B09_Rev1_Drawing_Shts_C3_1_C3_2_April_5_2024_Amd2_0002.pdf

PDF 489 KB Posted

Attached to
WRST 248940 - Replace Deficient WTP/Systems.
Solicitation number
140P2024R0034
Issued by

About this file

This document appears to be a set of design drawings and specifications related to a federal contract opportunity to replace a deficient water treatment system at Wrangell-St. Elias National Park and Preserve (WRST).

The drawings provide details on the proposed upgrades to the water and sewer utilities, including the installation of a 1,000-gallon septic tank, a leach field, and associated piping and infrastructure. Key details include the pipe sizes, lengths, slopes, and depths, as well as notes on construction requirements and documentation. The related federal contract opportunity is Solicitation Number 140P2024R0034 for the "WRST 248940 - Replace Deficient Visitor Center / Headquarters Water Treatment System", issued by the Department of the Interior National Park Service. The drawings appear to provide technical specifications in support of this solicitation.

View the file

Other files

File Type Posted
B09_240424-HQ-ADEC_Revisions_Amd6_0006.pdf PDF
Sol_140P2024R0034_Amd_0006.pdf PDF
B09_CBGCW1KS_Installation_Instructions_4-18-24_Amd5_0005.pdf PDF
B09_ElectricalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_MechanicalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd5_0005.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0005.pdf PDF
B09_Updated_Specification_Section_23_52_39_-_FIRE_TUBE_BOILERS_Amd5_0005.pdf PDF
B09_Rev1_2_Drawing_Shts_C3_0_C3_1_April_18_2024_Amd5__0005.pdf PDF
Sol_140P2024R0034_Amd_0004.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd4_0004.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0003.pdf PDF
B09_Updated_Spec_Section_46_20_10_Addendum_April_9_2024_Amd3_0003.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd3_0003.xlsx XLSX spreadsheet
B09_Updated_Spec_Section_46_20_10_April_5_2024_Amd2_0002.pdf PDF
Sol_140P2024R0034_Amd_0002.pdf PDF
B09_140P2024R0034_RFP_Body_Amd1_0001.pdf PDF
Sol_140P2024R0034_Amd_0001.pdf PDF
B08_140P2024R0034_RFP_Body_-_Final_3_12_2024.pdf PDF
B08_Attachment_9_-_Detailed_Contract_Price_Schedule.xlsx XLSX spreadsheet
B08_Attachment_8_-_Factor_4_PPQ_WRST_248940.docx DOCX document
B08_Attachment_1_-_Final_Specifications_WRST_248940_March2024.pdf PDF
B08_Attachment_6_-_General_References.doc DOC document
B08_Attachment_3_-_Wage_Determinitation_AK20240001_Feb2024.pdf PDF
Sol_140P2024R0034.pdf PDF
B08_Attachment_5_-_LimitOnSubcontractingWorksheet.xlsx XLSX spreadsheet
B08_Attachment_2_-_Final_Drawings_WRST_248940_March2024.pdf PDF
B08_Attachment_4_-_Construction_Admin_Provision.pdf PDF
B08_Attachment_7_-_Factor_1_PEQ_WRST_248940.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C

50LF 1" HDPE SEASONAL WATER

SERVICE, ~12" BURY DEPTH,

SLOPE TO DRAIN

50LF 4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0

CONNECTION TO BUILDING,

SEE DETAIL 3/C4.1

40LF 6x12 ARCTIC PIPE (2" HDPE SUPPLY

AND 2" HDPE RETURN SERVICE)

SEE DETAIL 2/C4.0

EXISTING CLEANOUT

TO REMAIN

SINGLE CLEANOUT WITH

45-DEGREE BEND,

SEE DETAIL 5/C4.0

45-DEGREE BEND

90-DEGREE BEND

10' MIN.

10' MIN.

TRAIL CREW BLDG.

17'

LEACH FIELD - FOUR 24-FT LONG LATERALS

CONSTRUCTED OF INFILTRATOR CHAMBERS.

SEE DETAILS ON C4.1

24'

~11.3'

DOUBLE CLEANOUT,

SEE DETAIL 5/C4.0

~8 LF 4x12 ARCTIC

PIPE @ 2.0% MIN.,

SEE DETAIL 1/C4.0

DISTRIBUTION BOX,

SEE DETAIL 4/C4.0

TWO RUNS OF ~6LF

4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0

USE DOUBLE WYE OR DISTRIBUTION BOX TO

COMBINE SEWER LINES AND CONNECT TO EXISTING

20'

9.4'

~10 LF 4x12 ARCTIC PIPE @ 2.0% MIN., SEE DETAIL 1/C4.0

45° BEND

DISTRIBUTION BOX,

SEE DETAIL 4/C4.0

11'

EXISTING POWER POLE,

PROTECT IN PLACE

SINGLE CLEANOUT,

SEE DETAIL 5/C4.0

SINGLE CLEANOUT WITH 45-DEGREE

BEND, SEE DETAIL 5/C4.0

GROUND EL≈1444.0

INV≈1439.75

50LF 4x12 ARCTIC PIPE @10.1%

SEE DETAIL 1/C4.0

EXISTING CLEANOUT

GROUND EL≈1447.5

INV≈1444.8

24LF 4x12 ARCTIC PIPE @ 1.7%

SEE DETAIL 1/C4.0

10LF 4x12 ARCTIC PIPE @ 2.7%

SEE DETAIL 1/C4.0

1,000 GALLON PE

SEPTIC TANK,

SEE C4.2

EXISTING SEPTIC

TANK TO REMAIN

CONNECT TO

EXISTING SERVICE

GROUND EL≈1443.0

INV≈1438.8

CAP LINE

CAP LINE

SHEET

PMIS/PKG NO.

DRAWING NO.

187491

SUB SHEET NO.DESIGNED:

CADD:

TECH REVIEW:

DATE:

TITLE OF SHEET

OF

248940

4/5 /20

7:

:49

A M

J:\

\63

7-

\65

CA

D\ Sh ee tF ile s\G

L - G len na lle n\S

C2 0-

CS

-U

T-

GL

EN

NA

LL

EN

_V 2.d wg U

SE

R:

NC

ON

W

AY

GL

WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE

REPLACE DEFICIENT VC/HQ WATER

TREATMENT SYSTEM WRST

N.CONWAY

N.CONWAY

B.DOGGETT

12/01/2023

LEACH FIELD NOTES:

1. CONTRACTOR SHALL EXCAVATE 6-FT BELOW BOTTOM OF PROPOSED

LEACH FIELD TO DETERMINE IF A CONFINING LAYER IS PRESENT,

DOCUMENT FINDINGS, AND REPORT TO ENGINEER.

2. THE PROPOSED LEACH FIELD SHALL COVER A MINIMUM OF 270 SF.

3. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED LEACH

FIELD AND SEWER PIPE MODIFICATIONS WITH AS-BUILT NOTES,

ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO

ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD

DRAWINGS.

4. THE CAPACITY OF EXISTING LEACH FIELD IS 511 GPD PER 2013 DESIGN

DOCUMENTS. EXISTING SYSTEM WAS APPROVED BY ADEC (PLAN

REVIEW NO.: 8037). PROPOSED LEACH FIELD WILL ADD 182 GPD

CAPACITY TO SYSTEM, PROVIDING A TOTAL CAPACITY OF 693 GPD.

5. DO NOT CONSTRUCT PROPOSED LEACH FIELD UNDER DRIVEWAYS.

WTP UTILITY NOTES:

1. SLOPE SEWER PIPE AT 2-PERCENT.

CONTRACTOR SHALL DETERMINE INVERT

ELEVATION OF EXISTING SEWER AT

CLEANOUT BEFORE CONSTRUCTING NEW

SEWER CONNECTION. MAINTAIN MAXIMUM

COVER OVER SEWER SERVICE FOR AS

MUCH OF THE RUN AS POSSIBLE. RECORD

INVERT ELEVATIONS AND DEPTH OF COVER

AT HORIZONTAL AND VERTICAL CHANGES.

CONTACT ENGINEER IF 4-FT COVER

CANNOT BE MAINTAINED.

C3.1

WTP UTILITIES

1"=10'

C3.1

SEPTIC TANK AND LEACH FIELD

1"=10'

C3.1-

UTILITY LAYOUT

SEPTIC TANK AND SEWER NOTES:

1. GROUND AND PIPE ELEVATIONS COLLECTED BY NPS STAFF.

CONTRACTOR TO LOCATE EXISTING PIPES AND VERIFY CONNECTION

ELEVATIONS BEFORE EXCAVATION AND INSTALLATION.

2. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED SEWER

SERVICE RE-ROUTE AND SEPTIC TANK WITH AS-BUILT NOTES,

ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO

ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD DRAWINGS.

REVISIONS

04/05/2024 ADEC REVIEW COMMENT NMC

DATE COMMENT BY

EXISTING 4" SEWER PIPE IN

ARCTIC INSULATION

EXISTING CLEANOUT,

INSTALL CONCRETE

COLLAR PER DETAIL 5/C4.0

GROUND EL≈1447.5

INV≈1444.8

SINGLE CLEANOUT AND

CONCRETE COLLAR PER

DETAIL 5/C4.0

GROUND EL≈1444.0

INV≈1439.75

SINGLE CLEANOUT PER

DETAIL 5/C4.0

CONNECT TO EXISTING

SERVICE WITH WYE

GROUND EL≈1443.0

INV≈1438.8

L F

X

A

R C

T

IC

P

IP

E

.1

10LF 4X12 ARCTIC PIPE @ 2.7%

24LF 4X12 ARCTIC PIPE @ 1.7%

EXISTING 4" SEWER PIPE IN

ARCTIC INSULATION

FINISHED GRADE =

EXISTING GROUND

NOTE:

1. CONTRACTOR SHALL VERIFY EXISTING PIPE ELEVATIONS AT

CONNECTION POINTS BEFORE BEGINNING INSTALLATION.

2. SLOPES OF EXISTING PIPES IS ASSUMED BASED ON GRADE OF

EXISTING GROUND.

3. A MINIMUM OF 10-FT OF PIPE IMMEDIATELY UPSTREAM OF SEPTIC

TANK SHALL BE SLOPED AT 1-2%.

T

O

L

E

A

C

H

F

I E

L

D

S

FROM WTP

1,000

GALLON

PE SEPTIC

TANK

DOUBLE CLEANOUT PER

DETAIL 5/C4.0

DISTRIBUTION BOX PER

DETAIL 4/C4.0

CONNECT TO EXISTING

SEWER SERVICE, INSTALL

DISTRIBUTION BOX PER

DETAIL 4/C4.0

45° BEND

~10-FT~8-FT

F

R

O

M

W

T

P

A

N

D

M

E

C

H

A

N

I C

S

H

O

P

24-FT

4X12

ARCTIC

PIPE,

2% MIN.

4X12

ARCTIC

PIPE,

2% MIN.

LEACH FIELD

CHAMBERS

LEACH FIELD, SEE

DETAILS ON C4.1

FINISHED GRADE =

EXISTING GROUND

EXISTING 4" SEWER PIPE IN

ARCTIC INSULATION

FLOW FROM WTP

EXISTING 4" SEWER PIPE IN

ARCTIC INSULATION

CONNECT TO EXISTING

SERVICE AT EXISTING

CLEANOUT, INSTALL

CONCRETE COLLAR PER

DETAIL 5/C4.0

SINGLE CLEANOUT AND

CONCRETE COLLAR PER

DETAIL 5/C4.0

FINISHED GRADE =

EXISTING GROUND

45° BEND

SINGLE CLEANOUT AND

CONCRETE COLLAR PER

DETAIL 5/C4.0, AND 45° BEND

NOTE:

1. CONTRACTOR SHALL MEASURE DEPTH OF EXISTING SEWER AT

EXISTING CLEANOUT BEFORE CONSTRUCTION OF WTP BEGINS.

2. FINISH FLOOR ELEVATION OF WTP SHALL BE SET TO OBTAIN THE

MINIMUM SLOPE AND COVER OF THE PROPOSED SEWER SERVICE

CONNECTION FROM THE EXISTING CLEANOUT TO THE WTP. SEE

NOTE 4 ON C3.0 AND THE UTILITY NOTES WITH 1/C3.1

~50-FT

4X12 ARCTIC

PIPE, 2% MIN.

SEE DETAIL 3/C4.1

FOR CONNECTION

TO BUILDING

SHEET

PMIS/PKG NO.

DRAWING NO.

187491

SUB SHEET NO.DESIGNED:

CADD:

TECH REVIEW:

DATE:

TITLE OF SHEET

OF

248940

4/5 /20

7:

:49

A M

J:\

\63

7-

\65

CA

D\ Sh ee tF ile s\G

L - G len na lle n\S

C2 0-

CS

-U

T-

GL

EN

NA

LL

EN

_V 2.d wg U

SE

R:

NC

ON

W

AY

GL

WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE

REPLACE DEFICIENT VC/HQ WATER

TREATMENT SYSTEM WRST

N.CONWAY

N.CONWAY

B.DOGGETT

12/01/2023

C3.2

WTP CONNECTION - PROFILE

NTP

C3.2-

UTILITY PROFILES

C3.2

LEACH FIELD - PROFILE

NTP

C3.2

SEPTIC TANK - PROFILE

NTP

REVISIONS

04/05/2024 ADEC REVIEW COMMENT NMC

DATE COMMENT BY

File details come from the government source that posted it. Updated .