Specification Section 05 36 00 Composite Metal Decking.pdf
PDF 132 KB Posted
- Solicitation number
- 36C26126R0019
About this file
This is a specification section for composite metal decking installation at the VA San Francisco Medical Center (Project No. 662-23-105). The specification establishes material and service requirements for installing composite steel decking, including shear connector studs and miscellaneous closures to prepare the deck for concrete placement.
Materials must comply with ASTM A653/A653M structural quality steel with G90 galvanizing (minimum 0.75 mm thickness) suitable for shear stud weld-through techniques. Shear connector studs shall be ASTM A108, Grades 1015-1020, with 350 MPa minimum yield and 400 MPa minimum tensile strength. Steel deck edges must feature vertical interlocking male and female lips for positive mechanical connection. Sheet metal accessories, including cover plates, edging, closure strips, and seat angles, must be minimum 1.3 mm (18 gauge) galvanized steel matching the deck quality. Welding electrodes must be E60XX minimum, and all work must comply with AWS D1.3/D1.3M standards performed by qualified welders per AWS D1.1/D1.1M certification.
Erection requirements mandate that steel framework be plumbed, aligned, and completed before deck installation begins. Floor deck units must be fastened to supporting members using 16 mm diameter puddle welds or equivalent, spaced not more than 305 mm on center with minimum two welds per unit at each support. Side laps of units spanning over 1,524 mm must be welded at midspan or 914 mm on center intervals. All cuts and penetrations must be made neatly using metal saws, drills, or punchout devices; torch cutting is prohibited. The contractor must provide shop drawings, manufacturer test reports establishing composite system structural characteristics, stud base qualification reports, welder certifications, and UL fire rating certifications. Shear studs must be installed per AWS D1.1/D1.1M Section 7, and the deck must be cleaned per manufacturer recommendations before concrete placement.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS VA SAN FRANCISCO MEDICAL CENTER PROJECT
NO:662-23-105
SPS Sterile Processing Service01-01-21
05 36 00 - 1
SECTION 05 36 00
COMPOSITE METAL DECKING
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies material and services required for installation of composite steel decking including shear connector studs and miscellaneous closures required to prepare deck for concrete placement as shown and specified.
1.2 RELATED WORK
A. Section 01 45 29, TESTING LABORATORY SERVICES: Materials testing and inspection during construction.
1.3 DESIGN REQUIREMENTS
A. Design steel decking in accordance with AISI S-100, except as otherwise shown or specified.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES. All items indicated below are required submittals requiring Contracting Officer’s Representative (COR) review and approval.
B. Shop Drawings: Shop and erection drawings showing decking unit layout, connections to supporting members, and information necessary to complete the installation as shown and specified, including supplementary framing, cant strips, cut openings, special jointing or other accessories.
1. Show welding, side lap, closure, deck reinforcing and closure reinforcing details.
2. Show openings required for work of other trades, including openings not shown on structural drawings.
3. Indicate where temporary shoring is required to satisfy design criteria.
C. Manufacturer's Literature and Data: Showing steel decking section properties and specifying required structural characteristics.
D. Manufacturer's written recommendations for:
1. Shape of decking section.
2. Cleaning of steel decking prior to concrete placement.
E. Test Report - Establishing structural characteristics of composite concrete and steel decking system.
F. Test Report - Stud base qualification.
SPS Sterile Processing Service01-01-21
05 36 00 - 2
G. Welding power setting recommendation by shear stud manufacturer.
H. Shear Stud Layouts: Submit drawings showing the quantity, pattern, spacing and configuration of shear studs for each beam and girder.
I. Certification: For each type and gauge of metal deck supporting concrete slab or fill, submit certification of specified fire ratings.
Certify that units supplied are UL listed as a “Steel Floor and Form
Unit”.
J. Manufacturers Certificates for deck units attesting compliance with specified requirements.
K. Submit manufacturer’s catalog data for Welding Equipment and Welding
Rods and Accessories intended use.
L. Power Actuated Tool Operator Certificates.
M. Welders qualifications.
1.5 QUALITY ASSURANCE
A. Fire Safety
1. Underwriters’ Label: Provide composite metal floor deck units listed in Underwriters’ Laboratories “Building Materials Directory”, with each deck unit bearing the UL label and marking for specific system detailed.
2. Insurance Certification: Assist the Government in preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance.
B. Wind Storm Resistance: Provide roof construction assembly capable of withstanding an uplift pressure of 3 kPa or 50 psf higher UL Class required by wind loading in the location of the project pounds per square foot) when tested in accordance with the uplift pressure test described in the FM DS 1-28 or as described in the UL 580.
C. Deck Units: Provide deck units and accessory products from a manufacturer engaged in the manufacture of steel decking for more than three (3) years. Submit manufacturer’s certificates attesting that the decking material complies with the specified requirements.
D. Certification of Powder-Actuated Tool Operator: Manufacturer’s certificate attesting that the operators are authorized to use the low velocity powder-actuated tool.
E. Qualifications for Welding Work: Submit qualified welder qualifications in accordance with AWS D1.1/D1.1M or under an approved qualification test.
SPS Sterile Processing Service01-01-21
05 36 00 - 3
1.6 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. Refer to the latest edition of referenced Standards and codes.
B. American Iron and Steel Institute (AISI):
S-100-16................North American Specification for the Design of
Cold-Formed Steel Structural Members
C. ASTM International (ASTM):
A36/A36M-19.............Standard Specification for Carbon Structural
Steel
A108-18.................Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finished
A653/A653M-20...........Standard Specification for Steel Sheet, Zinc
Coated (Galvanized) or Zinc Iron Alloy Coated
(Galvannealed) by the Hot Dip Process
D. American Institute of Steel Construction (AISC):
1. Specification for Structural Steel Buildings – Allowable Stress
Design and Plastic Design (Latest Edition)
2. Load and Resistance Factor Design Specification for Structural Steel
Buildings (Latest Edition)
E. American Welding Society (AWS):
D1.1/D1.1M-20...........Structural Welding Code - Steel
D1.3/D1.3M-18...........Structural Welding Code - Sheet Steel
F. FM Global (FM):
APP Guide...............Approval Guide
DS 1-28-15..............Design Wind Loads
G. Military Specifications (Mil. Spec.):
MIL-P-21035B............Paint, High Zinc Dust Content, Galvanizing
Repair
H. Underwriters Laboratories (UL):
Bld Mat Dir(Annually)...Building Materials Directory
PART 2 - PRODUCTS
2.1 MATERIALS
A. Steel Decking and Flashings: ASTM A653/A653M, Structural Quality suitable for shear stud weld-through techniques.
B. Galvanizing: ASTM A653/A653M, G90. Thickness not less than 0.75 mm
(0.029 inch).
SPS Sterile Processing Service01-01-21
05 36 00 - 4
C. Shear connector studs: ASTM A108, Grades 1015-1020, yield 350 Mpa
(50,000 pound/square inch) minimum, tensile strength - 400 Mpa (60,000 pounds/square inch) minimum, reduction of area 50 percent minimum.
1. Provide studs of uniform diameter, with heads concentric and on same axis to shaft.
2. Provide studs, after welding, free from substance or defect which would interfere with its function as a shear connector.
3. Do not paint or galvanize studs.
4. Provide size of studs as shown on drawings.
5. Provide studs manufactured by a company normally engaged in the manufacturer of shear studs, and can furnish equipment suitable for weld-through installation of shear studs.
D. Galvanizing Repair Paint: Mil. Spec. MIL-P-21035B.
E. Miscellaneous Steel Shapes: ASTM A36/A36M.
F. Welding Electrode: E60XX minimum.
G. Sheet Metal Accessories: ASTM A653/A653M, galvanized, unless noted otherwise. Provide accessories of every kind required to complete the installation of metal decking in the system shown. Finish sheet metal items to match deck including, but not limited to, the following items:
1. Metal Cover Plates: For end-abutting deck units, to close gaps at changes in deck direction, columns, walls and openings. Same quality as deck units but not less than 1.3 mm (18 gauge) sheet steel.
2. Continuous sheet metal edging: at openings and concrete slab edges.
Same quality as deck units but not less than 1.3 mm (18 gauge) steel. Side and end closures supporting concrete and their attachment to supporting steel to be designed by the manufacturer to safely support the wet weight of concrete and construction loads.
The deflection of cantilever closures to be limited to a total of 3 mm (1/8 inch) maximum.
3. Metal Closure Strips: For openings between decking and other construction, of not less than 1.3 mm (18 gauge) sheet steel of the same quality as the deck units. Form to the configuration required to provide tight-fitting closures at open ends of flutes and sides of decking.
4. Seat angles for deck: Where a beam does not frame into a column.
SPS Sterile Processing Service01-01-21
05 36 00 - 5
2.2 REQUIREMENTS
A. Steel decking depth, gauge, and section properties to be as shown on contract documents. Provide edges of deck with vertical interlocking male and female lip providing for a positive mechanical connection.
B. Fabricate deck units with integral embossments to provide mechanical bond with concrete slab. Deck units combined with concrete slab to be capable of supporting total design loads.
C. Provide integral system with single point of attachment for light duty hanger devices for flexibility for attaching hangers for support of acoustical, lathing, plumbing, heating, air conditioning electrical and similar items.
1. Provide a minimum spacing pattern of 305 mm (12 inches) on centers longitudinally and 610 mm or 914 mm (24 or 36 inches) on centers transversely.
2. Provide suspension system capable of safely supporting a maximum allowable load of 45 kg (100 pounds) concentrated at one hanger attachment point.
3. System may consist of fold-down type hanger tabs or a lip hanger.
PART 3 - EXECUTION
3.1 ERECTION:
A. Do not start installation of metal decking until corresponding steel framework has been plumbed, aligned and completed, and until temporary shoring, where required, has been installed.
1. Remove oil, dirt, paint, ice, water and rust from steel surfaces to which metal decking will be welded.
B. Coordinate and cooperate with structural steel erector in locating decking bundles to prevent overloading of structural members.
C. Do not use floor deck units for storage or working platforms until permanently secured.
1. Do not overload deck units once placed.
2. Replace deck units that become damaged after erection and prior to casting concrete at no additional cost to the Government.
D. Erect steel deck in accordance with manufacturer's printed instructions.
E. Ship steel deck units in standard widths and fabricated to proper length.
F. Provide steel decking in sufficient lengths to extend over 3 or more spans, except where structural steel layout does not permit.
SPS Sterile Processing Service01-01-21
05 36 00 - 6
G. Place steel decking units on supporting steel framework and adjust to final position before being permanently fastened.
1. Bring each unit to proper bearing on supporting beams.
2. Place deck units in straight alignment for entire length of run of flutes and with close registration of flutes of one unit with those of abutting unit.
3. 3. Maximum space between ends of abutting units is 13 mm (1/2 inch).
If space exceeds 13 mm (1/2 inch), install closure plates.
H. Ceiling hanger loops, if provided, must be flattened or removed to obtain bearing of units on structural steel.
I. Fastening Deck Units:
1. Fasten floor deck units to steel supporting members by not less than
16 mm (5/8 inch) diameter puddle welds or elongated welds of equal strength, spaced not more than 305 mm (12 inches) on center with a minimum of two welds per unit at each support. Where two units abut, fasten each unit individually to the supporting steel framework.
2. Tack weld or use self-tapping No. 8 or larger machine screws at
914 mm (3 feet) on center for fastening end closures. Only use welds to attach longitudinal end closures.
3. Weld side laps of adjacent floor deck units that span more than
1524 mm (5 feet). Fasten at midspan or 914 mm (3 feet) on center, whichever is smaller.
J. Weld in conformance to AWS D1.3/D1.3M and done by qualified experienced welding mechanics.
K. Clean and touch-up area and welds scarred during erection, and repair with zinc rich galvanizing repair paint.
1. Paint touch-up is not required for welds or scars that are to be in direct contact with concrete.
L. Provide metal concrete stops at edges of deck.
M. Cutting and Fitting:
1. Fabricate metal deck units to proper length prior to shipping.
2. Field cutting by the metal deck erector is restricted to bevel cuts, notching to fit around columns and similar items, and cutting openings that are located and dimensioned on the structural drawings.
3. Other penetrations shown on the approved metal deck shop drawings but not shown on the structural drawings are to be located, cut and reinforced.
SPS Sterile Processing Service01-01-21
05 36 00 - 7
4. Make cuts and penetrations neat and trim using a metal saw, drill or punchout device; cutting with torches is prohibited.
5. Do not make cuts in the metal deck that are not shown on the approved metal deck drawings.
6. If an additional opening not shown on the approved shop drawings is required, submit a sketch, to scale, locating the required new opening and other openings and supports in the immediate area. Do not cut the opening until the sketch has been reviewed and accepted by the Contracting Officer Representative (COR). Provide additional reinforcing or framing required for the opening at no additional cost to the Government.
7. Reinforcement at Openings: Provide additional metal reinforcement and closure pieces as required for strength, continuity of decking and support of other work shown.
N. Install shear connector studs through previously installed metal deck in conformance to AWS D1.1/D1.1M, Section 7.
CLEANING
O. Clean deck in accordance with manufacturer's recommendation before concrete placement.
- - - E N D - - -