B08 Attachment 0019 - PWS Annex C Transportation PRS (2 Aug 22).pdf
PDF 278 KB Posted
- Attached to
- EAGLE FORT CAMPBELL, KY W519TC-23-R-0022
- Solicitation number
- W519TC-23-R-0022
About this file
This document outlines performance requirements and quality standards for transportation and logistics services at Fort Campbell, Kentucky. Key requirements include providing reports and statistical data on transportation activities, counseling customers on entitlements and procedures, handling sensitive personal property shipments, processing transportation requests and invoices, reconciling centralized billing accounts, controlling and maintaining government vehicles, assisting with unit movements including loading and documentation, routing cargo shipments by various modes, monitoring airfield operations, operating container yards, and coordinating railcar movements and maintenance. Services will be monitored through surveillance activities and performance is expected to meet outlined standards for timeliness, quality and sampling metrics.
The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal to provide the transportation and logistics services defined in the performance requirements document at Fort Campbell, Kentucky. Responses are due by the date specified in the solicitation.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)
TRANSPORTATION - GENERAL
5.26.3 Provide reports and statistical data
Timeliness: Reports and statistical data delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and complete
Surveillance activity report
Lot: Inspect reports submitted per quarter.
AQL: 95%
PERSONAL PROPERTY OPERATIONS
5.27.2 Counsel customers
Timeliness: In conjunction with shipment application and/or movement request.
Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.
Random sampling
Lot: Counseling completed at the time of surveillance.
AQL: 99%
5.27.2 Counsel personnel on entitlements and procedures for pickup, delivery and/or storage of personal property/household goods
Timeliness: Personnel counseled with 3 hours of arrival/walk-in time and/or 1 hour of appointment time
Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.
Random sampling
Lot: Percent of personnel counseled within 3 hours of arrival/walk-in time;
percent counseled within 1 hour of appointment time.
AQL: 90%
5.27.3 Provide Specialized, Expedited Assistance for Sensitive circumstances
Timeliness: To meet member/family member’s needs.
Quality: Blue Bark shipments will be handled IAW DTR Part IV, 410-E, and a complete copy will be provided to QAE on request.
Random sampling
Lot: Blue Bark/Sensitive shipments Completed at the time of surveillance.
AQL: 100%
5.27.6 Prepare shipment applications and personally procured movement (PPM) Requests.
Timeliness: Assist DPS customers when required.
Quality: Will be completed IAW DTR Part IV and governing service regulations and a complete copy will be provided to QAE on request.
Random sampling
Lot: Shipments applications and self-movement requests completed at the time of surveillance.
5.27.9 Collect Excess Costs.
Timeliness: DD 139 prepared within the same week excess costs are discovered / determined; approved 139 will be submitted to DFAS as required. DD1131 prepared in the same week monies are received;
submitted to Government rep, for deposit weekly.
DD Form 139 or DD Form 1131 will be prepared and maintained completely and accurately. Provide a copy to QAE upon request.
Random sampling
Lot: Collection forms completed at time of surveillance.
AQL: 100%
5.27.9 Process request for extension of travel and transportation entitlements.
Timeliness: Review and forward to Government rep, within 5 business days of receipt.
Approved requests will be returned to the requestor the next business day.
Quality: Requests will be reviewed for eligibility. Requests forwarded to ITO will be complete, accurate, and contain all appropriate supporting documents/copies required by the JTR and an approval/recommendation letter for ITO signature and provide a copy to QAE upon request.
Random sampling
Lot: Each extension in process or completed at time of surveillance.
AQL: 90%
PASSENGER MOVEMENTS
5.28.1 Process Commercial Invoices.
Timeliness: Approved invoices and supporting documents will be submitted to the COR within 3 business days of receipt from TSP.
Quality: TSP charges will be complete and verified correctly before submitted to COR completely reviewed before submission to COR.
Random sampling
Lot: Each commercial ticket invoices in process or completed at time of surveillance.
AQL: 100%
5.28.1 Process Individual/Family passenger movement requests.
Timeliness: Requests will be processed and completed to meet passenger’s departure and arrival requirements.
Lot: Passenger movement requests in process, or completed at time of surveillance.
Quality: Mode of travel will be based on individual/family travel requirements and entitlements.
AQL: 97%
5.28.1 Process overseas travel requests.
Timeliness: Port calls and changes processed to meet customers travel requirements.
Quality: Port call request or orders processed accurately and completely.
Random sampling
Lot: Each port call request being processed, or completed at time of surveillance.
AQL: 97%
5.28.1 Prepare port call request
Timeliness: Port call requests processed to meet customers travel requirements.
Quality: Port call requests to CTO for commercial airline travel will be processed completely and accurately.
Random sampling
Lot: Each port call request In process or
5.28.5 Reconcile centralized billing accounts and certify payment by DFAS
Government tasking
Timeliness: Reconcile and submit to DFAS within 15 calendar days. NOTE:
Certify CBAs within 5 working days of hard copy receipt for DTS Accounts, and 10 days for manual accounts. FMR standard of 30 days still applies for processing.
Lot: Percent of CBAs reconciled and submitted to DFAS within 15 calendar days
AQL: 90%
MOTOR POOL OPERATIONS
5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse
Timeliness: By COB daily notify COR upon discovery.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt completed at time of surveillance.
AQL: 99%
5.29.1 Maintain hand receipts on GSA vehicles
Timeliness: Hand receipts updated annually, as a minimum.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt
AQL: 98%
5.29.1 Pick up and deliver vehicles
Timeliness: Vehicles pickup within (5) business days when notified.
Quality: Pick up & delivery to designated area.
Random sampling
Lot: Each vehicle requiring pickup and delivery completed at time of surveillance.
AQL: 98%
5.29.1 Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.
Timeliness: Annually
Quality: Justification must meet the requirements of AR 58-1.
Random sampling
Lot: GSA vehicle justifications prepared each year.
AQL: 100%
5.29.3 Receive requests for motor transportation
Timeliness: Requests reviewed and submitted to government rep, by COB.
Quality: Requests are complete and accurate prior to government rep, manual or telephonic approval.
Random sampling
Lot: Each request for motor transportation completed at time of surveillance.
AQL: 99%
5.29.3 Inspect & dispatch GSA vehicles and GSA credit cards
Timeliness: Vehicle inspected at time of dispatch and upon return. LSEV inspected and dispatch quarterly.
FORSCOM decal affixed prior to initial dispatch
Quality: Inspection shall be performed accurately
Random sampling
Lot: Each GSA vehicle dispatch in process or completed at time of surveillance.
AQL: 100%
5.29.4 Operate buses and other non-tactical vehicles
Timeliness: To meet mission requirements.
Quality: Vehicles operated safely.
Surveillance Activity checklist
Lot: Each special mission requirement
AQL: 99%
5.29.11 Schedule for Maintenance of GSA vehicles.
Timeliness: Users notified 5 business days prior to scheduled maintenance date
Surveillance activity checklist
Lot: Each GSA vehicle requiring maintenance completed at time of
Quality: Scheduled maintenance performed.
UNIT MOVEMENTS
5.30.1 Provide necessary assistance to the Unit Movement Coordinator (UMC) with unit movement data maintenance and movement planning.
Timeliness: Meet UMC’s processing times.
Quality: All unit moves completed as required.
Surveillance activity checklist
Lot: Each unit move
AQL: 97%
5.30.1 Document loaded equipment Properly
Timeliness: Upon completion of loading.
Quality: Load data will be obtained complete and accurate.
Random sampling
Lot: Each piece of equipment loaded in process or completed at time of surveillance
AQL: 99%
5.30.1 Utilize Radio Communications.
Contractor Operations shall record Start, Inspection, & completion times.
Timeliness: At all times during unit movement.
Quality: Radios are operational during unit movements.
Random sampling
Lot: Inspect transportation operation in process or completed at time of
5.30.1 Movement of DODX/ Commercial Railcars ALL Rail Cars
Timeliness: Disposition Instructions from SDDC will be requested within 2 business days of notification of completion of mission Coordinate with TSP to meet SDDC timelines CBL will be provided to TSP at the time of pick up
Quality: DODX/ Commercial cars will be completely and safely moved
Random Sampling
LOT: Each request for DODX railcar movement completed at time of surveillance
AQL: 99%
5.30.1 Conduct, with technical oversight, Marshalling Activities & Call Forward Process per load plan
Timeliness: To meet mission requirements.
Quality: Equipment will be properly weighed, marked, labeled, placarded, and documented prior to loading.
Surveillance Activity Report
LOT: Inspect deployment/training exercise
All modes of Transportation Inbound and Outbound
Equipment will be safely loaded IAW approved load plans. Equipment tie-down, blocking and bracing will be IAW industry practice.
AQL: 100%
5.30.2 Assist and advise unit movement planning and coordination
Timeliness: Meet UMC’s processing times.
Quality: Assist and advise UMO training 100 percent of the time
Lot: Each unit move
AQL: 100%
5.30.4 Provide Commercial Bus Support.
Std: In accordance with mission timelines.
Std: Buses will be escorted safely to/from loading point
LOT: Each TMR for commercial buses completed at time of surveillance
CARGO MOVEMENTS
5.31.1 Route military cargo and equipment.
Timeliness: To meet mission requirements
Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/GFM CMOS will be accurate and complete.
Random sampling
Lot: Each shipment competed at time of surveillance.
AQL: 100%
5.31.1 Provide technical assistance, guidance and customer service in support of unit movements.
Timeliness: Upon request, during the preparation, loading, unloading, blocking bracing, and tie-down of vehicle, cargo, and equipment.
Quality: Competent, correct, and helpful assistance provided.
All Modes of Transportation
Surveillance activity report
Lot: Inspect Deployment/Training exercise.
AQL: 95%
5.31.1 Obtain air/water clearance Timeliness: To meet mission requirements
Quality: Clearances are prepared and submitted accurately and correctly
LOT: Each TCMD
Route Military Cargo and Equipment
Timeliness: To meet mission requirements
Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/ CMOS will be accurate and complete
LOT: Each shipment competed at time of
Obtain air/water clearance Timeliness: To meet mission requirements
Quality: Clearances are prepared and submitted accurately and correctly
LOT: Each TCMD
Prepare and Distribute Government Bill of Lading
Timeliness: Complete GBL/ CBL, will be provided to the carrier before departure
Quality: CBL and supporting documents will be complete and accurate
LOT: Each shipment document completed at time of
Prepare REPSHIP
Timeliness: Process Report of Shipment (REPSHIP)
Quality: REPSHIP will be complete and accurate
Random Sampling
LOT: Each REPSHIP completed at time of surveillance
AQL: 100%
5.31.1 Receive small package freight for shipment
Timeliness: Small package will be shipped by expedited mode NLT than 1 business day after receipt
Quality: All documentation will be accurate and complete
LOT: Each small package freight shipments being processed OR
Control Government and/or Commercial Security Seals
Timeliness: To meet mission requirements
Surveillance Activity Report
Inspect security seals’ inventory
AQL: 99%
Quality: Security seals will be properly requisitioned, received, controlled and utilized
Process Inbound Freight Documentation
Timeliness: SF 361, Discrepancy Report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment
Quality: Mis consigned and/or Mismarked shipments will be correctly re-consigned Inbound shipment documentation processed, recorded, and reviewed promptly and
Accurately
LOT: Each inbound shipment received, OR completed at time of surveillance
Update the Transportation Facility Guide
Timeliness: Update when changes occur
Quality: Transportation facility guide updated as changes are received or required
Surveillance Activity Report
Inspect Transportation Facility Guides Updates
Control Government and/or Commercial Security Seals
For all modes of Transportation, Truck, Rail, Air & Barge sections because this is not a task of our Rail Section
Timeliness: To meet mission requirements.
Quality: Security seals will be properly requisitioned, received, controlled, and utilized. By the DACG or MCC
Surveillance Activity Checklist
Lot: Inspect security seals’ inventory
AQL: 99%
5.31.1 Process inbound freight documentation
Timeliness: SF 361, Discrepancy report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment.
In CARGO, for all Modes of TRANS
Quality: Mis consigned and/or mismarked shipments will be correctly re-consigned inbound shipment
Random sampling
Lot: Each inbound shipment received or
AQL 95%
documentation processed, recorded, and reviewed promptly and accurately.
5.31.2 Hazardous materials reviewed and verified, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded for all modes of Transportation. Add to Cargo, Unit Movements & Rail
Timeliness: Prior to preparation of
GBL/CBL.
Quality: Certified HazMat preparers are reviewed and verified; documents are complete and accurate for all modes of Transportation.
Random sampling
Lot: Each hazardous materials, oversized, sensitive shipments in process or completed at time of surveillance
AQL: 100%
ARRIVAL/DEPARTURE AIRFIELD CONTROL GROUP (A/DACG)
5.32.1 Monitor & report airfield arrivals and departures
Timeliness: Notified same day.
Quality: Convoys, equipment, buses, baggage trucks, and personnel accurately, and completely reported.
Random sampling
Lot: Each arrival & departure at completed at time of surveillance.
AQL: 100%
5.32.2 Generate wheels up/wheels down reports, manifest reports
Timeliness: Generate reports , manifest and forward to required organizations within 1-Hr. of wheels up/wheels down
Lot: Percentage of wheels up/wheels down reports generated within 1 hour
AQL: 95%
5.32.2 Operate tactical and non-tactical support vehicles
Timeliness: To meet mission requirements.
Quality: Vehicles & equipment will be operated safely by authorized licensed personnel.
Random sampling
Lot: Vehicle & equipment operations completed at time of surveillance.
AQL: 100%
5.32.2 Receive and process vehicle and MHE requirement requests.
Tasking: Vehicles will be coordinated with either Sustainment Brigade or A/DACG to meet mission schedule Quality: Vehicles will be appropriate to meet the needs of the requestor
LOT: Each equipment request
5.32.2 Direct loading/Off-loading of passengers and cargo
Timeliness: In conjunction with mission timelines.
Quality: Safely direct & escort to designated location.
Random sampling
Lot: Each mission completed at time of surveillance.
AQL: 100%
5.32.2 Assist with Air Force Joint inspections as required/requested
Timeliness: To meet mission requirements.
Quality: Vehicles, Containers & 463-L Pallet systems will be properly weighed, marked, placarded, loaded, placed, and tied-down.
Surveillance activity checklist
Lot: Inspect aircraft mission joint inspection.
5.32.2 Conduct Technical oversight
Please add this to “Cargo”
For all modes of Transportation
Timeliness: IAW mission requirements.
Quality: Vehicles, containers will be properly weighed, marked, placarded, loaded, placed, and tied-down.
Random sampling
Lot: Inspect aircraft mission joint inspection.
AQL: 100%
5.32.2 Perform aircraft boarding requirements.
Timeliness: To meet mission requirements.
Quality: Equipment will be properly weighed, marked, labeled, placarded, and documented prior to loading.
Equipment will be safely loaded IAW approved load plans. Equipment tie-down, blocking, and bracing will be IAW industry practice. All Modes of Transportation
Surveillance activity report
Lot: Inspect deployment/training exercise.
AQL: 100%
5.32.6 Validate air and surface load plans
All Modes of Transportation
Air, truck & Rail
Timeliness: Validate within 5 working days of receipt of load plan
Random sampling
Lot: Percentage of air and surface load plans validated within 5 working days of receipt
AQL: 95%
CONTAINER YARD OPERATIONS
5.33.1 Timeliness: To meet training
exercise/deployment requirements
Download, upload, reposition, retrieve, and transport containers with no additional commercial charges being incurred.
For non-deployment movement, when current scheduled workload permits support.
Quality: Containers placed safely and correctly at designated location.
Lot: Each container transported in process or completed at time of surveillance.
AQL: 99%
5.33.1 Issue & Receive ISO containers
& MILVANS
Timeliness: Control document prepared for each asset at the time of transfer.
Quality: Completely & accurately.
Random sampling
Lot: Each control document in process or completed at time of surveillance.
AQL: 100%
5.33.1 Inspect & certify ISO containers.
Timeliness: NLT 2 1/2 years from date of last certification.
Quality: To meet international CSC standards.
Random sampling
Lot: Each ISO container in process or completed at time of surveillance.
AQL: 95%
5.33.1 Arrange for scheduled and/or emergency maintenance of light sets.
Timeliness: Scheduled: IAW manufacturer’s recommendation Emergency: Same day
Quality: Required maintenance scheduled.
Random sampling
Lot: Each light set scheduled for maintenance at time of surveillance.
5.33.1 Reposition or retrieve light sets
Timeliness: Within 48 hours of directive.
Quality: Lights sets relocated safely to designated location.
Random sampling
Lot: Number of light sets repositioned/retrieved or completed at time of surveillance.
5.33.2 Conduct inventory of ISO containers and light sets
Timeliness: Containers: Inventoried & reported quarterly.
Light sets: Reported NLT 5th business day of each month.
Surveillance activity report
Lot: Each inventory completed at time of
Quality: Completely & accurately AQL: 99%
RAIL OPERATIONS
5.34.1 Assist & Coordinate Upload/Download of Commercial Line Haul Trucks.
Timeliness: Provide assistance immediately after truck arrival at the Freight Facility to avoid demurrage/ detention charges
Cargo will be called forward per load plan accurately and safely loaded/ downloaded and documented.
Quality: Trucks will be escorted safely to/from loading point.
CBL/packing receipts will be properly annotated and distributed
LOT: Each commercial line haul vehicle completed at time of surveillance
AQL: 95%
5.34.1 Perform operator level maintenance on on-hand government owned locomotives
Timeliness: IAW applicable maintenance manuals and to meet mission requirements.
Quality: Complete & accurate
AQL: 95%
5.34.1 Order all required petroleum liquids and lubricants for locomotives.
Timeliness:
Fuel: Ordered when on hand fuel reaches 1000 gallons minimum.
Oil: Ordered when on hand oil reaches 110 gallons minimum.
Oil sample: submitted every 25 hours of operation or 90 days, whichever occurs first?
Quality: fuel & petroleum levels maintained at or above level of ordering.
Surveillance Activity Checklist
Lot: Inspect fuel order request per quarter.
AQL: 97%
5.34.1 Take oil samples for oil test
Timeliness: oil sample: submitted every 25 hours of operation or 90 calendar days, whichever occurs first.
Lot: Inspection completed at time of
Quality: Completely, efficiently, and effectively.
5.34.1 Coordinate for track repairs & foliage/debris removal.
Timeliness: Second and fourth week of each month.
Quality: Completely, efficiently, and effectively.
Random sampling
Lot: Track coordination performed and complete at time of surveillance.
AQL: 95%
5.34.1 Movement of DODX/ commercial Railcars
ALL Rail Cars, remove DODX
Add to Unit Movements / CARGO sections this is not a task of our Rail Section.
Locomotive Engineers do not perform this task
Timeliness: Disposition instructions from SDDC will be requested within 2 business days of notification of completion of mission. Coordinate with TSP to meet SDDC timelines. CBL will be provided to TSP at the time of pick up.
Quality: DODX/ Commercial cars will be completely and safely moved.
Random sampling
Random sampling
Lot: Each request for DODX railcar movement completed at time of surveillance.
AQL: 99%
5.34.2 Provide loaded/empty rail car numbers to TSP, UMC, & SDDC;
release rail cars to TSP.
Timeliness: Within 4 hours of interchange.
Quality: Information & release order is complete and accurate.
Surveillance activity checklist
Lot: Inspect rail car load plan completed at time of surveillance.
AQL: 99%
5.34.3 Coordinate interchange with
TSP
Timeliness: Coordination completed not less than 24 hours prior to arrival/departure of railcars.
Quality: To meet mission requirements.
Surveillance activity checklist
Lot: Inspect interchange completed at time of surveillance.
AQL: 97%
5.34.3 Protect Rail Crossings
Provide people trained to perform this tasking.
Timeliness: Prior to Locomotive approach at pedestrian/vehicle crossing.
Surveillance activity checklist
Lot: Each track crossing protected at time of surveillance.
Quality: Completely and safely.
Flagmen will possess PPE which is visible in day and night.
5.34.3 Perform Interchange with rail carrier. Clear obstructions on track.
Timeliness: Arrive 30 minutes prior to scheduled interchange. Obstructions cleared to allow timely arrival at interchange.
Quality: Safely and efficiently.
Surveillance activity checklist
Lot: Inspect interchange with Carrier.
AQL: 98%
File details come from the government source that posted it. Updated .