B09_Rev1_2_Drawing_Shts_C3_0_C3_1_April_18_2024_Amd5__0005.pdf

PDF 539 KB Posted

Attached to
WRST 248940 - Replace Deficient WTP/Systems.
Solicitation number
140P2024R0034
Issued by

About this file

This document appears to be construction drawings for the replacement of a deficient water treatment system at the Wrangell-St. Elias National Park & Preserve Visitor Center/Headquarters. The key details are:

The project will involve the construction of a new water treatment plant building, leach field expansion, and associated utility work including sewer, water, and propane service. The new building will be placed in the same orientation as the existing building and the finish floor will be set to accommodate proper drainage around the structure. The contractor shall measure existing elevations and document as-built conditions during construction. The leach field will provide an additional 182 GPD capacity to the existing 511 GPD system, for a total of 693 GPD. The contractor shall excavate to determine if a confining layer is present and report findings to the engineer. All construction must comply with the applicable building codes and specifications.

This project is associated with Solicitation Number 140P2024R0034, issued by the Department of the Interior National Park Service, to replace the deficient Visitor Center/Headquarters Water Treatment System at Wrangell-St. Elias National Park & Preserve.

View the file

Other files

File Type Posted
B09_240424-HQ-ADEC_Revisions_Amd6_0006.pdf PDF
Sol_140P2024R0034_Amd_0006.pdf PDF
B09_CBGCW1KS_Installation_Instructions_4-18-24_Amd5_0005.pdf PDF
B09_ElectricalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_MechanicalDrawings_Bidder_Questions_2024-4-18_Amd5_0005.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd5_0005.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0005.pdf PDF
B09_Updated_Specification_Section_23_52_39_-_FIRE_TUBE_BOILERS_Amd5_0005.pdf PDF
Sol_140P2024R0034_Amd_0004.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd4_0004.xlsx XLSX spreadsheet
Sol_140P2024R0034_Amd_0003.pdf PDF
B09_Updated_Spec_Section_46_20_10_Addendum_April_9_2024_Amd3_0003.pdf PDF
B09_QR_Tracker_140P2024R0034_-_WRST_248940_Amd3_0003.xlsx XLSX spreadsheet
B09_Updated_Spec_Section_46_20_10_April_5_2024_Amd2_0002.pdf PDF
Sol_140P2024R0034_Amd_0002.pdf PDF
B09_Rev1_Drawing_Shts_C3_1_C3_2_April_5_2024_Amd2_0002.pdf PDF
B09_140P2024R0034_RFP_Body_Amd1_0001.pdf PDF
Sol_140P2024R0034_Amd_0001.pdf PDF
B08_140P2024R0034_RFP_Body_-_Final_3_12_2024.pdf PDF
B08_Attachment_9_-_Detailed_Contract_Price_Schedule.xlsx XLSX spreadsheet
B08_Attachment_8_-_Factor_4_PPQ_WRST_248940.docx DOCX document
B08_Attachment_1_-_Final_Specifications_WRST_248940_March2024.pdf PDF
B08_Attachment_6_-_General_References.doc DOC document
B08_Attachment_3_-_Wage_Determinitation_AK20240001_Feb2024.pdf PDF
Sol_140P2024R0034.pdf PDF
B08_Attachment_5_-_LimitOnSubcontractingWorksheet.xlsx XLSX spreadsheet
B08_Attachment_2_-_Final_Drawings_WRST_248940_March2024.pdf PDF
B08_Attachment_4_-_Construction_Admin_Provision.pdf PDF
B08_Attachment_7_-_Factor_1_PEQ_WRST_248940.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C

PROPOSED

WTP

TRAIL CREW BUILDING RELOCATED BY PARK STAFF, NOT IN CONTRACTORS SCOPE

TRAIL

CREW

BLDG.

20' MIN

PROPOSED LEACH FIELD EXPANSION

SITE GRADING AND FINISHED FLOOR, SEE NOTE 4 AND 5. GRADE

TO DRAIN AROUND BUILDING, DO NOT DIRECT STORMWATER

TOWARDS OTHER STRUCTURES OR DRIVING SURFACES.

CONTRACTOR STAGING AND LAYDOWN

PROPOSED SEPTIC TANK

BOLLARDS, SEE ARCHITECTURAL FOR LAYOUT.

INSTALL PER DETAIL 2/C4.2

200' WELL RADIUS

PROPANE TANK, GRADE GROUND

BELOW TANK LOCATION TO BE

LEVEL. TANK SHALL BE PLACED

ON CONCRETE BLOCKS

16'

3'

SHEET

PMIS/PKG NO.

DRAWING NO.

187491

SUB SHEET NO.DESIGNED:

CADD:

TECH REVIEW:

DATE:

TITLE OF SHEET

OF

248940

4/1 7/2

4 1

2:0 2:5

7 P M

J:\

\63

7-

\65

CA

D\ Sh ee tF ile s\G

L - G len na lle n\S

C2 0-

CS

-S

I-G

LE

NN

AL

LE

N_

V2 .dw g U

SE

R:

NC

ON

W

AY

GL

WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE

REPLACE DEFICIENT VC/HQ WATER

TREATMENT SYSTEM WRST

N.CONWAY

N.CONWAY

L.CHMIELOWSKI

12/01/2023

C3.0-

SITE LAYOUT

NOTES:

1. PROPOSED WATER TREATMENT PLANT (WTP) WILL BE PLACED PER THE

EXISTING WELL LOCATION. CONTRACTOR SHALL FIND CLEAR SPACE

BETWEEN FENCE AND BUILDING AND PROVIDE INFORMATION TO NPS

PROJECT MANAGER BEFORE CONSTRUCTION TO DETERMINE IF FENCE

WILL BE IMPACTED.

2. ORIENTATION OF PROPOSED BUILDING SHALL MATCH ORIENTATION OF

EXISTING BUILDING.

3. SEE STRUCTURAL SHEETS FOR SUBGRADE IMPROVEMENTS FOR

PROPOSED WTP.

4. CONTRACTOR SHALL MEASURE FINISH FLOOR OF EXISTING WTP

BEFORE DEMOLITION AND REPORT ELEVATION TO ENGINEER PRIOR TO

DEMOLITION.

4.1. PROPOSED FINISH FLOOR SHALL BE SET TO ALLOW THE GROUND

IMMEDIATELY ADJACENT TO THE FOUNDATION TO BE SLOPED AWAY

FROM THE BUILDING AT A SLOPE OF NOT LESS THAN 5-PERCENT

FOR A MINIMUM DISTANCE OF 10 FEET MEASURED PERPENDICULAR

TO THE FACE OF THE WALL. (2021 IBC 1804.4)

4.2. SEE SHEET C3.1. CONTRACTOR SHALL SURVEY AND MEASURE

INVERT OF EXISTING SEWER CLEANOUT AT CONNECTION POINT.

FINISH FLOOR OF PROPOSED WTP WILL BE SET TO ACCOMODATE

NEW PIPE SLOPE AND CONNECTION TO SEWER CATCH BASIN AS

SHOWN IN 3/C4.1. COORDINATE WITH ENGINEER.

5. GRAVEL DRIVEWAY SHALL EXTEND FROM EXISTING GRAVEL ACCESS

ROAD TO BUILDING ENTRANCE AND GARAGE DOOR. COMPACT GRAVEL

TO 95% TO CREATE A FIRM, STABLE SURFACE. RESTORE OTHER

DISTURBED AREA AROUND THE BUILDING TO ORIGINAL CONDITION.

6. SITE CONCRETE SHALL CONFORM TO SPECIFICATION 03 30 00.

REVISIONS

04/18/2024 RESPONSE TO BIDDER QUESTIONS NMC

DATE COMMENT BY

A B C

50LF 1" HDPE SEASONAL WATER

SERVICE, ~12" BURY DEPTH,

SLOPE TO DRAIN

50LF 4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0

CONNECTION TO BUILDING,

SEE DETAIL 3/C4.1

40LF 6x12 ARCTIC PIPE (2" HDPE SUPPLY

AND 2" HDPE RETURN SERVICE)

SEE DETAIL 2/C4.0

EXISTING CLEANOUT

TO REMAIN

SINGLE CLEANOUT WITH

45-DEGREE BEND,

SEE DETAIL 5/C4.0

45-DEGREE BEND

90-DEGREE BEND

10' MIN.

10' MIN.

TRAIL CREW BLDG.

17'

PROPANE TANK,

SEE MECHANICAL

LEACH FIELD - FOUR 24-FT LONG LATERALS

CONSTRUCTED OF INFILTRATOR CHAMBERS.

SEE DETAILS ON C4.1

24'

~11.3'

DOUBLE CLEANOUT,

SEE DETAIL 5/C4.0

~8 LF 4x12 ARCTIC

PIPE @ 2.0% MIN.,

SEE DETAIL 1/C4.0

DISTRIBUTION BOX,

SEE DETAIL 4/C4.0

TWO RUNS OF ~6LF

4x12 ARCTIC PIPE, SEE DETAIL 1/C4.0

USE DOUBLE WYE OR DISTRIBUTION BOX TO

COMBINE SEWER LINES AND CONNECT TO EXISTING

20'

9.4'

~10 LF 4x12 ARCTIC PIPE @ 2.0% MIN., SEE DETAIL 1/C4.0

45° BEND

DISTRIBUTION BOX,

SEE DETAIL 4/C4.0

11'

EXISTING POWER POLE,

PROTECT IN PLACE

SINGLE CLEANOUT,

SEE DETAIL 5/C4.0

SINGLE CLEANOUT WITH 45-DEGREE

BEND, SEE DETAIL 5/C4.0

GROUND EL≈1444.0

INV≈1439.75

50LF 4x12 ARCTIC PIPE @10.1%

SEE DETAIL 1/C4.0

EXISTING CLEANOUT

GROUND EL≈1447.5

INV≈1444.8

24LF 4x12 ARCTIC PIPE @ 1.7%

SEE DETAIL 1/C4.0

10LF 4x12 ARCTIC PIPE @ 2.7%

SEE DETAIL 1/C4.0

1,000 GALLON PE

SEPTIC TANK,

SEE C4.2

EXISTING SEPTIC

TANK TO REMAIN

CONNECT TO

EXISTING SERVICE

GROUND EL≈1443.0

INV≈1438.8

CAP LINE

CAP LINE

SHEET

PMIS/PKG NO.

DRAWING NO.

187491

SUB SHEET NO.DESIGNED:

CADD:

TECH REVIEW:

DATE:

TITLE OF SHEET

OF

248940

4/1 7/2

4 9

:56 :27

A M

J:\

\63

7-

\65

CA

D\ Sh ee tF ile s\G

L - G len na lle n\S

C2 0-

CS

-U

T-

GL

EN

NA

LL

EN

_V 2.d wg U

SE

R:

NC

ON

W

AY

GL

WRANGELL-ST. ELIAS NATIONAL PARK & PRESERVE

REPLACE DEFICIENT VC/HQ WATER

TREATMENT SYSTEM WRST

N.CONWAY

N.CONWAY

B.DOGGETT

12/01/2023

LEACH FIELD NOTES:

1. CONTRACTOR SHALL EXCAVATE 6-FT BELOW BOTTOM OF PROPOSED

LEACH FIELD TO DETERMINE IF A CONFINING LAYER IS PRESENT,

DOCUMENT FINDINGS, AND REPORT TO ENGINEER.

2. THE PROPOSED LEACH FIELD SHALL COVER A MINIMUM OF 270 SF.

3. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED LEACH

FIELD AND SEWER PIPE MODIFICATIONS WITH AS-BUILT NOTES,

ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO

ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD

DRAWINGS.

4. THE CAPACITY OF EXISTING LEACH FIELD IS 511 GPD PER 2013 DESIGN

DOCUMENTS. EXISTING SYSTEM WAS APPROVED BY ADEC (PLAN

REVIEW NO.: 8037). PROPOSED LEACH FIELD WILL ADD 182 GPD

CAPACITY TO SYSTEM, PROVIDING A TOTAL CAPACITY OF 693 GPD.

5. DO NOT CONSTRUCT PROPOSED LEACH FIELD UNDER DRIVEWAYS.

WTP UTILITY NOTES:

1. SLOPE SEWER PIPE AT 2-PERCENT.

CONTRACTOR SHALL DETERMINE INVERT

ELEVATION OF EXISTING SEWER AT

CLEANOUT BEFORE CONSTRUCTING NEW

SEWER CONNECTION. MAINTAIN MAXIMUM

COVER OVER SEWER SERVICE FOR AS

MUCH OF THE RUN AS POSSIBLE. RECORD

INVERT ELEVATIONS AND DEPTH OF COVER

AT HORIZONTAL AND VERTICAL CHANGES.

CONTACT ENGINEER IF 4-FT COVER

CANNOT BE MAINTAINED.

C3.1

WTP UTILITIES

1"=10'

C3.1

SEPTIC TANK AND LEACH FIELD

1"=10'

C3.1-

UTILITY LAYOUT

SEPTIC TANK AND SEWER NOTES:

1. GROUND AND PIPE ELEVATIONS COLLECTED BY NPS STAFF.

CONTRACTOR TO LOCATE EXISTING PIPES AND VERIFY CONNECTION

ELEVATIONS BEFORE EXCAVATION AND INSTALLATION.

2. CONTRACTOR SHALL DOCUMENT INSTALLATION OF PROPOSED SEWER

SERVICE RE-ROUTE AND SEPTIC TANK WITH AS-BUILT NOTES,

ELEVATIONS, AND PHOTOS. DOCUMENTATION SHALL BE DELIVERED TO

ENGINEER ONCE CONSTRUCTION IS COMPLETE FOR RECORD DRAWINGS.

REVISIONS

04/05/2024 ADEC REVIEW COMMENT NMC

04/18/2024 RESPONSE TO BIDDER QUESTIONS NMC

DATE COMMENT BY