Attachment JL.4, Indirect Ceiling Rates Build-Up Form.doc

DOC document 131 KB Posted

Attached to
Munitions Response Actions at Vieques, Puerto Rico
Solicitation number
N6247020R2004
Issued by

About this file

This document contains an attachment and instructions for an Indirect Ceiling Rates Build-Up Form for a federal contract opportunity for Munitions Response Actions at Vieques, Puerto Rico.

The attachment is a template for offerors to provide indirect ceiling rates for the prime contractor and any subcontractors for the base year and four option years. It includes spaces to provide rates for cost elements such as fringe benefits, overhead, G&A, and award fees. The instructions provide details for completing the form such as using disclosed accounting practices and documenting any variance from established rates. The federal contract opportunity is a 100% small business set-aside for environmental remediation services with a maximum value of $95 million over five years. The work includes munitions response such as investigations, removal and remedial actions at former Navy sites in Vieques, Puerto Rico and other locations. The award will be a cost-plus-award-fee IDIQ contract.

View the file

Other files

File Type Posted
Attachment JL.2A, Direct Labor Rate Escalation Submission (Amend 0004).xls XLS spreadsheet
Attachment JL.2, Direct Labor Bid and Billing Rate Submission (Amend 0004).xlsx XLSX spreadsheet
Attachment JL.21, Vieques Map #1.pdf PDF
Attachment JL.20, Vieques Program Overview PowerPoint Presentation.pdf PDF
Attachment JL.23, Vieques Map #3.pdf PDF
Attachment JL.22, Vieques Map #2.pdf PDF
N62470-20-R-2004 Amendment 0004.pdf PDF
N62470-20-R-2004 Amendment 0003.pdf PDF
N62470-20-R-2004 Amendment 0002.pdf PDF
N62470-20-R-2004 Amendment 0001.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ (Amend 0001).doc DOC document
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order (Amend 0001).doc DOC document
Attachment JL.8B, Vieques Sick Leave Cost.xlsx XLSX spreadsheet
Attachment JL.14, Key Personnel Experience and Qualifications.doc DOC document
Attachment JL.2A, Direct Labor Rate Escalation Submission.xls XLS spreadsheet
Attachment JL.13 Specialized Technical Experience on Example Projects.docx DOCX document
Attachment JL.6, SCA & DBA Ceiling Labor Rates.doc DOC document
Attachment JL.2, Direct Labor Bid and Billing Rate Submission.xlsx XLSX spreadsheet
Attachment JL.15, Past Performance Questionnaire.doc DOC document
Attachment J.19 Site Visit Map.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ.doc DOC document
Attachment JL.16, QASP and Matrix.doc DOC document
Attachment JL.18 SOP Field Data Collection and Management.pdf PDF
Attachment JL.9, Award Fee Plan Vieques.doc DOC document
Attachment JL.11 & JL.12, Instructions.doc DOC document
Attachment JL.5, Indirect Ceiling Rate Forms.doc DOC document
N6247020R2004_Solicitation.pdf PDF
Attachment J.10 Wage Determination.pdf PDF
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order.doc DOC document
Attachment JL.8 & JL.8A, Vieques Cost Model.xlsx XLSX spreadsheet
Attachment JL.1 Directives, Regulations, Definitions.doc DOC document
Attachment JL.3, Identification of Uncompensated Overtime Ratios.doc DOC document
Attachment JL.17, Commerical Vehicle and Truck Inspection Procedures.pdf PDF
Attachment JL.7, Proposed, Historical, and Year-To-Date Indirect Rates.doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING JL.4

1. Only use the base indirect rates, as applicable and in accordance with disclosed accounting practices, for the base year and each option year. The listed indirect rate categories may be adjusted to reflect the offeror’s accounting system. See additional information in Section L of the solicitation.

2. A separate rate sheet shall be submitted for the prime, each joint venture member, and each team subcontractor that may perform cost reimbursable work. If the prime or subcontractor has more than one cost center that will perform work under this contract, information shall be provided for each cost center.

3. Any variance between base indirect rates and historical rates, applicable forward pricing rates, DCAA approved rates, and/or approved CAS practices should be clearly documented in the supporting narrative.

4. Provide the percentage of labor expected to be performed by each allocation base proposed under “Proposed Distribution of Direct Labor.” The total percentage should equate to 100%.

5. Attachment JL.4 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.4 in Microsoft Excel format on CDs to show how the multiplier was calculated.

6. Award Fee shall not be applied to travel, Contractor – Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor’s cost at any tier, and taxes.

7. The offeror may adjust the columns or rows to be consistent with its cost accounting system.

8. Offerors shall include a list of all labor categories, if any, from Attachment JL.8B, Direct Cost Annual Sick Leave- Vieques, for which sick leave will be a direct charge. DIRECT CHARGES FOR SICK DAYS FOR EMPLOYEES WORKING IN VIEQUES OR OTHER PARTS OF PUERTO RICO WILL NOT BE AN ALLOWABLE DIRECT CHARGE UNDER THE CONTRACT IF NOT LISTED UNDER JL.4 AND JL.5.

ATTACHMENT JL.4, N62470-20-R-2004

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE INDIRECT RATES USED TO DERIVE CEILING RATES

BASE YEAR

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor Home

Provide in Chart below

Direct Labor Field

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (rd Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE INDIRECT RATES USED TO DERIVE CEILING RATES

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

Proposed Distribution of Work Offerors shall include the percentage of work expected to be performed by each proposed cost reimbursable subcontractor.

Prime

Joint Venture

Company A

_______% (if applicable)

Company B

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Total

100 %

File details come from the government source that posted it. Updated .