B08 Attachment 0023 - PWS Annex G MDRS PRS (1 Aug 22).pdf

PDF 134 KB Posted

Attached to
EAGLE FORT CAMPBELL, KY W519TC-23-R-0022
Solicitation number
W519TC-23-R-0022
Issued by

About this file

This document outlines performance requirements for equipment management services at the Military District Recycling Support facility at Fort Campbell, Kentucky. Key requirements include processing a minimum of 20 lateral transfers of rolling and non-rolling equipment per month, preparing all rolling stock for shipment within 15 days of receipt and all non-rolling stock within 7 days, turning in all non-rolling stock to the Defense Logistics Agency within 5 days and all rolling stock within 10 days, and turning in all condition code G items within 30 days for rolling stock and 15 days for non-rolling stock. Additional requirements include daily scheduling and reporting for equipment turn-ins, conducting monthly location surveys on 10% of non-sensitive items, ensuring all equipment meets shipping standards, and continuously updating storage location planograms. Performance will be evaluated on timeliness, quality, and inventory management standards.

View the file

Other files

File Type Posted
B08 Attachment 0001 - PWS (24 Jul 23).pdf PDF
W519TC23R0022-0003.pdf PDF
B08 Solicitation_FCKY conformed thru Amendment 0003.pdf PDF
B08 Attachment 0001 - PWS (24 Jul 23).pdf PDF
B08 Attachment 0039 - Ft. Campbell Q&A2 Responses (27 Jul 23).xlsx XLSX spreadsheet
W519TC23R0022-0002.pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0038 - Ft. Campbell Q&A Responses (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0007 - Department of Labor Wage Determinations-SCA (27 Dec 22).pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission (18 Jul 23).pdf PDF
B08 Solicitation_FCKY conformed thru Amendment 0002.pdf PDF
B08 Attachment 0005 - Cost Price Matrix (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0002 - Staffing and Labor Mix_FCKY (31 Aug 22).xlsx XLSX spreadsheet
B08 Attachment 0001 - PWS (17 Jul 23).pdf PDF
W519TC23R0022-0001.pdf PDF
B08 Solicitation_FCKY.pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission (9 Feb 23).pdf PDF
B08 Exhibit A - DD1423-1.pdf PDF
B08 Attachment 0020 - PWS Annex D Environmental Requirements (24 Aug 22).pdf PDF
B08 Exhibit B - CDRL Listing.xlsx XLSX spreadsheet
B08 Exhibit D - ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Exhibit F - MMD-02 MDRS Maintenance Report Format.XLSX XLSX spreadsheet
B08 Attachment 0025 - PWS Appendix A NON ASC_FCKY Classified Container (Safes) Maint_All Unit.pdf PDF
B08 Exhibit J - PM-09 Performance Management Review Format (version 16 Jun 20).pptx PPTX presentation
B08 Exhibit H - PM-08 GFE GFP CAP Format.xlsx XLSX spreadsheet
B08 Exhibit C - CD-02 Burn Rate Report V9.xlsx XLSX spreadsheet
B08 Attachment 0018 - PWS Annex B Supply PRS (1 Aug 22).pdf PDF
B08 Attachment 0019 - PWS Annex C Transportation PRS (2 Aug 22).pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet (02 Mar 22).xlsx XLSX spreadsheet
B08 Attachment 0007 - Department of Labor Wage Determinations-SCA (26 Aug 22).pdf PDF
B08 Attachment 0003 - Performance Questionnaire (29 Jan 21).pdf PDF
B08 Exhibit E - MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 Exhibit L - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
B08 Attachment 0021 - PWS Annex E Definitions Acronyms Abbreviations (24 Aug 22).pdf PDF
B08 Attachment 0027 - PWS Appendix C NON ASC FCKY SDDC Deployable Container Maint_ITD.pdf PDF
B08 Attachment 0009 - Purchasing Invoicing Guide (9 Feb 23).pdf PDF
B08 Exhibit G - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Attachment 0010 - Blocked File Extensions (9 Feb 23).pdf PDF
B08 Attachment 0022 - PWS Annex F Publications and Forms (24 Aug 22).pdf PDF
B08 Exhibit K - PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
B08 Attachment 0001 - PWS (24 May 23).pdf PDF
B08 Attachment 0017 - PWS Annex A Maintenance PRS (16 Aug 22).pdf PDF
B08 Attachment 0013 - Mission Essential Contractor Services (22 Jun 22).pdf PDF
B08 Attachment 0002 - Staffing and Labor Mix_FCKY_ 31_AUG_22.xlsx XLSX spreadsheet
B08 Attachment 0026 - PWS Appendix B NON ASC FCKY 160th Fuel Lab Operations_ISD (3 Nov 22).pdf PDF
B08 Attachment 0004 - Letter of Consent (04 May 23).pdf PDF
B08 Attachment 0005 - Cost Price Matrix (5 May 23).xlsx XLSX spreadsheet
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf PDF
B08 Attachment 0024 - PWS Annex H Government Property Incidental (27 Apr 23).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex G

FT Campbell. KY MDRS PWS Performance Requirements Summary

OCTOBER 2022

Task/ Requirement Standard Sampling Method, Lot &

Acceptable Quality Level

(AQL)

5.8 Bucket (1) ACOM to

ACOM lateral transfers.

The contractor shall ensure Process a minimum of 20 each Lateral transfers of both rolling stock and non-rolling stock equipment each calendar month.

Timeliness:

Verify the contactor processed 20 or more Bucket (1) and/or (2) Lateral Transfer actions in the previous month for both rolling and non-rolling stock equipment

Random Sampling

Lot: All Bucket (1) (2) Lateral transferred rolling stock/non-rolling stock during the previous month, data and records.

AQL-95%

5.8 Bucket (3) Rolling

Stock.

The contractor shall have 15 working days from MDRS receipt of equipment to place into a “ready to ship” status for all Rolling Stock (RS) CLVII in this bucket.

Timeliness:

Verify the contractor accomplished all preparatory steps to obtain ready to ship status for all Bucket (3) rolling stock within 15 days of PGR.

Quality:

Equipment placed into “ready to ship” IAW MDRS Business Rules and applicable AR 710-2, AR 7101, and DOL transportability requirements.

Random Sampling

Lot: All Bucket (3) rolling stock received during the previous month and associated data and records.

5.8 Bucket (3) Non-

Rolling Stock.

The contractor shall have seven working days from MDRS receipt of equipment to place into a “ready to ship” status for all

Timeliness

Verify the contractor accomplished all preparation for shipment of non-rolling Bucket (3) equipment within seven working days.

Random Sampling

Lot: All Bucket (3) non-rolling stock received, during the previous month all data and records.

Non-Rolling Stock (NRS) CL VII in this bucket.

Quality:

Equipment placed into “ready to ship” IAW MDRS Business Rules and applicable AR 710-2, AR 7101, and DOL transportability requirements

5.8 Bucket (4) ACOM to

DLA-DS turn-in.

5.35.6.4.4 The contractor

shall have five working days calculated from 24 hours after PGR to turn the equipment into DLA-DS for all non-rolling stock equipment.

Timeliness turned-in all Bucket (4) non-rolling stock equipment to DLA-DS within five working days of receipt.

Quality:

Equipment is turn-in to

DLA-DS IAW DLA-DS

Handbook, AR 710-2, AR 7101, and DEMIL requirements if applicable.

Lot: All Bucket (4) non-rolling stock received, during the previous month all data and records.

5.8 The contractor shall

have ten working days calculated from 24 hours after PGR to turn the items into DLA-DS for all rolling stock equipment.

turned-in all Bucket (4) rolling stock equipment to DLA-DS or the ISSA depending on workload and space at DLA-DS holding area, within ten working days of receipt.

Lot: All Bucket (4) rolling stock received, during the previous month all data and records.

Equipment is turn-in to

DLA-DS IAW DLA-DS

Handbook, AR 710-2, AR 7101, and DEMIL requirements if applicable.

5.8 The contractor shall be

responsible for turn-in of Condition Code G Rolling Stock items within a 30-day calendar period. All non-rolling stock items will be processed within a 15-day calendar period.

turned-in Bucket (5) rolling stock items of equipment within a 30-day calendar period beginning after induction and PGR of equipment at MDRS, and all non-rolling stock Bucket

(5) equipment within 15 days of induction.

Quality:

Equipment processed IAW AR 710-2 and AR 750-1 as applicable.

Lot: All Bucket (5) Condition Code G rolling and non-rolling stock received, during the previous 30 days for rolling stock and 15 days for non-rolling stock, all data and execute all pre-inspections of PSD packets for equipment to be turned in at the Schofield Barracks MDRS, as well as manage the scheduling of all turn-in appointments. The contractor shall update the turn-in schedule daily and report any/all changes to the government operations staff.

updates the turn-in appointment schedule daily as changes to the equipment turn-in schedule occur, and informs the MDRS government operations staff and PBO

Lot: Current turn-in appointment schedule for units.

ensure IAW EXORD and bucket category, the contractor shall induct CLVII IAW appropriate regulations, government external Standing Operating Procedures (SOP) and current published business rules, as well as the contractor’s approved internal SOP.

Timeliness/Quality:

Verify the contractor is following AR 710-2, AR 750-1, government external SOP and contractor internal SOP for induction, preparation of equipment for transfer or turn-in and preparation for shipment.

100%

Lot: All processes and procedures currently being followed by the contractor ISO induction, storage, maintenance, shipment and turn-in of non-expendable equipment at

MDRS.

AQL-100%

ensure all equipment is safeguarded in a designated storage location and can be promptly located at all times. This includes rolling and non-rolling stock at all MDRS operating locations.

Quality:

Verify the contractor is designating storage locations for all non-expendable equipment turned-in to the MDRS.

Random Sampling

Lot: All location information is in the LIS

5.8 IAW The contractor

shall ensure appropriate regulations; the contractor shall conduct location survey verifications of 10% non- sensitive items monthly (both rolling and non-rolling stocks). The list of items to be inventoried is provided by the PBO, and ensures that all storage locations have been verified annually. The contractor shall conduct internal inventories on a monthly basis, ensuring all equipment is inventoried annually.

Timeliness:

Verify the contractor conducts 10% location survey monthly per the listing provided by the government PBO for all non-sensitive item equipment, both rolling and non-rolling stock.

Quality:

Inventories performed IAW directive, AR 710-2 and

DA PAM 710-2-1.

Random Sampling:

Lot: completed monthly 10% location survey results provided to the government PBO.

present completed equipment to the government QA ready to ship per the PSD for the equipment. Any rejection of equipment by the government QA shall be entered into GCSS-A as a rejection for rework by the contractor and placed in GCSS-A work order status “8.”

checks contractor supply and transportation processes for compliance with Army policy in AR 750-1, AR 710-2 and DOT standards for shipment of equipment.

Random Sampling:

Lot: All equipment maintenance, supply and transportation processes used by the contractor.

manage and account for inventory of all commodities of Army equipment: receive supplies, establish storage racking and bin configuration both physically and within GCSS-Army

Quality:

Verify the contractor manages and accounts for all commodities of Army equipment inducted into the MDRS, and follows all regulatory requirements for retail supply and accountability in AR 710-2, AR 735-5, AR 190-11and other applicable regulations, and MDRS SOPs

Random Sampling:

Lot: All retail supply related records and data for inducted equipment.

AQL 95%

ensure Updating planograms of storage locations by site as changes occur.

Verify planograms of storage locations by site are updated as changes occur

Random Sampling:

Lot: All MDRS inside and outside storage locations.

AQL- 98%

track accountability of non-expendable equipment until PSD directed disposition instructions for said piece of equipment is

Quality:

Verify the contractor tracks all equipment by serial number and location from receipt until dropped from

Random Sampling:

Lot: All retail supply records and data related to MDRS equipment inducted executed and equipment is dropped from the government property government property records by the government

PBO.

and turned-in or shipped from MDRS.

AQL-98%

ensure all equipment to be shipped via commercial transportation meets the standards for commercial movement, and is staged and safely loaded on commercial transportation conveyance

Quality:

Verify the contractor inspects and documents that all equipment prepared by the contractor for commercial shipment meets the standards in the DOT regulatory requirement and is safely loaded on commercial conveyance.

Random Sampling:

Lot: All equipment shipped from MDRS via commercial conveyance.

AQL-98%