Attachment - Price Proposal Breakdown.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Z2DA--Solicitation No. 36C26126R0019 -- Project No. 662-23-105 Renovate Sterile Processing for VAMC - San Francisco
Solicitation number
36C26126R0019
Issued by

About this file

This is a Price Proposal Breakdown template for Solicitation Number 36C261C26R0019, Project Number 662-23-105 for the Renovate Sterile Processing Service at San Francisco VA Medical Center. The template is a blank form designed to capture offeror pricing across multiple construction divisions using the CSI (Construction Specifications Institute) MasterFormat classification system. It provides line items for 28 construction divisions including General Requirements, Concrete, Masonry, Metals, HVAC, Plumbing, Electrical, Fire Suppression, and other specialty trades. Each division section breaks down costs into Material and Labor components with subtotals, and the template includes sections for Design Total, Overhead, Profit, Insurance & Taxes, and Bonding to calculate the Grand Total.

The template is structured to require offerors to enter their Offeror Name and Preparer Name, with all cost fields currently showing $0.00 as placeholders. Material and Labor sums are calculated for each division, and the overall pricing structure rolls up through divisional totals to reach a final Grand Total that incorporates overhead, profit, insurance, taxes, and bonding costs. This blank template serves as the standardized format for all contractors responding to the firm-fixed price construction solicitation, which is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated contract value between $10,000,000 and $20,000,000.

View the file

Other files

File Type Posted
200 3A ELP6 Panel Schedule.jpg JPG image
Specification Section 07 22 00.pdf PDF
Specification Section 05 36 00 Composite Metal Decking.pdf PDF
ILSM Evaluation Sheet - FILLABLE-MASTER.pdf PDF
VHA PCRA 2024_1.1_Final.Template_Fillable.pdf PDF
VHA ICRA 2024_1.1_Final Template_Fillable 5.24.24.pdf PDF
Amendment to Solicitation No. 36C26126R0019 0004.docx DOCX document
Response to Pre-Proposal RFIs_20260429_36C26126R0019.pdf PDF
S06 - Amendment to Solicitation No. 36C26126R0019 0003.docx DOCX document
S06 - Amendment to Solicitation No. 36C26126R0019 0002.docx DOCX document
ATTACHMENT - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Pre-Proposal Site Visit Sign-in Roster 20260326.pdf PDF
S06 - Amendment to Solicitation No. 36C26126R0019 0001.docx DOCX document
662-23-105_Equipment Cutbook 2 of 2-min.pdf PDF
DBA CA20260018 20260130.docx DOCX document
VAAR 852.219-75 Certification_JAN 2023_DEVIATION.pdf PDF
662-23-105_Final CD Specifications 1 of 2_V1.pdf PDF
662-23-105_Final CD Specifications 2 of 2_V2.pdf PDF
Infection Control Risk Assessment.pdf PDF
662-23-105_Equipment Cutbook 1 of 2-min.pdf PDF
Solicitation No. 36C26126R0019.docx DOCX document
662-23-105_Project Room Contents.pdf PDF
662-23-105_Final Construction Documents_Combined Drawing Set.pdf PDF
RFI Form.docx DOCX document
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Breakdown Sheet

Solicitation Number: 36C261C26R0019
Project Number and Title: 662-23-105, RENOVATE STERILE PROCESSING SERVICE FOR SAN FRANCISCO VA Medical Center
Prepared Date:
Offeror Name:
Preparer Name:
Division Total:$0.00
Design Total$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:$0.00
Insurance & Taxes:$0.00
Subtotal:$0.00
Bonding:$0.00
Grand Total:$0.00
Division Totals
Division 01 - General Requirements$0.00
Division 02 - Existing Conditions$0.00
Division 03 - Concrete$0.00
Division 04 - Masonry$0.00
Division 05 - Metals$0.00
Division 06 - Wood and Plastic$0.00
Division 07 - Therm/Moisture Prot.$0.00
Division 08 - Doors and Windows$0.00
Division 09 - Finishes$0.00
Division 10 - Specialties$0.00
Division 11 - Equipment$0.00
Division 12 - Furnishings$0.00
Division 13 - Special Construction$0.00
Division 14 - Conveying Equipment$0.00
Division 21 - Fire Suppression$0.00
Division 22 - Plumbing$0.00
Division 23 - HVAC$0.00
Division 25 - Integrated Automation$0.00
Division 26 - Electrical$0.00
Division 27 - Communications$0.00
Division 28 - Elect. Safety/Security$0.00
Division 31 - Earthwork$0.00
Division 32 - Exterior Improvements$0.00
Division 33 - Utilities$0.00
Division 34 - Transportation$0.00
Division 48 - Electrical Power Gen.$0.00
Material
Division 01 - General RequirementsLabor0$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 02 - Existing ConditionsLabor$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 03 - ConcreteLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 04 - MasonryLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 05 - MetalsLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 06 - Wood and PlasticLabor0$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 07 - Therm /Moisture Prot.Labor0$0.00$0.00
0$0.00$0.00$0.00
00$0.00$0.00
00$0.00$0.00
00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 08 - Doors and WindowsLabor0$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 09 - FinishesLabor0$0.00$0.00
00$0.000$0.00$0.00
00$0.000$0.00$0.00
00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 10 - SpecialtiesLabor0$0.00$0.00
0$0.00$0.0000$0.00
0$0.00$0.0000$0.00
0$0.00$0.0000$0.00
0$0.00$0.0000$0.00
0$0.00$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 11 - EquipmentLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 12 - FurnishingsLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 13 - Special ConstructionLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 14 - Conveying EquipmentLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 21 - Fire SuppressionLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 22 - PlumbingLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 23 - HVACLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 25 - Integrated AutomationLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 26 - ElectricalLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 27 - CommunicationsLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 28 - Elect. Safety/SecurityLabor0$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 31 - EarthworkLabor$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 32 - Exterior ImprovementsLabor$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 33 - UtilitiesLabor$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 34 - TransportationLabor$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00
Material
Division 48 - Electrical Power Gen.Labor$0.00
$0.00$0.00
$0.00Material Sum:$0.00
Labor Sum:$0.00Division Total:$0.00

Modify Mental Health Nurse Station Page &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .