CHANNEL, 6" WIDE CAST IRON COVER, GRATE W/ PROTECTIVE COATING, MOUNT FLUSH WITH FINISHED FLOOR. PROVIDE WITH END DISCHARGE AND DOME STRAINER.Z886HD ---- -- -- -- ZURN --
WALLHANDWASH SINKP-1-GL 3/4" PROVIDE 2" CLEANOUT UNDER SINK, PROVIDE WITH MOEN M-DURA 8210 0.5 GPM FAUCET.SL-1921-A-GR CHROME3/4" 2" 1-1/2" 2" JUST --
EEMAX/SPEX55TEWH-2-GL 5.5 kW 240V/1PH UL INSTANTANEOUS WATER HEATER.
MODINEUH-2-GL HC-63 45.6 4.7 50% P.G. 180 160 0.6 1,120 1,550 1/12 120 60 1 SIDE PIPE CONNECTIONS.
3.5
3.3
AMPS
0.7
AMPS
107, 75, 38, 19
MCA
2.8
2.8
REVISION SCHEDULE
1 4/18/24 Response To Bidder Questions
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M0.3
- GL
MECHANICAL SCHEDULES
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
ENERGY RECOVERY VENTILATOR SCHEDULE
SYMBOL
EV450IN
MANUFACTURER MODEL
RENEWAIREERV-1-GL --200LBS
WEIGHT REMARKS
ENTHALPY RECOVERY CORE, TWO MOTORS IN UNIT, PROVIDE WITH MERV-8 FILTERS AND UNIT MOUNTED DISCONNECT.ECM 300
SIZE TYPE CFM
1.1"
ESP
WC
FAN MOTOR DATA (PER MOTOR)
VOLTS HZ
240 60
PH
FLA
3.9
HEATING COIL SCHEDULE
SYMBOL MANUFACTURER/MODEL
TRANE/D5WB12012G0AA080BABAPHC-1-GL 300TREATMENT ROOM
LOCATION REMARKS
MOUNTED UPSTREAM OF UNIT IN O/A DUCTWORK, SIDE PIPE CONNECTIONS, PROVIDE WITH 2-WAY CONTROL VALVE.0.03
AIR P.D.
FACE VEL.
CFM IN. W.C. FPM
-38
EAT
DEG F
LAT
DEG F
1.6
GPM
50% P.G.
MEDIUM
EGT
DEG F
DEG F
LGT
0.4
FT HD
WPD
TRANE/D5WB12012G0BA101HABAHC-1-GL 300TREATMENT ROOM 0.06 300 0 65 2.4 50% P.G. 180 160 0.4 MOUNTED DOWNSTREAM OF UNIT IN S/A DUCTWORK, SIDE PIPE CONNECTIONS, PROVIDE WITH 2-WAY CONTROL VALVE.
FAN SCHEDULE
SYMBOL MANUFACTURER MODEL SERVICE CFM RPM DRIVETYPE IN. W.C. SONES REMARKS
TSP
HP
MOTOR DATA
VOLTS
POWER
HZ PH
AIR INLET/OUTLET SCHEDULE
SYMBOL
300FL
MANUFACTURER MODEL
TITUS
REMARKS
A
TYPE
GRILLE FRAME TYPE FOR DUCT MOUNTED INSTALLATION, INTEGRAL BALANCE DAMPER.
USE
SUPPLY
FACE MATERIAL
ALUMINUM
FINISH
PER ARCH
CFM
PER PLANS
SIZE (IN)
PER PLANS
NC
<30
THROW
2-WAY
350FLTITUSB GRILLE FRAME TYPE FOR DUCT MOUNTED INSTALLATION, INTEGRAL BALANCE DAMPER.RETURN ALUMINUM PER ARCH PER PLANS PER PLANS <30 N/A
SQ-90-VGGREENHECKVF-1-GL TREATMENT ROOM DIRECT320 1,409INLINE 0.4 6.2 ALUNIMUM HOUSING, PROVIDE WITH OSHA OUTLET GUARD AND ECM MOTOR WITH UNIT MOUNTED SPEED CONTROLLER FOR BALANCING, CONTROL WITH LOCAL THERMOSTAT.1/10 120 60 1
REVISION SCHEDULE
1 2
A
B
B-2-GL
ET-1-GL
CP-1A/B-GL
UH-1-GLUH-3-GL
PHC-1-GL
HC-1-GL, FOR TYPICAL
HEATING COIL PIPING
DETAIL, SEE -
BCP-1-GL
BCP-2-GL
1-1/4" HGS
1-1/4" HGR
2" HGS/R
1" HGS/R
1" HGS
1" HGR
GT-1-GL, LOCATED
BELOW AS-1-GL
1" HGS/R
T
T
T
THERMOSTAT (TYP)
SLEEVE AND SEAL
PENETRATION (TYP)
UH-2-GL
UH-2-GL
UH-3-GL
B-1-GL
2" HGS/R
VEHICLE BAY
BOILER EMERGENCY
STOP BUTTON (TYP)
FOR TYPICAL UNIT
HEATER DETAIL, SEE -
FOR BOILER PIPING
SCHEMATIC, SEE -
M4.2- GL
M4.1- GL
M4.2- GL
PHC-1-GL
TEMPERATURE
CONTROLLER
HC-1-GL
TEMPERATURE
CONTROLLER
PROCESS ROOM
CHEMICAL
STORAGE
MECHANICAL
CLEARANCE (TYP)
3/4" LP TO PROPANE TANK,
REFER TO CIVIL FOR TANK
LOCATION, FOR TANK
DETAIL, SEE - 2
M4.1- GL
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M2.1-
GL
FIRST FLOOR HEATING
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
1/4" = 1'-0"1
FIRST FLOOR HEATING PLAN
GENERAL NOTES
A. ALL HEATING PIPING SERVING TERMINAL UNITS TO BE
1" UNLESS OTHERWISE NOTED.
REVISION SCHEDULE
1 2
A
B
ERV-1-GL
VF-1-GL, FOR
DETAIL, SEE -
10/10 S/A, ROUTE
TIGHT TO WALL AND
HIGH IN SPACE A
10/10
18/18 O/A ARCTIC TEE, FOR
TYPICAL DETAIL,
SEE -
18/18 E/A ARCTIC TEE
B 10/10
B-2-GL
B-1-GL
3" COMBUSTION AIR AND VENT,
MOUNT AHAP PER MFGR
GUIDELINES, SUPPORT FROM
ADJACENT WALL (TYP OF 2),
FOR WALL KIT DETAIL, SEE -
MECHANICAL
CLEARANCE
T
H
12/18 C/A, FOR DETAIL,
SEE -
M4.2- GL
M4.2- GL
M4.2- GL
B 6/6
M4.2- GL
PROVIDE VOLUME
DAMPER
APPROXIMATE LOCATION OF
WATER STORAGE TANK,
CONTRACTOR TO LOCATE AND
ROUTE MECHANICAL EQUIPMENT
NO LOWER THAN 11' AFF TO AVOID
TANK, AND COORDINATE FINAL
LOCATIONS WITH TANK HATCHES
AND ARCHITECTURAL STAIRS
HEATING COIL
(TYP OF 2)
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M3.1-
GL
FIRST FLOOR
VENTILATION
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
1/4" = 1'-0"1
FIRST FLOOR VENTILATION PLAN
SHEET NOTES
1. MOUNT UNIT OFFSET FROM WALL, AS NECESSARY
TO CLEAR STRUCTURAL MEMBERS.
12" MAX
ET-1-GLGT-1-GL
B-1-GL
CP-1A-GL
CP-1B-GL
AS-1-GL
2" HGR
THERMOMETER (TYP)
ISOLATION VALVE (TYP)
STRAINER WITH
BLOWDOWN (TYP)
ROUTE PRV DISCHARGE
LINE SIZE TO GT-1-GL (TYP)
UNION (TYP)
PRESSURE GAUGE (TYP)
FLOW CONTROL
VALVE (TYP)
CAPPED DRAIN VALVE (TYP)
2" HGS
CHECK VALVE (TYP)
ROUTE DISCHARGE TO GT-1-GL
1-1/2" HGS/R
(TYP OF 2)
3/4" HGS
2" HGR
4" HOUSEKEEPING PAD
PER STRUCTURAL
SEISMICALLY RESTRAIN
EQUIPMENT PER SPECS
(TYP)
CHECK VALVE (TYP)
2" HGR/S
F.C.
BP-1-GL
B-2-GL
F.C.
BP-2-GL
ROUTE DISCHARGE TO
ADJACENT TRENCH DRAIN (TYP)
CONDENSATE NEUTRALIZER (TYP)
L P
L P
LPG LOAD SUMMARY
TOTAL LOAD: 310 MBH
TOTAL DEVELOPED LENGTH: 50 FEET
INLET PRESSURE: 10 PSI
PIPING TABLE: 2021 IFGC TABLE 402.4(26)
PRESSURE DROP 3 PSI
SPECIFIC GRAVITY 1.5
NOTES:
1. PROPANE TANK IS PURVEYOR FURNISHED COMPLETE WITH
RELIEF VALVE, SERVICE VALVE, LIQUID WITHDRAWAL VALVE,
FILL VALVE, VAPOR RETURN VALVE, FIXED LIQUID LEVEL
GAUGE AND FUEL LEVEL (%) GAUGE.
ANGLE VALVE, WITH
EXCESS FLOW VALVE, (TYP.)
16" x 3/4" ID GAS LISTED BRAIDED
STAINLESS STEEL HOSE ASSEMBLY
ANODELESS RISER, (TYP.)
3/4" LP TO BOILERS
SECOND STAGE REGULATOR
LISTED BALL VALVE
3/4" B.I. LP PIPING
3/4" BURIED PE PIPING
FIRST STAGE REGULATOR
COPPER PIGTAIL
ESCUTCHEON
TANK FEET ON CONCRETE BLOCKS
1,000 GALOON PROPANE TANK
SIGNAGE PER
NFPA & IFC
LPG LOAD SUMMARY
TOTAL LOAD: 310 MBH
TOTAL DEVELOPED LENGTH: 30 FEET
INLET PRESSURE: 11.0 IN. WC.
PIPING TABLE: 2021 IFGC TABLE 402.4(28)
PRESSURE DROP 0.5 IN. WC.
SPECIFIC GRAVITY 1.5
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M4.1-
GL
SCHEMATICS & DETAILS
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
NOT TO SCALE1
BOILER PIPING SCHEMATIC
NOT TO SCALE2
PROPANE TANK DETAIL
VF-1-GL
2" INSULATION (TYP)
SUPPORT FROM
STRUCTUR (TYP)
O/A HOOD, SIZE
PER PLANS
EXTERIOR SIP WALL
CEILING
INSULATED CONTROL DAMPER (TYP)
CA DOWN TO ARCTIC TEE, FOR
CONTINUATION AND ARCTIC TEE
OSHA OUTLET GUARD
UNISTRUT
M
SLOPE TO DRAIN,
CEILING
12" UPTURN ELBOW
WITH WATER TIGHT
SEAMS. SIZES PER
PLANS.
2" INSULATION
(TYP)
C/A HOOD, SIZE
PER PLANS
SUPPORT FROM
STRUCTURE (TYP)
C/A DOWN TO ARCTIC
TEE, FOR CONTINUATION
AND ARCTIC TEE DETAIL,
SEE -
UNISTRUT
M
IN
METAL FASTENER
(TYP)
1" BIRD SCREEN
INSTALLED OVER
OPENING
SIZE PER PLANS (TYP OF 2)
DUCT THROUGH WALL,
SLEEVE AND SEAL
PENETRATION
AIR INTAKE/EXHAUST
(TYP OF 2)
1" BIRDSCREEN, FASTENED
SEE DETAIL
NOTE:
HINGED AIR INLETS ARE NOT
REQUIRED FOR GRAVITY AIR
INLETS OR EXHAUST OUTLETS.
1-1/2" ANGLE IRON BRACE,
(TYP OF 2, BOTH ENDS, TOP
AND BOTTOM), PAINT TO MATCH
BUILDING, SEE ARCH
COORDINATE OVERLAPPING &
SEALING OF BUILDING VAPOR
RETARDER W/ ARCHITECTURAL
F.C.
RETURN
SUPPLY
AUTO AIR VENT (TYP)
BALL VALVE (TYP)
FLOW CONTROL VALVE
UNION, DIELECTRIC AS REQUIRED
2-WAY CONTROL VALVE
STRAINER
HOSE END DRAIN W/ CAP
VIBRATION ISOLATOR (TYP)
SUPPORT FROM
STRUCTURE (TYP)
AUTO AIR VENT WITH ISOLATION
3-WAY MODULATING CONTROL VALVE
FLOW CONTROL VALVE
ISOLATION VALVE (TYP)
DUCT TEMPERATURE SENSOR
FROM SAME MANUFACTURER
AS TEMPERATURE CONTROLLER,
MOUNT 24" DOWN STREAM
FROM HEATING COIL
HEATING COIL
PROPORTIONAL TEMPERATURE
CONTROLLER, JOHNSON CONTROLS
MODEL A350P OR EQUAL, INSTALL
IN BOILER ROOM.
UNION CONNECTION (TYP)
VALVED AND CAPPED
THREADED DRAIN
STRAINER
S
EHW-1-GL
1/2" CW
1/2" TW
1-1/4" W, ROUTE
DISCHARGE TO ADJACENT
TRENCH DRAIN
EW-1-GL
ISOLATION VALVE (TYP)
12" MIN.
BETWEEN EDGE
OF AIR INLET
AND ADJACENT
VENT PIPE
3" AIR INLET
W/ BIRD SCREEN
(TYP OF 2)
12" MIN.
15" MAX.
3" VENT
W/ BIRDSCREEN
(TYP OF 2)
12"
MIN.
ROOF OVERHANG
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PAUL D. OWENS
4/18/24
ME-193764
4/
/2
8:
:0
A
M C
:\U se rs \P au l O w en s\ D oc um en ts
\M
.1
0_ M
S E
R
IE
S _R
_p ow en sM X
V T
U .r vt
PDO
AWW/EMM
PDO
M4.2-
GL
DETAILS
WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
NOT TO SCALE1
VENT FAN DETAIL
NOT TO SCALE2
COMBUSTION AIR DETAIL
NOT TO SCALE3
ARCTIC TEE DETAIL
NOT TO SCALE5
UNIT HEATER DETAIL
NOT TO SCALE6
DUCT HEATING COIL DETAIL
NOT TO SCALE7
EYEWASH DETAIL
NOT TO SCALE4
AIR INTAKE/VENT DETAIL
| Sheets |
| M0.2 - GL - MECHANICAL SCHEDULES |
| M0.3 - GL - MECHANICAL SCHEDULES |
| M2.1- GL - FIRST FLOOR HEATING |
| M3.1- GL - FIRST FLOOR VENTILATION |
| M4.1- GL - SCHEMATICS & DETAILS |
| M4.2- GL - DETAILS |