Sol_140P2024R0034_Amd_0002.pdf

PDF 90 KB Posted

Attached to
WRST 248940 - Replace Deficient WTP/Systems.
Solicitation number
140P2024R0034
Issued by

About this file

This document is an Amendment 0002 to Solicitation 140P2024R0034 issued by the Department of the Interior National Park Service for the "WRST 248940 - Replace Deficient Visitor Center / Headquarters Water Treatment System" project at Wrangell St. Elias National Park and Preserve in Alaska.

The purpose of this amendment is to: 1) Update Specification Section 46 20 10, Paragraph 2.6 G - Manufacturer Services, as detailed in the attached document "B09_Updated Spec Section 46 20 10 April 5 2024_Amd2.pdf", and 2) Revise Civil Drawing Sheets C3.1-GL and C3.2-GL, as detailed in the attached document "B09_Rev1 Drawing Shts.C3.1&C3.2 April 5 2024_Amd2.pdf". Additionally, the amendment extends the Offer Due Date to no later than 2pm Mountain Time (MT) / 12pm Alaska Standard Time (AKST) on April 23rd, 2024. All other terms and conditions remain unchanged.

View the file

Other files

File Type Posted
B09_240424-HQ-ADEC_Revisions_Amd6_0006.pdf PDF
Sol_140P2024R0034_Amd_0006.pdf PDF
B09_CBGCW1KS_Installation_Instructions_4-18-24_Amd5_0005.pdf PDF
B09_ElectricalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_MechanicalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd5_0005.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0005.pdf PDF
B09_Updated_Specification_Section_23_52_39_-_FIRE_TUBE_BOILERS_Amd5_0005.pdf PDF
B09_Rev1_2_Drawing_Shts_C3_0_C3_1_April_18_2024_Amd5__0005.pdf PDF
Sol_140P2024R0034_Amd_0004.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd4_0004.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0003.pdf PDF
B09_Updated_Spec_Section_46_20_10_Addendum_April_9_2024_Amd3_0003.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd3_0003.xlsx XLSX spreadsheet
B09_Updated_Spec_Section_46_20_10_April_5_2024_Amd2_0002.pdf PDF
B09_Rev1_Drawing_Shts_C3_1_C3_2_April_5_2024_Amd2_0002.pdf PDF
B09_140P2024R0034_RFP_Body_Amd1_0001.pdf PDF
Sol_140P2024R0034_Amd_0001.pdf PDF
B08_140P2024R0034_RFP_Body_-_Final_3_12_2024.pdf PDF
B08_Attachment_9_-_Detailed_Contract_Price_Schedule.xlsx XLSX spreadsheet
B08_Attachment_8_-_Factor_4_PPQ_WRST_248940.docx DOCX document
B08_Attachment_1_-_Final_Specifications_WRST_248940_March2024.pdf PDF
B08_Attachment_6_-_General_References.doc DOC document
B08_Attachment_3_-_Wage_Determinitation_AK20240001_Feb2024.pdf PDF
Sol_140P2024R0034.pdf PDF
B08_Attachment_5_-_LimitOnSubcontractingWorksheet.xlsx XLSX spreadsheet
B08_Attachment_2_-_Final_Drawings_WRST_248940_March2024.pdf PDF
B08_Attachment_4_-_Construction_Admin_Provision.pdf PDF
B08_Attachment_7_-_Factor_1_PEQ_WRST_248940.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0034 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

WRST 24894004/05/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/12/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WRST 248940 - "Replace Deficient Visitor Center / Headquarters Water Treatment System."

Wrangell St. Elias National Park and Preserve in Alaska.

The purpose of this Amendment 0002 is to:

- Update Specification Section 46 20 10, Paragraph 2.6 G - Manufacturer Services. Refer to attached document, "B09_Updated Spec Section 46 20 10 April 5 2024_Amd2.pdf," for complete details.

- Revise Civil Drawing Sheets C3.1-GL and C3.2-GL. Refer to attached document, "B09_Rev1

Drawing Shts.C3.1&C3.2 April 5 2024_Amd2.pdf," for complete details.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Amber Hughes

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0034/0002

- Extend the Offer Due Date to no later than 2pm

Mountain Time (MT) / 12pm Alaska Standard Time

(AKST) on April 23rd, 2024.

All other terms and conditions remain unchanged by this Amendment.

*Questions are due by close of business on

April 5th, 2024.

**Offers are due no later than 2pm MT / 12pm AKST on April 23rd, 2024.

Contract Specialist - Abby Villareal abigail_villareal@nps.gov

Contracting Officer - Amber Hughes amber_hughes@nps.gov

RFP No. 140P2024R0034 - Issued 3/12/2024.

- Amendment 0001 - Issued 3/20/2024; Not Extended.

- Amendment 0002 - Issued 4/5/2024; Extended.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .