REV (1) ATTACHMENT JL4 Proposed Distribution of Work.docx

DOCX document 14 KB Posted

Attached to
INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ) GLOBAL CONTINGENCY CONSTRUCTION (GCC) MULTIPLE AWARD CONTRACT (MAC)
Solicitation number
N6247020R5003
Issued by

About this file

This document contains an attachment for a solicitation regarding an Indefinite Delivery/Indefinite Quantity Global Contingency Construction Multiple Award Contract. Offerors are required to provide the percentage of work to be performed by the prime contractor, any joint venture partners, and proposed cost reimbursable subcontractors. The percentages must total 100%. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for construction services on an as-needed basis worldwide in support of contingency operations. There is no specified dollar ceiling and the period of performance is one base year with four one-year options.

View the file

Other files

File Type Posted
N6247020R5003 0005.pdf PDF
REV (3) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
REV (1) ATTACHMENT JL9 Historical Small Business Utilization.docx DOCX document
REV (2) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
N6247020R5003 0004.pdf PDF
REV (1) ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx DOCX document
N6247020R5003 0003.pdf PDF
REV (1) ATTACHMENT JL10 SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).docx DOCX document
REV (1) ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
N6247020R5003 0002.pdf PDF
N6247020R5003 0001.pdf PDF
N6247020R5003 SF33.pdf PDF
ATTACHMENT JL1 List of Directives.doc DOC document
ATTACHMENT JL4 PROPOSED Distribution of work.docx DOCX document
ATTACHMENT JL7 AND JL7A COST MODEL AND SUMMARY.xlsx XLSX spreadsheet
ATTACHMENT JL5A Indirect Rates Build Up Form.docx DOCX document
ATTACHMENT JL5 Indirect Ceiling Rate and Award Fee Application Form.DOC DOC document
ATTACHMENT JL9 Historical Small Business Utilization.docx DOCX document
ATTACHMENT JL12 AWARD FEE PLAN.doc DOC document
ATTACHMENT JL10 Small Business Participation Commitment Document.docx DOCX document
ATTACHMENT JL11 SBSP.docx DOCX document
ATTACHMENT JL6A SCA DBA Ceiling Labor Rates.doc DOC document
ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx DOCX document
ATTACHMENT JL8 Proj Data Sheet.docx DOCX document
ATTACHMENT JL13 PPQ.docx DOCX document
ATTACHMENT JL2 Direct Labor Rate Submission and JL2A Rate Build Up.xls XLS spreadsheet
ATTACHMENT JL3 Uncompensated Overtime.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT JL.4, N62470-20-R-5003 (Rev. 1)

JL.4

Proposed Distribution of Work

Offerors shall include the percentage of work expected to be performed by the Prime, Joint Venture partners and/or each proposed cost reimbursable subcontractor. (If multiple direct labor allocation bases are proposed, provide the percentage of labor expected to be performed by each allocation base proposed. Modify the form as necessary to comply with requirements.)

Prime _______%

Joint Venture

Company A_______% (if applicable)
Company B_______% (if applicable)
Cost Reimbursable Subcontractor_______% (if applicable)
Cost Reimbursable Subcontractor_______% (if applicable)

Total 100 %

File details come from the government source that posted it. Updated .