Attachment JL.13 Specialized Technical Experience on Example Projects.docx

DOCX document 17 KB Posted

Attached to
Munitions Response Actions at Vieques, Puerto Rico
Solicitation number
N6247020R2004
Issued by

About this file

This document provides details for a federal solicitation seeking munitions response services at Vieques, Puerto Rico. The solicitation is a 100% small business set-aside being issued by the Naval Facilities Engineering Command for a cost-plus-award-fee contract with a maximum value of $95 million over one base year and four option years. Services sought include field surveys, work plans, safety plans, investigations, removal and remedial actions for munitions and materials at former Navy sites on Vieques and other locations within the responsibility of the issuing command. Tasks may involve explosives safety, hazardous waste management, and other environmental and engineering support. The award will be made to the responsible offeror providing the best value based on technical factors, past performance, and cost.

View the file

Other files

File Type Posted
Attachment JL.2A, Direct Labor Rate Escalation Submission (Amend 0004).xls XLS spreadsheet
Attachment JL.2, Direct Labor Bid and Billing Rate Submission (Amend 0004).xlsx XLSX spreadsheet
Attachment JL.21, Vieques Map #1.pdf PDF
Attachment JL.20, Vieques Program Overview PowerPoint Presentation.pdf PDF
Attachment JL.23, Vieques Map #3.pdf PDF
Attachment JL.22, Vieques Map #2.pdf PDF
N62470-20-R-2004 Amendment 0004.pdf PDF
N62470-20-R-2004 Amendment 0003.pdf PDF
N62470-20-R-2004 Amendment 0002.pdf PDF
N62470-20-R-2004 Amendment 0001.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ (Amend 0001).doc DOC document
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order (Amend 0001).doc DOC document
Attachment JL.8B, Vieques Sick Leave Cost.xlsx XLSX spreadsheet
Attachment JL.14, Key Personnel Experience and Qualifications.doc DOC document
Attachment JL.2A, Direct Labor Rate Escalation Submission.xls XLS spreadsheet
Attachment JL.6, SCA & DBA Ceiling Labor Rates.doc DOC document
Attachment JL.2, Direct Labor Bid and Billing Rate Submission.xlsx XLSX spreadsheet
Attachment JL.15, Past Performance Questionnaire.doc DOC document
Attachment J.19 Site Visit Map.pdf PDF
Attachment JL.11 Factor 1 Corp Exp IDIQ.doc DOC document
Attachment JL.16, QASP and Matrix.doc DOC document
Attachment JL.18 SOP Field Data Collection and Management.pdf PDF
Attachment JL.9, Award Fee Plan Vieques.doc DOC document
Attachment JL.11 & JL.12, Instructions.doc DOC document
Attachment JL.5, Indirect Ceiling Rate Forms.doc DOC document
N6247020R2004_Solicitation.pdf PDF
Attachment J.10 Wage Determination.pdf PDF
Attachment JL.12, Factor 1 Corp Exp Standalone or Task Order.doc DOC document
Attachment JL.8 & JL.8A, Vieques Cost Model.xlsx XLSX spreadsheet
Attachment JL.1 Directives, Regulations, Definitions.doc DOC document
Attachment JL.3, Identification of Uncompensated Overtime Ratios.doc DOC document
Attachment JL.4, Indirect Ceiling Rates Build-Up Form.doc DOC document
Attachment JL.17, Commerical Vehicle and Truck Inspection Procedures.pdf PDF
Attachment JL.7, Proposed, Historical, and Year-To-Date Indirect Rates.doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment JL.13 - Specialized Technical Experience on Example Projects

Offerors shall indicate in the appropriate boxes below with an “X” those services in which they have specialized technical experience for each of their proposed example projects under Factor 1 Corporate Experience. Only one JL.13 form shall be submitted to cover all example projects. Offerors shall provide the contract/task order number and title for each example project in the appropriate column headings below. If supporting information is not provided in Attachment JL.11 or JL.12, the Government may not give credit for corporate experience specified in Attachment JL.13.

Work Elements
Project #1
Project #2
Project #3

Programs

1. RCRA

2. CERCLA

Contaminants

1. Chemical / Biological Warfare Material

2. Hazardous, Toxic, or Radiological Waste (HTRW)

3. Munitions Constituents (MC)

4. Unexploded Ordnance (UXO)

5. Discarded Military Munitions (DMM)

Media

1. Soil

2. Sediment

3. Groundwater

4. Air

5. Sludge

6. Surface Water

7. Structures

Sites

1. Former Ranges

2. Operational Ranges

3. Underwater Munitions

4. Terrestrial Munitions

5. Landfills

6. Hazardous Waste TSDFs

7. Lagoons

Services

1. Optimization of Remedy Design

2. Optimization of Remedial Action

3. Community Relations

4. Vegetation Removal

5. MDAS Removal / Management / Recycling

6. MPPEH Management and Disposal

7. Explosive Acquisition and Management

8. Terrestrial Munitions Geophysical Surveys

9. Underwater Munitions Geophysical Surveys

10. Geophysical Classification for Munitions Response (e.g. TEMTADS, Metal Mapper)

11. Side Scan Sonar Surveys

12. Autonomous Underwater Vehicles / Remotely Operated Vehicles

13. Underwater Dive Operations

14. GIS

15. Data Management

16. NIRIS Utilization

17. Implementation of Controlled Burns to Manage Vegetation

18. Implementation of Sediment and Erosion Control Measures

19. Successful Support of NOSSA Audits

20. Working on Site with Other Contractors

21. Experience with Puerto Rico Tax Laws

22. Experience with Puerto Rico Labor Laws

23. Management and Maintenance of Site Project Offices, Roads, Utilities, Security, and Other Infrastructure

24. Remote Location Logistics

25. Topographic Surveys

26. Multimedia Sampling and Analysis

27. Temporary Support Facilities

28. O&M Instruction

29. Partnering with Navy, CLEAN Architect-Engineer Contractors, and Regulators

30. Quality Assurance Support

Scope of Work Elements/Phases

1. Remedial Actions

2. Removal Actions

3. Expedited / Emergency Response Actions

4. Munitions Response Pilot / Treatability Studies

5. Work Plans (UFP-SAP/QAPP Format)

6. Explosive Safety Submissions

7. Underwater Dive Plans

8. Sediment and Erosion Control Plans

9. Implementation of Sediment and Erosion Control Measures

10. Investigation of Munitions Contaminated Areas

11. Range Clean-up / Closure / Sustainability

12. After Action Reports

13. Construction Completion Reports

Remediation Methods

1. Mag and Dig

2. Munitions Removal, Underwater

3. Munitions Removal, Land Surface

4. Munitions Removal, Land Subsurface

5. Munitions Demolition

6. Munitions Detonation Chamber

7. Munitions Encapsulation

8. Munitions Transport

9. Munitions Lift and Sift / Berm Removal

10. Remote Controlled Equipment for Munitions removal

File details come from the government source that posted it. Updated .