B08 Attachment 0019 - PWS Annex C Transportation PRS (2 Aug 22).pdf

PDF 278 KB Posted

Attached to
EAGLE FORT CAMPBELL, KY W519TC-23-R-0022
Solicitation number
W519TC-23-R-0022
Issued by

About this file

This document outlines performance requirements and quality standards for transportation and logistics services at Fort Campbell, Kentucky. Key requirements include providing reports and statistical data on transportation activities, counseling customers on entitlements and procedures, handling sensitive personal property shipments, processing transportation requests and invoices, reconciling centralized billing accounts, controlling and maintaining government vehicles, assisting with unit movements including loading and documentation, routing cargo shipments by various modes, monitoring airfield operations, operating container yards, and coordinating railcar movements and maintenance. Services will be monitored through surveillance activities and performance is expected to meet outlined standards for timeliness, quality and sampling metrics.

The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal to provide the transportation and logistics services defined in the performance requirements document at Fort Campbell, Kentucky. Responses are due by the date specified in the solicitation.

View the file

Other files

File Type Posted
B08 Attachment 0001 - PWS (24 Jul 23).pdf PDF
W519TC23R0022-0003.pdf PDF
B08 Solicitation_FCKY conformed thru Amendment 0003.pdf PDF
B08 Attachment 0001 - PWS (24 Jul 23).pdf PDF
B08 Attachment 0039 - Ft. Campbell Q&A2 Responses (27 Jul 23).xlsx XLSX spreadsheet
W519TC23R0022-0002.pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0038 - Ft. Campbell Q&A Responses (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0007 - Department of Labor Wage Determinations-SCA (27 Dec 22).pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission (18 Jul 23).pdf PDF
B08 Solicitation_FCKY conformed thru Amendment 0002.pdf PDF
B08 Attachment 0005 - Cost Price Matrix (18 Jul 23).xlsx XLSX spreadsheet
B08 Attachment 0002 - Staffing and Labor Mix_FCKY (31 Aug 22).xlsx XLSX spreadsheet
B08 Attachment 0001 - PWS (17 Jul 23).pdf PDF
W519TC23R0022-0001.pdf PDF
B08 Solicitation_FCKY.pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission (9 Feb 23).pdf PDF
B08 Exhibit A - DD1423-1.pdf PDF
B08 Attachment 0020 - PWS Annex D Environmental Requirements (24 Aug 22).pdf PDF
B08 Exhibit B - CDRL Listing.xlsx XLSX spreadsheet
B08 Exhibit D - ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Exhibit F - MMD-02 MDRS Maintenance Report Format.XLSX XLSX spreadsheet
B08 Attachment 0025 - PWS Appendix A NON ASC_FCKY Classified Container (Safes) Maint_All Unit.pdf PDF
B08 Exhibit J - PM-09 Performance Management Review Format (version 16 Jun 20).pptx PPTX presentation
B08 Exhibit H - PM-08 GFE GFP CAP Format.xlsx XLSX spreadsheet
B08 Attachment 0023 - PWS Annex G MDRS PRS (1 Aug 22).pdf PDF
B08 Exhibit C - CD-02 Burn Rate Report V9.xlsx XLSX spreadsheet
B08 Attachment 0018 - PWS Annex B Supply PRS (1 Aug 22).pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet (02 Mar 22).xlsx XLSX spreadsheet
B08 Attachment 0007 - Department of Labor Wage Determinations-SCA (26 Aug 22).pdf PDF
B08 Attachment 0003 - Performance Questionnaire (29 Jan 21).pdf PDF
B08 Exhibit E - MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 Exhibit L - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
B08 Attachment 0021 - PWS Annex E Definitions Acronyms Abbreviations (24 Aug 22).pdf PDF
B08 Attachment 0027 - PWS Appendix C NON ASC FCKY SDDC Deployable Container Maint_ITD.pdf PDF
B08 Attachment 0009 - Purchasing Invoicing Guide (9 Feb 23).pdf PDF
B08 Exhibit G - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Attachment 0010 - Blocked File Extensions (9 Feb 23).pdf PDF
B08 Attachment 0022 - PWS Annex F Publications and Forms (24 Aug 22).pdf PDF
B08 Exhibit K - PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
B08 Attachment 0001 - PWS (24 May 23).pdf PDF
B08 Attachment 0017 - PWS Annex A Maintenance PRS (16 Aug 22).pdf PDF
B08 Attachment 0013 - Mission Essential Contractor Services (22 Jun 22).pdf PDF
B08 Attachment 0002 - Staffing and Labor Mix_FCKY_ 31_AUG_22.xlsx XLSX spreadsheet
B08 Attachment 0026 - PWS Appendix B NON ASC FCKY 160th Fuel Lab Operations_ISD (3 Nov 22).pdf PDF
B08 Attachment 0004 - Letter of Consent (04 May 23).pdf PDF
B08 Attachment 0005 - Cost Price Matrix (5 May 23).xlsx XLSX spreadsheet
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf PDF
B08 Attachment 0024 - PWS Annex H Government Property Incidental (27 Apr 23).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)

TRANSPORTATION - GENERAL

5.26.3 Provide reports and statistical data

Timeliness: Reports and statistical data delivered by the due date.

Quality: IAW DLRS ITD-01 Accurate and complete

Surveillance activity report

Lot: Inspect reports submitted per quarter.

AQL: 95%

PERSONAL PROPERTY OPERATIONS

5.27.2 Counsel customers

Timeliness: In conjunction with shipment application and/or movement request.

Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.

Random sampling

Lot: Counseling completed at the time of surveillance.

AQL: 99%

5.27.2 Counsel personnel on entitlements and procedures for pickup, delivery and/or storage of personal property/household goods

Timeliness: Personnel counseled with 3 hours of arrival/walk-in time and/or 1 hour of appointment time

Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.

Random sampling

Lot: Percent of personnel counseled within 3 hours of arrival/walk-in time;

percent counseled within 1 hour of appointment time.

AQL: 90%

5.27.3 Provide Specialized, Expedited Assistance for Sensitive circumstances

Timeliness: To meet member/family member’s needs.

Quality: Blue Bark shipments will be handled IAW DTR Part IV, 410-E, and a complete copy will be provided to QAE on request.

Random sampling

Lot: Blue Bark/Sensitive shipments Completed at the time of surveillance.

AQL: 100%

5.27.6 Prepare shipment applications and personally procured movement (PPM) Requests.

Timeliness: Assist DPS customers when required.

Quality: Will be completed IAW DTR Part IV and governing service regulations and a complete copy will be provided to QAE on request.

Random sampling

Lot: Shipments applications and self-movement requests completed at the time of surveillance.

5.27.9 Collect Excess Costs.

Timeliness: DD 139 prepared within the same week excess costs are discovered / determined; approved 139 will be submitted to DFAS as required. DD1131 prepared in the same week monies are received;

submitted to Government rep, for deposit weekly.

DD Form 139 or DD Form 1131 will be prepared and maintained completely and accurately. Provide a copy to QAE upon request.

Random sampling

Lot: Collection forms completed at time of surveillance.

AQL: 100%

5.27.9 Process request for extension of travel and transportation entitlements.

Timeliness: Review and forward to Government rep, within 5 business days of receipt.

Approved requests will be returned to the requestor the next business day.

Quality: Requests will be reviewed for eligibility. Requests forwarded to ITO will be complete, accurate, and contain all appropriate supporting documents/copies required by the JTR and an approval/recommendation letter for ITO signature and provide a copy to QAE upon request.

Random sampling

Lot: Each extension in process or completed at time of surveillance.

AQL: 90%

PASSENGER MOVEMENTS

5.28.1 Process Commercial Invoices.

Timeliness: Approved invoices and supporting documents will be submitted to the COR within 3 business days of receipt from TSP.

Quality: TSP charges will be complete and verified correctly before submitted to COR completely reviewed before submission to COR.

Random sampling

Lot: Each commercial ticket invoices in process or completed at time of surveillance.

AQL: 100%

5.28.1 Process Individual/Family passenger movement requests.

Timeliness: Requests will be processed and completed to meet passenger’s departure and arrival requirements.

Lot: Passenger movement requests in process, or completed at time of surveillance.

Quality: Mode of travel will be based on individual/family travel requirements and entitlements.

AQL: 97%

5.28.1 Process overseas travel requests.

Timeliness: Port calls and changes processed to meet customers travel requirements.

Quality: Port call request or orders processed accurately and completely.

Random sampling

Lot: Each port call request being processed, or completed at time of surveillance.

AQL: 97%

5.28.1 Prepare port call request

Timeliness: Port call requests processed to meet customers travel requirements.

Quality: Port call requests to CTO for commercial airline travel will be processed completely and accurately.

Random sampling

Lot: Each port call request In process or

5.28.5 Reconcile centralized billing accounts and certify payment by DFAS

Government tasking

Timeliness: Reconcile and submit to DFAS within 15 calendar days. NOTE:

Certify CBAs within 5 working days of hard copy receipt for DTS Accounts, and 10 days for manual accounts. FMR standard of 30 days still applies for processing.

Lot: Percent of CBAs reconciled and submitted to DFAS within 15 calendar days

AQL: 90%

MOTOR POOL OPERATIONS

5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse

Timeliness: By COB daily notify COR upon discovery.

Quality: Complete & accurate

Random sampling

Lot: Each GSA vehicle hand receipt completed at time of surveillance.

AQL: 99%

5.29.1 Maintain hand receipts on GSA vehicles

Timeliness: Hand receipts updated annually, as a minimum.

Quality: Complete & accurate

Random sampling

Lot: Each GSA vehicle hand receipt

AQL: 98%

5.29.1 Pick up and deliver vehicles

Timeliness: Vehicles pickup within (5) business days when notified.

Quality: Pick up & delivery to designated area.

Random sampling

Lot: Each vehicle requiring pickup and delivery completed at time of surveillance.

AQL: 98%

5.29.1 Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.

Timeliness: Annually

Quality: Justification must meet the requirements of AR 58-1.

Random sampling

Lot: GSA vehicle justifications prepared each year.

AQL: 100%

5.29.3 Receive requests for motor transportation

Timeliness: Requests reviewed and submitted to government rep, by COB.

Quality: Requests are complete and accurate prior to government rep, manual or telephonic approval.

Random sampling

Lot: Each request for motor transportation completed at time of surveillance.

AQL: 99%

5.29.3 Inspect & dispatch GSA vehicles and GSA credit cards

Timeliness: Vehicle inspected at time of dispatch and upon return. LSEV inspected and dispatch quarterly.

FORSCOM decal affixed prior to initial dispatch

Quality: Inspection shall be performed accurately

Random sampling

Lot: Each GSA vehicle dispatch in process or completed at time of surveillance.

AQL: 100%

5.29.4 Operate buses and other non-tactical vehicles

Timeliness: To meet mission requirements.

Quality: Vehicles operated safely.

Surveillance Activity checklist

Lot: Each special mission requirement

AQL: 99%

5.29.11 Schedule for Maintenance of GSA vehicles.

Timeliness: Users notified 5 business days prior to scheduled maintenance date

Surveillance activity checklist

Lot: Each GSA vehicle requiring maintenance completed at time of

Quality: Scheduled maintenance performed.

UNIT MOVEMENTS

5.30.1 Provide necessary assistance to the Unit Movement Coordinator (UMC) with unit movement data maintenance and movement planning.

Timeliness: Meet UMC’s processing times.

Quality: All unit moves completed as required.

Surveillance activity checklist

Lot: Each unit move

AQL: 97%

5.30.1 Document loaded equipment Properly

Timeliness: Upon completion of loading.

Quality: Load data will be obtained complete and accurate.

Random sampling

Lot: Each piece of equipment loaded in process or completed at time of surveillance

AQL: 99%

5.30.1 Utilize Radio Communications.

Contractor Operations shall record Start, Inspection, & completion times.

Timeliness: At all times during unit movement.

Quality: Radios are operational during unit movements.

Random sampling

Lot: Inspect transportation operation in process or completed at time of

5.30.1 Movement of DODX/ Commercial Railcars ALL Rail Cars

Timeliness: Disposition Instructions from SDDC will be requested within 2 business days of notification of completion of mission Coordinate with TSP to meet SDDC timelines CBL will be provided to TSP at the time of pick up

Quality: DODX/ Commercial cars will be completely and safely moved

Random Sampling

LOT: Each request for DODX railcar movement completed at time of surveillance

AQL: 99%

5.30.1 Conduct, with technical oversight, Marshalling Activities & Call Forward Process per load plan

Timeliness: To meet mission requirements.

Quality: Equipment will be properly weighed, marked, labeled, placarded, and documented prior to loading.

Surveillance Activity Report

LOT: Inspect deployment/training exercise

All modes of Transportation Inbound and Outbound

Equipment will be safely loaded IAW approved load plans. Equipment tie-down, blocking and bracing will be IAW industry practice.

AQL: 100%

5.30.2 Assist and advise unit movement planning and coordination

Timeliness: Meet UMC’s processing times.

Quality: Assist and advise UMO training 100 percent of the time

Lot: Each unit move

AQL: 100%

5.30.4 Provide Commercial Bus Support.

Std: In accordance with mission timelines.

Std: Buses will be escorted safely to/from loading point

LOT: Each TMR for commercial buses completed at time of surveillance

CARGO MOVEMENTS

5.31.1 Route military cargo and equipment.

Timeliness: To meet mission requirements

Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/GFM CMOS will be accurate and complete.

Random sampling

Lot: Each shipment competed at time of surveillance.

AQL: 100%

5.31.1 Provide technical assistance, guidance and customer service in support of unit movements.

Timeliness: Upon request, during the preparation, loading, unloading, blocking bracing, and tie-down of vehicle, cargo, and equipment.

Quality: Competent, correct, and helpful assistance provided.

All Modes of Transportation

Surveillance activity report

Lot: Inspect Deployment/Training exercise.

AQL: 95%

5.31.1 Obtain air/water clearance Timeliness: To meet mission requirements

Quality: Clearances are prepared and submitted accurately and correctly

LOT: Each TCMD

Route Military Cargo and Equipment

Timeliness: To meet mission requirements

Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/ CMOS will be accurate and complete

LOT: Each shipment competed at time of

Obtain air/water clearance Timeliness: To meet mission requirements

Quality: Clearances are prepared and submitted accurately and correctly

LOT: Each TCMD

Prepare and Distribute Government Bill of Lading

Timeliness: Complete GBL/ CBL, will be provided to the carrier before departure

Quality: CBL and supporting documents will be complete and accurate

LOT: Each shipment document completed at time of

Prepare REPSHIP

Timeliness: Process Report of Shipment (REPSHIP)

Quality: REPSHIP will be complete and accurate

Random Sampling

LOT: Each REPSHIP completed at time of surveillance

AQL: 100%

5.31.1 Receive small package freight for shipment

Timeliness: Small package will be shipped by expedited mode NLT than 1 business day after receipt

Quality: All documentation will be accurate and complete

LOT: Each small package freight shipments being processed OR

Control Government and/or Commercial Security Seals

Timeliness: To meet mission requirements

Surveillance Activity Report

Inspect security seals’ inventory

AQL: 99%

Quality: Security seals will be properly requisitioned, received, controlled and utilized

Process Inbound Freight Documentation

Timeliness: SF 361, Discrepancy Report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment

Quality: Mis consigned and/or Mismarked shipments will be correctly re-consigned Inbound shipment documentation processed, recorded, and reviewed promptly and

Accurately

LOT: Each inbound shipment received, OR completed at time of surveillance

Update the Transportation Facility Guide

Timeliness: Update when changes occur

Quality: Transportation facility guide updated as changes are received or required

Surveillance Activity Report

Inspect Transportation Facility Guides Updates

Control Government and/or Commercial Security Seals

For all modes of Transportation, Truck, Rail, Air & Barge sections because this is not a task of our Rail Section

Timeliness: To meet mission requirements.

Quality: Security seals will be properly requisitioned, received, controlled, and utilized. By the DACG or MCC

Surveillance Activity Checklist

Lot: Inspect security seals’ inventory

AQL: 99%

5.31.1 Process inbound freight documentation

Timeliness: SF 361, Discrepancy report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment.

In CARGO, for all Modes of TRANS

Quality: Mis consigned and/or mismarked shipments will be correctly re-consigned inbound shipment

Random sampling

Lot: Each inbound shipment received or

AQL 95%

documentation processed, recorded, and reviewed promptly and accurately.

5.31.2 Hazardous materials reviewed and verified, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded for all modes of Transportation. Add to Cargo, Unit Movements & Rail

Timeliness: Prior to preparation of

GBL/CBL.

Quality: Certified HazMat preparers are reviewed and verified; documents are complete and accurate for all modes of Transportation.

Random sampling

Lot: Each hazardous materials, oversized, sensitive shipments in process or completed at time of surveillance

AQL: 100%

ARRIVAL/DEPARTURE AIRFIELD CONTROL GROUP (A/DACG)

5.32.1 Monitor & report airfield arrivals and departures

Timeliness: Notified same day.

Quality: Convoys, equipment, buses, baggage trucks, and personnel accurately, and completely reported.

Random sampling

Lot: Each arrival & departure at completed at time of surveillance.

AQL: 100%

5.32.2 Generate wheels up/wheels down reports, manifest reports

Timeliness: Generate reports , manifest and forward to required organizations within 1-Hr. of wheels up/wheels down

Lot: Percentage of wheels up/wheels down reports generated within 1 hour

AQL: 95%

5.32.2 Operate tactical and non-tactical support vehicles

Timeliness: To meet mission requirements.

Quality: Vehicles & equipment will be operated safely by authorized licensed personnel.

Random sampling

Lot: Vehicle & equipment operations completed at time of surveillance.

AQL: 100%

5.32.2 Receive and process vehicle and MHE requirement requests.

Tasking: Vehicles will be coordinated with either Sustainment Brigade or A/DACG to meet mission schedule Quality: Vehicles will be appropriate to meet the needs of the requestor

LOT: Each equipment request

5.32.2 Direct loading/Off-loading of passengers and cargo

Timeliness: In conjunction with mission timelines.

Quality: Safely direct & escort to designated location.

Random sampling

Lot: Each mission completed at time of surveillance.

AQL: 100%

5.32.2 Assist with Air Force Joint inspections as required/requested

Timeliness: To meet mission requirements.

Quality: Vehicles, Containers & 463-L Pallet systems will be properly weighed, marked, placarded, loaded, placed, and tied-down.

Surveillance activity checklist

Lot: Inspect aircraft mission joint inspection.

5.32.2 Conduct Technical oversight

Please add this to “Cargo”

For all modes of Transportation

Timeliness: IAW mission requirements.

Quality: Vehicles, containers will be properly weighed, marked, placarded, loaded, placed, and tied-down.

Random sampling

Lot: Inspect aircraft mission joint inspection.

AQL: 100%

5.32.2 Perform aircraft boarding requirements.

Timeliness: To meet mission requirements.

Quality: Equipment will be properly weighed, marked, labeled, placarded, and documented prior to loading.

Equipment will be safely loaded IAW approved load plans. Equipment tie-down, blocking, and bracing will be IAW industry practice. All Modes of Transportation

Surveillance activity report

Lot: Inspect deployment/training exercise.

AQL: 100%

5.32.6 Validate air and surface load plans

All Modes of Transportation

Air, truck & Rail

Timeliness: Validate within 5 working days of receipt of load plan

Random sampling

Lot: Percentage of air and surface load plans validated within 5 working days of receipt

AQL: 95%

CONTAINER YARD OPERATIONS

5.33.1 Timeliness: To meet training

exercise/deployment requirements

Download, upload, reposition, retrieve, and transport containers with no additional commercial charges being incurred.

For non-deployment movement, when current scheduled workload permits support.

Quality: Containers placed safely and correctly at designated location.

Lot: Each container transported in process or completed at time of surveillance.

AQL: 99%

5.33.1 Issue & Receive ISO containers

& MILVANS

Timeliness: Control document prepared for each asset at the time of transfer.

Quality: Completely & accurately.

Random sampling

Lot: Each control document in process or completed at time of surveillance.

AQL: 100%

5.33.1 Inspect & certify ISO containers.

Timeliness: NLT 2 1/2 years from date of last certification.

Quality: To meet international CSC standards.

Random sampling

Lot: Each ISO container in process or completed at time of surveillance.

AQL: 95%

5.33.1 Arrange for scheduled and/or emergency maintenance of light sets.

Timeliness: Scheduled: IAW manufacturer’s recommendation Emergency: Same day

Quality: Required maintenance scheduled.

Random sampling

Lot: Each light set scheduled for maintenance at time of surveillance.

5.33.1 Reposition or retrieve light sets

Timeliness: Within 48 hours of directive.

Quality: Lights sets relocated safely to designated location.

Random sampling

Lot: Number of light sets repositioned/retrieved or completed at time of surveillance.

5.33.2 Conduct inventory of ISO containers and light sets

Timeliness: Containers: Inventoried & reported quarterly.

Light sets: Reported NLT 5th business day of each month.

Surveillance activity report

Lot: Each inventory completed at time of

Quality: Completely & accurately AQL: 99%

RAIL OPERATIONS

5.34.1 Assist & Coordinate Upload/Download of Commercial Line Haul Trucks.

Timeliness: Provide assistance immediately after truck arrival at the Freight Facility to avoid demurrage/ detention charges

Cargo will be called forward per load plan accurately and safely loaded/ downloaded and documented.

Quality: Trucks will be escorted safely to/from loading point.

CBL/packing receipts will be properly annotated and distributed

LOT: Each commercial line haul vehicle completed at time of surveillance

AQL: 95%

5.34.1 Perform operator level maintenance on on-hand government owned locomotives

Timeliness: IAW applicable maintenance manuals and to meet mission requirements.

Quality: Complete & accurate

AQL: 95%

5.34.1 Order all required petroleum liquids and lubricants for locomotives.

Timeliness:

Fuel: Ordered when on hand fuel reaches 1000 gallons minimum.

Oil: Ordered when on hand oil reaches 110 gallons minimum.

Oil sample: submitted every 25 hours of operation or 90 days, whichever occurs first?

Quality: fuel & petroleum levels maintained at or above level of ordering.

Surveillance Activity Checklist

Lot: Inspect fuel order request per quarter.

AQL: 97%

5.34.1 Take oil samples for oil test

Timeliness: oil sample: submitted every 25 hours of operation or 90 calendar days, whichever occurs first.

Lot: Inspection completed at time of

Quality: Completely, efficiently, and effectively.

5.34.1 Coordinate for track repairs & foliage/debris removal.

Timeliness: Second and fourth week of each month.

Quality: Completely, efficiently, and effectively.

Random sampling

Lot: Track coordination performed and complete at time of surveillance.

AQL: 95%

5.34.1 Movement of DODX/ commercial Railcars

ALL Rail Cars, remove DODX

Add to Unit Movements / CARGO sections this is not a task of our Rail Section.

Locomotive Engineers do not perform this task

Timeliness: Disposition instructions from SDDC will be requested within 2 business days of notification of completion of mission. Coordinate with TSP to meet SDDC timelines. CBL will be provided to TSP at the time of pick up.

Quality: DODX/ Commercial cars will be completely and safely moved.

Random sampling

Random sampling

Lot: Each request for DODX railcar movement completed at time of surveillance.

AQL: 99%

5.34.2 Provide loaded/empty rail car numbers to TSP, UMC, & SDDC;

release rail cars to TSP.

Timeliness: Within 4 hours of interchange.

Quality: Information & release order is complete and accurate.

Surveillance activity checklist

Lot: Inspect rail car load plan completed at time of surveillance.

AQL: 99%

5.34.3 Coordinate interchange with

TSP

Timeliness: Coordination completed not less than 24 hours prior to arrival/departure of railcars.

Quality: To meet mission requirements.

Surveillance activity checklist

Lot: Inspect interchange completed at time of surveillance.

AQL: 97%

5.34.3 Protect Rail Crossings

Provide people trained to perform this tasking.

Timeliness: Prior to Locomotive approach at pedestrian/vehicle crossing.

Surveillance activity checklist

Lot: Each track crossing protected at time of surveillance.

Quality: Completely and safely.

Flagmen will possess PPE which is visible in day and night.

5.34.3 Perform Interchange with rail carrier. Clear obstructions on track.

Timeliness: Arrive 30 minutes prior to scheduled interchange. Obstructions cleared to allow timely arrival at interchange.

Quality: Safely and efficiently.

Surveillance activity checklist

Lot: Inspect interchange with Carrier.

AQL: 98%

File details come from the government source that posted it. Updated .