DI-MGMT-81648_Condition_Found_Report.pdf

PDF 86 KB Posted

Attached to
Technical Oversight Rudder Seal Assemblies Federal contract opportunity
Solicitation number
N4523A19R0815
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Technical Oversight Rudder Seal Assemblies, newest first.
File Type Posted
Amendment_2.docx DOCX document
Amendment_1.docx DOCX document
CDRL_A001_CFR-_Rudder_Seal_Assemblies.pdf PDF
CDRL_A002_Work_Completion_Cert.pdf PDF
DI-MGMT-82061_Work_Completion_Cert.pdf PDF
RFP_N4523AR0815.pdf PDF
J3_Contractor_Bading_and_Access_Requirements.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONDITION FOUND REPORT

Number: DI-MGMT-81648 Approval Date: 20040809 AMSC Number: N7531 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: N PEO SHIPS-FL32 Applicable Forms: N/A

Use/Relationship: The Condition Found Report identifies needed repairs and recommends corrective action for work discovered during the contract performance period which are not covered by the work specifications.

This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract.

Requirements:

1. Reference documents. N/A.

2. Format. The report shall be in contractor’s format.

3. Content. The report shall be serialized by CFR Number, and shall include the following:

a. Contract number, ship and hull number

b. Work Item Number to which the CFR relates

c. Date work requirement was discovered

d. Clear description of the work requirement

e. Specific location of the work requirement

f. Recommendation for corrective action

3.1 Recommendation for appropriate/best time to accomplish (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability), and supporting rationale for the recommendation (such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.).

3.2 Cost and time estimates and the time frame for which it is valid, including:

a. Class “C” cost estimates. For work requirements which could be estimated within five working days, a class “F” estimate (+/-40%) identifying any potential impact which may affect the current schedule shall be included. The Class “F” estimate shall also contain the date on which a class “C” estimate will be provided.

b. Estimated Premium/Acceleration Costs, including premium costs for; material, subcontractors, man-hours, rework and any additional costs to on going work resulting from inclusion of the CFR work requirement.

c. Identification of related changes, if any, to the internal milestones and production and contract completion dates shall be included. When no changes were required a statement to that fact shall also be included

4. Media. The electronic media requirements shall be as specified in the contract on the DD 1423 CDRL.

5. End of DI-MGMT-81648

Source: https://assist.dla.mil -- Downloaded: 2016-08-11T20:59Z

Check the source to verify that this is the current version before use.

DATA ITEM DESCRIPTION

File details come from the government source that posted it.