ATTACHMENT J-11 Cathodic Protection.docx

DOCX document 666 KB Posted

Attached to
Operation and Maintenance of Philadelphia Inactive Vessels and CG/LSD Modernization Detachment Norfolk
Solicitation number
N00024-21-R-4203
Issued by

About this file

This document contains four Naval Sea Systems Command cathodic protection inspection guidelines forms for inactive vessels. The forms provide guidance on periodic inspections of anodes, hull potentials, power supply outputs, reference cells, ship bonding, and other aspects of cathodic protection systems. Inspections are to be conducted quarterly and any discrepancies recorded. The related solicitation seeks proposals for operation and maintenance of inactive vessels in Philadelphia and modernization work in Norfolk. Proposals are due by November 1, 2021 for award by the Department of the Navy.

View the file

Other files

File Type Posted
QA Master List 2 Nov 2021.xlsx XLSX spreadsheet
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001_Rev1.xlsx XLSX spreadsheet
N00024-21-R-4203 Conformed through Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0005.pdf PDF
QA Master List 12 Oct 2021.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0004.pdf PDF
N00024-21-R-4203 Amendment 0003.pdf PDF
N00024-21-R-4203 Amendment 0002.pdf PDF
QA Master List 06 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-22 INACTSHIPMAINTO Philadelphia Organizational Chart .pdf PDF
N00024-21-R-4203 Amendment 0001_rev1.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0001.pdf PDF
QA Master List 05 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-12 Dehumidification.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J-7 Janitorial Task and Frequency Chart.xlsx XLSX spreadsheet
Attachment J-20 Quality Assurance Surveillance Plan.doc DOC document
ATTACHMENT J-17 Fire Extinguisher Log.docx DOCX document
ATTACHMENT J-3 VESSELS.xls XLS spreadsheet
ATTACHMENT J-19 PCB Inventory.doc DOC document
ATTACHMENT J-10 Tools and Material.xls XLS spreadsheet
CDRL33_36.pdf PDF
CDRL41_44.pdf PDF
ATTACHMENT J-6 History Folder Index.docx DOCX document
CDRL17-20.pdf PDF
ATTACHMENT J-15 Arrival Inspection.docx DOCX document
ATTACHMENT J-8 GFE from NAVY ERP.xls XLS spreadsheet
ATTACHMENT J-9 Vehicles.xlsx XLSX spreadsheet
CDRL13-16.pdf PDF
CDRL45-48.pdf PDF
CDRL29-32.pdf PDF
CDRL53-54.pdf PDF
N00024-21-R-4203 RFP.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
Exhbt B - Past Performance Data.docx DOCX document
CDRL05_08.pdf PDF
Attachment J-21 DD 254 for N00024-21-R-4203.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
CDRL49-52.pdf PDF
CDRL37_40.pdf PDF
ATTACHMENT J-16 Security Report.doc DOC document
CDRL21-24.pdf PDF
ATTACHMENT J-5 RRWO.docx DOCX document
CDRL09_12.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
ATTACHMENT J-13 Fire and Flood.docx DOCX document
ATTACHMENT J-14 Integrity Inspection.docx DOCX document
ATTACHMENT J-18 Mooring.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CP1

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Power supply readings have been taken and recorded and are satisfactory.

System has been checked for shorts and opens and none were found.

Have all other discrepancies been reported? If not report them here.

C/P Rectifier

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

Attachment 10 NSTM 50 INSPECTION GUIDELINES - Descrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CP2

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Take and record hull potential readings every 50 feet and record. All readings fall within the range of 0.8 to 1.2 volt range.

Current readings to each anode have been checked and are normal? Record readings.

Are support cords for anodes taking strain off cable?

Reference cell has been checked against shop standard cell and is satisfactory.

Potentiometer-voltmeter has been checked against a standard Weston cell or a battery with a known voltage and is within specifications or adjustments have been made to bring within specs.

Have all other discrepancies been reported? If not report them here.

C/P Potential

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager Cathodic Protection Anode Results Number Cathodic Protection Hull Potential Results Output Number Output Number Output Number Output Number Hull Reading Number Number Number Hull Reading Hull Reading

Line Item # Location Discrepancy

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CP3

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Check power supply ammeters and voltmeters against a suitable calibrated meter. Were results within specifications ?

Remove dust and debris from power supply enclosures. Is the general condition satisfactory ?

(Automatic hull potential control only) Check reference electrode on the unit against a standard cell. Is the error 0.05 volts or less compared to standard silver-silver chloride reference cell?

Clean all exposed terminal connection, ship bonds, rectifier connections, ground return connections by sandpapering. Have all listed connections been sandpapered and in good condition?

All ships in nest have CP installed.

Are there 2 bonding cables installed, one fwd and one aft between ships. (Ships over 400 foot long require a third bonding cable in the middle) Have all other discrepancies been reported? If not report them here.

C/P System Check

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

Line Item # Location Discrepancy

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CP4

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item (Automatic hull pontential control only) Record the date the reference electrode was installed. Does the reference electrode require replacement ? (must be replaced every 5 years) Have all other discrepancies been reported? If not report them here.

C/P Electrode (Auto Systems)

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager Cathodic Protection Anode Results Number Cathodic Protection Hull Potential Results Output Number Output Number Output Number Output Number Hull Reading Number Number Number Hull Reading

Line Item # Location Discrepancy

File details come from the government source that posted it. Updated .