B09_ElectricalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf
PDF 449 KB Posted
- Attached to
- WRST 248940 - Replace Deficient WTP/Systems.
- Solicitation number
- 140P2024R0034
About this file
This document appears to be a set of electrical drawings and related documents for the WRST 248940 - Replace Deficient Visitor Center / Headquarters Water Treatment System federal contract opportunity.
The drawings provide detailed electrical demolition and remodeling plans for the Glennallen site, including the electrical service equipment, panel schedules, power and signal plans, and electrical site plan. Key details include the requirement to demolish the existing building service entrance equipment and feeder, maintain and repair electrical equipment in the Trail Crew Building, coordinate with the local utility company for new underground electric service, and install new electrical components such as heater blankets, a SCADA control panel, and motor/pump equipment. The document also includes notes on specific requirements around a Class 1, Division 1 hazardous location near the propane fill port. The contract opportunity is Solicitation Number 140P2024R0034, issued by the Department of the Interior National Park Service National Office, for the replacement of the deficient water treatment system at the Wrangell St. Elias National Park & Preserve.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PATRICK C. COLLINS
4/18/24
EE-133219
4/
/2
2:
:5
P
M C
:\U se rs \L ill y
A ra go n\
O ne
D riv e rs a-ak .c om \D oc um en ts
\R
Lo ca ls \M
.1 0_
E S
E R
IE
S
_R
_l ar ag on
9T
3.
rv t
LKA
PCC, TEH
LKA
E0.3 -
GL
ELECTRICAL SITE PLAN -
GLENNALLEN
WRANGELL ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
GENERAL NOTES:
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM A NON-
DESTRUCTIVE WALK THROUGH OF THE FACILITY. THERE IS NO
WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE INFORMATION
SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL ITEMS
SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO
A WAREHOUSE AS DIRECTED BY THE OWNER. THE CONTRACTOR SHALL
DISPOSE OF, OFF SITE, ALL UNWANTED MATERIALS.
C. DASHED OR DOTTED LINES INDICATE ITEMS TO BE REMOVED. SOLID LINES
INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES:
1. DEMOLISH BUILDING SERVICE ENTRANCE EQUIPMENT AND FEEDER TO
TRAIL CREW BUILDING.
2. MAINTAIN ALL ELECTRICAL EQUIPMENT WITHIN TRAIL CREW BUILDING.
REPAIR ANY EQUIPMENT IF DAMAGED DURING RELOCATION.
3. COORDINATE WITH COPPER VALLEY ELECTRIC ASSOCIATION (CVEA),
DARIN D. SAULS 907.835.7028, TO DEMOLISH UNDERGROUND ELECTRIC
FROM TRANSFORMER TO BUILDING ELECTRICAL SERVICE.
4. ELECTRICAL SERVICE EQUIPMENT, SEE 3/E3.1 FOR WORK REQUIRED AND
1/E2.3-GL FOR LOCATION.
5. TRAIL CREW BUILDING DISCONNECT, SEE 3/E3.1 FOR WORK REQUIRED.
6. COORDINATE WITH CVEA TO PROVIDE UNDERGROUND ELECTRIC FROM
NEW UTILITY TRANSFORMER TO BUILDING ELECTRICAL SERVICE.
7. PROVIDE CONDUIT FROM COPPER VALLEY TELECOM (PHONE NUMBER:
907.822.3551) NEW UTILITY PEDESTAL (PROVIDED AND INSTALLED BY CVT)
TO TTB WITHIN BUILDING, SEE 2/E3.2 FOR DETAIL AND 1/E2.3-GL FOR
LOCATION. COORDINATE EXACT INSTALLATION REQUIREMENTS WITH
SERVICE PROVIDER. SEE 3/E3.2 FOR TRENCH DETAIL.
8. PROVIDE (2) ELECTRIC HEATER BLANKETS WITH 20' CORD AND PLUG AND
INTEGRAL THERMOSTAT. PLUG EACH HEATING BLANKET INTO A
DEDICATED RECEPTACLE.
9. PER NFPA 58 TABLE 6.25.2.2 THERE IS A CLASS 1, DIVISION 1 LOCATION 5'
IN ALL DIRECTION OF FILL PORT, AND A CLASS 1, DIVISION 2 LOCATION
BETWEEN 5' AND 15' IN ALL DIRECTION FROM FILL PORT DURING
SERVICING OF THE TANK. PROVIDE SIGNAGE TO UNPLUG HEATING
BLANKETS DURING SERVICING OF THE TANK.
REVISION SCHEDULE
1 4/18/24 Response to Bidder Questions
1 2 3
A
B
C
1 ELECTRICAL DEMOLITION SITE PLAN - GLENNALLEN
1"=30'-0"
2 ELECTRICAL REMODEL SITE PLAN - GLENNALLEN
1"=30'-0"
J J
J
T
T
TT
JJ
T T
J
T
J
T
T
J
J
T T
T
J P
J
J
JJ
J
J
J
J
J
J
J
J
J
C
A
1 32
B
PANEL 'A'
EWH-1-GL
6.5kW,240V,1Ø
UH-2-GL
1/12HP,120V
UH-2-GL
1/12HP,120V
UH-1-GL
1/12HP,120V
UH-3-GL
1/8HP,120V
CP-1A/B-GL
480W,240V,1Ø
BCP-1/2-GL
3.5A,120V
B-1/2-GL
2.2FLA,120V
GT-1-GL
50W,120V
ERV-1-GL
(2)3.9A,240V,1Ø
VF-1-GL
1/10HP,120V
P-10-3
2HP,240V,1Ø
CT CABINET
SERVICE RATED
MANUAL TRANSFER
SWITCH
M
WP,WR
B
B
O/H DOOR
1/2HP,120V
+24"
+24"
+24"
TTB5
VEHICLE
BAY
PROCESS
ROOM
CHEMICAL
STORAGE
+24"
FCV-8-1/2
0.7A,120V
MXR-12-1/2
1/4HP,120V
FIT-8-1
0.22A,120V
P-8-1
2HP,240V,1Ø
METERBASEWP,WR
UH-3-GL
1/8HP,120V
FS-8-2
6W,120V
A-1A-3
A- 6
A- 9
SCP
A- 11
SCP
SCP
A- 22
A-18,20
A-10
A-14
A- 8
A-12
MDP
TRUCK FILL PUMP CONTROL PANEL(TFCP)
240V,1Ø
A- 17,19
TFCP
P-10-2
7.5HP,240V,3Ø
P-10-1
7.5HP,240V,3Ø
SCP SCP
FIT-10-2
0.22A,120V
FIT-10-1
0.22A,120V
SCP SCP
P-11-1/2
5HP,240V,1Ø
P
SCADA CONTROL PANEL
(SCP)
F
SCP
LCP-11-1
FS-9-1
6W,120V
SCP
FCV-9-1
0.8A,120V
FCV-9-2
0.8A,120V
SCP
SCP
A-5,7
C
A-13,15
#10
#10
P-12-3 2A,120V
P-12-1/2 2A,120V
#10
#10
CHEMICAL DOSING JUNCTION BOX(CDJB)
120VSCP
A-4
A- 21
POTABLE WATER STORAGE TANK
1"C, 2#4 AND 1#8 GND
1.5"C, 3#1/0
AND 1#6 GND
SCP
SCP
A- 16
EWH-2-GL
5.5kW,240V,1Ø
MDP-3
A- 23,25
MDP-2
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PATRICK C. COLLINS
4/18/24
EE-133219
4/
/2
2:
:5
P
M C
:\U se rs \L ill y
A ra go n\
O ne
D riv e rs a-ak .c om \D oc um en ts
\R
Lo ca ls \M
.1 0_
E S
E R
IE
S
_R
_l ar ag on
9T
3.
rv t
LKA
PCC, TEH
LKA
E2.3 -
GL
POWER AND SIGNAL PLAN
- GLENNALLEN
WRANGELL ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
1/2" = 1'-0"1 POWER AND SIGNAL PLAN - GLENNALLEN
SHEET NOTES:
1. ELECTRICAL SERVICE EQUIPMENT, SEE 3/E3.1.
2. JUNCTION BOX FOR PHOTOEYE SENSOR. CONNECT TO OVERHEAD DOOR
PER MANUFACTURER'S INSTRUCTIONS.
3. JUNCTION BOX FOR VENT THROUGH ROOF HEAT TRACE CONNECTION.
PROVIDE 6W/FT, 120V SELF-LIMITING HEAT TRACE RAYCHEM #GM-1X OR
APPROVED EQUAL. PROVIDE 20A RED PILOT LIGHT SWITCH FOR HEAT
TRACE (LIGHT ON WITH LOAD ON). PROVIDE LABEL "VENT THROUGH ROOF
HEAT TRACE" ABOVE PILOT LIGHT SWITCH. COORDINATE WITH
MECHANICAL FOR LOCATION PRIOR TO ROUGH-IN.
4. EMERGENCY BOILER SHUT OFF PROVIDED BY MECHANICAL INSTALLED BY
ELECTRICAL. CONNECT TO BOILER SHUT OFF CIRCUIT PER
MANUFACTURER'S INSTRUCTIONS.
5. SEE 2/E3.2 FOR TTB DETAIL.
6. EQUIPMENT PROVIDED WITH INTEGRAL DISCONNECT, SEE MECHANICAL.
7. 3Ø MOTORS BEING SUPPLIED WITH 1Ø POWER SUPPLY WITH VFD
CONVERTING PHASE POWER TO SUPPLY PUMPS.
GENERAL NOTES:
A. SEE E2.1 - HQ FOR GENERAL NOTES.
B. EQUIPMENT INDICATED 'SCP' IS FED FROM SCADA CONTROL PANEL (SCP).
SEE INSTRUMENT AND CONTROL DRAWINGS FOR CONDUIT AND
CONDUCTOR SIZES.
REVISION SCHEDULE
1 4/18/24 Response to Bidder Questions
PANEL 'A' - GLENNALLEN
MFR/MODEL: SQUARE 'D' TYPE NQ VOLTS: 120/240V,1PH,3W ENCLOSURE: NEMA 1 200 A
TYPE: PANELBOARD VOLT-AMPS MTG: SURFACE
N O
T E
C
IR
C
P O
LE
A M
P S
SERVICE TYPE A B TYPE SERVICE A
M
P S
P O
LE
C
IR
C
N O
T E
1 1 15 BCP-1,B-1 - GL MOTR 684 663 LTG LTG 20 1 2
3 1 15 BCP-2,B-2 - GL MOTR 684 900 RECP RECP-VEHICLE BAY, PROCESS 20 1 4
5 2 15 CP-1A/1B - GL MOTR 480 500 RECP RECP-TTB 20 1 6
7 2 15 ^^ MOTR 480 804 MOTR UH-1, UH-1, RECP 15 1 8
9 1 20 RECP - P-12-1/2/3 RECP 720 1,176 MISC O/H DOOR 15 1 10
11 1 20 RECP - MXR-12-1/2 RECP 1,566 473 MOTR VF-1, UH-2 15 1 12
13 2 30 EWH-1 MISC 3,250 864 MOTR UH-3, UH-3 15 1 14
15 2 30 ^^ MISC 3,250 530 RECP GT-1, RECP - EXT 20 1 16
17 2 25 TRUCK FILL PUMP CONTROL PANEL MOTR 1,440 1,053 MOTR ERV-1 20 2 18
19 2 25 ^^ MOTR 1,440 1,053 MOTR ^^ 20 2 20
21 1 20 RECP - NEAR PANELS RECP 360 50 HEAT HEAT TRACE 15 1 22 a
23 2 25 EWH-2 MISC 2,750 SPARE 20 1 24
25 2 25 ^^ MISC 2,750 SPARE 20 1 26
27 1 20 SPARE SPARE 20 1 28
29 1 20 SPARE SPARE 20 1 30
31 1 20 SPARE 1,440 HEAT PROPANE HEAT BLANKET - L 20 1 32
33 1 20 SPARE 1,440 HEAT PROPANE HEAT BLANKET - R 20 1 34
35 1 - SPACE SPACE - 1 36
37 1 - SPACE SPACE - 1 38
39 2 30 SPD 240 SPACE - 1 40
41 2 30 ^^ 240 SPACE - 1 42
TOTAL V-A 15,670 15,610 31,280 VA
TOTAL AMPS 131 130 130 A
CALCULATED FAULT CURRENT : 13,526 A MIN. AIC RATING: 20,000 A
LTG RECP MOTR LG.MT MISC HEAT TOTAL AMPS
CONNECTED LOAD IN KVA (THIS PANEL): 0.66 4.58 9.45 0.72 13.18 2.93 30.8 KVA 128 A
TOTAL CONNECTED LOAD IN KVA: 0.66 4.58 9.45 0.72 13.18 2.93 30.8 KVA 128 A
DEMAND LOAD IN KVA: 0.83 4.58 9.45 0.72 13.18 2.93 31.7 KVA 132 A
PANEL NOTES: PANEL OPTIONS:
a PROVIDE BREAKER INDICATED WITH 30mA EPD. MAIN CIRCUIT BREAKER (SEE ONE-LINE FOR SIZE)
PROVIDE WITH CONTINUOUS HINGED TRIM
PANEL 'GA' - COPPER CENTER
MFR/MODEL: SQUARE 'D' TYPE NQ VOLTS: 120/208V,3PH,4W ENCLOSURE: NEMA 1 225 A
VOLT-AMPS MTG: SURFACE
N O
T E
C
IR
C
P O
LE
A M
P S
SERVICE TYPE A B C TYPE SERVICE A
M
P S
P O
LE
C
IR
C
N O
T E a 1 1 20 EXTERIOR LIGHTS LTG 700 720 RECP GARAGE RECPT 20 1 2 a a 3 1 20 GARAGE LIGHTS LTG 620 720 RECP GARAGE RECPT 20 1 4 a a 5 1 20 PUMP RM LIGHTS LTG 480 900 RECP GARAGE RECPT 20 1 6 a b 7 1 20 SUMP MOTR 1,176 1,500 RECP HEADBOLT RECPT 20 1 8 a a 9 2 20 SEWER HEAT TRACE HEAT 950 1,500 RECP HEADBOLT RECPT 20 1 10 a a 11 2 20 ^^ HEAT 950 540 RECP PUMP RM RECPT 20 1 12 a
13 1 20 P-5-1, MXR-5-1 MOTR 1,566 180 RECP RESTROOM RECPT 20 1 14 a
15 1 20 P-5-2, MXR-5-2 MOTR 1,566 180 RECP RESTROOM RECPT 20 1 16 a
17 1 20 P-5-3, MXR-5-3 MOTR 870 180 RECP CNLG RECPT 101 20 1 18 a
19 1 20 P-5-4, MXR-5-4 MOTR 1,566 SPARE 20 1 20
21 1 20 P-5-7, MXR-5-6 MOTR 1,566 582 MOTR EF-7-1 15 1 22 a
23 1 20 P-5-5, MXR-5-5 MOTR 1,566 1,500 MOTR WH-7-1 25 1 24 a b 25 3 20 JOCKEY PUMP MOTR 1,321 1,000 MOTR EF-7-4, SP-7-1 20 1 26 a b 27 3 20 ^^^ MOTR 1,321 680 MOTR CP-2A/B 15 2 28 b 29 3 20 ^^^ MOTR 1,321 680 MOTR ^^ 15 2 30 b 31 3 15 OUTLET MISC 1,440 2,108 MOTR LCP-6-1 35 3 32 b 33 3 15 ^^^ MISC 1,440 2,108 MOTR ^^^ 35 3 34 b 35 3 15 ^^^ MISC 1,440 2,108 MOTR ^^^ 35 3 36
37 1 20 SCADA PANEL MISC 1,660 360 RECP RECP - DESK WORKSTATION 20 1 38
39 1 25 VF-1 MOTR 1,656 1,542 FEDR EXISTING PANEL 'GAE' * 2 40 a
41 1 15 UH-2-HQ MOTR 540 1,418 FEDR ^^ * 2 42 a
43 1 20 SPARE 4,150 MISC EWH-1-HQ 40 2 44
45 1 15 MXR-7-1 MOTR 870 4,150 MISC ^^ 40 2 46
47 1 20 MXR-4-1, MXR-4-2 MOTR 1,566 SPARE 20 1 48
49 1 20 MXR-4-3, MXR-4-4 MOTR 1,566 SPARE 20 1 50
51 1 15 P-5-6 MOTR 870 SPARE 20 1 52
53 1 20 SPARE SPARE 20 1 54
55 1 20 SPARE SPACE - 1 56
57 1 - SPACE SPACE - 1 58
59 1 - SPACE SPACE - 1 60
61 1 - SPACE SPACE - 1 62
63 1 - SPACE SPACE - 1 64
65 1 - SPACE SPACE - 1 66
67 1 - SPACE SPACE - 1 68
69 2 30 SPD MISC 240 SPACE - 1 70
71 2 30 ^^ MISC 240 SPACE - 1 72
TOTAL V-A 21,013 22,561 16,299 59,872 VA
TOTAL AMPS 175 188 136 166 A
CALCULATED FAULT CURRENT : 3,573 A MIN. AIC RATING: 10,000 A
PANEL NOTES: PANEL OPTIONS:
* SEE ONE-LINE FOR BREAKER SIZE. MAIN LUGS ONLY
a EXISTING LOAD TO REMAIN. LOAD SHOWN FROM PLANS DATED 6/99. PROVIDE WITH CONTINUOUS HINGED TRIM b EXISTING LOAD TO REMAIN. LOAD SHOWN BASED ON LOAD SERVED.
MAIN DISTRIBUTION PANEL 'MDP' - GLENNALLEN
MFR/MODEL: SQUARE 'D' TYPE I-LINE VOLTS: 120/240V,1PH,3W ENCLOSURE: NEMA 1 600 A
MTG SPACE: AS REQUIRED VOLT-AMPS MTG: SURFACE
N O
T E
P O
LE
A M
P S
SERVICE TYPE A B TYPE SERVICE A
M
P S
P O
LE
N O
T E a 2 * PANEL 'A' - GLENNALLEN FEDR 15,670 19,043 FEDR SCADA CONTROL PANEL (SCP) * 2 a a 2 * ^^ FEDR 15,610 19,043 FEDR ^^ * 2 a a 2 * LCP-11-1 FEDR 7,560 5,760 FEDR TRAIL CREW BUILDING * 2 a a 2 * ^^ FEDR 7,560 5,760 FEDR ^^ * 2 a
2 30 SPD MISC 240 SPACE - 2
2 30 ^^ MISC 240 ^^ 2
2 - SPACE SPACE - 2
2 ^^ ^^ 2
2 - SPACE SPACE - 2
2 ^^ ^^ 2
TOTAL V-A 48,273 48,213 96,486 VA
TOTAL AMPS 402 402 402 A
A.I.C. RATING: 10,000
LTG RECP MOTR LG.MT MISC SPEC TOTAL AMPS
CONNECTED LOAD IN KVA (THIS PANEL): 0.00 0.00 0.00 0.00 0.48 0.00 0.5 KVA 2
CONNECTED LOAD IN KVA (BRANCH PANELS): 0.66 4.58 62.66 0.72 24.70 2.93 95.5 KVA 401
TOTAL CONNECTED LOAD IN KVA: 0.66 4.58 62.66 0.72 25.18 2.93 96.0 KVA 402
DEMAND LOAD IN KVA: 0.83 4.58 62.66 0.72 25.18 2.93 96.9 KVA 404
PANEL NOTES: PANEL OPTIONS:
a SEE POWER ONE-LINE FOR BREAKER SIZE/TYPE. INTEGRAL SPD
SHEET
PMIS/PKG NO.
DRAWING NO.
187491
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 120
PATRICK C. COLLINS
4/18/24
EE-133219
4/
/2
2:
:5
P
M C
:\U se rs \L ill y
A ra go n\
O ne
D riv e rs a-ak .c om \D oc um en ts
\R
Lo ca ls \M
.1 0_
E S
E R
IE
S
_R
_l ar ag on
9T
3.
rv t
LKA
PCC, TEH
LKA
E4.1
PANEL SCHEDULES
WRANGELL ST. ELIAS NATIONAL PARK & PRESERVE12/01/2023
248940
REPLACE DEFICIENT VC/HQ WATER
TREATMENT SYSTEM WRST
1 1
REVISION SCHEDULE
1 4/18/24 Response to Bidder Questions
| Sheets |
| E0.3 - GL - ELECTRICAL SITE PLAN - GLENNALLEN |
| E2.3 - GL - POWER AND SIGNAL PLAN - GLENNALLEN |
| E4.1 - PANEL SCHEDULES |
File details come from the government source that posted it. Updated .