Attachment JL.5, Indirect Ceiling Rate Forms.doc

DOC document 130 KB Posted

Attached to
Munitions Response Actions at Vieques, Puerto Rico
Solicitation number
N6247020R2004
Issued by

About this file

This document contains an indirect ceiling rate form and information on a federal contract opportunity for munitions response actions. The indirect ceiling rate form provides templates for offerors to submit indirect ceiling rates for fringe benefits, overhead, general and administrative costs, and award fees for the base year and up to four option years of work. It instructs offerors to complete the forms in Microsoft Word and Excel.

The federal contract opportunity is solicitation number N6247020R2004 for munitions response actions at Vieques, Puerto Rico. It is set aside for small businesses with a NAICS code of 562910 and size standard of 750 employees. The cost plus award fee IDIQ contract has a one year base period and four one-year options with a total maximum value of $95 million. The contractor will perform munitions response work including investigations, removals, and remedial actions. The work may involve explosives safety, hazardous waste management, and other environmental and engineering disciplines. The award will be made to the responsible offeror providing the best value to the government considering technical factors, past performance, and cost.

View the file

Other files

File Type Posted
Attachment JL.2A, Direct Labor Rate Escalation Submission (Amend 0004).xls XLS spreadsheet
Attachment JL.2, Direct Labor Bid and Billing Rate Submission (Amend 0004).xlsx XLSX spreadsheet
Attachment JL.21, Vieques Map #1.pdf PDF
Attachment JL.20, Vieques Program Overview PowerPoint Presentation.pdf PDF
Attachment JL.23, Vieques Map #3.pdf PDF
Attachment JL.22, Vieques Map #2.pdf PDF
N62470-20-R-2004 Amendment 0004.pdf PDF
N62470-20-R-2004 Amendment 0003.pdf PDF
N62470-20-R-2004 Amendment 0002.pdf PDF
N62470-20-R-2004 Amendment 0001.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ (Amend 0001).doc DOC document
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order (Amend 0001).doc DOC document
Attachment JL.8B, Vieques Sick Leave Cost.xlsx XLSX spreadsheet
Attachment JL.14, Key Personnel Experience and Qualifications.doc DOC document
Attachment JL.2A, Direct Labor Rate Escalation Submission.xls XLS spreadsheet
Attachment JL.13 Specialized Technical Experience on Example Projects.docx DOCX document
Attachment JL.6, SCA & DBA Ceiling Labor Rates.doc DOC document
Attachment JL.2, Direct Labor Bid and Billing Rate Submission.xlsx XLSX spreadsheet
Attachment JL.15, Past Performance Questionnaire.doc DOC document
Attachment J.19 Site Visit Map.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ.doc DOC document
Attachment JL.16, QASP and Matrix.doc DOC document
Attachment JL.18 SOP Field Data Collection and Management.pdf PDF
Attachment JL.9, Award Fee Plan Vieques.doc DOC document
Attachment JL.11 & JL.12, Instructions.doc DOC document
N6247020R2004_Solicitation.pdf PDF
Attachment J.10 Wage Determination.pdf PDF
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order.doc DOC document
Attachment JL.8 & JL.8A, Vieques Cost Model.xlsx XLSX spreadsheet
Attachment JL.1 Directives, Regulations, Definitions.doc DOC document
Attachment JL.3, Identification of Uncompensated Overtime Ratios.doc DOC document
Attachment JL.4, Indirect Ceiling Rates Build-Up Form.doc DOC document
Attachment JL.17, Commerical Vehicle and Truck Inspection Procedures.pdf PDF
Attachment JL.7, Proposed, Historical, and Year-To-Date Indirect Rates.doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING JL.5

1. The listed indirect rate categories may be adjusted to reflect the offeror’s accounting system. (See Section L instructions, paragraph b. INDIRECT RATES SUBMITTAL – ATTACHMENTS JL.4, JL.5 AND JL.7).

2. Attachment JL.5 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.5 in Microsoft Excel format on CDs to show how the multiplier was calculated.

ATTACHMENT JL.5, N62470-20-R-2004

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE YEAR INDIRECT CEILING RATES

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM Offerors shall include the percentage of work expected to be performed by each proposed cost reimbursable subcontractor.

Prime

Joint Venture

Company A

_______% (if applicable)

Company B

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Total

100 %