662-23-105_Final Construction Documents_Combined Drawing Set.pdf
PDF 53 MB Posted
- Solicitation number
- 36C26126R0019
About this file
This is a final construction documents file containing the combined drawing set for Project No. 662-23-105, the renovation of the Sterile Processing Service at the San Francisco VA Medical Center. The drawings provide detailed architectural, mechanical, electrical, and plumbing designs necessary to execute the extensive renovation work that includes demolition, replacement, installation, and commissioning of a new sterile processing department compliant with current design criteria. The design incorporates HVAC systems and water processing equipment, along with site preparation requirements and provisions for a mobile processing trailer to maintain operations during the interior construction phase.
The construction drawings serve as the technical basis for the firm-fixed price contract valued between $10 million and $20 million being solicited under Solicitation No. 36C26126R0019. As part of these final construction documents, the drawings define all specifications and requirements that offerors must use to develop accurate pricing and project schedules. The renovation scope requires contractors to possess expertise in healthcare facility construction, sterile processing design standards, and compliance with applicable building codes and medical facility regulations.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .