This document contains a submittal register for a contract to upgrade the electrical system at Camp Darby (South) in Livorno, Italy. The contract solicitation W912GB21R0030 was issued by the Department of the Army European Command to upgrade the electrical system, including replacing medium voltage switchgears, transformers, cables, lighting fixtures, and other system components. A mandatory site visit will be held on July 15, 2021 between 1000-1200 hours local time at Camp Darby, with contractors limited to two attendees unless they already have installation access. Contractors must register for the site visit by email no later than July 8, 2021 at 1500 hours CEST by submitting the registration form attached to the solicitation to the specified Army Corps of Engineers points of contact. Submittals will be required from the contractor on items including testing reports, qualifications, certifications, plans, manuals, and equipment.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER DELIVERY ORDER

TITLE AND LOCATION

SECTION

PARAGRAP

H NUMBER

DESCRIPTION OF ITEM SUBMITTED

P R

E C

O N

S U

B M

IT

T

A L

S

S H

O P

D R

A W

IN

G

P R

O D

U C

T D

A T

A

S A

M P

L E

D E

S

IG

N D

A

T E

S T

R E

P O

R

C E

R T

IF

IC

A T

M F

R S

I N

S T

R U

C T

IO

N

M F

R S

F

IE

L D

R E

P O

R

O

M D

A

C L

O S

E O

U T

S U

B M

IT

T

A

O T

H

F

IO

F O

R I

N F

O R

M A

T

IO

N O

N

Y

G O

V E

R N

M E

N T

A P

P R

O V

D

D E

S

IG

N E

R O

F R

E C

O R

D A

P P

R O

V

C

C O

N F

O R

M A

N C

E R

E V

IE

W

C

O

D

IS

T R

IC

T

O F

F

IC

A R

E A

O F

F

R E

S

ID

E N

T O

F F

P

P R

O

JE

C T

O F

F

D E

S

IG

N E

R O

F R

E C

O

A R

C H

IT

E

C T

E

N G

IN

E

E R

IIIj 3j-07 a. Removal and Disposal of Asbestos Materials x x x

IIIj 3j-07 a. Contractor Certification x x x

IIIj 3j-07 b. Final Clean.Up Certification x x x

IIIj 3j-07 c. Certificate to Transport Asbestos x x x

IIIj 3j-07 d. Cer5tificate of Disposal x x x

IIIj 3j-07 e. Plan of Disposal x x x

IVa 4a-04 a. Concrete Mix Tests x x x

IVa 4a-04 b. Reinforcing Bar Tests x x x

Ve 5e-02 General x x x

Ve 5e-02 General x x x

VIIc 7c-04 a. Certificate of Compliances x x x

VIIc 7c-04 b. Samples x x x

VIIIb 8b-01 a. (1) Qualification of Manufacturer x x x

VIIIb 8b-01 a. (2) Qualification of Applicator x x x

VIIIb 8b-01 a. (3) Procedures for removal of waterproofing x x x

VIIIb 8b-01 a. (4) Inspection procedures for roofing work x x x

VIIIb 8b-01 a. (5) Inspection procedures for insulation materials x x x

VIIIb 8b-01 a. (6) Certificates of Compliance x x x

VIIIc 8c-02 e. Certications and Tests x x x

XId 11d-02 Admixtures x x x

XIIf 12f-05 Operation and Maintenance Manuals x x x

XIIIa 13a-01 b. Requirements of the Firm installing the systems x x x

XIIIa 13a-01 c. Statement of Compliance x x x

XIIIa 13a-03 c. Ground Systems Components x x x

XIIIa 13a-03 c. Ground Systems Components x x x

XIIIa 13a-04 b. Metal Cable Trays x x x

XIIIa 13a-04 b. Galvanized Steel Pipes x x x

XIIIa 13a-04 f. Rigid Insulating Pipes x x x

XIIIa 13a-04 i. Junction Boxes of Insulating material x x x

XIIIa 13a-04 i. Junction Boxes of metallic material x x x

XIIIa 13a-04 l. Low Voltage Cables x x x

XIIIa 13a-04 m. Medium Voltage Cables and accessories x x x

XIIIa 13a-07 c. LED Lighting Fixtures x x x

XIIIa 13a-07 c. LED Lighting Fixtures x x x

XIIIa 13a-07 d. LED Emergency Lighting Fixtures x x x

XIIIa 13a-07 d. LED Emergency Lighting Fixtures x x x

XIIIa 13a-08 a. Medium Voltage Switchgears x x x

XIIIa 13a-08 a. Medium Voltage Switchgears x x x

XIIIa 13a-08 a. Medium Voltage Switchgears x x x

XIIIa 13a-08 a. Medium Voltage Switchgears x x x

XIIIa 13a-08j. Digital Relay Settings x x

XIIIa 13a-08j. Skilled Technicial Qualifications x x

XIIIa 13a-09 a. MV/LV Power Transformer x x x

RMS SUBMITTAL REGISTER INPUT FORM

W912PF-16-D-0007 T.O. 003 DMC

UPGRADE ELECTRICAL SYSTEM CAMP DARBY (SOUTH) - CAMP DARBY - PISA - ITALY

Button <-----Right click for Instructions

TYPE OF SUBMITTAL CLASSIFICATION REVIEWING OFFICE

XIIIa 13a-09 a. MV/LV Power Transformer x x x

XIIIa 13a-09 a. MV/LV Power Transformer x x x x

XIIIa 13a-09 a. MV/LV Power Transformer x x x

XIIIa 13a-09 b. Transformer Power Factor Corrector x x x

XIIIa 13a-09 b. Transformer Power Factor Corrector x x x

XIIIa 13a-09 b. Transformer Power Factor Corrector x x x x

XIIIa 13a-09 b. Transformer Power Factor Corrector x x x

XIIIa 13a-10 a. Low Voltage Distribution Panels x x x

XIIIa 13a-10 a. Low Voltage Distribution Panels x x x

XIIIa 13a-10 a. Low Voltage Distribution Panels x x x x

XIIIa 13a-10 a. Low Voltage Distribution Panels x x x

XIIIa 13a-10 h. Automatic Power Factor Corrector x x x

XIIIa 13a-10 h. Automatic Power Factor Corrector x x x

XIIIa 13a-10 h. Automatic Power Factor Corrector x x x x

XIIIa 13a-10 h. Automatic Power Factor Corrector x x x

XIIIb 13a-10 i. Uninterruptible Power Supply x x x

XIIIb 13a-10 i. Uninterruptible Power Supply x x x

XIIIb 13a-10 i. Uninterruptible Power Supply x x x x

XIIIb 13a-10 i. Uninterruptible Power Supply x x x

XIIIb 13a-17 m. Final Tests Documentation x x x

XIIIb 13b-01 b. Requirements of the Firm Installing the System x x x

XIIIb 13b-01 c. Statement of Compliance x x x

XIIIb 13b-01 f. As-Built Drawings x x x

XIIIb 13b-03 b. Cable Ducts x x x

XIIIb 13b-03 b. Cable Ducts x x x

XIIIb 13b-01 e. Maintenance Manholes x x x

XIIIb 13b-01 e. Maintenance Manholes x x x

XIIIb 13b-01 e. Maintenance Manholes x x x

XIIIb 13b-01 e. Maintenance Manholes x x x

XIIIb 13b-01 f. Pulling Manholes x x x

XIIIb 13b-01 f. Pulling Manholes x x x

XIIIb 13b-01 f. Pulling Manholes x x x

XIIIb 13b-01 f. Pulling Manholes x x x

XIIIb 13b-04 a. Fiber Optic cables outside buildings x x x

XIIIb 13b-04 a. Fiber Optic cables outside buildings x x x

XIIIb 13b-04 b. Copper cables x x x

XIIIb 13b-04 b. Copper cables x x x

XIIIb 13b-04 a. Fiber Optic cables inside buildings x x x

XIIIb 13b-04 a. Fiber Optic cables inside buildings x x x

XIIIb 13b-04 d. Copper cables for LAN Networks x x x

XIIIb 13b-04 d. Copper cables for LAN Networks x x x

XIIIb 13b-08 Installation of Telecommunication system in bldgs x x x

XIIIb 13b-09 a. Telecommunication Rack x x x

XIIIb 13b-09 a. Telecommunication Rack x x x

XIIIb 13b-09 b. Patch Panels x x x

XIIIb 13b-09 b. Patch Panels x x x

XIIIc 13b-09 b. Patch Panels x x x

XIIIc 13b-09 b. Patch Panels x x x

XIIIc 13b-11 Certification Inspection x x x

XIIIc 13b-13 d. Final Tests Documentation x x x

XIIIc 13c-02 Workmanship UNI EN ISO 9001: 2015 x x x

XIIIc 13c-05 b. Cable Ducts x x x

XIIIc 13c-05 b. Cable Ducts x x x

XIIIc 13c-05 b. Pulling Manholes x x x

XIIIc 13c-05 b. Pulling Manholes x x x

XIIIc 13c-05 b. Pulling Manholes x x x

XIIIc 13c-05 b. Pulling Manholes x x x

XIIIc 13c-05 f. Cast Iron Covers for Manholes x x x

XIIIc 13c-05 i. HDPE Piping for DDT Technology x x x

XIIIc 13c-06 Cable Ducts for entrance into Substations x x x

XIIIc 13c-08 Final Tests x x x