Attachment J-20 Quality Assurance Surveillance Plan.doc

DOC document 54 KB Posted

Attached to
Operation and Maintenance of Philadelphia Inactive Vessels and CG/LSD Modernization Detachment Norfolk
Solicitation number
N00024-21-R-4203
Issued by

About this file

This document provides a Quality Assurance Surveillance Plan for maintenance services on inactive ships located in Philadelphia. The contractor will be responsible for providing quality maintenance, repair, and disposal services on the ships in accordance with contract requirements and specifications. Performance will be evaluated on criteria such as schedule adherence, deliverable quality, cost control, and overall performance. Surveillance methods will include planned inspections covering 25% of work, random inspections, audits of reports, and unscheduled inspections as needed. Acceptable performance will be assessed based on standards for the contractor's quality control plan, safety and environmental programs, accuracy of voucher submissions, completion of inactivation and disposal actions per contract terms, and accuracy of estimates provided within 20% of cost.

View the file

Other files

File Type Posted
QA Master List 2 Nov 2021.xlsx XLSX spreadsheet
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001_Rev1.xlsx XLSX spreadsheet
N00024-21-R-4203 Conformed through Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0005.pdf PDF
QA Master List 12 Oct 2021.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0004.pdf PDF
N00024-21-R-4203 Amendment 0003.pdf PDF
N00024-21-R-4203 Amendment 0002.pdf PDF
QA Master List 06 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-22 INACTSHIPMAINTO Philadelphia Organizational Chart .pdf PDF
N00024-21-R-4203 Amendment 0001_rev1.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0001.pdf PDF
QA Master List 05 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-12 Dehumidification.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J-7 Janitorial Task and Frequency Chart.xlsx XLSX spreadsheet
ATTACHMENT J-17 Fire Extinguisher Log.docx DOCX document
ATTACHMENT J-3 VESSELS.xls XLS spreadsheet
ATTACHMENT J-19 PCB Inventory.doc DOC document
ATTACHMENT J-10 Tools and Material.xls XLS spreadsheet
CDRL33_36.pdf PDF
CDRL41_44.pdf PDF
ATTACHMENT J-6 History Folder Index.docx DOCX document
CDRL17-20.pdf PDF
ATTACHMENT J-15 Arrival Inspection.docx DOCX document
ATTACHMENT J-8 GFE from NAVY ERP.xls XLS spreadsheet
ATTACHMENT J-9 Vehicles.xlsx XLSX spreadsheet
CDRL13-16.pdf PDF
CDRL45-48.pdf PDF
CDRL29-32.pdf PDF
CDRL53-54.pdf PDF
N00024-21-R-4203 RFP.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
Exhbt B - Past Performance Data.docx DOCX document
CDRL05_08.pdf PDF
Attachment J-21 DD 254 for N00024-21-R-4203.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
CDRL49-52.pdf PDF
CDRL37_40.pdf PDF
ATTACHMENT J-16 Security Report.doc DOC document
CDRL21-24.pdf PDF
ATTACHMENT J-5 RRWO.docx DOCX document
CDRL09_12.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
ATTACHMENT J-13 Fire and Flood.docx DOCX document
ATTACHMENT J-14 Integrity Inspection.docx DOCX document
ATTACHMENT J-18 Mooring.xlsx XLSX spreadsheet
CDRL01_04.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

For

INACTIVE SHIPS MAINTENANCE OFFICE PHILADELPHIA

I. Objective. To provide a government Quality Assurance Surveillance Plan (QASP) to ensure the contractor practices quality control and provides the government with a quality and cost effective product of the contract. This Plan provides guidance for surveillance of the contractor's operation, cost control and maintenance effort for ensuring compliance with standards set forth in the contract.

II. Scope. The provisions of this Plan apply to all contractor functions at this command. This plan does not supersede INACTSHIPOFFINST 5401. 1 SERIES. Where there is a discrepancy between the two documents the INACTSHIPOFFINST 5401.1 SERIES takes precedence.

III. Performance Standards. This Plan shall be used to evaluate the quality of the contractor's performance to provide the Government with a proactive way to help avoid unacceptable or deficient performance and provides verifiable input for performance evaluations using attachment one (1) for guidance:

a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against due dates and milestones established in the contract.

b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract for the required content, quality, timeliness, and accuracy.

c. Cost - The Contracting Officers Representative (COR) will review estimates and expenditures submitted by the contractor and will do a one hundred percent review of monthly public vouchers to monitor the contractor’s expenditures throughout the contract and/or performance period. The COR will analyze the impact on cost of any inaccurate management decisions, performance and due dates for financial reports.

d. Performance - The Government will assess the contractor’s record of conforming to contract requirements. The contractor will be assessed on its ability to forecast, control cost, adherence to contract schedules and standards of good workmanship. The contractor shall provide reports and inspection results free of errors. The contractor shall ensure that sub-contractors work meets the standard expected by the government.

IV. Surveillance methods. All planned/scheduled surveillance shall be performed as listed and per INACTSHIPOFFINST 5401.1 SERIES (INACTIVE SHIPS POLICY). Random inspections, audit of reports and unscheduled surveillance of emergency work, new work, fabrication and repair shops shall be performed as deemed necessary. The method used for monitoring the contractor's performance may vary with the function. However, the same criteria shall be used from month to month so trends can be detected:

a. Planned surveillance. Planned surveillance of 25 percent or more shall be done in inspecting condition of ships/craft/boats and in monitoring contractor's ongoing work, so quality assurance efforts can be directed to those areas where it is most needed. This method provides a systematic way of subjectively inspecting performance. It is designed to evaluate some part of, but not all of, the contract requirements being monitored.

b. Random Surveillance. Random surveillance shall be done to monitor contractor's performance on routine maintenance work. Random surveillance allows for estimating the contractor's overall level of performance for a given contract requirement.

c. One Hundred Percent (100%) Inspection. 100% inspection shall be done on completed public vouchers. This approach is best suited for monitoring contract requirements that occur infrequently, have a low number of occurrences or of great importance. This method measures the contractor's true level of performance and accuracy, but is expensive and time-consuming.

d. Unscheduled Surveillance. Unscheduled surveillance shall be done when monitoring emergency work, hazardous work, and new work and employees performing fabrication and maintenance work at Inactive ships maintenance and CG/LSD Modernization Detachment facilities. This method of surveillance is impromptu and is conducted as needed.

e. Audit inspection. Audit of contractor's records and reports shall be done to assure they are complete, current, and correct. A review for indications of problems and trends shall be done by comparing the contractor records, reports, and emails.

V. Level of Surveillance.

a. Normal surveillance if contractor's overall work is within acceptable quality levels during an evaluation period. Normal surveillance shall be 100% inspection of completed work and public vouchers, and an inspection of a minimum of 25% of all scheduled contractor work, inspections and records on a weekly basis to cover all work and vessels in a one-month period.

b. Surveillance will increase if contractor's performance is unsatisfactory (marginal or sub-marginal) for any evaluation period of a 30 day or greater period. Increased surveillance shall be up to 100% inspection of all contractor work. A minimum of 25% of all scheduled contractor work, inspections and records on a monthly basis will be performed. If increased surveillance is implemented, it shall be maintained until confidence level in the contractor's performance is reestablished.

VI. Guidelines.

a. Provide technical guidance and discussions, but do not tell the contractor how to do a job.

b. Assign task priorities, but do not interfere with the contractor's production schedule.

c. QA Inspectors to be knowledgeable of contract work requirements and specifications ensuring the requirements of the contract are accomplished.

d. Ensure that the government does not accept work that is of a lower quality than required by the contract.

VII. Actions.

a. Verify the contractor's compliance with all work and quality requirements of the contract. Higher priority and hazardous work will receive the most surveillance.

b. Observe the contractor's Quality Control Inspectors performing their duties. Spot check the contractor’s in-progress work to ensure employees are gainfully employed and that only authorized work is being performed. Make independent surveillance and compare findings with the contractor's records and reports.

c. Document non-conformances to the contract by initiating a Quality Assurance Discrepancy Report (QADR), as appropriate, when a deficiency in the contractor's work or quality control inspection system is discovered.

d. Maintain a QADR log that includes the date issued, type of discrepancy, location, date completed, and the QADR serial number.

e. Prepare a written report if contractor fails to answer a QADR within five working days and after an overdue notice is sent to the contractor. Provide backup documentation and recommendation for corrective action. Return all QADRs to the contractor for additional response, if contractor's reply is unsatisfactory. Provide appropriate follow-up on all completed QADR’s to ensure adequate corrective action was taken. Maintain a file of completed QADRs to identify repeat discrepancies.

f. Review all contractor requests for material to ensure materials ordered are needed for an approved task order. Return all questionable requests to contractor for additional justification or re-accomplishment.

g. Perform acceptance inspections of work completed by the contractor. Provide a report of each day’s inspection showing brief summary of items, jobs and/or vessels inspected and any problem areas and other comments that are noteworthy.

VIII. Performance trends.

a. COR inspection reports/documentation and evaluation reports shall be used to provide trend information on contractor’s performance.

IX. Performance Incentives.

a. The Contracting Officer’s Representative (COR) shall make a annual report using the Contractor Performance Assessment Report (CPARS).

b. In accordance with contract clause FAR 52.246, the Inspection of Services series, the contractor will be incentivized to provide quality products in a timely manner, since the Government can require the Contractor, at no additional fee, to replace or correct work that fails to meet contract requirements. The contractor is incentivized to provide a quality product to help ensure exercise of available/future contract options.

Performance Measurement. Evaluation of the contractor is essentially an audit and shall entail surveillance of contractor's work and verification of contractor's records and shall be measured in accordance with the following table:

Performance Element
Performance Requirement
Surveillance Method
Frequency for Normal Surveillance
Acceptable Quality Level

Contractor's

Quality

Control Plan

All actions completed as required by plan
Planned, random and audit inspections
Quarterly for overall QC activities
100% Compliance
Safety / Environmental Program
Meet all contract, Navy, OSHA and local requirements
Planned, unscheduled and audit inspections
Daily inspections
No major QADR's for safety or environmental
Vouchers
Timely/accurate
100% inspection
All vouchers
100% accuracy
Inactivation actions
Meet all contract and inactivation plan requirements
Random for on-going work and 25% for completed work
Section IV: Surveillance Methods
100% Compliance

w/requirements

Contract and specification requirements

Inspections/maint completed as required by contract
Planned, random and audit inspections
Section IV: Surveillance Methods
In accordance with the contract.
Disposal actions
Disposal actions completed as outlined in contract & disposal letter
Random for on-going work and 25% for completed work
Section IV: Surveillance Methods
100% of work completed on time as detailed in disposal ltr.
Estimates
Accurate and timely estimates
Review and approve by COR
100% for all estimates
Submitted on time and within 20% of cost