ATTACHMENT JL7 AND JL7A COST MODEL AND SUMMARY.xlsx

XLSX spreadsheet 107 KB Posted

Attached to
INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ) GLOBAL CONTINGENCY CONSTRUCTION (GCC) MULTIPLE AWARD CONTRACT (MAC) Federal contract opportunity
Solicitation number
N6247020R5003
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document package outlines requirements for an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) for global contingency construction services. The solicitation is issued by the Naval Facilities Engineering Command to support construction projects worldwide on an as-needed basis. Offerors will compete for multiple awards to provide services including program management, engineering, construction, demolition, and facilities operations and maintenance. The period of performance is one base year with seven one-year options. The total contract value is not specified. Offerors must submit cost proposals using the labor categories and rates defined in Attachment JL.7 to estimate pricing for the base year and all option periods for both CONUS and OCONUS work. Joint ventures must complete separate cost models for each member entity. The response deadline is not provided.

View the file

Other files for this federal contract opportunity

Other files attached to INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ) GLOBAL CONTINGENCY CONSTRUCTION (GCC) MULTIPLE AWARD CONTRACT (MAC), newest first.
File Type Posted
REV (3) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
N6247020R5003 0005.pdf PDF
REV (1) ATTACHMENT JL9 Historical Small Business Utilization.docx DOCX document
N6247020R5003 0004.pdf PDF
REV (2) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
REV (1) ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx DOCX document
N6247020R5003 0003.pdf PDF
REV (1) ATTACHMENT JL10 SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).docx DOCX document
REV (1) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
REV (1) ATTACHMENT JL4 Proposed Distribution of Work.docx DOCX document
N6247020R5003 0002.pdf PDF
N6247020R5003 0001.pdf PDF
ATTACHMENT JL9 Historical Small Business Utilization.docx DOCX document
ATTACHMENT JL4 PROPOSED Distribution of work.docx DOCX document
N6247020R5003 SF33.pdf PDF
ATTACHMENT JL5A Indirect Rates Build Up Form.docx DOCX document
ATTACHMENT JL1 List of Directives.doc DOC document
ATTACHMENT JL11 SBSP.docx DOCX document
ATTACHMENT JL10 Small Business Participation Commitment Document.docx DOCX document
ATTACHMENT JL12 AWARD FEE PLAN.doc DOC document
ATTACHMENT JL6A SCA DBA Ceiling Labor Rates.doc DOC document
ATTACHMENT JL5 Indirect Ceiling Rate and Award Fee Application Form.DOC DOC document
ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx DOCX document
ATTACHMENT JL13 PPQ.docx DOCX document
ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
ATTACHMENT JL2 Direct Labor Rate Submission and JL2A Rate Build Up.xls XLS spreadsheet
ATTACHMENT JL3 Uncompensated Overtime.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

CONUS
BASE YEAR DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

CONUS BASE YEAR INDIRECT COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS BASE YEAR DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS Base Year Indirect Costs

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

ATTCHMENT JL.7

COST MODEL

OPY 1

CONUS
OPTION YEAR 1 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 1 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 1 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 1 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

COST MODEL

OPY 2

CONUS
OPTION YEAR 2 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 2 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 2 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 2 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

COST MODEL

OPY 3

CONUS
OPTION YEAR 3 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 3 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 3 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 3 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

COST MODEL

OPY 4

CONUS
OPTION YEAR 4 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 4 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 4 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 4 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

COST MODEL

OPY 5

CONUS
OPTION YEAR 5 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 5 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 5 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 5 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-20-R-5003

COST MODEL

OPY 6

CONUS
OPTION YEAR 6 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site Quality Control (QC) Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 6 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .