Attachment - Price Proposal Breakdown.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 36C26126R0019
About this file
This is a Price Proposal Breakdown template for Solicitation Number 36C261C26R0019, Project Number 662-23-105 for the Renovate Sterile Processing Service at San Francisco VA Medical Center. The template is a blank form designed to capture offeror pricing across multiple construction divisions using the CSI (Construction Specifications Institute) MasterFormat classification system. It provides line items for 28 construction divisions including General Requirements, Concrete, Masonry, Metals, HVAC, Plumbing, Electrical, Fire Suppression, and other specialty trades. Each division section breaks down costs into Material and Labor components with subtotals, and the template includes sections for Design Total, Overhead, Profit, Insurance & Taxes, and Bonding to calculate the Grand Total.
The template is structured to require offerors to enter their Offeror Name and Preparer Name, with all cost fields currently showing $0.00 as placeholders. Material and Labor sums are calculated for each division, and the overall pricing structure rolls up through divisional totals to reach a final Grand Total that incorporates overhead, profit, insurance, taxes, and bonding costs. This blank template serves as the standardized format for all contractors responding to the firm-fixed price construction solicitation, which is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated contract value between $10,000,000 and $20,000,000.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Breakdown Sheet
| Solicitation Number: 36C261C26R0019 |
| Project Number and Title: 662-23-105, RENOVATE STERILE PROCESSING SERVICE FOR SAN FRANCISCO VA Medical Center |
| Prepared Date: |
| Offeror Name: |
| Preparer Name: |
| Division Total: | $0.00 |
| Design Total | $0.00 |
| Overhead: | $0.00 |
| Subtotal: | $0.00 |
| Profit: | $0.00 |
| Subtotal: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Subtotal: | $0.00 |
| Bonding: | $0.00 |
| Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Material | ||||||
| Division 01 - General Requirements | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | |||||
| Division 02 - Existing Conditions | Labor | $0.00 | |||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | |
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 03 - Concrete | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 04 - Masonry | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 05 - Metals | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 06 - Wood and Plastic | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||||
| $0.00 | Material Sum: | $0.00 | ||||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 07 - Therm /Moisture Prot. | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 08 - Doors and Windows | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 09 - Finishes | Labor | 0 | $0.00 | $0.00 | ||
| 0 | 0 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | 0 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | 0 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 10 - Specialties | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 11 - Equipment | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 12 - Furnishings | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 13 - Special Construction | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 14 - Conveying Equipment | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 21 - Fire Suppression | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 22 - Plumbing | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 23 - HVAC | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 25 - Integrated Automation | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 26 - Electrical | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 27 - Communications | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 28 - Elect. Safety/Security | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||||
| $0.00 | Material Sum: | $0.00 | ||||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 31 - Earthwork | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 32 - Exterior Improvements | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 33 - Utilities | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 34 - Transportation | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 48 - Electrical Power Gen. | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
Modify Mental Health Nurse Station Page &P of &N
Sheet2
Sheet3
File details come from the government source that posted it. Updated .