FY19
Project NameProject Description
Mechanical Upgrade Quadrant 1400 (Phase I) - DesignThe Contractor shall design a solution in accordance with the mechanical strategy developed under contract H95001-10-D-0001, Task Order 8006. All lessons learned from these prior designs shall be incorporated into this design. The design shall install a new air handling unit (AHU) onto the open mechanical pad within room 108 to include all supporting components needed to make the AHU complete. The new AHU shall provide additional air supply capacity.
Room 1205 Facility Modification1205 CR- Provide an electrical design for one electrical outlet to support a Time Zone clock installation; Modify 1205-03- Provide a design to extend the South and West walls from true floor to true ceiling and install a new STC 50 door to meet A sound Group 4 rating. May involve moving electrical and mechanical infrastructure; Provide back-up cooling for Room 1205-04. Provide a design to replace the belt driven motor with 3 Direct Drive ECM motors
Building 720 Roof ReplacementReplace the Roofing System on Bldg 720 with a weather-tight system, drain to existing roof drains, and secured to resist loading per American Society of Civil Engineers Standard 7-10.
Mission Control Center A&B UpgradesUpgrade a refresh space to include furniture and Audio/Visual upgrades for MCC-A and B to support DT/GM Mission Requirements
Data Center Chilled Water Pumps & Piping - Implementation* Add a new dedicated chilled water piping circuit serving the 2200 Data Center Computer Room Air Conditioner (CRAC) units, sized to meet a cooling capacity of (14 ea.) 50-ton CRAC units.

* Upgrade the pump station by combining the existing Automated Data Processing Equipment (ADPE) chilled water loop to the Data Center piping circuit. This will help provide standardization of all future chilled water pumps located in room B-63, which will minimize pump equipment inventories, space, and maintenance costs.

* Install a dedicated chilled water filtration unit to protect both existing and future CRACs throughout MDA from fouling while maintaining cooling efficiencies throughout.

Mission Control Center T Upgrades Upgrade the MCC-T to meet current mission requirements, updates include but are not limited to:

Reference: Attached PowerPoint presentation – MDIOC Flight Test Upgrades MCC-T

- Furniture Upgrades o Remove and replace the consoles in the proposed configuration o Replace consoles chairs (similar to those procured in the MCC A&B upgrade); provide 3 spare chairs in addition to the 24 console positions

- IT Upgrades/Reconfigurations o Each console position will be provided 4 monitors o Provide keyboard, video and mouse (KVM) switching capability o Provide for Video Inject Capability (supplied by others) o Possible relocation of rack equipment to support console configuration o ULAN Capability at each console position

- Infrastructure Upgrades o Provide redundant power to support each console position o Provide user accessible electrical outlets at each console position

- Architectural Upgrades o Replace carpeting throughout (replace cove base as required) o Patch and Paint where required Custodial Storage and Office buildout Implementation • Contractor shall complete the facility design given the following requirements:

- Objective: Prepare room 115 for custodial supply, equipment storage, and equipment charging capability. Work includes, but is not limited to:

o Compliant with OSHA and NFPA including wall-mounted, self-contained eye wash station with signage (minimum 15 minute deluge) and the addition of fire alarm notification appliances (horn and strobe).

o Remove room contents and prepare area for custodial supply, equipment storage, and equipment charging.

o Adjust electrical and HVAC infrastructure as required including two, 20A, GFI protected circuits to service up to three trickle chargers each.

- Objective: Prepare room 136-01 for custodial office, break area, locker storage, and washer and dryer service. Work includes, but is not limited to:

o Paint walls o Install new standard carpet tile o Relocate the 2 Internet/ Phone lines for 115 to 136-01.

o Install new ceiling lighting.

o Adjust electrical and HVAC infrastructure as required o Relocate and hang 2 each white boards and cork boards from 115 to 136-01 o Provide plumbing and electrical service for one each, standard size Washer and Dryer. Dryer circuit must be 220V, GFI protected with three-prong outlet. Dryer venting must go directly to the outside of the building and if through fire rated wall, the penetrations must be restored to original fire rating.

o Compliant with OSHA and NFPA including the addition of fire alarm notification appliances (horn and strobe).

Data Center 2201 Electrical for C2BMC - Implementation 1) Modify electrical infrastructure to support redundant power to listed C2BMC racks (see attached excel file)

- Demo 110V power

- Install new 220V receptacles to each rack identified with “A” and “B” sources

- Install new RPPs as required

- Demo Legacy electrical panels as required and ensure clean finish after demo

- Modify(rotate) existing RPP to support new racks as required

- Re-feed any existing RPPs as required to adhere to standard data room “A” and “B” RPP locations

2) Design new cable trays to support new racks.

3) Verify heat loading delta from existing serves to be decommissioned and new equipment to determine any mechanical modification and ensure modification are included within design

4) Removal of outdated racks, procurement and installation of new updated racks by others. Procure and install new updated racks as specified by customer.

FY20
Building 730 Stairwells (Full Lifecycle)The contractor shall perform the task of a refresh of stairwells 2 and 3 of building 730. The task that shall be performed includes the design of a total refresh of stairwells 2 and 3 of building 730. The design and implementation shall consistent with all local, state, and federal building codes including, but not limited to UFC standards, ADA code, OSHA code, and NFPA code. Work to be included in the design:

- Replace flooring, treads, and risers.

- Remove wallcovering and prepare wall surfaces for paint.

- Patch and paint walls.

- Refinish or replace handrails as deemed by cost.

- Upgrade lighting fixture to LED lights.

Construct Secure Area for DES (Implementation)Design and implement a new SAP-F facility; The new SAP-F will be constructed within DE/S allocated space and will include the following requirements
2409 GNOSC Buildout (Implementation)Reconfigure 2408/2409 to accommodate additional personnel

Upgrade the entire area to current facility standards to include, but not limited to:

Carpet Paint Ceiling LED light fixtures Mechanical Electrical Systems furniture The executive furniture for rooms 2409-02 and 2409-03 will be purchased new per MDIOC standard The effort to modify the 2409-10 break room is included as an engineering estimate

Building 730 Penthouse Louver ReplacementDesign and implement a solution to the BLDG 730 PentHouse louvers to prevent weather penitrations
UPS Battery Coordination SupportProcure and install 980 UPS Batteries
Building 730 SkylightsReplace (8) old and delaminating skylights
Building 730 Lobby Restroom RefreshUpdate Building 730 Lobby, Bathrooms to include plumbing, HVAC supply & exhaust, tile, partitions, counters, fixtures, ceiling, lighting, and fire detection/suppression system.
Building 730 Common Area RefreshRefresh paint, flooring, ceiling, lights, and door hardware in BLDG 720
FY21
Non-Tech Power Upgrade for Data Center (Implementation)Provide redundant power for HVAC equipment in the data center (2201). Also includes the addition of three CRACS and cleaning of the ducts into 2201.
Operational Test Agency Area Refresh (Full Lifecycle)Build out space to support OTA mission requirements and conference room
MDSOCMissile Defense Space Enterprise Architecture (MDSEA) Space Operations Center (MDSOC) Design and implementationProvide space capable of supporting 20 seats in the four backroom offices (6 personnel per office)

Ops floor to support 15 operational workstations Video wall (to be designed and installed by RECs) 20 Person conference room with glass wall to view operations floor Video wall (to be designed and installed by RECs) Four person flight operations seating Install new AHU in 239 to support increase in personnel an equipment All network and IT install CSSP (B34/28; B47/50 Restroom; RM 132; AHU RM 108) 2.1 Buildout B34/B34-02 and B28 capable of supporting no less than 54 MDS CSSP personnel, 24/7 Operational Space (see attachment for conceptual layout of approved and identified space)

2.2 Provide restroom refresh which includes the install of no less than two additional water closets and seven sinks in the basement to support personnel growth

2.3 Buildout and refresh B79 and B71-04 as MDIOC Swing space (walls, lights, ceilings, furniture, HVAC) to maximize occupancy at no less than 36 sq. ft. configuration

2.4 Convert B37 to MS storage (walls, lights, ceilings, storage)

2.5 Modify the HVAC system within room 108 to provide redundant cooling to the 1400 quadrant and the CSSP area in the basement.

2.6 Modify room 132 to support

MDIOC BLDG 720 Air Handling Units (AHU)
(AHU-New; AHU-003; AHU-105; AHU-121)2.1 Perform activities necessary to implement an AHU solution to support the Battery Rooms B38 and B43 (B52) to include, but is not limited to: install one unit in B-52 on existing empty pad and remove two (003 and 004); supply/exhaust/outside air ductwork, fan arrays with ECM motors, etc.

2.2 Perform activities necessary to implement an AHU solution to support the 1300 Quad to include, but is not limited to: Replace one legacy units for the 1300 quad with associated electrical distribution equipment, supply/return/outside air ductwork, fan arrays with ECM motors, etc.

2.3 Perform activities necessary to implement an AHU solution to support the 1200 Quad

2.4 Perform activities necessary to implement an AHU solution to support the 2400 Quad to include, but is not limited to: Install one new unit for 2400 quad to include electrical distribution equipment, supply/return/outside air ductwork, fan arrays with ECM motors, etc.

FY22
MDIOC BLDG 730/720 AHUs
(AHU-208; AHU-210; AU-211; AHU-314A)The Contractor shall design and implement a solution to replace the following Air Handling Units (AHUs):

2.1 AHU-208 in Building 720 Room 236

2.2 AHU-211 in Building 720 Room 239

2.3 AHU-314A in Building 720 Room 314

2.4 AHU-210 in Building 720 Room 236

Room 105B 2.1 Remove all items from Room 105 and 105B and identify items to be reutilized.

2.2 Survey space to determine all facility requirements as needed (not limited to: flooring, electrical, abandoned cable, etc.)

2.3 Provide SRR and DDR artifacts and CDRL to meet SS, IT, RECs, and facility requirements (see initial conceptual design and stated IT requirements below)

2.4 Utilize MUFGS to meet MDIOC facility standards.

2.5 Procure and install required furniture to meet SS and facility requirements.

2.6 Coordinate with all stakeholders throughout the project to ensure proactive integration and communication.

Room B03 Refresh 2.1 Design and implement to meet conceptual design (attachment 1)

2.2 Provide space capable of supporting a minimum of 40 MSF IRES personnel

2.3 Demo B03 hard walls

2.4 Demo B12 and combine with B13 breakroom

2.5 Demo B13 to meet conceptual design layout

2.6 Demo and refresh B03, B12/13, B16/17 ceiling, lighting, flooring and furniture

2.7 Refresh B16/17 conference room

2.7.1 Coordinate with RECs to execute tech refresh

2.8 Temporarily relocate personnel to support refresh and buildout

2.9 Coordinate all outages and closures per PWS

Data Center Special Use Space (SUS) Design & Implementation 2.1 Implement demolition of 2202 and procure maximum amount of equipment prior to QRT-15R1 Detailed Design Package completion

2.2 Implement the Detailed Design Package being completed under 20F8600 QRT-15R1, Data Center SUS Design

Technical Utility Systems (TUS) 2 SupportReplace TUS 2 Gear
Building 720 Interior RefreshRefresh paint, flooring, ceiling, lights, and door hardware in BLDG 720
AHU 730 DesignDesign only solution to replace two large AHUs
AHU 720 DesignDesign only solution to replace 4 end of life AHUs
Building 720 East Restroom Stack• Demo and remove all tile (flooring and wall), partition walls, sinks, plumbing fixtures (toilets and urinals), light fixtures, mirrors, and associated plumbing.

• Repair ceiling as needed, rework current lighting layout to provide maximum foot candles in the space and replace with new LED fixtures

• Repair walls as needed and install new tile from floor to ceiling

• Install new flooring/wall tile throughout

• Install new toilet and urinal partition walls

• Install new automated commodes, urinals, faucets, paper towel dispensers, and soap dispensers

• Install new solid surface countertops with sinks integrated into Solid Surface material

• Install new cove base

• Install new entry doors

• Install new mirrors

• Paint interior portion of door frame with new MDA standard door color

• Verify all installed materials and equipment are operational upon completion

• Work activities shall be coordinated with active projects, events and missions at the MDIOC

• All changes to As-Built drawings shall be red lined in CAD or similar software and delivered to the government at closeout. Note that the red lined drawings are not required to be a stamped drawing by an architect, but are for reference only Building 720 Rooms 3306 & 1401 Refresh Designs Design the complete refresh and furniture solution to maximize seating within the 3306 and 1401 quads

File details come from the government source that posted it. Updated .