This is a specification section for roof and deck insulation work at the VA San Francisco Medical Center for the SPS Sterile Processing Service project (Project No. 662-23-105). The section covers the installation of roof and deck insulation, substrate board, vapor retarder, and cover board on existing concrete and metal deck substrates, along with repairs and alterations to existing roof insulation.

The specification requires a minimum overall average R-value of RSI-57 (R-33) and any location R-value of RSI-17 (R-10). Insulation products must comply with ASTM C1289 Type II Class 1 Grade 2 polyisocyanurate board with glass fiber reinforced cellulosic felt facers, or alternative materials including mineral fiberboard, perlite board, or cellular glass for tapered sections. Tapered roof insulation systems must maintain a minimum thickness of 38 mm (1.5 inches) and minimum slope of 1/48 (1/4 inch per 12 inches). Substrate boards must be glass-mat water-resistant gypsum roof board or cellulosic-fiber-reinforced gypsum per ASTM standards, 16 mm (5/8 inch) thick. Cover boards must meet similar specifications. Installation requires either adhered insulation using urethane adhesive or hot asphalt, mechanically fastened insulation using corrosion-resistant fasteners to resist uplift pressures, or a combination method. Insulation joints must be staggered minimum 150 mm (6 inches) between layers, and cover board joints must be offset from insulation joints minimum 6 inches. All materials must be delivered in original sealed packaging and stored indoors in dry conditions. The installer must meet the same qualifications as the Division 07 roofing section installer. Products must comply with UL listings, ASTM standards, ASHRAE Standard 90.1-13, ASCE 7-16, and NRCA Manual-15 guidelines.

View the file

Other files

File Type Posted
200 3A ELP6 Panel Schedule.jpg JPG image
Specification Section 05 36 00 Composite Metal Decking.pdf PDF
ILSM Evaluation Sheet - FILLABLE-MASTER.pdf PDF
VHA PCRA 2024_1.1_Final.Template_Fillable.pdf PDF
VHA ICRA 2024_1.1_Final Template_Fillable 5.24.24.pdf PDF
Amendment to Solicitation No. 36C26126R0019 0004.docx DOCX document
Response to Pre-Proposal RFIs_20260429_36C26126R0019.pdf PDF
S06 - Amendment to Solicitation No. 36C26126R0019 0003.docx DOCX document
S06 - Amendment to Solicitation No. 36C26126R0019 0002.docx DOCX document
ATTACHMENT - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Pre-Proposal Site Visit Sign-in Roster 20260326.pdf PDF
S06 - Amendment to Solicitation No. 36C26126R0019 0001.docx DOCX document
662-23-105_Equipment Cutbook 2 of 2-min.pdf PDF
DBA CA20260018 20260130.docx DOCX document
VAAR 852.219-75 Certification_JAN 2023_DEVIATION.pdf PDF
662-23-105_Final CD Specifications 1 of 2_V1.pdf PDF
Attachment - Price Proposal Breakdown.xlsx XLSX spreadsheet
662-23-105_Final CD Specifications 2 of 2_V2.pdf PDF
Infection Control Risk Assessment.pdf PDF
662-23-105_Equipment Cutbook 1 of 2-min.pdf PDF
Solicitation No. 36C26126R0019.docx DOCX document
662-23-105_Project Room Contents.pdf PDF
662-23-105_Final Construction Documents_Combined Drawing Set.pdf PDF
RFI Form.docx DOCX document
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

VA SAN FRANCISCO MEDICAL

CENTER PROJECT NO:662-23-105

SPS Sterile Processing Service

SECTION 07 22 00

ROOF AND DECK INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

B. Roof and deck insulation, substrate board, vapor retarder, and cover board on existing concrete and metal deck substrates ready to receive roofing or waterproofing membrane.

C. Repairs and alteration work to existing roof insulation.

1 . 2 RELATED WORK

A. N/A

1 . 3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American Society of Civil Engineers

ASCE 7-16 ............... Minimum Design Loads and Associated Criteria for Buildings and Other Structures

C. American Society of Heating, Refrigeration and Air Conditioning

(ASHRAE):

Standard 90.1-13 ........ Energy Standard for Buildings Except Low-Rise

Residential Buildings.

D. ASTM International (ASTM):

C208-12(2017)e2 ......... Cellulosic Fiber Insulating Board.

C552-17el ............... Cellular Glass Thermal Insulation.

C726-17 ................. Mineral Fiber Roof Insulation Board.

C728-17a ................ Perlite Thermal Insulation Board.

Cl177/Cl177M-17 ......... Glass Mat Gypsum Substrate for Use as

Sheathing.

Cl278/Cl278M-17 ......... Fiber-Reinforced Gypsum Panel.

Cl289-19 ................ Faced Rigid Cellular Polyisocyanurate Thermal

Insulation Board.

Cl396/Cl396M-17 ......... Gypsum Board.

D41/D41M-11 (2016) ...... Asphalt Primer Used in Roofing, Damp proofing, and Waterproofing.

D312/D312M-16a .......... Asphalt Used in Roofing.

07 22 00 - 1

DEPARTMENT OF VETERANS AFFAIRS VA

SAN FRANCISCO MEDICAL CENTER

PROJECT NO:662-23-105

SPS Sterile Processing Service

D1970/D1970M-20 ......... Self-Adhering Polymer Modified Bituminous Sheet

Materials Used as Steep Roofing Underlayment for Ice Dam Protection.

D2178/D2178M-15a ........ Asphalt Glass Felt Used in Roofing and

Waterproofing.

D2822/D2822M-05(2011)el.Asphalt Roof Cement, Asbestos Containing.

D4586/D4586M-07(2018) ... Asphalt Roof Cement, Asbestos-Free.

E84-20 .................. Surface Burning Characteristics of Building

Materials.

F1667-18a ............... Driven Fasteners: Nails, Spikes, and Staples.

E. National Roofing Contractors Association (NRCA):

Manual-15 ............... The NRCA Roofing Manual: Membrane Roof Systems-

2019.

F. UL LLC (UL):

Listed Online Certifications Directory.

G. U.S. Department of Agriculture (USDA):

USDA BioPreferred Program Catalog.

H. U.S. Department of Commerce National Institute of Standards and

Technology (NIST):

DOC PS 1-19 ............. Structural Plywood.

DOC PS 2-18 ............. Performance Standard for Wood-Based

Structural-Use Panels.

1 . 4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and installation details.

a. Nailers, cants, and terminations.

b. Layout of insulation showing slopes, tapers, penetrations, and edge conditions.

C. Manufacturer's Literature and Data:

1. Description of each product.

D. Samples:

1. Roof insulation, each type.

2. Fasteners, each type.

E. Qualifications: Substantiate qualifications meet specifications.

1. Installer.

07 22 00 - 2

VA SAN FRANCISCO MEDICAL CENTER

PROJECT NO:662-23-105

SPS Sterile Processing Service

1 . 5 QUALITY ASSURANCE

A. Installer Qualifications: Same installer as Division 07 roofing section installer.

1 . 6 DELIVERY

A. Comply with recommendations of NRCA Manual.

B. Deliver products in manufacturer's original sealed packaging.

C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, and manufacture date.

D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1 . 7 STORAGE AND HANDLING

A. Comply with recommendations of NRCA Manual.

B. Store products indoors in dry, weathertight facility.

C. Protect products from damage during handling and construction operations.

1 . 8 FIELD CONDITIONS

A. Environment: Install products when existing and forecasted weather permit installation according to manufacturer's instructions.

1 . 9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant substrate board, vapor retarder, insulation, and cover board against material and manufacturing defects as part of Division 07 roofing system warranty.

PART 2 - PRODUCTS

2 . 1 SYSTEM PERFORMANCE

A. Insulation Thermal Performance:

1. Overall Average R-Value: RSI-57 (R-33), minimum.

2. Any Location R-Value: RSI-17 (R-10), minimum.

B. Fire and Wind Uplift Resistance: Provide roof insulation complying with requirements specified in Division 07 roofing section.

07 22 00 - 3

PROJECT NO:662-23-105

SPS Sterile Processing Service

C. Insulation on Metal Decking: UL labeled indicating compliance with one of the following:

1. UL Listed.

2. Insulation Surface Burning Characteristics: When tested according to ASTM E84.

a) Flame Spread Rating: 75 maximum.

b) Smoke Developed Rating: 150 maximum.

2 . 2 PRODUCTS - GENERAL

A. Provide each product from one manufacturer.

2 . 3 ADHESIVES

A. Primer: ASTM D41/D41M.

B. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to adhere roof insulation to substrate or to another insulation layer.

C. Full-Spread Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to adhere roof insulation to substrate or to another insulation layer.

2 . 4 ROOF AND DECK INSULATION

A. Roof and Deck Insulation, General: Preformed roof insulation boards approved by roofing manufacturer.

B. Polyisocyanurate Board Insulation: ASTM Cl289, Type II, Class 1, Grade

2, faced with glass fiber reinforced cellulosic felt facers on both major surfaces of the core foam.

C. Tapered Roof Insulation System:

1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass. Use only one insulation material for tapered sections. Use only factory-tapered insulation.

2. Cut to provide high and low points with crickets and slopes as shown.

3. Minimum thickness of tapered sections; 38 mm (1-1/2 inch).

4. Minimum slope 1/48 (1/4 inch per 12 inches).

07 22 00 - 4

VA SAN FRANCISCO MEDICAL CENTER

PROJECT NO:662-23-105

SPS Sterile Processing Service

2 . 5 INSULATION ACCESSORIES

A. Glass (Felt): ASTM D2178/D2178M, Type VI, heavy duty ply sheet.

B. Cants and Tapered Edge Strips:

1. Insulation Cant Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.

2. Tapered Edge Strips: 1/12 (1 inch per 12 inches), from 0 mm

(0 inches), 300 mm to 450 mm (12 inches to 18 inches) wide.

a. Cellulosic Fiberboard: ASTM C208.

b. Mineral Fiberboard: ASTM C726.

c. Perlite Board: ASTM C728.

C. Substrate Board:

1. Glass-Mat, Water-Resistant Gypsum Roof Board: ASTM Cll77/Cll77M, Type X, 16 mm (5/8 inch) thick, factory primed.

2. Cellulosic-Fiber-Reinforced, Water-Resistant Gypsum Roof Board:

ASTM Cl278/Cl278M, 16 mm (5/8 inch) thick.

3. Perlite Board Insulation: ASTM C728, 19 mm (3/4 inch).

D. Cover Board:

1. Glass-Mat, Water-Resistant Gypsum Roof Board: ASTM Cll77/Cll77M, Type X, 16 mm (5/8 inch) thick, factory primed.

2. Cellulosic-Fiber-Reinforced, Water-Resistant Gypsum Roof Board:

ASTM Cl278/Cl278M, 16 mm (5/8 inch) thick.

3. Cellulosic-Fiber Insulation Board: ASTM C208, Type II, Grade 2, 13 mm (1/2 inch) thick.

2 . 6 ACCESSORIES

A. Fasteners: Corrosion-resistant carbon steel fasteners and galvalume-coated steel or plastic round plates for fastening substrate board and insulation to roof deck.

B. Nails: ASTM F1667; type to suit application.

PART 3 - EXECUTION

3 .1 EXAMINATION

A. Comply with requirements of Division 07 roofing section.

3 . 2 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

07 22 00 - 5

VA SAN FRANCISCO MEDICAL

CENTER PROJECT NO:662-23-105

SPS Sterile Processing Service

3.3 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for the Contracting Officer's Representative

(COR) consideration.

B. Comply with requirements of UL for insulated steel roof deck.

C. Attach substrate board and other products to meet requirements of

Division 07 roofing section.

3.4SUBSTRATE BOARD INSTALLATION

A. Fasten substrate board to top flanges of steel decking to resist uplift pressures according requirements for specified roofing system.

1. Locate the long dimension edge joints solidly bearing on top of decking ribs.

3.SINSULATION INSTALLATION

A. Insulation Installation, General:

1. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate before installation of insulation.

2. Cant Strips: Install at junctures of roofing system with vertical construction.

3. Use same insulation as existing for roof repair and alterations unless specified otherwise.

B. Insulation Thickness:

1. Thickness of roof insulation shown on drawings is nominal. Provide thickness required to comply with specified thermal performance.

2. Insulation on Metal Decks: Provide insulation in minimum thickness recommended by insulation manufacturer to span deck flutes. Support edges of insulation on metal deck ribs.

3. When actual insulation thickness differs from drawings, coordinate alignment and location of roof drains, flashing, gravel stops, fascias and similar items.

4. Where tapered insulation is used, maintain insulation thickness at high points and roof edges shown on drawings.

a. Low Point Thickness: Minimum 38 mm (1-1/2 inches).

07 22 00 - 6

PROJECT NO:662-23-105

SPS Sterile Processing Service

5. Use minimum two layers of insulation when required thickness is

68 mm (2.7 inch) or greater.

C. Lay insulating units with close joints, in regular courses and with end joints staggered.

1. Stagger joints between layers minimum 150 mm (6 inches).

D. Lay units with long dimension perpendicular to the rolled

(longitudinal) direction of the roofing felt.

E. Seal cut edges at penetrations and at edges against blocking with bitumen or roof cement.

F. Cut to fit tightly against blocking or penetrations.

G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.

H. Installation Method:

1. Adhered Insulation:

a. Prime substrate as required.

b. Set each layer of insulation firmly in solid mopping of hot asphalt.

c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.

d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.

2. Mechanically Fastened Insulation:

a. Fasten insulation according to requirements in Division 07 roofing section.

b. Fasten insulation to resist uplift pressures specified in

Division 07 roofing section and ASCE-7.

3. Mechanically Fastened and Adhered Insulation:

a. Fasten first layer of insulation according to "Mechanically

Fastened Insulation" requirements.

b. Fasten each subsequent layer of insulation according to "Adhered

Insulation" requirements.

3.6COVER BOARD INSTALLATION

A. Install cover boards over insulation with long joints in continuous straight lines with staggered end joints.

B. Offset cover board joints from insulation joints 6 inches, minimum.

Secure cover boards according to "Adhered Insulation" requirements.