Attachment J-6 Data Item Description CFR DI-MGMT-81648.pdf
PDF 77 KB Posted
- Attached to
- District Craft Preservation IDIQ-MAC Federal contract opportunity
- Solicitation number
- N4523A-23-R-0308
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 6.20.2023.pdf | ||
| Questions and Answers 6.15.2023.pdf | ||
| IDIQ 5 Year Boat delivery Plan.xlsx | XLSX spreadsheet | |
| Questions and Answers 6.9.2023.pdf | ||
| C04.0 Attachment J-1 Revision 1 STATEMENT OF WORK IDIQ 2023.pdf | ||
| Attachment J-1 Statement of Work.pdf | ||
| Attachment J-2 Corporate Experience Data Sheet.docx | DOCX document | |
| Exhibit A CDRL A001 CFR DI-MGMT-81648 Signed.pdf | ||
| C06.0 Solicitation N4523A23R0308.pdf | ||
| Attachment J-3 Request for Clarification Form.doc | DOC document | |
| Attachment J-7 QASP.pdf | ||
| Attachment J-4 Contract Performance Data Sheet.docx | DOCX document | |
| Attachment J-5 Boat Specs.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONDITION FOUND REPORT
Number: DI-MGMT-81648 AMSC Number: N7531 DTIC Applicable: N/A
Approval Date:
Limitation: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: N PEO SHIPS-FL32 Applicable Forms: N/A
Use/Relationship: The Condition Found Report identifies needed repairs and recommends corrective action for work discovered during the contract performance period which are not covered by the work specifications.
This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract.
Requirements:
1. Reference documents. N/A.
2. Format. The report shall be in contractor’s format.
3. Content. The report shall be serialized by CFR Number, and shall include the following:
a. Contract number, ship and hull number
b. Work Item Number to which the CFR relates
c. Date work requirement was discovered
d. Clear description of the work requirement
e. Specific location of the work requirement
f. Recommendation for corrective action
3.1 Recommendation for appropriate/best time to accomplish (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability), and supporting rationale for the recommendation (such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.).
3.2 Cost and time estimates and the time frame for which it is valid, including:
a. Class “C” cost estimates. For work requirements which could be estimated within five working days, a class “F” estimate (+/-40%) identifying any potential impact which may affect the current schedule shall be included. The Class “F” estimate shall also contain the date on which a class “C” estimate will be provided.
b. Estimated Premium/Acceleration Costs, including premium costs for; material, subcontractors, man-hours, rework and any additional costs to on going work resulting from inclusion of the CFR work requirement.
c. Identification of related changes, if any, to the internal milestones and production and contract completion dates shall be included. When no changes were required a statement to that fact shall also be included
4. Media. The electronic media requirements shall be as specified in the contract on the DD 1423 CDRL.
5. End of DI-MGMT-81648
Source: https://assist.dla.mil -- Downloaded: 2018-11-28T13:30Z
Check the source to verify that this is the current version before use.
DATA ITEM DESCRIPTION
File details come from the government source that posted it. Updated .